Completion of Pilot Plant Construction
Filed with ASX · · 6 pages · English
Summary by 6ix AI
Alligator Energy Ltd has announced the completion of its pilot plant construction, which was finished safely, on schedule, and under budget. The control of the site has been transferred back to Alligator, allowing the company to begin final pre-operation activities.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Earlier from Alligator Energy
- DEV: DevEx to Acquire Alligator Energy's NT Uranium Tenure
- Alligator Divests Non-Core NT Assets for $7.5m
- Pilot Plant Mobilised at Site and Drilling of Wells Complete
- Quarterly Report and Appendix 5B for 30 September 2025
- Contractor for Field Recovery Trial Mobilised on Schedule
Later from Alligator Energy
- Quarterly Report and Appendix 5B for 31 December 2025
- Alligator Energy Ltd (ASX: AGE) Commences Bankable Feasibility Study
- Commissioning of Pilot Plant Complete
- Director Changes
- Commencement of Uranium Extraction for Samphire FRT
Follow Alligator Energy into a list and get an email when it puts out news.
Follow Alligator Energy