PERTH, Western Australia, Oct. 30 /CNW/ - During the three months ending 30 September 2007, CGA Mining Limited's ("CGA", the "Company") activities focused on an optimisation review of the Masbate Gold Project in the Philippines, Leighton's mobilisation to site and compilation of a prefeasibility study for the Mkushi Cooper project in Zambia.

MASBATE PROJECT UPDATE

----------------------

Optimisation Review

-------------------

The focus of the quarter has been completion of an optimisation review, which enhanced the economics of the Masbate Gold Project and securing the funding necessary to develop the new mine. A detailed announcement in relation to the results of that review was released to the market on 5 October 2007 and is available at www.cgamining.com.

The Definitive Feasibility Study ("DFS") carried out by Ausenco International Pty Ltd Australia ("Ausenco") and published in May 2006 formed the basis of the optimisation review carried out by CGA and Filminera Resources Corp. ("Filminera"), with assistance from independent external consultants.

The optimisation review focused on 6 main initiatives:

-   Excess grinding capability due to the procurement of two pre-used
    ball mills whose combined capacity exceeded that specified as
    required in the DFS.

-   High grade resources were identified within the pit limits delineated
    in the DFS.

-   The water management strategy was reviewed to minimise the use of
    fresh water.

-   Power generation using coal fired boilers to protect the project from
    high fuel prices and to reduce LOM operating costs.

-   Appointment of Leighton Contractors (Philippines) Inc ("LCP") to
    conduct a revalidation of the capital costs associated with the
    process plant and infrastructure using their Philippine experience.

-   Selection of Lycopodium Engineers based in Perth and Manila,
    experienced in the design and construction of large (+4.0 Mtpa)
    process plants.

-   Review of project economics applying current operating costs and gold
    price assumptions.

The results of the optimisation review were published in an announcement
to the Australian Securities Exchange and the Toronto Stock Exchange on 5
October 2007 and are summarised in table 1.1 below.


                              Table 1.1
-------------------------------------------------------------------------
               Optimisation Study Results Years 1 - 8
-------------------------------------------------------------------------
Physical Parameters               Unit
-------------------------------------------------------------------------
Milled Ore                        million tonnes                    37.8
-------------------------------------------------------------------------
Grade                             g/t                               1.63
-------------------------------------------------------------------------
Mill Recovery - Gold              %                                82.7%
-------------------------------------------------------------------------
Refining Recovery - Gold          %                                99.9%
-------------------------------------------------------------------------
Bullion Produced - Gold           million ozs                       1.65
-------------------------------------------------------------------------
Bullion produced per annum        ozs                            206,000
-------------------------------------------------------------------------
Mill Throughput YR1-2             Mtpa                                 4
-------------------------------------------------------------------------
Mill Throughput YR3-8             Mtpa                                 5
-------------------------------------------------------------------------
Operating Cash Cost               US$/oz                             306
-------------------------------------------------------------------------
Capital Cost - Project            US$ million                      119.5
-------------------------------------------------------------------------

The capital cost includes a contingency of US$7.2m (6.4%) and the proposed funding package has made an additional allowance for up to US$2.5m for foreign currency movements prior to execution of the fixed price lump sum construction contract.

Average annual gold production during the initial eight (8) years of production averages 206 000 oz at a cash operating cost of US$ 306/ounce. The Philippine tax regime allows a minimum six (6) year income tax holiday, the benefit of which is not included within the above forecast cash operating costs.

In addition to the ore reserves reported in the DFS there were an additional 16 million tonne of indicated resources left stockpiled from the previous operations. The gold price at the time of preparation of the DFS did not allow for these resources to be included in reserves.

With the recent reported gold price of in excess of US$650/oz, we plan to do the additional work necessary to have these indicated resources converted into probable reserves and included in the reported production and statistics.

Appointment of Leighton Contractors (Philippine) Inc

----------------------------------------------------

Leighton Holdings Limited ("Leighton"), which controls 100% of LCP, is Australia's largest project development and construction company, well regarded and respected internationally and also today, the world's leading contract miner, operating a fleet in excess of US$1.5 billion. LCP is to be awarded both the fixed price lump sum ("FPLS") construction contract (covering a scope of works to the value of US$84.94m), with all key terms now agreed, and an alliance mining contract (with LCP providing the full mining fleet estimated to cost in the order of US$34m).

A letter of Intent ("LOI") was provided to LCP and an initial purchase order issued to enable LCP to mobilise an earthmoving fleet to the project site to commence the earthworks associated with the process plant construction.

To date LCP has commenced the following activities:

-   Process Plant Earthworks.

-   Contractor's Office erection.

-   Contractor's accommodation and utilities.

-   Concrete batch plant erection.

A selection of photographs illustrating the progress to date have been posted on the CGA website www.cgamining.com under Projects/Masbate Gold Project.

Power

DMCI Corporation ("Consunji)" is the largest construction company in the Philippines and own and operate a large coal mine on an island close to Masbate. At the coal mine, Consunji generates their own power via coal fired boilers. Consunji was recently awarded a contract to supply power to Maselco (the appointed franchise for power distribution on Masbate Island). CGA and Filminera have entered into negotiations with Consunji for the construction and operation of a dedicated coal fired 25 MW coal fired power station adjacent to the project site. Consunji has engaged Thermax Limited ("Thermax"), an experienced Indian engineering company specialised in coal fired power generation, to design the appropriate facility. The preliminary estimate supplied to CGA / Filminera by Consunji and Thermax includes an all in power cost (Capital, Operating & Maintenance, Raw Materials) averaging US$0.10/kWh over a 10 year project life. This is a significant reduction when compared to diesel powered generators and the heavy fuel (bunker) powered generation contemplated in the DFS. The effective power cost can be further reduced by disposing of the facility at the end of the life of mine to Consunji at a contracted residual value of 30% of the new price i.e. US$10m.

The construction of the power station will take 24 months i.e. 9 months longer than the process plant. The optimisation study has allowed for a conservative 12 month delay. During the interim period power will be provided via barge mounted units berthed close to the existing jetty at the project site. The cost of interim power is forecast at US$0.16 / kWh. Appropriate and available barges have been identified and negotiations with the supplier and operator have commenced.

Permits

All key permits have now been secured including the recent approval of the feasibility study in respect of PGPRC (processing) and Filminera (mining and infrastructure) and the issue of a Mineral Processing Permit by the central and regional authorities in the Philippines.

Staffing

CGA, Filminera, and PGPRC have made the following appointments of consultant or employees for the development activities at Masbate.

General Manager - Tim Armstrong, a Canadian mining engineer with in excess of 20 years experience in the development and operation of underground and surface mines in North America, Greece and Philippines (10 years) will oversee the project.

Construction Manager - Mark Hughes, an Australian electrical engineer with over 20 years construction and project management experience in Australia and South East Asia will oversee the FLSP contract with LCP.

Manager Mining - Noel Rollo, an Australian mining engineer with in excess of 30 years experience in Australia, Africa and South East Asia will be responsible for all geological, mining / earthmoving activities on site.

Geology Manager - Max Tuesley, an experienced Australian geologist who has worked in Australia and South East Asia will be responsible for all geological activities on site at Masbate.

In connection with the above new appointments and the continued objective of attracting and retaining the best team to develop the Masbate Gold Project, the Company issued 2.25m options under The Employee Option Plan to employees, with an exercise price of $0.90 per option and expiring on 30 September 2012.

Financing

The Company has secured preliminary credit approval, subject to documentation and completion of detailed due diligence for a US$65m project finance facility and engaged Haywood Securities Inc. to undertake a placement of new shares and units comprised of promissory notes and warrants to raise, on a best effort basis, a further US$65m, subject to a number of conditions, one of which is shareholder approval of various instruments.

The proceeds of these debt and equity financings are planned to be applied to the development at the Masbate Gold Project and other working capital needs.

A shareholder's meeting has been called for 15 November 2007, to seek approval for the issue of:

-   48.2 million new shares at an issue price of C$0.83; and
-   25,000 US$1,000 promissory notes with 250 attaching warrants per
    note, with an exercise price of C$1.03 and a maximum 3 year term.

The gross proceeds of the proposed placings, as set out above, are approximately US$65m.

MKUSHI PROJECT UPDATE

---------------------

The prefeasibility study is on target for completion in the next quarter and at present is looking positive. Results from the metallurgical testwork have indicated a good grade and clean copper concentrate can be achieved from a simple flotation circuit.

Resource drilling is continuing and is indicating some encouraging results in a southerly extension zone, and also at depth. Further resource drilling has been planned, including from within the existing open pit, which has been dewatered for this purpose.

Recent significant assay results are indicated in the following table. The results have extended the resource potential of the three principal mineralisation zones H, L and G Zones. The promising results from L Zone, including MH073, 37m at 2.42% Cu, require follow up drilling to establish the full extent of the higher grade mineralisation. Good results have also been found at depth in hole MMU038, 33m @ 3.12% Cu, and this is a strong indication that quality mineralization continues at depth. Although drilling will continue for some time it is expected that a Stage 1 resource estimate will be generated during the last quarter of 2007. Additional copper mineralisation has been located in the hanging wall to both L and H Zones and this will be further targeted in the ongoing drilling programmes. The southern extensions of H Zone have provided good indications and this area will be further tested during the December quarter.

                       Recent Drilling Results

-------------------------------------------------------------------------
                                                                    Cu
HOLE NO   PROSPECT     EAST    NORTH     FROM     TO   INTERVAL  GRADE %
-------------------------------------------------------------------------
MH048       L ZONE   731140  8456911      113      123       10     1.26
-------------------------------------------------------------------------
MH048       H ZONE   731140  8456911      175      187       12     1.20
-------------------------------------------------------------------------
MH048       H ZONE   731140  8456911      264      277       13     0.45
-------------------------------------------------------------------------
MH069       L ZONE   731027  8456733       85      107       22     0.34
-------------------------------------------------------------------------
MH069       H ZONE   731027  8456733      224      230        6     3.36
-------------------------------------------------------------------------
MH069       H ZONE   731027  8456733      240      245        5     0.63
-------------------------------------------------------------------------
MH071     new zone   731145  8457010       73       79        6     1.52
-------------------------------------------------------------------------
MH073       L ZONE   731069  8456795      119      156       37     2.42
-------------------------------------------------------------------------
MH073       L ZONE       includes         139      145        6     8.90
-------------------------------------------------------------------------
MH073       H ZONE   731069  8456795      223      239       16     1.51
-------------------------------------------------------------------------
MH073       H ZONE   731069  8456795      250      267       17     1.39
-------------------------------------------------------------------------
MH073       H ZONE   731069  8456795      270      275        5     0.71
-------------------------------------------------------------------------
MH075     new zone   730904  8456720      107      111        4     0.85
-------------------------------------------------------------------------
MH075     new zone   730904  8456720      129      135        6     1.61
-------------------------------------------------------------------------
MH075       L ZONE   730904  8456720      292      297        5     0.72
-------------------------------------------------------------------------
MH076       L ZONE   730830  8456540      256      258        2     3.68
-------------------------------------------------------------------------
MMU036    new zone   731409  8457370      132      143       11     1.80
-------------------------------------------------------------------------
MMU036    new zone   731409  8457370      147      153        6     1.33
-------------------------------------------------------------------------
MMU036      H ZONE   731409  8457370      175      178        3     0.95
-------------------------------------------------------------------------
MMU036      H ZONE   731409  8457370      210      222       12     0.93
-------------------------------------------------------------------------
MMU038      G ZONE   731452  8457399      151      157        6     2.00
-------------------------------------------------------------------------
MMU038      G ZONE   731452  8457399      163      173       10     0.80
-------------------------------------------------------------------------
MMU038      G ZONE   731452  8457399      193      198        5     1.10
-------------------------------------------------------------------------
MMU038      G ZONE   731452  8457399      200      233       33     3.12
-------------------------------------------------------------------------
MMU041      G ZONE   731487  8457169       24       57       33     1.00
-------------------------------------------------------------------------
MMU043      G ZONE   731496  8457248       26       76       50     0.97
-------------------------------------------------------------------------
MMU043      G ZONE   731496  8457248      101      103        2     1.08
-------------------------------------------------------------------------
MMU042      G ZONE   731757  8457465      166      173        7     0.90
-------------------------------------------------------------------------

An Environmental Impact Assessment is also underway and a draft Environmental Impact Statement is due in December 2007.

SEGILOLA PROJECT UPDATE

-----------------------

An agreement has been signed with Spektra Jeotek AS ("Specktra"), a Turkish drilling company, for the supply and operation of a diamond core drill rig at the Segilola project site for the planned drilling of a minimum 10,000m. Arrangements are currently underway to have the drill transported to the Segilola Project in Nigeria.

Spektra is an established drilling company based and registered in Ankara, Turkey having a registered branch office in Tehran-Iran, Karachi-Pakistan and a local company in Serbia. Spektra has its own fully equipped and staffed workshop in Ankara. In addition they fully own a manufacturing company, DELTA Machinery AS (Delta), which manufactures drill rigs and equipment for the needs of Spektra. For Segilola they have built a crawler mounted diamond drill rig and have supplied the necessary drilling equipment for the planned drilling programme.

Spektra has a highly skilled, experienced and competent team of staff and technicians who also operate and maintain their rigs. They have almost 25 years of experience in the drilling industry and are currently operating mainly in the mineral resource industry. Spektra has drilled, and is currently drilling, for various national and multinational companies all around the world and is operating in: Morocco; Algeria; Serbia; Turkey; Azerbeijan; Iran; Pakistan; Yemen and Turkey.

Prior to arrival of the rig, trenching and sampling is continuing. Quartz samples recently taken from the existing trench in the old open pit are shown below.

Trench Sample Results

-------------------------------------------------------------------------

Trench ID Au intersect Comments

-------------------------------------------------------------------------

1620N 6m @ 4.9g/t includes 1m @ 14.1g/t, &

1m @ 8.5g/t

-------------------------------------------------------------------------

1745N 10m @ 3.2 g/t includes 1m @ 9.95g/t

-------------------------------------------------------------------------

National Instrument 43-101 Compliance

Mr Geoff.G.Jones, F.Aus.I.M.M.CP Mng, CGA's general manager, technical, is acting as the Qualified Person in compliance with NI 43-101 and JORC reporting requirements with respect to this announcement. He has prepared and or supervised the preparation of the scientific or technical information in this announcement.

Cautionary Note Regarding Forward Looking Statements

This announcement includes certain "forward-looking statements" within the meaning of Canadian securities legislation. All statements, other than statements of historical fact, included herein including, without limitation, statements regarding anticipated dates for construction and production, and other milestones related to the Masbate Gold Project and other projects; estimates of capital and operating costs, recovery rates, production estimates and estimated economic return; and CGA's future operating or financial performance, are forward-looking statements. Information concerning mineral reserve and resource estimates including statements regarding the conversion of inferred resources to reserves also may be deemed to be forward-looking statements in that it reflects a prediction of the mineralization that would be encountered if a mineral deposit were developed and mined. Forward-looking statements involve various risks and uncertainties and are based on certain factors and assumptions. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from CGA's expectations include uncertainties related to fluctuations in gold and other commodity prices and currency exchange rates; uncertainties relating to interpretation of drill results and the geology, continuity and grade of mineral deposits; uncertainty of estimates of capital and operating costs, recovery rates, production estimates and estimated economic return; the need for cooperation of government agencies in the development of the Masbate Gold Project; the need to obtain additional financing to develop the Masbate Gold Project; the possibility of delay in development programs or in construction projects and uncertainty of meeting anticipated program milestones for the Masbate Gold Project; and other risks and uncertainties disclosed under the heading "Caution Regarding Forward-Looking Statements" in CGA's Annual Information Form for the year ended 30 June 2007 filed with the Canadian securities regulatory authorities on the SEDAR website at www.sedar.com.

                             Appendix 5B

              Mining exploration entity monthly report

Introduced 1/7/96.  Origin:  Appendix 8.
Amended 1/7/97, 1/7/98, 30/9/2001.

Name of entity
-------------------------------------------------------------------------
CGA Mining Limited
-------------------------------------------------------------------------

ABN                                         Month ended ("current month")
-----------------------------              ------------------------------
88 009 153 128                                            September 2007
-----------------------------              ------------------------------

Consolidated statement of cash flows
                                               --------------------------
                                                                    Year
                                                                 to date
                                                    Current       (three
Cash flows related to                                 Month       months)
 operating activities                                $A'000       $A'000
                                               --------------------------

1.1  Receipts from product sales and
      related debtors                                     -            -

1.2  Payments for (a) exploration and evaluation       (597)      (2,210)
                  (b) development                      (559)      (1,109)
                  (c) production                          -            -
                  (d) administration (incl.
                       annual audit fee & legal)       (220)        (508)

1.3  Dividends received                                   -            -
1.4  Interest and other items of a similar
      nature received                                   207          485
1.5  Interest and other costs of finance paid             -            -
1.6  Income taxes paid                                    -            -
                                               --------------------------
1.7  Other -Business development                     (1,169)      (3,342)

     Net Operating Cash Flows
-------------------------------------------------------------------------

     Cash flows related to investing activities
1.8  Payment for purchases of: (a) prospects              -            -
                               (b) equity investments
                               (c) other fixed assets
1.9  Proceeds from sale of:    (a) prospects              -            -
                               (b) equity investments     -            -
                               (c) other fixed assets     -            -
1.10 Loans to other entities
1.11 Loans repaid by other entities
1.12 Other (provide details if material)
                                               --------------------------
     Net investing cash flows                             -            -
                                               --------------------------
1.13 Total operating and investing cash flows
      (carried forward)                              (1,169)      (3,342)
                                               --------------------------

1.13 Total operating and investing cash flows
      (brought forward)                              (1,169)      (3,342)
                                               --------------------------

     Cash flows related to financing activities
1.14 Proceeds from issues of shares, options, etc.       30           30
1.15 Proceeds from sale of forfeited shares               -            -
1.16 Proceeds from borrowings                             -            -
1.17 Repayment of borrowings                              -            -
1.18 Dividends paid                                       -            -
1.19 Other (provide details if material)                  -            -

                                               --------------------------
     Net financing cash flows                            30           30
                                               --------------------------
     Net increase (decrease) in cash held            (1,139)      (3,312)

1.20 Cash at beginning of quarter/year to date       27,236       29,324
1.21 Exchange rate adjustments to item 1.20            (173)         (88)
                                               --------------------------

1.22 Cash at end of quarter                        25,924(x)    25,924(x)
-------------------------------------------------------------------------
(x) Filminera Resources Corp. has an additional $9.1m in cash.


Payments to directors of the entity and associates of the directors
Payments to related entities of the entity and associates of the related
entities
                                                        -----------------
                                                         Current quarter
                                                                  $A'000
                                                        -----------------

1.23 Aggregate amount of payments to the parties
      included in item 1.2                                           120
                                                        -----------------

1.24 Aggregate amount of loans to the parties included
      in item 1.10                                                     -
-------------------------------------------------------------------------

1.25 Explanation necessary for an understanding of the transactions
     --------------------------------------------------------------------
     Payment of salaries, taxes, and superannuation.
     --------------------------------------------------------------------

Non-cash financing and investing activities

2.1  Details of financing and investing transactions which have had a
      material effect on consolidated assets and liabilities but did not
      involve cash flows
     --------------------------------------------------------------------
     -
     --------------------------------------------------------------------
2.2  Details of outlays made by other entities to establish or increase
      their share in projects in which the reporting entity has an
      interest
     --------------------------------------------------------------------
     -
     --------------------------------------------------------------------

Financing facilities available

Add notes as necessary for an understanding of the position.
                                                -------------------------
                                                     Amount
                                                  available  Amount used
                                                     $A'000       $A'000
                                                -------------------------
3.1  Loan facilities                                      -            -
                                                -------------------------
3.2  Credit standby arrangements                          -            -
-------------------------------------------------------------------------

                                                             ------------
Estimated cash outflows for next quarter                          $A'000
                                                             ------------

4.1  Exploration and evaluation                                    1,768
                                                             ------------
4.2  Development                                                  25,467
-------------------------------------------------------------------------
Total                                                             27,236
-------------------------------------------------------------------------

Reconciliation of cash
                                                -------------------------
     Reconciliation of cash at the end
      of the quarter (as shown in the
      consolidated statement of cash flows)           Current   Previous
      to the related items in the accounts            quarter    quarter
      is as follows.                                   $A'000     $A'000
                                                -------------------------

5.1  Cash on hand and at bank                          23,845     24,560
                                                -------------------------
5.2  Deposits at call                                     132        132
                                                -------------------------
5.3  Bank overdraft                                         -          -
                                                -------------------------
5.4  Other (provide details)
     USD Account                                        1,947      4,632
     USD Deposit
-------------------------------------------------------------------------
     Total: cash at end of quarter (item 1.22)         25,924     29,324
-------------------------------------------------------------------------


Changes in interests in mining tenements
                     ----------------------------------------------------
                                    Nature of   Interest at  Interest at
                         Tenement    interest   beginning of    end of
                        reference   (note (2))    quarter      quarter
                     ----------------------------------------------------
6.1  Interests in
      mining tenements
      relinquished,
      reduced or lapsed         -            -            -            -
                     ----------------------------------------------------
6.2  Interests in
      mining tenements
      acquired or
      increased                 -            -            -            -
                     ----------------------------------------------------


Issued and quoted securities at end of current quarter

Description includes rate of interest and any redemption or conversion
rights together with prices and dates.

                     ----------------------------------------------------
                                                             Amount paid
                                               Issue price       up per
                                              per security     security
                         Total        Number   (see note 3)  (see note 3)
                         number       quoted        (cents)      (cents)
-------------------------------------------------------------------------
7.1  Preference
      +securities
      (description)
                     ----------------------------------------------------
7.2  Changes during
      quarter
      (a) Increases
      through issues
      (b) Decreases
      through returns
      of capital,
      buy-backs,
      redemptions
-------------------------------------------------------------------------
7.3   +Ordinary
      securities      161,549,976  161,549,976
                     ----------------------------------------------------
7.4  Changes during
      quarter
      (a) Increases
      through issues
      (b) Decreases
      through returns
      of capital,
      buy-backs
-------------------------------------------------------------------------
7.5   +Convertible debt
      securities
      (description)
                     ----------------------------------------------------
7.6  Changes during
      quarter
      (a) Increases
      through issues
      (b) Decreases
      through
      securities
      matured,
      converted
-------------------------------------------------------------------------
7.7  Options
      (description
      and conversion
      factor)
                     ----------------------------------------------------
7.8  Issued during
      quarter
                     ----------------------------------------------------
7.9  Exercised
      during
      quarter             300,000            -         0.60         0.60
                     ----------------------------------------------------

7.10 Expired
      during
      quarter
-------------------------------------------------------------------------
7.11 Debentures
      (totals only)
-------------------------------------------------------------------------
7.12 Unsecured notes
      (totals only)
                     ----------------------------------------------------

Compliance statement

1   This statement has been prepared under accounting policies which
    comply with accounting standards as defined in the Corporations Act
    or other standards acceptable to ASX (see note 4).

2   This statement does/does not(x) (delete one) give a true and fair
    view of the matters disclosed.

    Sign here: (Signed)                         Date:   30 October 2007

    (Director/Company secretary)

    Print name:  Hannah Hudson.........................................

Notes

1   The quarterly report provides a basis for informing the market how
    the entity's activities have been financed for the past quarter and
    the effect on its cash position.  An entity wanting to disclose
    additional information is encouraged to do so, in a note or notes
    attached to this report.

2   The "Nature of interest" (items 6.1 and 6.2) includes options in
    respect of interests in mining tenements acquired, exercised or
    lapsed during the reporting period. If the entity is involved in a
    joint venture agreement and there are conditions precedent which will
    change its percentage interest in a mining tenement, it should
    disclose the change of percentage interest and conditions precedent
    in the list required for items 6.1 and 6.2.

3   Issued and quoted securities
    The issue price and amount paid up is not required in items 7.1 and
    7.3 for fully paid securities.

4   The definitions in, and provisions of, AASB 1022: Accounting for
    Extractive Industries and AASB 1026: Statement of Cash Flows apply to
    this report.

5   Accounting Standards
    ASX will accept, for example, the use of International Accounting
    Standards for foreign entities. If the standards used do not address
    a topic, the Australian standard on  that topic (if any) must be
    complied with.

%SEDAR: 00021775E

CGA Mining Limited on 6ix

Earlier from CGA Mining

Later from CGA Mining

All CGA Mining news releases