Charger confirms large lithium system at Lake Johnston
Filed with ASX · · 18 pages · English
Summary by 6ix AI
Charger Metals NL has announced the completion of project-wide soil geochemistry programs at the Lake Johnston Lithium Project, confirming a large lithium system with multiple target zones identified along a significant corridor. The most advanced target, the Medcalf Spodumene Prospect, is being prepared for drilling, with mineralized outcrops extending over a considerable distance. Charger is also working on obtaining necessary approvals for drilling at its other projects, indicating proactive engagement with regulatory bodies.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Story so far
Earlier from Charger Metals NL
- Charger -Battery Minerals Conference Presentation April 2022
- Charger confirms massive sulphide targets at Coates Project
- CHR: Access A/ment signed to Drill Coates target near Julimar
- Charger's targeting suggests Large Lithium System
- Lithium Pegmatite Trends Highlighted at Bynoe
Later from Charger Metals NL
- Charger commences drilling at Coates Ni-Cu-Co-Au-PGE Project
- Drilling Update for Coates Nickel-Copper-PGE Project
- Charger advances Medcalf Lithium Prospect towards Drilling
- Chargers $5.5M Placement strongly supported
- Lake Johnston drilling advances, target generation continues
Follow Charger Metals NL into a list and get an email when it puts out news.
Follow Charger Metals NL