CGA Mining LimitedTSX: CGA

CGA Mining Limited - Announcement to the Australian Securities Exchange and Toronto Stock Exchange

· Issued by CGA Mining Limited via CNW
                       MARCH QUARTERLY REPORT
                            30 APRIL 2008

PERTH, Western Australia, April 30 /CNW/ -

                         QUARTERLY HIGHLIGHTS

-   New Spektra drilling rig arrived on site at the Segilola Project in
    Nigeria, the most advanced gold project in the country and a 10,000m
    drilling program has commenced

-   Feasibility Study underway and progressing well for the Mkushi Copper
    Project in Zambia

-   Masbate construction is ahead of schedule by 4 weeks

-   Mining Alliance Agreement with Leighton Contractors (Philippines)
    Incorporated ("Leighton") executed with a 6 year term and total
    contract value of US$170M

-   Significant milestone of 1,000,000 manhours reached with no lost time
    injury

-   Construction currently 45% complete, with engineering and design 55%
    complete

-   All refurbishment works completed on the SAG mill and it is ready for
    shipment to the Philippines

-   Work commenced under the Mining Alliance Agreement on the tailings
    storage facility ("TSF")

-   Leighton to manage procurement and installation of 3 Sulzer power
    units with a 32 mw capacity under a variation to the fixed price lump
    sum contract

-   Final credit approvals secured by a number of banks and signing of an
    US$80.3m project finance facility expected in the June quarter

-   Development expenditure on Masbate to March 31 of US$38.6M and total
    cash reserves of US$47.7M

-   New high grade system discovered at Libra (Masbate Project)
    including:

                     37m    @    3.57 g Au /t
                     19m    @    9.39 g Au /t
                     27m    @    9.88 g Au /t
                     42m    @    10.51 g Au/t
                     29m    @     4.70 g Au/t

During the three months ending 31 March 2008, CGA Mining Limited's ("CGA", the "Company") activities focused on the development on the Masbate Gold Project in the Philippines and commencement of the detailed feasibility study for the Mkushi Copper Project in Zambia.

MASBATE PROJECT UPDATE

----------------------

Process Plant and Infrastructure

--------------------------------

Leighton Scope

The total construction program is currently 45% complete.

Lycopodium Engineering Pty Ltd ("Lycopodium") continued to carry out the engineering design activities to provide technical specifications and technical drawings to the Leighton construction team on site. As of March 31, the engineering/design was 55% complete.

For images please see http://files.newswire.ca/621/CGA.doc.

During the quarter the following site activities continued or were
commenced:

-   earthworks for all amenities and installations at the processing
    plant;
-   mobilisation of the second concrete batch plant;
-   construction office, laboratory and warehouse erected and fully
    operational;
-   completion of the contract labour accommodation;
-   construction of the permanent staff accommodation and messing
    facility - 87% complete;
-   Carbon in Leach ("CIL") tankage erection - 63% complete;
-   primary crusher foundations;
-   bin and conveyor foundations; and
-   reagent mixing tank, desorption column and gold room foundations.

In addition a number of offsite activities and fabrications were
commissioned by Leighton:

-   steelwork to be located above CIL tanks;
-   tank launders;
-   disposal tanks;
-   elution columns; and
-   mixing tanks.

For images please see http://files.newswire.ca/621/CGA.doc.

Leighton continues to expedite the orders placed for all of the mechanical equipment. As of the 31 March all deliveries were on schedule.

SAG Mill Refurbishment

The mill as was moved from the storage facility in Spokane, Washington State to the Weir Minerals (Australia) Ltd ("Weir") workshop facility in Edmonton, Canada. As of 31 March, all refurbishment works have been completed and checked and will be prepared for sea freight to Cebu, Philippines.

All mill ancillary equipment motors, gearboxes etc. are in the process of refurbishment. Mill electrics are being designed by BEC Engineering Pty Ltd ("BEC"), a Perth based company specialising in work of this nature.

Ball Mill

The ball mills located in Cebu have been stripped of the ancillary equipment. Gearboxes are being refurbished in Perth. Motor rewinds are being carried out by ABB Electrical Asea Brown Boveri, Inc. ("ABB") in the Philippines.

As of 31 March, ball mill refurbishment is on schedule.

The design of the mills general arrangement and the associated engineering is being carried out by Metso, Metso Minerals (Australia) Ltd ("Metso") Weir and Lycopodium.

Tailings Storage Facility

GHD Engineering Pty Ltd ("GHD") completed the design of the facility to accommodate the tailings resulting from treatment of the existing announced mining reserve (37.5 million tonne). Construction of the facility forms part of the Mining Alliance Agreement and as such is the responsibility of Leighton. Work commenced in March on the clearing of the tailings pipeline route and the excavation of the keyway below the main embankment. The tailings storage facility is expected to be ready for commissioning by November 30.

For images please see http://files.newswire.ca/621/CGA.doc.

Mining

------

The Mining Alliance Agreement with Leighton was executed on 20 March. The agreement is for six years and includes the supply of all mining/earthmoving equipment, maintenance and personnel to mine the ore and associated waste material. The agreement allows for a three month pre commissioning period.

For images please see http://files.newswire.ca/621/CGA.doc.

Power

-----

During the quarter, the power arrangements have been finalised with the plan to acquire 3 Sulzer units currently utilised in China to provide a 32 mw capacity on site. This has the advantage of both lower operating costs (due to the efficiencies of the equipment) and ownership of power supply from commencement of operations (ie no reliance on third parties). The units have been inspected by our power consultants, Poyry Pic and Leighton has agreed to manage procurement, shipping, installation (with related site works) and commissioning of the units under a variation to the fixed price lump sum construction contract. The total estimated capital cost (which includes a reallocation from the operating budget) is US$25m including all related site works.

Work has also continued on the longer term power plans of construction of a coal fired power station on the project site.

Safety Milestones

-----------------

The Masbate Gold Project achieved a major safety milestone on the 8th April 2008 with 1,000,000 man hours completed without any time lost to injury.

This milestone has been achieved with the constant commitment by CGA, Phil Gold Processing and Refining Corp, Filminera Resources Corporation and its Masbate Gold Project team to ensure that safety to its employees and subcontractors is paramount.

The Masbate Gold Project management team and the head contractor to the project, Leighton have treated safety as a high priority on the project site and this cooperation has lead to this milestone being obtained.

Exploration

-----------

During the quarter both the diamond drill and a reverse circulation drill continued to test the prospectivity of some areas in the immediate vicinity of known resources at the Masbate Project. During the quarter two regions were targeted, the Libra North and Panique areas.

A location map showing these areas is shown in Figure 1 available at http://files.newswire.ca/621/CGA.doc.

The Libra North area lies immediately along strike and to the north-west of the current designed Masbate open pits and within 200 metres of the planned ROM pad; in the previous quarter high grade assay results were reported from this vicinity, follow up drilling during this reporting period has again returned significant intercepts, the results of which are reported in Table 1 below.

                               Table 1
                     Libra North Area Intercepts

-------------------------------------------------------------------------
                          LIBRA DRILL HOLES
-------------------------------------------------------------------------
                       SIGNIFICANT INTERCEPTS
-------------------------------------------------------------------------
                                                                AVERAGE
HOLE ID  NORTHINGS  EASTINGS  AZIMUTH  DIP  FROM  TO  WIDTH  ASSAY RESULT
-------------------------------------------------------------------------
MEXRC01A     25715  29565.23     30     70     0   2   2.00      2.08
-------------------------------------------------------------------------
MEXRC01A     25715  29565.23     30     70     5  11   6.00      2.60
-------------------------------------------------------------------------
MEXRC01A     25715  29565.23     30     70    16  19   3.00      1.13
-------------------------------------------------------------------------
MEXRC01A     25715  29565.23     30     70    21  58  37.00      3.56
-------------------------------------------------------------------------
MEXRC02      25746  29526.19     30     60     4  10   6.00      7.92
-------------------------------------------------------------------------
MEXRC02A     25742  29521.69     30     60     4   7   3.00      1.15
-------------------------------------------------------------------------
MEXRC02A     25742  29521.69     30     60     8  11   3.00      2.07
-------------------------------------------------------------------------
MEXRC02A     25742  29521.69     30     60    21  40  19.00      9.39
-------------------------------------------------------------------------
MEXRC04      25769  29485.29     30     60    26  53  27.00      9.87
-------------------------------------------------------------------------
MEXRC04      25769  29485.29     30     60    56  57   1.00      3.65
-------------------------------------------------------------------------
MEXRC04      25769  29485.29     30     60    64  68   4.00      2.66
-------------------------------------------------------------------------
MEXRC04      25769  29485.29     30     60    74  86  12.00      1.74
-------------------------------------------------------------------------
MEXRC04      25769  29485.29     30     60    89  91   2.00      3.26
-------------------------------------------------------------------------
MEXRC07      25709  29617.93     30     60    12  14   2.00      2.58
-------------------------------------------------------------------------
MEXRC07      25709  29617.93     30     60   112 114   2.00      2.24
-------------------------------------------------------------------------
MEXRC09      25767  29537.76     30     60     1   2   1.00      1.37
-------------------------------------------------------------------------
MEXRC09      25767  29537.76     30     60    46  48   2.00      0.92
-------------------------------------------------------------------------
MEXRC10      25792  29495.03     30     60     0   5   5.00      1.16
-------------------------------------------------------------------------
MEXRC10      25792  29495.03     30     60    67  68   1.00      1.29
-------------------------------------------------------------------------
MEXRC11      25812  29449.13     30     60     2   3   1.00      1.03
-------------------------------------------------------------------------
MEXRC11      25812  29449.13     30     60    15  22   7.00     13.43
-------------------------------------------------------------------------
MEXRC11      25812  29449.13     30     60    66  67   1.00      1.07
-------------------------------------------------------------------------
MEXRC11      25812  29449.13     30     60   117 120   3.00      0.91
-------------------------------------------------------------------------
MEXRC12      25690  29607.74     30     60     1  43  42.00     10.51
-------------------------------------------------------------------------
MEXRC12      25690  29607.74     30     60    67  68   1.00      0.95
-------------------------------------------------------------------------
MEXRC12      25690  29607.74     30     60    78  79   1.00      1.33
-------------------------------------------------------------------------
MEXRC12      25690  29607.74     30     60   113 115   2.00      1.29
-------------------------------------------------------------------------
MEXRC13      25671  29596.37     30     60     0   7   7.00      1.70
-------------------------------------------------------------------------
MEXRC13      25671  29596.37     30     60    61  90  29.00      4.70
-------------------------------------------------------------------------
MEXRC14      25645  29639.88     30     60    16  64  48.00      2.80
-------------------------------------------------------------------------
MEXRC16      25599  29677.19     30     60    25  26      1      7.94
-------------------------------------------------------------------------
MEXRC16      25599  29677.19     30     60    37  38      1      2.24
-------------------------------------------------------------------------
MEXRC16      25599  29677.19     30     60    50  52      2      2.80
-------------------------------------------------------------------------
MEXRC16      25599  29677.19     30     60    71  72      1      1.23
-------------------------------------------------------------------------
MEXRC16      25599  29677.19     30     60    76  79      3      1.30
-------------------------------------------------------------------------
MEXRC16      25599  29677.19     30     60    82  96     14      4.20
-------------------------------------------------------------------------
MEXRC18      25575  29716.34     30     60    40  41      1      1.44
-------------------------------------------------------------------------
MEXRC18      25575  29716.34     30     60    93  97      4      3.20
-------------------------------------------------------------------------
MEXRC20      25572  29767.65     30     60     8  12      4      4.22
-------------------------------------------------------------------------
MEXRC20      25572  29767.65     30     60    88  90      2      3.84
-------------------------------------------------------------------------
MSHRC41      25725  29513.94     30     60    50  55      5      1.80
-------------------------------------------------------------------------
MSHRC41      25725  29513.94     30     60    70  75      5      2.70
-------------------------------------------------------------------------
MSHRC41      25725  29513.94     30     60   107 120     13      2.31
-------------------------------------------------------------------------

During the quarter in the Libra North area, 21 reverse-circulation drillholes were completed for a total of 1706 metres. The results of this drilling are extremely encouraging and will enable the designed open pit to be expanded in this area. Geological interpretation has been completed and geological/geostatistical block model of this additional data is underway.

In the Panique region both reverse circulation and diamond drilling was carried out with the aim of converting the current inferred resource material to a reserve status. During the quarter, 42 RC holes were completed (3,653m) and 6 diamond tails were completed (473m) for a total of 4,126m.

                               Table 2
                       Panique Area Intercepts

-------------------------------------------------------------------------
                         PANIQUE DRILL HOLES
-------------------------------------------------------------------------
                       SIGNIFICANT INTERCEPTS
-------------------------------------------------------------------------
                                                                  ASSAY
HOLE ID  NORTHING   EASTING  AZIMUTH  DIP     TO    FROM  WIDTH  AU PPM
-------------------------------------------------------------------------
PNQRC20     24592     30234      246   60     56     57      1     1.27
-------------------------------------------------------------------------
PNQRC27     24591     30378      246   60     11     13      2     1.11
-------------------------------------------------------------------------
PNQRC27     24591     30378      246   60    109    111      2     0.44
-------------------------------------------------------------------------
PNQRC26     24582     30358      246   60      8     10      2     0.73
-------------------------------------------------------------------------
PNQRC34     24528     30384      246   65     33     36      3    14.36
-------------------------------------------------------------------------
PNQRC46     24432     30468      246   60     87     91      4     1.00
-------------------------------------------------------------------------
PNQRC41     24482     30435      246   60      0     12     12     1.40
-------------------------------------------------------------------------
PNQRC41     24482     30435      246   60     25     26      1     0.44
-------------------------------------------------------------------------
PNQRC41     24482     30435      246   60     48     49      1     0.40
-------------------------------------------------------------------------
PNQRC41     24482     30435      246   60     62     63      1     0.56
-------------------------------------------------------------------------
PNQRC41     24482     30435      246   60     66     73      7     0.60
-------------------------------------------------------------------------
PNQRC65     24302     30619      246   60     19     21      2     1.50
-------------------------------------------------------------------------
PNQRC65     24302     30619      246   60     43     44      1     1.32
-------------------------------------------------------------------------
PNQRC65     24302     30619      246   60     62     63      1     1.45
-------------------------------------------------------------------------
PNQRC65     24302     30619      246   60     74     75      1     0.43
-------------------------------------------------------------------------
PNQRC65     24302     30619      246   60     89     91      2     2.03
-------------------------------------------------------------------------
PNQRC65     24302     30619      246   60     96     97      1     1.15
-------------------------------------------------------------------------
PNQRC60     24378     30639      246   60     12     14      2     1.15
-------------------------------------------------------------------------
PNQRC48     24482     30757      246   60     22     23      1     1.14
-------------------------------------------------------------------------
PNQRC48     24482     30757      246   60     49     55      6     4.60
-------------------------------------------------------------------------
PNQRC22     24462     30343      246   60      1      9      8     0.70
-------------------------------------------------------------------------
PNQRC22     24462     30343      246   60     15     16      1     0.40
-------------------------------------------------------------------------
PNQRC22     24462     30343      246   60     33     39      6     0.60
-------------------------------------------------------------------------
PNQRC22     24462     30343      246   60     40     41      1     0.62
-------------------------------------------------------------------------
PNQRC22     24462     30343      246   60     42     43      1     0.52
-------------------------------------------------------------------------
PNQRC22     24462     30343      246   60     60     61      1     0.60
-------------------------------------------------------------------------
PNQRC3      24642     30270      246   65      6      8      2     0.38
-------------------------------------------------------------------------
PNQRC3      24642     30270      246   65     56     57      1     1.02
-------------------------------------------------------------------------
PNQRC3      24642     30270      246   65     58     61      3     0.80
-------------------------------------------------------------------------
PNQRC3      24642     30270      246   65     66     68      2     2.00
-------------------------------------------------------------------------
PNQRC3      24642     30270      246   65     74     77      3     0.60
-------------------------------------------------------------------------
PNQRC3      24642     30270      246   65     80     81      1     0.35
-------------------------------------------------------------------------
PNQRC3      24642     30270      246   65     82     83      1     0.69
-------------------------------------------------------------------------
PNQRC4      24891     30305      246   65      1      3      2     6.50
-------------------------------------------------------------------------
PNQRC4      24891     30305      246   65     15     20      5     3.10
-------------------------------------------------------------------------
PNQRC4      24891     30305      246   65     40     43      3     2.70
-------------------------------------------------------------------------
PNQRC7A     24808     30256      246   60      0      3      3     1.00
-------------------------------------------------------------------------
PNQRC7A     24808     30256      246   60      7     10      3     1.50
-------------------------------------------------------------------------
PNQRC7A     24808     30256      246   60     13     14      1     2.01
-------------------------------------------------------------------------
PNQRC7A     24808     30256      246   60     44     45      1     0.50
-------------------------------------------------------------------------
PNQRC7A     24808     30256      246   60     46     47      1     0.30
-------------------------------------------------------------------------
PNQRC7A     24808     30256      246   60     48     50      2     1.20
-------------------------------------------------------------------------
PNQRC7A     24808     30256      246   60     52     53      1     0.97
-------------------------------------------------------------------------
PNQRC7A     24808     30256      246   60     60     65      5     0.50
-------------------------------------------------------------------------
PNQRC5      24699     30037       66   60      1      9      8     0.70
-------------------------------------------------------------------------
PNQRC5      24699     30037       66   60     11     13      2     0.89
-------------------------------------------------------------------------
PNQRC5      24699     30037       66   60    111    117      6     0.60
-------------------------------------------------------------------------
PNQRC9      24829     30328       66   60     19     21      2     1.09
-------------------------------------------------------------------------
PNQRC9      24829     30328       66   60     58     61      3     1.50
-------------------------------------------------------------------------
PNQRC9      24829     30328       66   60     97    106      9     1.10
-------------------------------------------------------------------------
PNQRC9      24829     30328       66   60    107    108      1     0.40
-------------------------------------------------------------------------
PNQRC9      24829     30328       66   60    115    117      2     1.70
-------------------------------------------------------------------------
PNQRC8      24829     30328      246   75      0      4      4     0.60
-------------------------------------------------------------------------
PNQRC8      24829     30328      246   75      6      8      2     1.00
-------------------------------------------------------------------------
PNQRC8      24829     30328      246   75     12     14      2     0.31
-------------------------------------------------------------------------
PNQRC8      24829     30328      246   75     24     26      2     0.60
-------------------------------------------------------------------------
PNQRC8      24829     30328      246   75     40     42      2     0.60
-------------------------------------------------------------------------
PNQRC8      24829     30328      246   75     46     50      4     3.40
-------------------------------------------------------------------------
PNQRC8      24829     30328      246   75     52     53      1     0.39
-------------------------------------------------------------------------
PNQRC8      24829     30328      246   75     56     58      2     1.50
-------------------------------------------------------------------------
PNQRC8      24829     30328      246   75     61     63      2     0.60
-------------------------------------------------------------------------
PNQRC8      24829     30328      246   75     67     71      4     0.80
-------------------------------------------------------------------------
PNQRC8      24829     30328      246   75     75     80      5     0.63
-------------------------------------------------------------------------
PNQRC6      24754     30157      246   60      2      4      2     0.48
-------------------------------------------------------------------------
PNQRC6      24754     30157      246   60     10     12      2     0.32
-------------------------------------------------------------------------
PNQRC6      24754     30157      246   60     20     24      4     0.36
-------------------------------------------------------------------------
PNQRC6      24754     30157      246   60     28     30      2     0.32
-------------------------------------------------------------------------
PNQRC12     24739     30261      246   60     15     16      1     0.40
-------------------------------------------------------------------------
PNQRC12     24739     30261      246   60     28     30      2     1.40
-------------------------------------------------------------------------
PNQRC12     24739     30261      246   60     40     41      1     0.37
-------------------------------------------------------------------------
PNQRC18A    24694     30326      246   60      9     13      4     1.23
-------------------------------------------------------------------------
PNQRC19     24724     30378      246   60      2     13     11     0.46
-------------------------------------------------------------------------
PNQRC19     24724     30378      246   60     17     25      8     0.41
-------------------------------------------------------------------------
PNQRC19     24724     30378      246   60     30     33      3     0.95
-------------------------------------------------------------------------
PNQRC40     24447     30352       66   70      0      2      2     0.31
-------------------------------------------------------------------------
PNQRCD5     24699     30037       65   60    124    125      1     0.92
-------------------------------------------------------------------------
PNQRCD5     24699     30037       65   60    126    127      1     0.56
-------------------------------------------------------------------------
PNQRCD5     24699     30037       65   60    129    131      2     0.50
-------------------------------------------------------------------------
PNQRCD5     24699     30037       65   60  142.1  144.1      2     0.40
-------------------------------------------------------------------------
PNQRCD5     24699     30037       65   60  145.1  150.1      5     1.92
-------------------------------------------------------------------------
PNQRCD5     24699     30037       65   60  151.1  153.1      2     1.50
-------------------------------------------------------------------------
PNQRCD5     24699     30037       65   60  167.1  170.1      3     0.63
-------------------------------------------------------------------------
PNQRCD5     24699     30037       65   60  171.7  172.4    0.7     0.71
-------------------------------------------------------------------------
PNQRCD5     24699     30037       65   60  175.4  176.4      1     0.37
-------------------------------------------------------------------------
PNQRC35     24546     30434      246   65     25     26      1     1.42
-------------------------------------------------------------------------
PNQRC35     24546     30434      246   65     31     32      1     0.49
-------------------------------------------------------------------------
PNQRC35     24546     30434      246   65     42     43      1     0.44
-------------------------------------------------------------------------
PNQRC35     24546     30434      246   65     48     49      1     0.80
-------------------------------------------------------------------------
PNQRC35     24546     30434      246   65     58     59      1     0.88
-------------------------------------------------------------------------
PNQRC35     24546     30434      246   65     70     71      1     0.32
-------------------------------------------------------------------------
PNQRC35     24546     30434      246   65     85     87      2     0.60
-------------------------------------------------------------------------
PNQRC35     24546     30434      246   65     88     90      2     1.30
-------------------------------------------------------------------------
PNQRC35     24546     30434      246   65     96    101      5     1.23
-------------------------------------------------------------------------
PNQRC35     24546     30434      246   65     29     31      2     0.40
-------------------------------------------------------------------------
PNQRC57     24290     30444      246   75     46     47      1     0.98
-------------------------------------------------------------------------
PNQRC57     24290     30444      246   75     93     97      4     4.60
-------------------------------------------------------------------------
PNQRC57     24290     30444      246   75     98     99      1     1.25
-------------------------------------------------------------------------
PNQRC57     24290     30444      246   75    100    101      1     0.34
-------------------------------------------------------------------------
PNQRC57     24290     30444      246   75    108    110      2     0.50
-------------------------------------------------------------------------
PNQRC57     24290     30444      246   75    116    118      2     0.60
-------------------------------------------------------------------------
PNQRC53     24386     30512      246   75     64     65      1     0.39
-------------------------------------------------------------------------
PNQRC53     24386     30512      246   75     66     67      1     1.77
-------------------------------------------------------------------------
PNQRC53     24386     30512      246   75     74     76      2     0.32
-------------------------------------------------------------------------
PNQRC53     24386     30512      246   75     92     96      4     0.70
-------------------------------------------------------------------------
PNQRC53     24386     30512      246   75    108    110      2     0.54
-------------------------------------------------------------------------
PNQRC53     24386     30512      246   75    112    117      5     0.50
-------------------------------------------------------------------------
PNQRC53     24386     30512      246   75    119    120      1     0.35
-------------------------------------------------------------------------

For Figures 2 and 3 please see http://files.newswire.ca/621/CGA.doc.

Expenditure

As of 31 March 2007, the group had spent approximately US$38.6M on development of the project, with total cash reserves at the same date of US$47.7M (including the cash reserves of Filminera Resources Corporation).

Project Finance Facility

Significant progress has been made on the project debt finance facility during the quarter. A number of banks have now secured their final credit approval for participation in the financing and final documentation is expected to be signed shortly. The project finance facility has been increased from US$65M to US$80.3M to consolidate the funding for the project power arrangements with the banking facility. As with all project finance facilities it will be subject to normal conditions precedent, which are presently on track to be satisfied for a drawdown in the second quarter of 2008.

MKUSHI PROJECT UPDATE

---------------------

Good progress has been made on the various components of the detailed feasibility study, which is on track for completion in the last quarter of 2008. An application for a Mining Licence over the Mkushi deposit and adjacent prospects with resource potential was submitted during February.

Drill results received during the quarter indicate potential for additional resources in the old Munshiwemba Pit and support our geological interpretations of H, L, and G Zones. An independent resource estimate to JORC and 43-101 guidelines is due for completion in the September quarter and will include all data that was not available at the time of the preliminary study.

Exploration work by our partner African Eagle Resources pic ("AFE") has intersected significant mineralisation at the Munda prospect and identified several new soil geochemical copper anomalies within the wider 476 sq km prospecting licence.

Detailed Feasibility Study - Summary

The feasibility study ("FS") is currently underway with Bateman Engineering Pty Ltd/Metplant, Metplant Engineering Services Pty Ltd (Metplant) being the principal consulting group carrying out the feasibility study for the process plant area. The geotechnical drilling has been completed and the report, being prepared by African Mining Consultants Ltd Zambia ("AMC"), is expected in the next month. The Environmental Impact Assessment has also been completed by AMC and has been presented to the authorities for review.

Snowden Mining Industry Consultants Pty Ltd ("Snowden"), Perth, has been engaged to prepare the NI 43-101 for the reserves and resources.

Discussions are advanced with the two main power suppliers in Zambia to provide a secure supply of power to the operation. In addition, discussions have commenced with smelter operations in Zambia concerning possible off-take agreements.

Completion of the FS is on track for the last quarter of 2008.

Resource Drilling & Estimation

The resource evaluation drilling programme at Munshiwemba H Zone has been completed and drill rigs transferred to our joint venture partner, Katanga Resources Ltd, for drilling programmes on additional exploration targets within the joint venture licence areas. Success on these targets could result in an increase in the resource base at the Mkushi Project. It is anticipated that further resource drilling at Munshiwemba H Zone and other core area prospects will recommence after the completion of the FS.

Results received during the quarter indicate potential for additional resources in the old Munshiwemba Pit (north east of G Zone) and have confirmed geological interpretations at H, L, and G Zones.

A close spaced vertical reverse circulation programme on a 10m x 10m grid at G Zone has also confirmed the continuity of copper mineralisation, based on visual observations as few laboratory results for this programme are yet available.

Significant new drill intersection results can be found in Table 3.

                               Table 3
                       Mkushi Area Intercepts

-------------------------------------------------------------------------
                           MKUSHI PROJECT
-------------------------------------------------------------------------
            SIGNIFICANT INTERSECTIONS (greater than)1% CU
-------------------------------------------------------------------------
                                                               CU
                                                              GRADE
HOLE NO PROSPECT     EAST    NORTH AZIMUTH DIP FROM  TO WIDTH   %   TYPE
-------------------------------------------------------------------------
MH029   H ZONE      731208  8456791  142  -50   142  147   5 1.008   DD
-------------------------------------------------------------------------
MH029   H ZONE      731208  8456791  142  -50   150  153   3  1.89   DD
-------------------------------------------------------------------------
MH084   LZONE       731050  8456855  142  -50   137  144   7  1.26   DD
-------------------------------------------------------------------------
MH084   LZONE       731050  8456855  142  -50   206  207   1  3.95   DD
-------------------------------------------------------------------------
MH085   H ZONE      731216  8456882  142  -50    25   30   5  1.03   DD
-------------------------------------------------------------------------
MH094   H ZONE      730761  8456299  142  -50    48   49   1  1.53   RC
-------------------------------------------------------------------------
MH098   H ZONE      730818  8456396  142  -50    28   31   3  1.69   RC
-------------------------------------------------------------------------
MH098   H ZONE      730818  8456396  142  -50    37   39   2  1.09   RC
-------------------------------------------------------------------------
MH099   H ZONE      730788  8456435  142  -50    83   84   1  1.88   RC
-------------------------------------------------------------------------
MH100   H ZONE      730788  8456435  142  -50 174.5  179 4.5  1.87   DD
-------------------------------------------------------------------------
MH100   H ZONE      730788  8456435  142  -50   182  185   3  1.64   DD
-------------------------------------------------------------------------
MMU050  MUNSHIWEMBA 731623  8457676  142  -50    17   20   3  1.99   DD
-------------------------------------------------------------------------
MMU050  MUNSHIWEMBA 731623  8457676  142  -50    31   57  26  1.75   DD
-------------------------------------------------------------------------
MMU051  MUNSHIWEMBA 731596  8457631  142  -50    48   57   9  2.71   DD
-------------------------------------------------------------------------
MMU052A MUNSHIWEMBA 731595  8457632  142  -50    50   53   3  1.19   DD
-------------------------------------------------------------------------
MMU053  MUNSHIWEMBA 731552  8457381  322  -50    57   65   8  4.65   RC
-------------------------------------------------------------------------
MMU053  MUNSHIWEMBA 731552  8457381  322  -50    70   74   4  2.63   RC
-------------------------------------------------------------------------
MMU053  MUNSHIWEMBA 731552  8457381  322  -50    93   96   3  1.1    RC
-------------------------------------------------------------------------
MMU055  MUNSHIWEMBA 731668  8457616  142  -50     8   13   5  1.17   RC
-------------------------------------------------------------------------
MMU057  MUNSHIWEMBA 731723  8457703  142  -50    11   16   5 2.068   RC
-------------------------------------------------------------------------
MMU060  MUNSHIWEMBA 731633  8457586  142  -50    20   29   9  1.74   RC
-------------------------------------------------------------------------
MMUP038 G ZONE      731547  8457288    0  -90    11   16   5  2.67 VertRC
-------------------------------------------------------------------------
MMUP039 G ZONE      731542  8457301    0  -90     0   11  11  1.27 VertRC
-------------------------------------------------------------------------
MMUP045 G ZONE      731564  8457345    0  -90     9   19  10  1.15 VertRC
-------------------------------------------------------------------------

Geotechnical Study

The geotechnical diamond drilling programme has been completed and a report is being prepared by AMC for inclusion in the FS.

Sterilisation Drilling

A 4,100m reverse circulation programme has been completed on proposed sites for plant, waste and tailings facilities. No mineralisation of significance was located and sites are now adequately sterilised for infrastructure.

Licences

An application for a Mining Licence over the Mkushi deposit and adjacent prospects with resource potential was submitted to the Zambian Ministry of Mines on 12 February 2008. The Environmental Impact Assessment ("EIA") prepared by AMC has been completed and submitted for review and approval by the Environmental Council of Zambia. The EIA is also a key requirement of the Mining Licence application.

Regional Exploration

Our joint venture partner AFE, which is exploring the wider 478 sq km licence around the known deposits, has now received most of the laboratory analyses from its soil geochemical programme. These have revealed several promising copper anomalies, which AFE will follow up.

AFE's diamond and reverse circulation drilling of the Munda Prospect, 5km south of Munshiwemba, yielded several intersections of copper sulphide, with grades up to 2% indicated by visual inspection and in-field XRF X-Ray Fluorescence Spectroscopy analysis.

General

As part of our ongoing commitment of community improvements work was completed on rewiring of the local medical facility in the nearby Mkushi Copper Mine village during the quarter.

SEGILOLA GOLD PROJECT UPDATE

----------------------------

The two containers that arrived at the Appapa wharf, Lagos, Turkish drill rig and the accessories and consumables, were cleared by customs in the first week of April. Arrangements were made to transport the two containers to site where the Turkish drilling crew and supervisors offloaded them. The main drilling programme has now commenced.

For an image of the Spektra Drill Rig see http://files.newswire.ca/621/CGA.doc

Drill pad construction and access track clearing in preparation for the Spektra Drill Rig continued during the quarter, a total of 18 drill pads were constructed of which 3 have been drilled by Tanylag, the Nigerian drilling company on site.

The core recovery from Tanylag Nigeria Ltd ("Tanylag"), the current local Nigerian driller on site, was not good due to only a single tube core barrel being available to them at the time. This indicates that there is a potential for an upside on the grade due to a potential loss of mineralisation from the core retrieved and also that the extent of mineralisation may be increased. The assay results (from SGS Laboratory Services Ghana Ltd ("SGS") in Ghana) can be found in Table 4.

The hole as drilled on an average angle of minus 60 degrees and the widths referred to in the table are apparent widths. Importantly, the results do confirm expected zones of mineralisation identified during previous drilling campaigns by others.

                               Table 4
                       Segilola Area Intercepts

-------------------------------------------------------------------------
                           SEGILOLA PROJECT
-------------------------------------------------------------------------
                    ASSAY RESULTS FOR HOLE SGD002
-------------------------------------------------------------------------
HOLE ID      FROM       TO     INTERVAL   SAMPLE ID    WEIGHT      AUG/T
-------------------------------------------------------------------------
SGD002       20.00     22.00      2.00     SX070001      3.05       1.49
-------------------------------------------------------------------------
SGD002       30.00     32.00      2.00     SX070006      2.20       1.03
-------------------------------------------------------------------------
SGD002       34.00     36.00      2.00     SX070008      3.70       2.23
-------------------------------------------------------------------------
SGD002       42.00     44.00      2.00     SX070012      1.65       0.97
-------------------------------------------------------------------------
SGD002       46.00     48.00      2.00     SX070014      3.80       1.69
-------------------------------------------------------------------------

Fugro Environmental Consultants, a Nigerian based company, has been approached to provide a proposal to establish an environmental baseline study. It is planned for this to commence during the next quarter.

A total of 282m of new trenches were dug during the quarter with some 525 samples being collected from them, together with some sampling from old existing trenches, bringing the total samples collected to date to 570. A shipment was made to SGS in Accra, Ghana comprising of 360 trench samples during the end of this quarter and results are expected to be received in the next quarter.

CORPORATE

---------

During the quarter 1,070,000 options were exercised for total cash proceeds of AUD$718,000. At 31 March 2008, the Company had 8,950,000 options and 6,250,000 outstanding warrants on issue. The total issued capital of the Company as at 31 March 2008 was 211,624,976 fully paid ordinary shares.

National Instrument 43-101 and JORC Compliance

Mr Geoff.G.Jones, F.Aus.l.M.M.CP Mng, CGA's Consulting Engineer, is acting as the Qualified Person in compliance with NI 43-101 and JORC reporting requirements with respect to this announcement. He has prepared and or supervised the preparation of the scientific or technical information in this announcement.

Cautionary Note Regarding Forward Looking Statements

This announcement includes certain "forward-looking statements" within the meaning of Canadian securities legislation. All statements, other than statements of historical fact, included herein including, without limitation, statements regarding anticipated dates for construction and production, and other milestones related to the Masbate Gold Project and other projects; estimates of capital and operating costs, recovery rates, production estimates and estimated economic return; and CGA's future operating or financial performance, are forward-looking statements. Information concerning mineral reserve and resource estimates including statements regarding the conversion of inferred resources to reserves also may be deemed to be forward-looking statements in that it reflects a prediction of the mineralization that would be encountered if a mineral deposit were developed and mined. Forward-looking statements involve various risks and uncertainties and are based on certain factors and assumptions. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from CGA's expectations include uncertainties related to fluctuations in gold and other commodity prices and currency exchange rates; uncertainties relating to interpretation of drill results and the geology, continuity and grade of mineral deposits; uncertainty of estimates of capital and operating costs, recovery rates, production estimates and estimated economic return; the need for cooperation of government agencies in the development of the Masbate Gold Project; the need to obtain additional financing to develop the Masbate Gold Project; the possibility of delay in development programs or in construction projects and uncertainty of meeting anticipated program milestones for the Masbate Gold Project; and other risks and uncertainties disclosed under the heading "Caution Regarding Forward-Looking Statements" in CGA's Annual Information Form for the year ended 30 June 2007 filed with the Canadian securities regulatory authorities on the SEDAR website at www.sedar.com.

                             Appendix 5B

               Mining exploration entity monthly report

Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001.

Name of entity
-------------------------------------------------------------------------
CGA Mining Limited
-------------------------------------------------------------------------

ABN                                         Month ended ("current month")
-----------------------                     -----------------------------
88 009153128                                March 2008
-----------------------                     -----------------------------

Consolidated statement of cash flows

                                                   ----------------------
                                                                    Year
                                                                 to date
                                                    Current        (nine
Cash flows related to                               quarter       months)
 operating activities                               US$'000      US$'000
                                                   ----------------------

1.1  Receipts from product sales and
      related debtors                                     -            -

1.2  Payments for (a) exploration and evaluation     (1,837)      (5,805)
                  (b) development                    (9,525)     (36,355)
                  (c) production                          -            -
                  (d) administration                   (650)      (3,421)

1.3  Dividends received                                   -            -
1.4  Interest and other items of a similar
      nature received                                   338        1,214
1.5  Interest and other costs of finance paid          (115)      (3,722)
1.6  Income taxes paid                                    -            -
1.7  Other -Business development                       (346)        (346)
                                                   ----------------------
                                                    (12,135)     (48,435)
     Net Operating Cash Flows
-------------------------------------------------------------------------

-------------------------------------------------------------------------

     Cash flows related to investing activities
1.8  Payment for purchases of: (a)prospects
                               (b)equity investments
                               (c) other fixed assets  (150)        (150)
1.9  Proceeds from sale of:    (a)prospects               -            -
                               (b)equity investments      -            -
                               (c)other fixed assets      -            -
1.10 Loans to other entities
1.11 Loans repaid by other entities
1.12 Other (provide details if material)
                                                   ----------------------
                                                       (150)        (150)

     Net investing cash flows                      ----------------------
1.13 Total operating and investing cash flows
      (carried forward)                             (12,285)     (48,585)
-------------------------------------------------------------------------

-------------------------------------------------------------------------
1.13 Total operating and investing cash flows
      (brought forward)
-------------------------------------------------------------------------

Cash flows related to financing activities
1.14 Proceeds from issues of shares, options, etc.      656       40,541

1.15 Proceeds from sale of forfeited shares
1.16 Proceeds from borrowings                             -       25,000

1.17 Repayment of borrowings
1.18 Dividends paid
1.19 Other (provide details if material)
                                                   ----------------------
     Net financing cash flows                           656       65,541
-------------------------------------------------------------------------

     Net increase (decrease) in cash held           (11,629)      16,956

1.20 Cash at beginning of quarter/year to date       56,370       25,399
1.21 Exchange rate adjustments to item 1.20              64        2,450
                                                   ----------------------
1.22 Cash at end of quarter                          44,805       44,805
-------------------------------------------------------------------------
(x) Filminera Resources Corp. has an additional $2.9m in cash.


Payments to directors of the entity and associates of the directors
Payments to related entities of the entity and associates of the related
entities

                                                   ----------------------
                                                         Current quarter
                                                                 US$'000
                                                   ----------------------
1.23 Aggregate amount of payments to the parties
      included in item 1.2                                           287
                                                   ----------------------
1.24 Aggregate amount of loans to the parties
      included in item 1.10                                            -
-------------------------------------------------------------------------

1.25 Explanation necessary for an understanding of the transactions
-------------------------------------------------------------------------
     Payment of salaries, directors fees, taxes, and superannuation.
-------------------------------------------------------------------------

Non-cash financing and investing activities

2.1  Details of financing and investing transactions which have had a
     material effect on consolidated assets and liabilities but did not
     involve cash flows

-------------------------------------------------------------------------
In accordance with accounting standards the Company is required to
recognise the fair value of the Warrants issued in November 2007 as a
current liability. The Warrants are required to be revalued at each
balance date, with the movement recognised as either a gain or loss in
the Income Statement. The Company does not have any current or future
cash payment liabilities in relation to the Warrants, however, accounting
standards require that a theoretical fair value be placed on them and
that this be recognised as a current liability in the Company's Financial
Statements. At 31 March 2008, the fair value of the Warrants recognised
as a current liability on the balance sheet is $6.528m and the fair value
of the movement for the quarter ended March 31, 2008 recognised in the
profit and loss statement is ($2.764m). These amounts do not reflect
either a current or future cash flow to the entity.
-------------------------------------------------------------------------

2.2  Details of outlays made by other entities to establish or increase
     their share in projects in which the reporting entity has an
     interest
-------------------------------------------------------------------------

-------------------------------------------------------------------------

Financing facilities available
Add notes as necessary for an understanding of the position.

                                                -------------------------
                                                     Amount
                                                  available  Amount used
                                                    US$'000      US$'000
                                                -------------------------

3.1  Loan facilities                                      -            -
                                                -------------------------
3.2  Credit standby arrangements                          -            -
-------------------------------------------------------------------------
Estimated cash outflows for next quarter

                                                -------------------------
                                                                 US$'000
                                                -------------------------
4.1  Exploration and evaluation                                    2,433
                                                -------------------------
4.2  Development                                                  38,330
-------------------------------------------------------------------------
     Total                                                        40,763
-------------------------------------------------------------------------

Reconciliation of cash


                                                -------------------------
Reconciliation of cash at the end of the
 quarter (as shown in the consolidated                Current   Previous
 statement of cash flows) to the related              quarter    quarter
 items in the accounts is as follows.                 US$'000    US$'000
-------------------------------------------------------------------------
5.1  Cash on hand and at bank                          34,200     53,397
                                                -------------------------
5.2  Deposits at call                                   9,030          -
                                                -------------------------
5.3  Bank overdraft                                         -          -
                                                -------------------------
5.4  Other (provide details)

     AUD Account                                        1,376      2,781
     AUD Deposit                                          199        192
-------------------------------------------------------------------------
     Total: cash at end of quarter (item 1.22)         44,805     56,370
-------------------------------------------------------------------------

Changes in interests in mining tenements
                     ----------------------------------------------------
                                    Nature of   Interest at  Interest at
                         Tenement    interest  beginning of       end of
                        reference   (note (2))      quarter      quarter
                     ----------------------------------------------------

6.1  Interests in
      mining
      tenements
      relinquished,
      reduced or
      lapsed                    -           -             -            -
                     ----------------------------------------------------
6.2  Interests in
      mining
      tenements
      acquired or
      increased                 -           -             -            -
                     ----------------------------------------------------


Issued and quoted securities at end of current quarter
Description includes rate of interest and any redemption or conversion
rights together with prices and dates.

                     ----------------------------------------------------
                                                             Amount paid
                                               Issue price        up per
                                              per security      security
                          Total       Number   (see note 3)  (see note 3)
                         number       quoted        (cents)       (cents)
-------------------------------------------------------------------------
7.1  Preference
      +Securities
     (description)
                     ----------------------------------------------------
7.2  Changes during
      quarter
      (a) Increases
      through issues
      (b) Decreases
      through returns
      of capital,
      buy-backs,
      redemptions
-------------------------------------------------------------------------
7.3  +Ordinary
      securities      211,624,976  211,624,976
                     ----------------------------------------------------
7.4  Changes during
      quarter
      (a) Increases
      through issues
      (b) Decreases
      through returns
      of capital,
      buy-backs
-------------------------------------------------------------------------
7.5  +Convertible debt
      securities
      (description)
                    ----------------------------------------------------
7.6  Changes during
      quarter
     (a) Increases
     through issues
     (b) Decreases
     through securities
     matured,
     converted
-------------------------------------------------------------------------
7.7  Options
     (description and
      conversion factor)
                    ----------------------------------------------------
7.8  Issued during
      quarter
                    ----------------------------------------------------
7.9  Exercised during
      quarter           1,070,000    1,070,000        0.67          0.67
                    ----------------------------------------------------
7.10 Expired during
      quarter
-------------------------------------------------------------------------
7.11 Debentures
     (totals only)
7.12 Unsecured notes
     (totals only)         25,000            0
                    ---------------------------

Compliance statement

1   This statement has been prepared under accounting policies which
    comply with accounting standards as defined in the Corporations Act
    or other standards acceptable to ASX (see note 4).

2   This statement does give a true and fair view of the matters
    disclosed.

Sign here: (signed)                               Date:  30 April 2008

(Company secretary)

Print name: Hannah Hudson..............................

Notes

1   The quarterly report provides a basis for informing the market how
    the entity's activities have been financed for the past quarter and
    the effect on its cash position. An entity wanting to disclose
    additional information is encouraged to do so, in a note or notes
    attached to this report.

2   The "Nature of interest" (items 6.1 and 6.2) includes options in
    respect of interests in mining tenements acquired, exercised or
    lapsed during the reporting period. If the entity is involved in a
    joint venture agreement and there are conditions precedent which will
    change its percentage interest in a mining tenement, it should
    disclose the change of percentage interest and conditions precedent
    in the list required for items 6.1 and 6.2.

3   Issued and quoted securities

    The issue price and amount paid up is not required in items 7.1 and
    7.3 for fully paid securities.

4   The definitions in, and provisions of, MSB 1022: Accounting for
    Extractive Industries and MSB 1026: Statement of Cash Flows apply to
    this report.

5   Accounting Standards

    ASX will accept, for example, the use of International Accounting
    Standards for foreign entities. If the standards used do not address
    a topic, the Australian standard on that topic (if any) must be
    complied with.