C.n.t.e.e. Transelectrica SaBVB: TEL

Prezentare rezultate financiare T3 2024

· Issued by C.n.t.e.e. Transelectrica Sa

Transelectrica SA

Transmission and System Operator

of the Romanian Electrical Power System

We lead the power

Financial results

9M 2024

(01.01.2024 - 30.09.2024)

unconsolidated accounts

Results 9M2024

Purpose, disclaimer and other cautionary statements

DOCUMENT PURPOSE:

This presentation has been prepared with the sole intention to facilitate the understanding of Transelectrica's operational and financial results by the general investing public (shareholders. creditors. analysts. financial media). Therefore it is of a purely informative nature. This presentation is not an offer. invitation or a recommendation to trade in securities issued by the Company. The detailed financial statements and the full reports prepared in accordance with capital market regulations are available online at www.transelectrica.ro.

FINANCIAL NUMBERS:

reporting period:

1st January 2024 - 30st Septembrie 2024

reporting standard:

International Financial Reporting Standards (IFRS)

basis/scope:

standalone (unconsolidated)

external audit:

audited

rounded numbers:

for ease of reading, certain figures used in this presentation (tables and charts) are displayed in millions and rounded to such

unit or to one or two decimals. In some cases this leads to minor differences between totals and the sum of the individual elements

(rounding errors)

LANGUAGE DISCLAIMER:

This document represents the English-language version of the original Romanian-language document. The English version has been created for English readers' convenience. Reasonable efforts have been made to provide an accurate translation. However, discrepancies may occur. The Romanian version of this document is the original official document. If any questions arise related to the accuracy of the information contained in the English version, please refer to the Romanian version of the document.

2

Results 9M2024

Highlights | operational trends

Domestic demand +2.8% y.o.y.

Domestic production -7.5% y.o.y.

CONSUMPTION

2023

2024

9M

+2.8%

TWh

1Q +3.1% 2Q +3.5%

3Q +1.9%

6,0

5,5

5,0

4,5

4,0

3,5

0,0

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

2024/2023 +6.5% +1.0% +1.6% 0.0% +1.3% +9.4% +5.9% -0.9% +0.4%

PRODUCTION

2023

2024

9M-7.5%

1Q -0.1% 2Q-15.4% 3Q-7.6%

TWh

6,0

5,0

4,0

0,0

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

2024/2023 -1.2% +0.2% +0.9% -19.8% -17.0% -8.8% -8.5% -10.1% -4.1%

NET EXPORT

2023

2024

TWh

1,0

IMPORT

0,5

(+)|

0,0

−)

-0,5

(

-1,0

EXPORT

Jan Feb Mar Apr May Jun

Jul Aug Sep Oct Nov Dec

Consumption and generation numbers do not include power plants' own electricity consumption. Consumption includes (i) energy losses in transmission and distribution networks. and (ii) consumption for hydro pumped storage. Cross-border net flow is calculated based on physical flows (import-export).

3

Results 9M2024

Financial results

Operations | Revenues

Operational revenues

Operational revenues

ALL OPERATIONS

PROFIT-ALLOWED OPERATIONS

PROFIT-ALLOWED OPERATIONS: BREAKDOWN

2024

4,013

6,171

1,745

413

Profit-

Balancing

Balancing

Total

allowed

services

services

operations (Capacity)

(Energy)

2023

1,532

3,308

1,504

273

Profit-

Balancing

Balancing

Total

allowed

services

services

operations (Capacity)

(Energy)

Chart unit: mil Lei

307

1,745

189

49

1,200

Transmission

Cross-

Grid losses

Other

Total

tariff

border

anticipatory

income

rents

tariff

income

255

3

109

1,504

1,137

Transmission

Cross-

Grid losses

Other

Total

tariff

border

anticipatory

income

rents

tariff

income

+241

+197

1,745

1,504

+63

+47

-66

2023

2024

Revenues

Transmission

Cross-

Grid losses

Other

Revenues

9M 2023

fee

border rents

anticipatory

9M 2024

tariff income

DRIVERS BEHIND THE INCREASE IN REVENUES

  • Higher tariff revenue. Larger volumes (+2.3%) and higher tariff (+3%)
  • Lower cross-border capacity income due to lower energy prices across the region
  • Other income: Higher income from emergency energy assistance provided to neighboring TSOs (+42 mil Lei), sale of excess energy (purchased to offset grid losses) in the spot and balancing markets (+51 mil Lei), exceptional non- recurring income from recovery of a sizeable amount (ca. 95 mil Lei) as a result of a lawsuit won in court against the tax authorities for a case back in 2017

4

Results 9M2024

Financial results

Operations | Costs

Operational expenses

Operational expenses

ALL OPERATIONS

PROFIT-ALLOWED OPERATIONS

PROFIT-ALLOWED OPERATIONS: BREAKDOWN

2024

4,012

5,739

1,321

406

Profit-

Balancing

Balancing

Total

allowed

services

services

operations (Capacity)

(Energy)

2023

+138

253

1,321

+14

1,321

263

1,183

+57

+12

+43

+11

286

435

84

Grid

MaintenancePersonnel Depreciation

Other

Total

2023

2024

losses

costs

Costs

Grid

Maintenance Personnel Depreciation

Other

Costs

9M 2023

losses

costs

9M 2024

1,532

3,078

363

1,183

Profit-

Balancing

Balancing

Total

allowed

services

services

operations (Capacity)

(Energy)

239

1,183

252

243

377

72

Grid

MaintenancePersonnel Depreciation

Other

Total

losses

costs

DRIVERS BEHIND THE EVOLUTION OF COSTS

▲Grid losses (driven by a higher purchase price)

▲Higher grid maintenance costs

▲Higher personnel expenses

▲Other costs (+13 mil lei paid to electricity distribution operators for as compensation for additional grid losses power due to transits in the distribution grids - new cost item added to the transmission cost base under non-controllable OPEX hence full cost recovery)

Chart unit: mil Lei

5

Results 9M2024

Financial results

2023

2024

2024 / 2023

-0.26PP

2.40%

2.14%

Lei / MWh

Regulatory cap 2024: 2.19% (annual average)

1Q 2.22%

2Q 2.34%

3Q 1.89%

3.0

2.5

2.0

1.5

1.0

0.5

/ MWh

0.0

Jan Feb Mar Apr May Jun

Jul

Aug Sep Oct Nov Dec

Lei

2024

2.25

2.17

2.24

2.44

2.36

2.21

1.92

1.71

2.05

2023

2,62

2,42

2,57

2,63

2,29

2,69

1,91

2,15

2,31

2,03

2,50

2,32

2024 / 2023

Operational costs | grid losses

452 Lei

-1% FM

448 Lei

2024

Balancing

500

2023

Market (net)

400

BM

300

7%

200

100

11%

Jan Feb Mar Apr May Jun

Jul Aug Sep Oct Nov Dec

22%

17%

2024 / 2023

568 Lei

-1% DAM

561 Lei

72%

71%

1Q

412

2Q

475

3Q

709

800

600

Spot Market (net)

Forward

Market

Day-ahead Market

400

FM

Intraday

200

0

Ian

Feb Mar Apr

Mai Iun

Iul

Aug Sep Oct Noi Dec

GRID LOSSES

PRICES PAID PER MARKET

AVERAGE PRICE / PURCHASE MIX

31.68 TWh

448 Lei/MWh (▼ 1%)

519 Lei/MWh (▲ 10%)

GRID IN-TAKE VOLUME IN 9M 2024

FORWARD MARKET (FM)

CROSS-MARKET AVERAGE PRICE PAID

31.00 TWh

561 Lei/MWh (▼ 1%)

71%FM / 22%SPOT / 7%BM (9M 2024)

GRID OFF-TAKE VOLUME IN 9M 2024

DAY-AHEAD MARKET (DAM)

PURCHASE MIX (VOLUMES)

2.14% (0.68TWh)

1,031 Lei/MWh (▲ 150%)

72%FM / 17%SPOT / 11%BM (9M 2023)

GRID LOSSES 9M 2024

BALANCING MARKET (BM) (Net, BRP fee included) PURCHASE MIX (VOLUMES)

6

Results 9M2024

Financial results

Operational profit | EBITDA

FROM REVENUES TO EBITDA

EBITDA BREAKDOWN (PROFIT-ALLOWED)

2024

+241

197

1,745

63

47

1,745

1,504

-66

687

8

695

2023

REVENUES

2024

-1,058

Revenues

Transmission

Cross-

Grid losses

Other

Revenues

9M 2023

fee

border rents

anticipatory

9M 2024

Revenues

Costs

EBITDA

Pass-

EBITDA

tariff income

EBITDA

EBITDA

through

reported

Profit-allowed

573

+114

687

2023

1,504

2023

2024

+127

931

57

12

43

14

1.058

573

483

-931

-90

2023

EXPENSES

2024

Revenues

Costs

EBITDA

Pass-

EBITDA

before depreciation

through

reported

Operating

Grid

Maintenance Personnel

Other

Operating

Profit-allowed

costs 9M

losses

costs 9M

Chart unit: mil Lei

2023

2024

7

Results 9M2024

Financial results

FROM EBITDA TO NET INCOME

2024

687

424

8

432

+16

448

410

-263

-38

EBITDA Depreciation EBIT

Profit from

EBIT

Financial

EBT

Income

Net

Profit-

Profit-

Pass-

reported

result

tax

Income

allowed

allowed

through

operations

operationsoperations

2023

573

320

231

+3

234

-252

207

-90

-27

EBITDA Depreciation EBIT

Profit from

EBIT

Financial

EBT

Income

Net

Profit-

Profit-

Pass-

reported

result

tax

Income

allowed

allowed

through

operations

operationsoperations

From EBITDA to Net income

NET INCOME BREAKDOWN

+204

98

13

410

114

-10

207

-11

Net

EBITDA Depreciation

EBIT

Financial

Income tax

Net

Income

Profit-

Pass-

result

Income

9M 2023

allowed

through

9M 2024

operations

operations

MAIN DRIVERS BEHIND

THE INCREASE IN NET INCOME

  • EBITDA from profit-allowed operations (primarily driven by an exceptional non-recurring income from recovery of a sizeable amount (ca. 95 mil Lei) as a result of a lawsuit won in court against the tax authorities for a case back in 2017)
  • EBITDA from pass-through operations due to base effect (a significant negative result was reported in 2023 due to the clearing of a large backlog of historical gains accumulated over the previous years)

Chart unit: mil Lei

8

Results 9M2024

Investments

Delivered in 9M 2024

411

New contracts

Lei m

Total aggregate amount for contracts signed in

9M 2024

Selected items:

200 Lei m - Upgrade to 400 kV of internal transmission corridor Porțile de Fier - Reșița - Timișoara - Săcălaz - Arad , phase II: Line 400 KV d.c. Reșița - Timișoara - Săcălaz

65 Lei m - Refurbishment substation Calafat

38 Lei m - Power Quality Monitoring System

408

Capital expenditure

Lei m

Amounts added to construction-work-in-progress

in 9M 2024

Selected items:

93 Lei m - Connection of lines Isaccea - Varna and Isaccea - Dobrudja in substation Medgidia Sud - Phase I: extension of Medgidia Sud substation

63 Lei m - New 400kV line Porțile de Fier - Reșița 49 Lei m - New 400 kV line Gutinas - Smardan

538

Lei m

Assets commissioned

Amounts transferred from construction-work-in- progress to fixed assets in 9M 2024

Selected items:

160 Lei m - New 400kV line Porțile de Fier - Reșița

97 Lei m - Connection of lines Isaccea - Varna and Isaccea - Dobrudja in substation Medgidia Sud - Phase II: in-out connections in Medgidia Sud substation

74 Lei m - Refurbishment of substation Baru Mare

of which RAB: 215 Lei m

Note: The biggest two investments commissioned in 9M2024 do not add to the RAB as they were financed with cross-border interconnection revenues. Other non-RAB investments amount to a total of ca. 66 Lei m, mainly consisting of electrical lines re-routing works to secure the safe operation of the electricity transmission network at crossing points with other infrastructures (transmission network capex funded by the owners of other infrastructures crossing the electricity transmission network),

9