QUARTERLY REPORT - SEPTEMBER 2007
LEIGHTON MOBILISES TO SITE AT THE MASBATE GOLD PROJECT
MKUSHI DRILLING RESULTS INCLUDE
33m @ 3.12% Cu & 37m @2.42% Cu
PERTH, Western Australia, Oct. 30 /CNW/ - During the three months ending 30 September 2007, CGA Mining Limited's ("CGA", the "Company") activities focused on an optimisation review of the Masbate Gold Project in the Philippines, Leighton's mobilisation to site and compilation of a prefeasibility study for the Mkushi Cooper project in Zambia.
MASBATE PROJECT UPDATE
----------------------
Optimisation Review
-------------------
The focus of the quarter has been completion of an optimisation review, which enhanced the economics of the Masbate Gold Project and securing the funding necessary to develop the new mine. A detailed announcement in relation to the results of that review was released to the market on 5 October 2007 and is available at www.cgamining.com.
The Definitive Feasibility Study ("DFS") carried out by Ausenco International Pty Ltd Australia ("Ausenco") and published in May 2006 formed the basis of the optimisation review carried out by CGA and Filminera Resources Corp. ("Filminera"), with assistance from independent external consultants.
The optimisation review focused on 6 main initiatives:
- Excess grinding capability due to the procurement of two pre-used
ball mills whose combined capacity exceeded that specified as
required in the DFS.
- High grade resources were identified within the pit limits delineated
in the DFS.
- The water management strategy was reviewed to minimise the use of
fresh water.
- Power generation using coal fired boilers to protect the project from
high fuel prices and to reduce LOM operating costs.
- Appointment of Leighton Contractors (Philippines) Inc ("LCP") to
conduct a revalidation of the capital costs associated with the
process plant and infrastructure using their Philippine experience.
- Selection of Lycopodium Engineers based in Perth and Manila,
experienced in the design and construction of large (+4.0 Mtpa)
process plants.
- Review of project economics applying current operating costs and gold
price assumptions.
The results of the optimisation review were published in an announcement
to the Australian Securities Exchange and the Toronto Stock Exchange on 5
October 2007 and are summarised in table 1.1 below.
Table 1.1
-------------------------------------------------------------------------
Optimisation Study Results Years 1 - 8
-------------------------------------------------------------------------
Physical Parameters Unit
-------------------------------------------------------------------------
Milled Ore million tonnes 37.8
-------------------------------------------------------------------------
Grade g/t 1.63
-------------------------------------------------------------------------
Mill Recovery - Gold % 82.7%
-------------------------------------------------------------------------
Refining Recovery - Gold % 99.9%
-------------------------------------------------------------------------
Bullion Produced - Gold million ozs 1.65
-------------------------------------------------------------------------
Bullion produced per annum ozs 206,000
-------------------------------------------------------------------------
Mill Throughput YR1-2 Mtpa 4
-------------------------------------------------------------------------
Mill Throughput YR3-8 Mtpa 5
-------------------------------------------------------------------------
Operating Cash Cost US$/oz 306
-------------------------------------------------------------------------
Capital Cost - Project US$ million 119.5
-------------------------------------------------------------------------
The capital cost includes a contingency of US$7.2m (6.4%) and the proposed funding package has made an additional allowance for up to US$2.5m for foreign currency movements prior to execution of the fixed price lump sum construction contract.
Average annual gold production during the initial eight (8) years of production averages 206 000 oz at a cash operating cost of US$ 306/ounce. The Philippine tax regime allows a minimum six (6) year income tax holiday, the benefit of which is not included within the above forecast cash operating costs.
In addition to the ore reserves reported in the DFS there were an additional 16 million tonne of indicated resources left stockpiled from the previous operations. The gold price at the time of preparation of the DFS did not allow for these resources to be included in reserves.
With the recent reported gold price of in excess of US$650/oz, we plan to do the additional work necessary to have these indicated resources converted into probable reserves and included in the reported production and statistics.
Appointment of Leighton Contractors (Philippine) Inc
----------------------------------------------------
Leighton Holdings Limited ("Leighton"), which controls 100% of LCP, is Australia's largest project development and construction company, well regarded and respected internationally and also today, the world's leading contract miner, operating a fleet in excess of US$1.5 billion. LCP is to be awarded both the fixed price lump sum ("FPLS") construction contract (covering a scope of works to the value of US$84.94m), with all key terms now agreed, and an alliance mining contract (with LCP providing the full mining fleet estimated to cost in the order of US$34m).
A letter of Intent ("LOI") was provided to LCP and an initial purchase order issued to enable LCP to mobilise an earthmoving fleet to the project site to commence the earthworks associated with the process plant construction.
To date LCP has commenced the following activities:
- Process Plant Earthworks. - Contractor's Office erection. - Contractor's accommodation and utilities. - Concrete batch plant erection.
A selection of photographs illustrating the progress to date have been posted on the CGA website www.cgamining.com under Projects/Masbate Gold Project.
Power
DMCI Corporation ("Consunji)" is the largest construction company in the Philippines and own and operate a large coal mine on an island close to Masbate. At the coal mine, Consunji generates their own power via coal fired boilers. Consunji was recently awarded a contract to supply power to Maselco (the appointed franchise for power distribution on Masbate Island). CGA and Filminera have entered into negotiations with Consunji for the construction and operation of a dedicated coal fired 25 MW coal fired power station adjacent to the project site. Consunji has engaged Thermax Limited ("Thermax"), an experienced Indian engineering company specialised in coal fired power generation, to design the appropriate facility. The preliminary estimate supplied to CGA / Filminera by Consunji and Thermax includes an all in power cost (Capital, Operating & Maintenance, Raw Materials) averaging US$0.10/kWh over a 10 year project life. This is a significant reduction when compared to diesel powered generators and the heavy fuel (bunker) powered generation contemplated in the DFS. The effective power cost can be further reduced by disposing of the facility at the end of the life of mine to Consunji at a contracted residual value of 30% of the new price i.e. US$10m.
The construction of the power station will take 24 months i.e. 9 months longer than the process plant. The optimisation study has allowed for a conservative 12 month delay. During the interim period power will be provided via barge mounted units berthed close to the existing jetty at the project site. The cost of interim power is forecast at US$0.16 / kWh. Appropriate and available barges have been identified and negotiations with the supplier and operator have commenced.
Permits
All key permits have now been secured including the recent approval of the feasibility study in respect of PGPRC (processing) and Filminera (mining and infrastructure) and the issue of a Mineral Processing Permit by the central and regional authorities in the Philippines.
Staffing
CGA, Filminera, and PGPRC have made the following appointments of consultant or employees for the development activities at Masbate.
General Manager - Tim Armstrong, a Canadian mining engineer with in excess of 20 years experience in the development and operation of underground and surface mines in North America, Greece and Philippines (10 years) will oversee the project.
Construction Manager - Mark Hughes, an Australian electrical engineer with over 20 years construction and project management experience in Australia and South East Asia will oversee the FLSP contract with LCP.
Manager Mining - Noel Rollo, an Australian mining engineer with in excess of 30 years experience in Australia, Africa and South East Asia will be responsible for all geological, mining / earthmoving activities on site.
Geology Manager - Max Tuesley, an experienced Australian geologist who has worked in Australia and South East Asia will be responsible for all geological activities on site at Masbate.
In connection with the above new appointments and the continued objective of attracting and retaining the best team to develop the Masbate Gold Project, the Company issued 2.25m options under The Employee Option Plan to employees, with an exercise price of $0.90 per option and expiring on 30 September 2012.
Financing
The Company has secured preliminary credit approval, subject to documentation and completion of detailed due diligence for a US$65m project finance facility and engaged Haywood Securities Inc. to undertake a placement of new shares and units comprised of promissory notes and warrants to raise, on a best effort basis, a further US$65m, subject to a number of conditions, one of which is shareholder approval of various instruments.
The proceeds of these debt and equity financings are planned to be applied to the development at the Masbate Gold Project and other working capital needs.
A shareholder's meeting has been called for 15 November 2007, to seek approval for the issue of:
- 48.2 million new shares at an issue price of C$0.83; and
- 25,000 US$1,000 promissory notes with 250 attaching warrants per
note, with an exercise price of C$1.03 and a maximum 3 year term.
The gross proceeds of the proposed placings, as set out above, are approximately US$65m.
MKUSHI PROJECT UPDATE
---------------------
The prefeasibility study is on target for completion in the next quarter and at present is looking positive. Results from the metallurgical testwork have indicated a good grade and clean copper concentrate can be achieved from a simple flotation circuit.
Resource drilling is continuing and is indicating some encouraging results in a southerly extension zone, and also at depth. Further resource drilling has been planned, including from within the existing open pit, which has been dewatered for this purpose.
Recent significant assay results are indicated in the following table. The results have extended the resource potential of the three principal mineralisation zones H, L and G Zones. The promising results from L Zone, including MH073, 37m at 2.42% Cu, require follow up drilling to establish the full extent of the higher grade mineralisation. Good results have also been found at depth in hole MMU038, 33m @ 3.12% Cu, and this is a strong indication that quality mineralization continues at depth. Although drilling will continue for some time it is expected that a Stage 1 resource estimate will be generated during the last quarter of 2007. Additional copper mineralisation has been located in the hanging wall to both L and H Zones and this will be further targeted in the ongoing drilling programmes. The southern extensions of H Zone have provided good indications and this area will be further tested during the December quarter.
Recent Drilling Results
-------------------------------------------------------------------------
Cu
HOLE NO PROSPECT EAST NORTH FROM TO INTERVAL GRADE %
-------------------------------------------------------------------------
MH048 L ZONE 731140 8456911 113 123 10 1.26
-------------------------------------------------------------------------
MH048 H ZONE 731140 8456911 175 187 12 1.20
-------------------------------------------------------------------------
MH048 H ZONE 731140 8456911 264 277 13 0.45
-------------------------------------------------------------------------
MH069 L ZONE 731027 8456733 85 107 22 0.34
-------------------------------------------------------------------------
MH069 H ZONE 731027 8456733 224 230 6 3.36
-------------------------------------------------------------------------
MH069 H ZONE 731027 8456733 240 245 5 0.63
-------------------------------------------------------------------------
MH071 new zone 731145 8457010 73 79 6 1.52
-------------------------------------------------------------------------
MH073 L ZONE 731069 8456795 119 156 37 2.42
-------------------------------------------------------------------------
MH073 L ZONE includes 139 145 6 8.90
-------------------------------------------------------------------------
MH073 H ZONE 731069 8456795 223 239 16 1.51
-------------------------------------------------------------------------
MH073 H ZONE 731069 8456795 250 267 17 1.39
-------------------------------------------------------------------------
MH073 H ZONE 731069 8456795 270 275 5 0.71
-------------------------------------------------------------------------
MH075 new zone 730904 8456720 107 111 4 0.85
-------------------------------------------------------------------------
MH075 new zone 730904 8456720 129 135 6 1.61
-------------------------------------------------------------------------
MH075 L ZONE 730904 8456720 292 297 5 0.72
-------------------------------------------------------------------------
MH076 L ZONE 730830 8456540 256 258 2 3.68
-------------------------------------------------------------------------
MMU036 new zone 731409 8457370 132 143 11 1.80
-------------------------------------------------------------------------
MMU036 new zone 731409 8457370 147 153 6 1.33
-------------------------------------------------------------------------
MMU036 H ZONE 731409 8457370 175 178 3 0.95
-------------------------------------------------------------------------
MMU036 H ZONE 731409 8457370 210 222 12 0.93
-------------------------------------------------------------------------
MMU038 G ZONE 731452 8457399 151 157 6 2.00
-------------------------------------------------------------------------
MMU038 G ZONE 731452 8457399 163 173 10 0.80
-------------------------------------------------------------------------
MMU038 G ZONE 731452 8457399 193 198 5 1.10
-------------------------------------------------------------------------
MMU038 G ZONE 731452 8457399 200 233 33 3.12
-------------------------------------------------------------------------
MMU041 G ZONE 731487 8457169 24 57 33 1.00
-------------------------------------------------------------------------
MMU043 G ZONE 731496 8457248 26 76 50 0.97
-------------------------------------------------------------------------
MMU043 G ZONE 731496 8457248 101 103 2 1.08
-------------------------------------------------------------------------
MMU042 G ZONE 731757 8457465 166 173 7 0.90
-------------------------------------------------------------------------
An Environmental Impact Assessment is also underway and a draft Environmental Impact Statement is due in December 2007.
SEGILOLA PROJECT UPDATE
-----------------------
An agreement has been signed with Spektra Jeotek AS ("Specktra"), a Turkish drilling company, for the supply and operation of a diamond core drill rig at the Segilola project site for the planned drilling of a minimum 10,000m. Arrangements are currently underway to have the drill transported to the Segilola Project in Nigeria.
Spektra is an established drilling company based and registered in Ankara, Turkey having a registered branch office in Tehran-Iran, Karachi-Pakistan and a local company in Serbia. Spektra has its own fully equipped and staffed workshop in Ankara. In addition they fully own a manufacturing company, DELTA Machinery AS (Delta), which manufactures drill rigs and equipment for the needs of Spektra. For Segilola they have built a crawler mounted diamond drill rig and have supplied the necessary drilling equipment for the planned drilling programme.
Spektra has a highly skilled, experienced and competent team of staff and technicians who also operate and maintain their rigs. They have almost 25 years of experience in the drilling industry and are currently operating mainly in the mineral resource industry. Spektra has drilled, and is currently drilling, for various national and multinational companies all around the world and is operating in: Morocco; Algeria; Serbia; Turkey; Azerbeijan; Iran; Pakistan; Yemen and Turkey.
Prior to arrival of the rig, trenching and sampling is continuing. Quartz samples recently taken from the existing trench in the old open pit are shown below.
Trench Sample Results
-------------------------------------------------------------------------
Trench ID Au intersect Comments
-------------------------------------------------------------------------
1620N 6m @ 4.9g/t includes 1m @ 14.1g/t, &
1m @ 8.5g/t
-------------------------------------------------------------------------
1745N 10m @ 3.2 g/t includes 1m @ 9.95g/t
-------------------------------------------------------------------------
National Instrument 43-101 Compliance
Mr Geoff.G.Jones, F.Aus.I.M.M.CP Mng, CGA's general manager, technical, is acting as the Qualified Person in compliance with NI 43-101 and JORC reporting requirements with respect to this announcement. He has prepared and or supervised the preparation of the scientific or technical information in this announcement.
Cautionary Note Regarding Forward Looking Statements
This announcement includes certain "forward-looking statements" within the meaning of Canadian securities legislation. All statements, other than statements of historical fact, included herein including, without limitation, statements regarding anticipated dates for construction and production, and other milestones related to the Masbate Gold Project and other projects; estimates of capital and operating costs, recovery rates, production estimates and estimated economic return; and CGA's future operating or financial performance, are forward-looking statements. Information concerning mineral reserve and resource estimates including statements regarding the conversion of inferred resources to reserves also may be deemed to be forward-looking statements in that it reflects a prediction of the mineralization that would be encountered if a mineral deposit were developed and mined. Forward-looking statements involve various risks and uncertainties and are based on certain factors and assumptions. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from CGA's expectations include uncertainties related to fluctuations in gold and other commodity prices and currency exchange rates; uncertainties relating to interpretation of drill results and the geology, continuity and grade of mineral deposits; uncertainty of estimates of capital and operating costs, recovery rates, production estimates and estimated economic return; the need for cooperation of government agencies in the development of the Masbate Gold Project; the need to obtain additional financing to develop the Masbate Gold Project; the possibility of delay in development programs or in construction projects and uncertainty of meeting anticipated program milestones for the Masbate Gold Project; and other risks and uncertainties disclosed under the heading "Caution Regarding Forward-Looking Statements" in CGA's Annual Information Form for the year ended 30 June 2007 filed with the Canadian securities regulatory authorities on the SEDAR website at www.sedar.com.
Appendix 5B
Mining exploration entity monthly report
Introduced 1/7/96. Origin: Appendix 8.
Amended 1/7/97, 1/7/98, 30/9/2001.
Name of entity
-------------------------------------------------------------------------
CGA Mining Limited
-------------------------------------------------------------------------
ABN Month ended ("current month")
----------------------------- ------------------------------
88 009 153 128 September 2007
----------------------------- ------------------------------
Consolidated statement of cash flows
--------------------------
Year
to date
Current (three
Cash flows related to Month months)
operating activities $A'000 $A'000
--------------------------
1.1 Receipts from product sales and
related debtors - -
1.2 Payments for (a) exploration and evaluation (597) (2,210)
(b) development (559) (1,109)
(c) production - -
(d) administration (incl.
annual audit fee & legal) (220) (508)
1.3 Dividends received - -
1.4 Interest and other items of a similar
nature received 207 485
1.5 Interest and other costs of finance paid - -
1.6 Income taxes paid - -
--------------------------
1.7 Other -Business development (1,169) (3,342)
Net Operating Cash Flows
-------------------------------------------------------------------------
Cash flows related to investing activities
1.8 Payment for purchases of: (a) prospects - -
(b) equity investments
(c) other fixed assets
1.9 Proceeds from sale of: (a) prospects - -
(b) equity investments - -
(c) other fixed assets - -
1.10 Loans to other entities
1.11 Loans repaid by other entities
1.12 Other (provide details if material)
--------------------------
Net investing cash flows - -
--------------------------
1.13 Total operating and investing cash flows
(carried forward) (1,169) (3,342)
--------------------------
1.13 Total operating and investing cash flows
(brought forward) (1,169) (3,342)
--------------------------
Cash flows related to financing activities
1.14 Proceeds from issues of shares, options, etc. 30 30
1.15 Proceeds from sale of forfeited shares - -
1.16 Proceeds from borrowings - -
1.17 Repayment of borrowings - -
1.18 Dividends paid - -
1.19 Other (provide details if material) - -
--------------------------
Net financing cash flows 30 30
--------------------------
Net increase (decrease) in cash held (1,139) (3,312)
1.20 Cash at beginning of quarter/year to date 27,236 29,324
1.21 Exchange rate adjustments to item 1.20 (173) (88)
--------------------------
1.22 Cash at end of quarter 25,924(x) 25,924(x)
-------------------------------------------------------------------------
(x) Filminera Resources Corp. has an additional $9.1m in cash.
Payments to directors of the entity and associates of the directors
Payments to related entities of the entity and associates of the related
entities
-----------------
Current quarter
$A'000
-----------------
1.23 Aggregate amount of payments to the parties
included in item 1.2 120
-----------------
1.24 Aggregate amount of loans to the parties included
in item 1.10 -
-------------------------------------------------------------------------
1.25 Explanation necessary for an understanding of the transactions
--------------------------------------------------------------------
Payment of salaries, taxes, and superannuation.
--------------------------------------------------------------------
Non-cash financing and investing activities
2.1 Details of financing and investing transactions which have had a
material effect on consolidated assets and liabilities but did not
involve cash flows
--------------------------------------------------------------------
-
--------------------------------------------------------------------
2.2 Details of outlays made by other entities to establish or increase
their share in projects in which the reporting entity has an
interest
--------------------------------------------------------------------
-
--------------------------------------------------------------------
Financing facilities available
Add notes as necessary for an understanding of the position.
-------------------------
Amount
available Amount used
$A'000 $A'000
-------------------------
3.1 Loan facilities - -
-------------------------
3.2 Credit standby arrangements - -
-------------------------------------------------------------------------
------------
Estimated cash outflows for next quarter $A'000
------------
4.1 Exploration and evaluation 1,768
------------
4.2 Development 25,467
-------------------------------------------------------------------------
Total 27,236
-------------------------------------------------------------------------
Reconciliation of cash
-------------------------
Reconciliation of cash at the end
of the quarter (as shown in the
consolidated statement of cash flows) Current Previous
to the related items in the accounts quarter quarter
is as follows. $A'000 $A'000
-------------------------
5.1 Cash on hand and at bank 23,845 24,560
-------------------------
5.2 Deposits at call 132 132
-------------------------
5.3 Bank overdraft - -
-------------------------
5.4 Other (provide details)
USD Account 1,947 4,632
USD Deposit
-------------------------------------------------------------------------
Total: cash at end of quarter (item 1.22) 25,924 29,324
-------------------------------------------------------------------------
Changes in interests in mining tenements
----------------------------------------------------
Nature of Interest at Interest at
Tenement interest beginning of end of
reference (note (2)) quarter quarter
----------------------------------------------------
6.1 Interests in
mining tenements
relinquished,
reduced or lapsed - - - -
----------------------------------------------------
6.2 Interests in
mining tenements
acquired or
increased - - - -
----------------------------------------------------
Issued and quoted securities at end of current quarter
Description includes rate of interest and any redemption or conversion
rights together with prices and dates.
----------------------------------------------------
Amount paid
Issue price up per
per security security
Total Number (see note 3) (see note 3)
number quoted (cents) (cents)
-------------------------------------------------------------------------
7.1 Preference
+securities
(description)
----------------------------------------------------
7.2 Changes during
quarter
(a) Increases
through issues
(b) Decreases
through returns
of capital,
buy-backs,
redemptions
-------------------------------------------------------------------------
7.3 +Ordinary
securities 161,549,976 161,549,976
----------------------------------------------------
7.4 Changes during
quarter
(a) Increases
through issues
(b) Decreases
through returns
of capital,
buy-backs
-------------------------------------------------------------------------
7.5 +Convertible debt
securities
(description)
----------------------------------------------------
7.6 Changes during
quarter
(a) Increases
through issues
(b) Decreases
through
securities
matured,
converted
-------------------------------------------------------------------------
7.7 Options
(description
and conversion
factor)
----------------------------------------------------
7.8 Issued during
quarter
----------------------------------------------------
7.9 Exercised
during
quarter 300,000 - 0.60 0.60
----------------------------------------------------
7.10 Expired
during
quarter
-------------------------------------------------------------------------
7.11 Debentures
(totals only)
-------------------------------------------------------------------------
7.12 Unsecured notes
(totals only)
----------------------------------------------------
Compliance statement
1 This statement has been prepared under accounting policies which
comply with accounting standards as defined in the Corporations Act
or other standards acceptable to ASX (see note 4).
2 This statement does/does not(x) (delete one) give a true and fair
view of the matters disclosed.
Sign here: (Signed) Date: 30 October 2007
(Director/Company secretary)
Print name: Hannah Hudson.........................................
Notes
1 The quarterly report provides a basis for informing the market how
the entity's activities have been financed for the past quarter and
the effect on its cash position. An entity wanting to disclose
additional information is encouraged to do so, in a note or notes
attached to this report.
2 The "Nature of interest" (items 6.1 and 6.2) includes options in
respect of interests in mining tenements acquired, exercised or
lapsed during the reporting period. If the entity is involved in a
joint venture agreement and there are conditions precedent which will
change its percentage interest in a mining tenement, it should
disclose the change of percentage interest and conditions precedent
in the list required for items 6.1 and 6.2.
3 Issued and quoted securities
The issue price and amount paid up is not required in items 7.1 and
7.3 for fully paid securities.
4 The definitions in, and provisions of, AASB 1022: Accounting for
Extractive Industries and AASB 1026: Statement of Cash Flows apply to
this report.
5 Accounting Standards
ASX will accept, for example, the use of International Accounting
Standards for foreign entities. If the standards used do not address
a topic, the Australian standard on that topic (if any) must be
complied with.
%SEDAR: 00021775E