Peako LtdASX: PKO

Completion of Phase 2 Drilling at Eastman PGE Project

· Issued by Peako Ltd

Filed with ASX · · 14 pages · English

Summary by 6ix AI

The campaign aimed to test for continuity and define higher-grade PGE mineralization along strike from previous drill results. Analysis from earlier drilling confirmed the presence of rare metals such as Rhodium and Iridium, which are valuable in the market.

Written by 6ix AI from the company’s filing. How 6ix writes summaries

Peako Ltd on 6ix

Story so far

Earlier from Peako

Later from Peako

All Peako news releases