Financial Summary

Unit:Million RMB

2024 ANNUAL REPORT CONCORD NEW ENERGY GROUP LIMITED

As of 31st Dec 2024

As of 31st Dec 2023

Changes

Total Assets

32,129.84

31,236.37

+3.0%

Net Assets

8,906.31

8,435.41

+5.6%

Cash and Cash Equivalents

2,229.19

3,902.92

-42.9%

Key Financial Data

As of 31st Dec 2024

As of 31st Dec 2023

Changes

Continuing Operation1

Revenue

Profit Attributable to Owners of the Company

Fully Diluted EPS

2,752.05

2,588.65

+6.3%

805.13

963.77

-16.5%

10.05 cents

11.39 cents

-11.8%

Segment Revenue

Power Generation2

2,515.95

2,259.41

+11.4%

Others

236.10

329.23

-28.3%

Segment Results3

Power Generation

1,432.69

1,262.40

+13.5%

Others

16.71

-34.48

+148.5%4

  1. Excluding O&M Revenue

  2. Power generation revenue from consolidated power plants

  3. The Segment Results are the earnings before interest and tax and disposal gain. The Power Generation includes the power generation, URP release,

    deferred tax contribution and shared profits of joint ventures 2

  4. Changes rate = (current - previous)/(-previous)



1.2

*Continuing Operation Revenue

* Rate of change from 2023 to 2024

0.9

1.0

1.1

10.0%*

Net Asset Value per Share (RMB)

80%

* Rate of change from 2023 to 2024

Liabilities to Asset Ratio (%)

* Rate of change from 2023 to 2024

Comprehensive Financing Rate(%)

0.6

70.21% 72.99% 72.28%

6%

0.71

Percentage

3%

*

5.12% 4.60%

3.98%

62 bps*

0.0

2022 2023 2024

* Rate of change from 2023 to 2024

50%

2022 2023 2024

* Rate of change from 2023 to 2024

0%

2022 2023 2024

* Rate of change from 2023 to 2024

3

Major Financial Indicators

2024 ANNUAL REPORT

CONCORD NEW ENERGY GROUP LIMITED

Revenue*(Billion RMB)

Segment Result: Power

Generation (Billion RMB)

2.59

2.75

1.7

1,100

Profit Attributable to Owners of

the Company (Million RMB)

963.77

2.6

2.40

1.29

1.26

1.43

858.08

805.13

6.3 %*

1.1

13.5 %*

700

16.5 %*

2.1

1.6

0.5

2022 2023

2024

300

2022

2023

2024

2022

2023

2024



Attributable Installed Capacity Composition (MW)

Wind

3,732

80.9%

Solar PV

883

19.1%

Attributed Installed Capacity

2024

2023

In the year 2024: Newly Added

566 MW

512

MW

Sold

50 MW

102

MW

As the end of year: Operational Attributable Installed Capacity

4,615 MW

4,050 MW

Subsidiary-owned Wind

2,966 MW

2,701 MW

JV&Asso. Wind

766 MW

766 MW

Subsidiary-owned Solar PV

876 MW

576 MW

JV&Asso. Solar PV

7 MW

7 MW



4

Attributable Installed Capacity

2024 ANNUAL REPORT

CONCORD NEW ENERGY GROUP LIMITED

  • In 2024, attributable installed capacity reached 4,615MW, with 3,732MW in wind power and 883MW in solar PV

  • Capacity composition is optimized,with a higher proportion of wind power capacity



Revenue and Net Profits of Power Generation Continue to Grow

2024 ANNUAL REPORT CONCORD NEW ENERGY GROUP LIMITED

Attributable

Power Generation (GWh)

Power Generation

Revenue

('000 RMB)

Power Generation

Attributable Net Profit

('000 RMB)

2024

2023

Changes

2024

2023

Changes

2024

2023

Changes

Subsidiary-owned Total

7,515

6,024

+24.8%

2,515,951

2,259,413

+11.4%

797,814

762,048

+4.7%

Subsidiary-owned

Wind

6,580

5,199

+26.6%

2,154,968

1,893,041

+13.8%

732,853

664,885

+10.2%

Subsidiary-owned

Solar PV

935

825

+13.3%

360,983

366,372

-1.5%

64,961

97,163

-33.1%

JV&Asso.

Attribution

1,130

1,800

-37.2%

-

-

-

157,898

190,887

-17.3%

Attributable Total

8,645

7,824

+10.5%

2,515,951

2,259,413

+11.4%

955,712

952,935

+0.3%

5



Project Development Achieves New Successes Worldwide

2024 ANNUAL REPORT CONCORD NEW ENERGY GROUP LIMITED

Nations

Type

Capacity (MW)

Worldwide Wind & Solar PV

1,399

PRC.

Wind & Solar PV

720

Other Nations

Solar PV

679

Energy Storage

308MW/616MWh

6



New Projects

895MW

2024 Total Construction Scale 2,562MW

1,667MW

Previous Year Carried Over Projects

Solar PV

Wind

300MW

2024

Completed 566MW

266MW

7

Construction is Progressing in an Orderly Manner

2024 ANNUAL REPORT

CONCORD NEW ENERGY GROUP LIMITED

  • In 2024, total construction scale reached 2,562 MW. It includes 1,667 MW from ongoing construction carried over from the previous year and 566 MW already became operational this year. The rest of 1,996 MW will continue to construct in year of next.



Streamlining project reserves and flexibly adopting

operational development models

Implementing multiple measures to achieve cost reduction and efficiency enhancement

2024 ANNUAL REPORT CONCORD NEW ENERGY GROUP LIMITED

Strengthening budget management

Adjusting operations units in segment of others

15%

404

2023

344

2024

Unit:Million RMB

Optimizing/restructuring the development units in certain countries and provinces

8

  • Group Administrative Expenses decreased by 15% comparing to last year



Operating Indicators

As of 31thDec. 2024

As of 31thDec. 2023

Changes

Weighted Average Utilization Hours

2,192 hours

2,326 hours

1,272 hours

1,256 hours

9.5%

8.2%

18.5%

19.5%

2,449 hours

2,667 hours

1,455 hours

1,465 hours

3.7%

3.9%

5.9%

6.2%

-10.5%

-12.8%

-12.6%

-14.2%

+5.8 pp

+4.3 pp

+12.6 pp

+13.2 pp

Wind (Attributable Installed)

Incl.: Wind (Subsidiary-owned) Solar (Attributable Installed)

Incl.: Solar PV (Subsidiary-owned)

Curtailment Rate

Wind (Attributable Installed)

Incl.: Wind (Subsidiary-owned) Solar (Attributable Installed)

Incl.: Solar PV (Subsidiary-owned)

Average Tariff

Wind (Attributable Installed)

Incl.: Wind (Subsidiary-owned) Solar (Attributable Installed)

Incl.: Solar PV (Subsidiary-owned)

0.3933 RMB/kWh

0.3803 RMB/kWh

0.4552 RMB/kWh

0.4503 RMB/kWh

0.4042 RMB/kWh

0.3858 RMB/kWh

0.5196 RMB/kWh

0.5141 RMB/kWh

-0.0109 RMB/kWh

-0.0055 RMB/kWh

-0.0644 RMB/kWh

-0.0638 RMB/kWh

Notes: According to data from the National Energy Administration of China, the average utilization hours of wind power in China in 2024 were 2,127 hours; the 9

average utilization hours of photovoltaics in China were 1,211 hours.

Power Plants Operating Indicators

2024 ANNUAL REPORT

CONCORD NEW ENERGY GROUP LIMITED



1







Focusing on electricity marketing, build a intelligent trading platforms IO support decision-making

Guaranteed Procurement 28.48%

Sub-owned Power Settlement

Green

3





Mid- to long-term Trading

Green electricity settled 811 million kWh, increased by 31.5% comparing to last year. Contribute over 24.03 million RMB revenue



2

Subsidiary-owned power plants settled in total 7.45 billion kWh, among which trading party is

5.33 billion kWh, accounting for 71.5%

Electricity

10.88%

Spot Trading 3.36%

57.28%

4

Green certificates 100Ooissued, 100Oosold with zero inventory. Sale profits exceeds 27 Million RMB

10

C¿E:.:,.

Market Trading of Electricity

2024 ANNUAL REPORT

CONCORD NEW ENERGY GROUP LIMITED



0.28

Select projects with strong risk resistance and good benefits

0.18

0.38

0.18

Power Plants LCOE (RMB/kWh)

0.2529

0.2504

0.2434

2022 2023 2024

2022 2023 2024

Engineering Construction:

Apply new technologies and new process to build

Amortized LCOE (RMB/kWh)

0.3059

0.2965

0.2813

efficient power plants

Operating:

Refine O&M, carry out targeted technical improvements, enhance the reliability of wind power plants and units, and increase the power generation of units

11

LCOE Strategy

2024 ANNUAL REPORT

CONCORD NEW ENERGY GROUP LIMITED

Investment and Development















1

2

3





Comprehensive financing rate dropped 62 bps, newly withdraw

4 has 3.43% interest rate in average, newly signed contracts with

the lowest interest rate at 2.7%

5

12

Annual Results Outlines

2024 ANNUAL REPORT

CONCORD NEW ENERGY GROUP LIMITED



Industry Changes

2024 ANNUAL REPORT CONCORD NEW ENERGY GROUP LIMITED

Electricity

Consumption

Global

Wind Turbine

PV Module

Novel Energy Storage

Financing Cost

  • AI drives US electricity consumption growth, multiple countries firmly support the development of renewable energy

  • China issued "Energy Law", and recently released the "Notice on Deepening the Market-Oriented Reform of new Energy on-Grid Pricing."

  • Large-scale wind turbines tread slowed down, design approaches showed differentiation

  • Wind turbine price remain high, with a slightly increase compared to 2023

  • China's cost per kilowatt remains low, wind turbine price generally remain stable

  • TOPCon market share exceeded 60%, firming its position in mainstream photovoltaic technology

  • Module price is at a low level , which benefit power plant investments by reducing the cost

  • The average cost of global electrochemical energy storage systems has decreased by 40%, with

    new types of storage experiencing explosive growth

  • Global inflation is easing, central banks like the Federal Reserve and the European Central Bank are entering into a rate-cutting phase

  • The People's Bank of China has consecutively lowered the five-year Loan Prime Rate (LPR) three

    times, with a total reduction of 60 basis points to 3.60% 13



    • Focus on safety and equipment management, to improve efficiency

    • Strengthen power trading and marketing capabilities

    • Adjust business strategies and focus on developing high-quality projects

    • Enhance adequate preparation of construction, ensure new capacity installed

    • Lower financing cost

    • Analyze market changes and continuously optimize assets

    • Implement refined and specialized management to continue reducing costs and increasing

      efficiency

    • Carry out corporate culture development to enhance cohesion 14

Development Strategy and Business Outlook

2024 ANNUAL REPORT

CONCORD NEW ENERGY GROUP LIMITED

  • Declined inflation and loose monetary policies by various economies will boost global economic activity

  • Global renewable energy sector continues to grow rapidly, energy transition trend remains clear

  • Insights in new conditions and changes, focus on key markets, plan and achieve robust development goals



A

MSCI ESG

Rating

AA

S&P CSA

Outperformed

& over 84%*

Peers Worldwide



  • MSCI ESG latest rating is A level, score increases by 9%

    2021-2025 MSCI ESG rating result

  • Received



    "Top 10% S&P Global ESG Score (China)"



    • Received

"Industry Mover

(Power Generation)"

15

*data as of the end of 2024

Leading Position of ESG Performance

2024 ANNUAL REPORT

CONCORD NEW ENERGY GROUP LIMITED

  • Value the ESG management, ESG ratings maintain at a leading position among peers



Appendix

2024 ANNUAL REPORT

CONCORD NEW ENERGY GROUP LIMITED



Profit or Loss (RMB'000)

2024

2023

Continuing Operations

Revenue

2,752,054

2,588,646

Cost of sales and service rendered

(1,236,206)

(1,183,020)

Gross profit

1,515,848

1,405,626

Other income

183,840

104,887

Other gains and losses, net

31,684

404,149

Impairment losses under expected credit loss model, net of reversal

(702)

(1,130)

Distribution and selling expenses

(13,849)

(6,141)

Administrative expenses

(343,759)

(404,458)

Finance cost

(683,945)

(644,165)

Share of profit of joint ventures, net

166,503

172,836

Share of profit of associates, net

11,152

17,029

Profit before income tax

866,772

1,048,633

Income tax expense

8,803

(153,825)

Profit from continuing operations

875,575

8G4,808

Profit from discontinued operation, net of tax

-

G3,G42

Profit for the period

875,575

G88,750

Profit Attributable to:

Owners of the Company

805,133

G63,774

Non-controlling Interests

70,442

24,976

Assets (RMB'000)

2024

2023

Current Assets Non-current Assets Total Assets Current Liabilities

Non-current liabilities

Total liabilities

Net Current Assets

Net Assets

Share capital Reserves

8,144,058

23,985,781

32,129,839

(7,940,253)

(15,283,280)

(23,223,533)

203,805

8,906,306

68,390

8,646,560

6,986,439

24,249,929

31,236,368

(6,878,585)

(15,922,369)

(22,800,954)

107,854

8,435,414

72,598

8,210,438

Cash Flows (RMB'000)

2024

2023

Net cashflow from operating

Net cashflow used in investing Net cashflow from financing

Net increase/(decrease) in cash and cash equivalents

Cash and cash equivalents

2,190,826

(3,418,196)

525,042

(702,328)

2,229,188

1,580,634

(4,587,639)

1,973,670

(1,033,335)

3,902,924

Total Liabilities (RMB'000)

16,649,824

16,692,318

Incl.:Short-term liabilities

Long-term Liabilities mature within one year

Long-term liabilities

588,228

1,537,451

14,524,145

754,185

1,136,733

14,801,400

Financial Reports

2024 ANNUAL REPORT

CONCORD NEW ENERGY GROUP LIMITED





Installed Wind Capacity
  • Subsidiary-owned projects: 2,966.5MW attributable installed capacity ⮚ JV&Asso. projects: 765.63MW attributable installed capacity

    2024 ANNUAL REPORT CONCORD NEW ENERGY GROUP LIMITED

    Year Project Regions Province Capacity (MW) CNE's Stake Attributable )

    Capacity(MW

    2015

    Feixi

    E

    Anhui

    34

    100%

    34

    2016

    Jiepai

    CS

    Hunan

    48

    100%

    48

    2016

    Jiagou

    E

    Anhui

    48

    100%

    48

    2017

    Wuhe

    E

    Anhui

    48

    100%

    48

    2017

    Qiaotoupu

    CS

    Hunan

    48

    100%

    48

    2017

    Hongtang

    CS

    Hunan

    48

    100%

    48

    2017

    Jingmen

    CS

    Hubei

    48

    100%

    48

    2018

    Yushan

    CS

    Hubei

    48

    100%

    48

    2018

    Lixi

    CS

    Hubei

    48

    100%

    48

    2018

    Jindashan

    E

    Anhui

    50

    100%

    50

    2019

    Baimangying

    CS

    Hunan

    48

    100%

    48

    2019

    Wulanhua D

    NE

    Jilin

    49.5

    100%

    49.5

    2019

    Wulanhua E

    NE

    Jilin

    49.5

    100%

    49.5

    2019

    Wulanhua F

    NE

    Jilin

    49.5

    100%

    49.5

    2020

    Mengzhuling

    CS

    Hunan

    50

    100%

    50

    2020

    Yingshanmiao

    CS

    Henan

    50

    100%

    50

    2020

    Yilan

    NE

    Heilongjiang

    200

    100%

    200

    2021

    Guazhou

    NW

    Gansu

    100

    100%

    100

    2021

    Shiziling Phase I

    CS

    Guangxi

    48

    100%

    48

    2021

    Dongda

    CS

    Hunan

    48

    100%

    48

    2021

    Fuxin Hailiban

    NE

    Liaoning

    50

    100%

    50

    2021

    Xinfa D

    NE

    Jilin

    49.5

    100%

    49.5

    2021

    Wuying

    CS

    Hubei

    20

    100%

    20

    2022

    Shiziling Phase II

    CS

    Guangxi

    42

    100%

    42

    2022

    Shiziling Phase III

    CS

    Guangxi

    48

    100%

    48

    2022

    Chaoyang

    NE

    Liaoning

    49.5

    100%

    49.5

    2022

    Kaiyuan

    SW

    Yunan

    350

    100%

    350

    2022

    Danfeng

    SW

    Yunan

    300

    100%

    300

    2022

    Guazhou Phase II

    NW

    Gansu

    100

    100%

    100

    2022

    Huilong

    CS

    Hunan

    21

    100%

    21

    2022

    Jinbi

    CS

    Hunan

    30

    100%

    30

    2022

    Xiangbei I

    CS

    Hubei

    100

    51%

    51

    2023

    Tonghe

    NE

    Heilongjiang

    300

    60%

    180

    2023

    Xiangbei Fengchu II

    CS

    Hubei

    100

    100%

    100

    2023

    Donglan

    CS

    Guangxi

    100

    100%

    100

    2024

    Qiaodong II

    E

    Anhui

    51

    100%

    51

    2024

    Songbei I

    NE

    Heilongjiang

    100

    100%

    100

    2024

    Alashan Distribute

    N

    Inner Mongolia

    15

    100%

    15

    2024

    Wenan Jianzhong

    SW

    Guizhou

    100

    100%

    100

    Year Project Regions Province Capacity (MW) CNE's Stake Attributable )

    Capacity(MW

    2006

    Chantu Phase I

    NE

    Liaoning

    50.25

    25%

    12.56

    2008

    Erlianhaote Phase I

    N

    Inner Mongolia

    21

    49%

    10.29

    2009

    Linchang Phase I

    NE

    Jilin

    49.5

    49%

    24.26

    2009

    Zhaqi Phase I

    N

    Inner Mongolia

    49.5

    49%

    24.26

    2009

    Heiyupao Phase I

    NE

    Jilin

    49.5

    49%

    24.26

    2010

    Huadeng Phase I

    N

    Inner Mongolia

    49.5

    32.16%

    15.92

    2010

    Huadeng Phase II

    N

    Inner Mongolia

    49.5

    32.16%

    15.92

    2010

    Zhalute Phase II

    N

    Inner Mongolia

    49.5

    32.16%

    15.92

    2010

    Zhalute Phase III

    N

    Inner Mongolia

    49.5

    32.16%

    15.92

    2010

    Guazhou

    NW

    Gansu

    201

    51.45%

    103.41

    2011

    Kailu

    N

    Inner Mongolia

    49.5

    32.16%

    15.92

    2011

    Maniuhu

    NE

    Liaoning

    49.5

    30%

    14.85

    2011

    Gulibengao

    NE

    Liaoning

    49.5

    30%

    14.85

    2013

    Chaoyang Wanjia

    NE

    Liaoning

    49.5

    30%

    14.85

    2013

    Guanshan

    E

    Anhui

    48

    49%

    23.52

    2013

    Suzhou Fuli

    E

    Anhui

    48

    49%

    23.52

    2013

    Jianghua

    CS

    Hunan

    48

    59.3%

    28.46

    2014

    Zilingpu

    CS

    Hubei

    48

    59.3%

    28.46

    2014

    Huolonggang

    CS

    Henan

    49.5

    59.3%

    29.35

    2014

    Yantai Gaotuan

    E

    Shandong

    48

    49%

    23.52

    2016

    Lingshan

    E

    Anhui

    48

    49%

    23.52

    2018

    Shenzhagtang

    CS

    Hunan

    48

    25%

    12

    2018

    Jingtang

    CS

    Hunan

    48

    25%

    12

    2019

    Kailu Phase II

    N

    Inner Mongolia

    50

    32%

    16.08

    2019

    Yushan Phase II

    CS

    Hubei

    89

    49%

    43.61

    2019

    Zhaqi Phase IV

    N

    Inner Mongolia

    50

    32.16%

    16.08

    2020

    Kailu Phase II

    N

    Inner Mongolia

    200

    32.16%

    64.32

    2023

    Binxian

    NE

    Heilongjiang

    200

    49%

    98





    Installed Solar PV Capacity
    • 883 MW Attributable Installed Capacity

2024 年报協合新能源集 團有限公司

Subsidiary-owned Projects: 876.22MW attributable installed capacity

2012

Hawaii (Hoku)

--

USA

0.9

80%

0.72

2013

Wisconsin (Jefferson)

--

USA

1

100%

1

2014

Naidong

WS

Tibet

20

100%

20

2015

Indiana

--

USA

10

100%

10.2

2015

Eryuan

WS

Yunnan

30

100%

30

2015

Yanyuan

WS

Sichuan

30

100%

30

2015

Rhode Island (Johnston)

--

USA

1.5

100%

1.5

2015

Rhode Island (North kingstown)

--

USA

0.5

100%

0.5

2016

Ohio

(Minster)

--

USA

4.3

100%

4.3

2017

Cuomei

WS

Tibet

20

100%

20

2017

Jiangzi

WS

Tibet

15

100%

15

2018

Haerbin

NE

Heilongjiang

1

100%

1

2021

Xiangbei Agri-PV

CS

Hubei

100

100%

100

2021

Xishui

CS

Hubei

40

100%

40

2021

Dachaidan

NW

Qinghai

100

100%

100

2022

Nandagang

N

Hebei

70

100%

70

2023

Dachaidan II

NW

Qinghai

100

100%

100

2023

Eastern distributed PV

-

-

2

100%

2

2023

Cuomei II

WS

Tibet

30

100%

30

2024

Chengde Fengning

N

Hebei

200

100%

200

2024

Gaoyou

E

Jiangsu

100

100%

100

JVsAsso.:6.43MW attributable installed capacity

2015

Zhaer

N

Inner Mongolia

20

32.16%

6.43

Year

Projects

Regions

Province

/Country

Capacity

CNE's

(MW) Stake





Welcome



https://www.cnegroup.com

to Contract Us

Niu Wenhui

Executive Director s CFO Email: niuwh@cnegroup.com

Andrew Liu Financing Director

Cell: +86-1500126673G

Email: liuny@cnegroup.com

Renee Wang

IR and Financing Manager

Cell: +86-13G01047384

Email: wangxuan@cnegroup.com

股票代码 182

C

Attention: This is an excerpt of the original content. To continue reading it, access the original document here.

Earlier from Concord New Energy

All Concord New Energy news releases