CGA Mining LimitedTSX: CGA

CGA Mining Limited - Announcement to the Australian Securities Exchange and Toronto Stock Exchange

· Issued by CGA Mining Limited via CNW

DECEMBER QUARTERLY REPORT

CONSTRUCTION OF THE MASBATE GOLD PROJECT ON SCHEDULE

NEW HIGH GRADE DRILLING RESULTS AT MASBATE INCLUDE 37M @ 3.57 g/t

6m @ 9.93 g/t and 27m @ 9.88 g/t

COMMITMENT TO FEASIBILITY STUDY ON SECOND DEVELOPMENT OPPORTUNITY - THE

MKUSHI COPPER PROJECT

PERTH, Western Australia, Jan. 31 /CNW/ - During the three months ending 31 December, CGA Mining Limited's ("CGA", the "Company") activities focused on commencing construction of the Masbate Gold Project in the Philippines and the finalisation of the detailed assessment of the Mkushi Cooper project in Zambia, which demonstrated positive economics allowing for the project to move forward to the formal feasibility study stage.

MASBATE PROJECT UPDATE

----------------------

During the December quarter, the Company secured the necessary equity funding to enable a commitment to development of the Masbate Gold Project and construction was commenced. As at 31 December 2007, the following provides an update of activities that were underway.

Process Plant & Infrastructure Construction

On 5 November 2007 each of Philippine Gold Processing and Refining Corporation ("PGPRC") a wholly owned subsidiary of CGA and Filminera Resources Corporation ("FRC") executed agreements with Leighton Contractors (Asia) Limited ("Leighton") and Leighton Holdings Limited ("LHL") for the Fixed Price Lump Sum ("FPLS") design and construct contracts for a total scope of works of US$84.9M. Lycopdium Engineering ("Lycopodium") will be sub-contacted by Leighton and will be responsible for all design matters.

LHL is one of Australia's largest and most highly regarded construction and mining contractors.

The FPLS contracts are executed in US dollars, ensuring that Leighton is responsible for any currency movements under their scope of work.

Lycopodium commenced detailed plant design during the previous quarter which enabled preliminary earth works on site to commence prior to the execution date.

Masbate Project Construction

General Site Layout:

http://files.newswire.ca/578/General_Site_Layout.doc

Subsequent to the execution of the contract Leighton placed orders for all major mechanical and electrical equipment and as of 31 December all deliveries of such equipment were on schedule.

During the quarter the following on site construction activities
commenced.

-   Mobilisation and commissioning of the concrete batch plant and
    associated crushing facility.
-   Contract labour accommodation and messing facility.
-   Permanent 300 man accommodation and messing facility.
-   Earthworks associated with the grinding (mills) section of the
    process plant.
-   Earthworks associated with the CIL tankage.
-   Concrete foundations.
-   Mobilisation of the tower crane - presently 5 days ahead of schedule.
-   Excavation and earthworks required for the primary crusher
    installation.

Construction is due for completion in December 2008. The project is forecast to produce over 200,000 ounces of gold per annum.

Masbate Project Construction

CIL Tanks:

http://files.newswire.ca/578/CIL_Tanks.doc

As of 31 December, progress in the CIL tankage area was one week (7 days) ahead of schedule and construction of the contract workers camp and the permanent camp were 9 days and 4 days respectively ahead of schedule. All permits associated with building and occupying of the facilities have been obtained.

Mill Refurbishment

During the quarter FRC engaged Weir Services Australia Pty Ltd (a subsidiary of Wier International Services), a company specialising in grinding mills, mine pump design and supply. The previously purchased, semi autogenous ("SAG") mill was transported from Spokane Washington State to Weirs engineering workshop facility in Edmonton, Canada where refurbishment work has commenced and is on schedule and due for completion in April. The two ball mills located in Cebu, Philippines will also be refurbished by Weir, in the Philippines and in Australia. Work has also commenced on these units.

Power

FRC signed a Letter of Intent with D.M. Consunji Inc. ("DMCI") for the permanent supply of electrical power to the project. It is envisaged that a coal fired boiler will use coal from the nearby DMCI controlled, Semarara Coal Mine. The coal can be barged to, and off loaded at, the project site. Thermax Limited, a Mumbai, India, based and experienced power generation / boiler design engineering company has been commissioned to carry out an investigation of the most appropriate technology / facility to meet the power demands for the project, whilst ensuring that the Philippine emissions requirements are met.

Mining

FRC is in the final stages of negotiating the supply of contract mining services via an Alliance type agreement with Leighton. The contract will be for six (6) years and will include the supply of all mining / earth moving equipment, maintenance facilities and people to exploit the resources according to the agreed mining schedule of 4.0 Mtpa in years 1 and 2 and 5.0 Mtpa in years 3 to 6. The six year schedule includes a period of three (3) months prior to process plant commissioning.

Tailings Dam

FRC commissioned GHD Engineering ("GHD") a Perth based engineering company specialising in tailings dam, hydrology and infrastructure with an office in Manila to carry out detailed engineering and design of an appropriate tailings storage facility at the Masbate Site. As of 31 December, GHD had issued general arrangement drawings and the necessary engineering parameters to allow the Manila office to carry out the detailed design.

Exploration

During the quarter a diamond drill and a reverse circulation drill were mobilised to site to initially carry out geotechnical and sterilisation investigations at the process plant and tailings dam sites. The rigs have subsequently been used to test the prospectivity of some areas in the immediate vicinity of known resources at Masbate. Initially the Boston area to the south of the planned Main Vein pit was investigated.

A summary of the most recent results is reported in Table 1 below.

The Boston area lies immediately along strike and to the south of the current designed Masbate open pits (Figure 1); this was previously mined and produced approximately 25,000 ounces of recovered gold from a small open pit. The latest drilling has concentrated on testing strike extents of the known mineralisation and also locating parallel vein and stock-work zones.

Figure 1

Boston And Panique Areas - Drill Program:

http://files.newswire.ca/578/Drill_Program.doc

The Boston area is particularly favourable as a proportion of the mineralisation is oxide and will have positive metallurgical characteristics.

Drilling is now underway on the adjacent Panique vein system where an inferred resource of 900,000 ounces Au has already been delineated. This new drilling program is designed to close up the drill spacing and enable this resource to be converted to reserve status.

                               Table 1
                 Boston Area Significant Intercepts

------------------------------------------------------------------------
Hole       North   East   From   To   Interval   Au     Material  Drill
ID           m       m      m     m      m       g/t
------------------------------------------------------------------------
BTNRC04     TBA     TBA    13    17      4       1.34       Oxide    RC
------------------------------------------------------------------------
                           19    23      4       9.66       Oxide    RC
------------------------------------------------------------------------
BTNRC07     TBA     TBA    15    17      2       1.17       Fresh    RC
------------------------------------------------------------------------
BTNRC08     TBA     TBA    49    51      2       1.28       Oxide    RC
------------------------------------------------------------------------
BTNRC10A    TBA     TBA     1     9      8       0.97       Oxide    RC
------------------------------------------------------------------------
                           16    17      1       5.77       Oxide    RC
------------------------------------------------------------------------
                           19    22      3       2.29  Transition    RC
------------------------------------------------------------------------
                           24    33      9       1.25  Transition    RC
------------------------------------------------------------------------
BTNRC12     TBA     TBA     3     4      1       1.12       Oxide    RC
------------------------------------------------------------------------
                           10    12      2       1.03       Oxide    RC
------------------------------------------------------------------------
                           14    19      5       1.07       Fresh    RC
------------------------------------------------------------------------
BTNRC16     TBA     TBA    39    41      2       2.63  Transition    RC
------------------------------------------------------------------------
                           46    48      2       0.63       Fresh    RC
------------------------------------------------------------------------
                           41    48      7       1.49       Fresh    RC
------------------------------------------------------------------------
BTNRC19     TBA     TBA     9    12      3       0.54       Oxide    RC
------------------------------------------------------------------------
                           14    16      2       0.66  Transition    RC
------------------------------------------------------------------------
                           20    26      6       1.04       Fresh    RC
------------------------------------------------------------------------
                           38    41      3       4.62       Fresh    RC
------------------------------------------------------------------------
                           53    54      1       2.96       Fresh    RC
------------------------------------------------------------------------
BTNRC34A    TBA     TBA    38    39      1      16.34       Fresh    RC
------------------------------------------------------------------------
                           42    43      1       1.25       Fresh    RC
------------------------------------------------------------------------

A recently carried out drill program in the Libra area and the proximity to the process plant site is detailed in Figure 2. As can be seen, the identified mineralisation is outside the planned pit outlines and represents an opportunity to add to the reserve base.

The area has been interpreted as dissimilar to the main mineralisation at Masbate. Current interpretation suggests that the gold mineralisation in this vicinity is related to the presence of metasediments and the high grade intercepts are related to the intersection of the Libra vein with the chemically reactive rocks. Table 2 summarises the latest drilling results.

Figure 2 - Plan View showing KYZ (Libra) area and position of recent drill holes:

http://files.newswire.ca/578/KYZ_(Libra)_area.doc

                               Table 2
                  Libra Zone Significant Intercepts

------------------------------------------------------------------------
Hole         North    East       Dip      From    To   Interval    Grade
ID             m       m       Degrees      m      m       m         g/t
------------------------------------------------------------------------
MEXRC 01A    25715    29565       60        0      2       2        2.08
------------------------------------------------------------------------
                                            5     11       6        2.68
------------------------------------------------------------------------
                                           21     58      37        3.57
------------------------------------------------------------------------
MEXRC 02     25746    29526       60        4     10       6        9.93
------------------------------------------------------------------------
MEXRC 04     25769    29485       60       26     53      27        9.88
------------------------------------------------------------------------
MEXRC 06     25796    29440       60        6      7       1        8.56
------------------------------------------------------------------------

Masbate Safety

The site has adopted the Safety Policies and Procedures of Leighton to ensure uniformity across the project site. On 31 January 2008, Leighton will achieve 500,000 man hours without any lost injury time. This is a milestone to the project and there will be a formal function to recognise this achievement.

Community Relations

As previously announced, the Social Development and Management Program ("SDMP") has been approved by the Mines and Geosciences Bureau and outlines a comprehensive community relations and improvement program to ensure focus is given to local community issues and an enhancement of benefits to the local barangays (villages) and Masbate Island as a whole. We have already commenced implementation of several programs including:

-   construction of a 3.2-km water supply line that benefits Barangay
    Panique with a population of around 6000;
-   construction of Chapels, Waiting Sheds, Basketball Courts, Repair of
    School Buildings, Construction of Daycare Centers, Parents/Teachers
    Multi-purpose Buildings;
-   livelihood projects such as crop production by allowing residents of
    impacted barangays to farm in company lands; and
-   purchase of an ambulance for project use as well as for use of the
    surrounding communities.

FRC has also focussed on maintaining and continuing to improve good
relations with the local religious groups and communities including the
following:

-   attendance in PTCA Meetings and Teachers' Conferences;
-   participation in sports and cultural programs during sitio, barangay
    and town fiestas;
-   spearheading religious activities in Sto Nino Parish of the
    surrounding communities in the mine complex; and
-   sponsoring one-night social activities for the Aroroy annual town
    fiesta.

Representatives of FRC were also afforded an opportunity to meet with the President of the Philippines, President Gloria-Macapagal Arroyo in December who was very supportive of both the project and our efforts in moving it successfully into the construction phase.

Expenditure

As of 31 December 2007, the group had spent approximately US$29M on construction of the project, with total cash reserves at 31 December 2007 of US$60.7M (including the cash reserves of FRC)

Project Finance Facility

The project finance facility being arranged by BNP Paribas is progressing well and final documentation is close to being signed. As with all project finance facilities it is subject to normal conditions precedent, which are presently on track to be satisfied for a drawdown in the second quarter of 2008.

Taxation

PGPRC also successfully secured the Board of Investment's approval for a minimum 6 year income tax holiday from the commencement of operation, currently expected to be in the first quarter 2009. There is also potential to extend by a further 2 years for a total income tax holiday of 8 years.

New Appointment

FRC, the holder of the licence also appointed Mr Cris Acosta, a highly regarded Philippine National, as President of the company. Mr Acosta has spent over 10 years with Shell in both London and the Philippines, most recently dealing with Government relations and external affairs. He was a special assistant to the President of the Philippines from 1992 - 1995, was a commissioned officer in the armed forces of the Philippines, attended the United States Military Academy at West Point, New York, won the Fulbright Scholarship to both the Massachusetts Institute of Technology (where he completed his Master of Science, MBA and PhD) and Cornell University (where he received his Master of Engineering degree), and earned a postgraduate certificate in cross sector partnership at the University of Cambridge. Mr. Acosta is also a Chartered Financial Analyst charter holder and a Fellow of the Institute of Corporate Directors in the Philippines.

MKUSHI PROJECT UPDATE

---------------------

CGA has completed a detailed study designed to assess the viability of developing a 1.6mtpa open pit copper mine processing facility and associated infrastructure and ancillaries at the Mkushi Copper Project in Zambia ("the Study").

The Study has been undertaken by the CGA technical team supported by independent technical consultants when required.

The analysis from the Study supports that the project is economically viable at current prices and the joint venture now intends to commit to the preparation of a detailed feasibility study, including the release of a NI 43-101 compliant report by an independent qualified person. The Study was prepared on the basis of drill results only up to the end of August but drilling has continued beyond August and the NI 43-101 report will report on all drilling results for the project.

The detailed feasibility study is scheduled for completion by the end of calendar 2008, at which time the joint venture will then make a decision on the development of the project. This coincides with the scheduled completion of construction of the Masbate Gold Project in the Philippines, and allows experienced project staff to relocate from the Philippines to Zambia.

Capital Estimate

The estimated capital requirement as determined by the Study (based primarily on work carried out by Metplant Engineering Services Pty Ltd) is US$61M, including a contingency of U$5M. The estimated breakdown of the capital cost is set out below.

                                                                     US$
Mine                                                           3,300,000
Infrastructure, Buildings and Utilities                       15,700,000
Process Plant                                                 33,100,000
EPCM                                                           8,800,000

                                               --------------------------
                                          TOTAL            US$60,900,000
                                               --------------------------

Ownership

The Mkushi deposit is within the original Exploration License No. PL114 which is surrounded by a new, larger Exploration License No. PL290. Both licenses are held by Mkushi Copper Joint Venture Company ("MCJV") which is a joint venture 51% owned by Seringa Mining Company ("Seringa") (100% controlled by CGA) and 49 % by Katanga Resources Company ("Katanga") (100% controlled by African Eagle Resources plc). African Eagle Resources plc ("AFE") is listed on the Alternative Investment Market in London.

Figure 3

Map Of Area Showing Licences And Core Area:

http://files.newswire.ca/578/Licenses_and_Core_Area.doc

Location

The project is located in Zambia, some 220 kilometers north east of the capital city of Lusaka and 35 kilometers east of the regional township of Kapiri Mposhi. The site is easily accessed by the main northern highway (a sealed road) from Lusaka to Kapiri Mposhi, where the main sealed highway to the northeast and Tanzania is followed for 15 kilometers, at which point an existing gravel road (20 km) leads to the project site. The site is at an altitude of 1100m ASL. Plentiful water and electrical power is available nearby from the Lumsemfwa HEP facility.

Geology

The Mkushi Deposit is a shear hosted sub vertical suite of mineralization extending over a distance of two (2) kilometers and is exposed by way of an existing open pit over a length of 800m. This is part of a broader mineralized belt extending over more than 12 kilometers within the licenced tenements. The deposit is structurally complex, hosted by metamorphic gneissic rocks, and associated with a suite of felsic intrusive rocks, with evidence of several generations of faulting. The mineralization pinches and swells along strike and to depth. Copper mineralization has been identified to 300m vertical depth.

The deposit was originally developed by an Italian mining company in the 1970's and operated for 5yrs, producing 2.2M tonnes of ore at a grade of about 0.98% copper which was processed in a small concentration facility (part of which still exists on site) to produce 78,000 tonnes of copper concentrate at a grade of 24%Cu. The concentrate was sold to smelters within Zambia.

The project is located close to the southern end of the Zambian Copperbelt, however the style of mineralization is quite different to that of the stratabound deposits for which the copper belt is well known.

Exploration drilling carried out by Katanga in the period prior to CGA's involvement totaled almost 10,000 m. Subsequent to the formation of the joint venture in May 2007 an additional 16,000 m of diamond drilling and 6,100 m of reverse circulation ("RC") has been carried out. As part of the Study, CGA has combined all of the previous drilling and sampling data into a digital database and reviewed the geological interpretation.

The database contains 81 drill holes, and 8,000 core and 3,600 RC chip sample assays.

The geological interpretation and orebody evaluation were conducted by CGA using an experienced geologist appropriately experienced in the copper sulphide style of mineralization and resource modeling.

Mining

CGA appointed African Mining Consultants ("AMC" a Zambian Company) to review the geotechnical conditions within the existing pit on site and then develop a set of design parameters on which to base the preliminary open pit design. AMC Consultants ("AMCC" - Australian Company) with involvement from CGA and Seringa carried out an optimization of the in-house generated geological model and developed a preliminary open pit.

The recommendation from AMC is that the pit slopes could be designed for a final overall angle of up to 70 degrees. Density measurements were established from the geological core generated form the drilling operations.

Review of the hydrogeological records and recent observation of the pit walls (the existing pit was completely dewatered to enable a complete geological interpretation), suggests that the mine will not generate significant water.

The Study assumes an annual production rate of 1.6M tonnes per annum with an 18 month pre-production period. The mining sequence would likely progress from the north to the south along the strike of the deposit.

The mine is planned to utilize a mining contractor, with 60t haul trucks combined with 100t excavators. Indicative rates have been sourced from a Zambian based contractor, a South African and an Australian contractor, based on the preliminary pit designs.

At this stage the mine is planned to operate on a two shift per day basis, six days a week. The use of local labour would be maximized with mining contractors experienced in mine development and operations likely to be used for the initial development and training of local operators.

Metallurgy

The collection of appropriate drill core samples and the supervision of the test programme was supervised by a consultant metallurgist with 40 years experience in Australia and overseas. CGA carried out a comprehensive test work programme on 196kg of sample which was made up by quartering core from a total of 12 diamond drill holes, and representing three depth zones which covered the entire mineralized zones. The programme was conducted at AMMTEC Laboratories in Perth.

The results of the programme indicate a potential 96% recovery of copper using conventional copper sulphide flotation technology. The ore as tested does not have any significant levels of other onerous minerals and thus would not likely to experience any smelter penalties.

Ore Processing

Due to their previous experience in sulphide developments, Metplant Engineering Pty Ltd were commissioned to design and cost the planned process plant. The planned facility will comprise primary crushing followed by single stage autogenous milling. A standard flotation circuit followed by a pressure filter/drying process is proposed to be constructed to recover a concentrate from the run-of-mine ore. The concentrate is planned to be trucked to nearby (200km) smelters in Zambia for sale.

Tailings Disposal

D. Cooper and Associates planned and supervised the tailings disposal investigation and testwork. Process plant tailings would be sent to an appropriately designed and constructed impoundment located nearby to the processing facility.

The tailings dam is planned to be constructed as to allow surplus water to be recovered and returned for use in the process plant.

Environmental Impact

CGA commissioned AMC to carry out a baseline study and to produce an environmental brief which sets the guidelines for a full environmental impact assessment to be conducted as a part of any feasibility study. The investigation did not highlight any significant issues that may affect any development at the project area. The single identified issue is that of the existing tailings dump, which is eroding and requires remedial action. CGA has received confirmation from the regulatory body that the previous operators, not the current joint venture, are responsible for any remediation. CGA is considering enclosing the existing tailings within a new development so as to mitigate any possible remedial action.

Infrastructure and Utilities

Process water can be sourced from either the nearby Lumsemfwa River, from a dam to be constructed on the Lumsemfwa or one of its tributaries. A final decision will be made as part of any feasibility study.

Potable water could be sourced from the nearby river and treated to an acceptable standard.

Electrical power can be sourced from either an existing National Grid power line, located 300m north of the planned open pit or from the nearby Lumsemfwa hydrostation. Power in Zambia is presently charged at US$0.34 per kW.

It is proposed to upgrade the existing gravel road to allow for all year round access of people and materials.

Domestic suppliers of consumables, presently supplying the requirements of the Zambian copperbelt, would likely be contracted to deliver into appropriately designed and constructed buildings established onsite at Mkushi.

Future Exploration

Katanga is the manager and operator of the exploration activities outside of the immediate project (core) area at Mkushi. A number (+ 5) of prospective zones have been identified as prospective and will be investigated using either diamond drilling or RC drilling during the project development phase.

Zambian Taxation System

The Finance Minister in Zambia has recently announced that the country intends to introduce a new tax regime to include a windfall tax of +25% on the incremental price where the copper price is between $2.50/lb and $3.00/lb; to a maximum of +75% on the incremental price on copper prices above $3.50/lb. They have also announced a reduction in the depreciation allowance. The new tax regime will be included in the analysis to be prepared during completion of the detailed feasibility study and release of the NI43-101 report.

Exploration Results

Drilling on the project continued through the quarter and the significant assay results from the quarter are indicated in the following table.

The results are encouraging and have extended the resource potential of the three principal mineralisation zones H, L and G Zones. The promising results from L Zone, including MH080 14m at 1.23%Cu and 9m at 1.93% Cu, highlight the potential of L zone at depth and are the target of ongoing drilling. Additional copper anomalism has been located in drilling the hanging wall to both L and H Zones and this will be further targeted in the ongoing drilling programmes.

TORONTO, Jan. 31 /CNW/ -

                               Table 3
                               -------
         Mkushi Significant Results - (greater than)1.0% CU
         --------------------------------------------------

-------------------------------------------------------------------------
Hole No    Prospect     East     North    From    To  Width   Cu %  Type
-------------------------------------------------------------------------
MH078        L ZONE   731093   8456896     126   129      3   1.31    DD
-------------------------------------------------------------------------
MH078        L ZONE                        138   143      5   1.49    DD
-------------------------------------------------------------------------
MH080        L ZONE   731096   8456828     229   243     14   1.23    DD
-------------------------------------------------------------------------
MH080        L ZONE                        247   255      9   1.93    DD
-------------------------------------------------------------------------
MH081        L ZONE   731024   8456822     109   119     10   1.07    DD
-------------------------------------------------------------------------
MH081A       L ZONE   731024   8456822     113   122      9   0.96    DD
-------------------------------------------------------------------------
MH081A       L ZONE                        249   258      9   1.08    DD
-------------------------------------------------------------------------
MH082        L ZONE   730979   8456760     117   119      2   2.75    DD
-------------------------------------------------------------------------
MH083        H ZONE   731164   8456705      28    31      3   2.95    DD
-------------------------------------------------------------------------
MH083        H ZONE                         64    66      2   2.10    DD
-------------------------------------------------------------------------
MH083        H ZONE                         85    86      1   1.61    DD
-------------------------------------------------------------------------
MH084        L ZONE   731050   8456855     112   115      3   0.76    DD
-------------------------------------------------------------------------
MH084        L ZONE                        137   144      7   1.26    DD
-------------------------------------------------------------------------
MH084        L ZONE                        206   207      1   3.95    DD
-------------------------------------------------------------------------
MH085        H ZONE   731216   8456882      25    30      5   1.03    DD
-------------------------------------------------------------------------
MMU046       G ZONE   731543   8457094       7    12      5   1.45    DD
-------------------------------------------------------------------------
MMU047       G ZONE   731522   8457506      87    96      9   2.05    DD
-------------------------------------------------------------------------
MMU047       G ZONE                        103   109      6   0.98    DD
-------------------------------------------------------------------------
MMU049  MUNSHIWEMBA   731582   8457578      34    38      4   0.98    DD
-------------------------------------------------------------------------
MMU050  MUNSHIWEMBA   731623   8457676      17    20      3   1.99    DD
-------------------------------------------------------------------------
MMU050  MUNSHIWEMBA                         31    57     26   1.75    DD
-------------------------------------------------------------------------
MMU051  MUNSHIWEMBA   731596   8457631      48    57      9   2.71    DD
-------------------------------------------------------------------------

The Environmental Impact Assessment is expected to be completed by AMC Consultants early in the first quarter of 2008. In the meantime an Environmental Commitment Statement has been prepared and presented. The geotechnical programme has been planned and commenced with an initial site visit in December with geotechnical drilling to be carried out in January of 2008. Several mine plan options have been generated along with reviews of the locations, and alternatives, for the various items of infrastructure.

Work has commenced on roofing and plastering of the Mkushi Copper Mine High School new classroom block community project and is expected to be finished for the school new year.

NIGERIA PROJECT UPDATE

----------------------

The agreements with Spektra Jeotek AS ("Specktra"), a Turkish drilling company, have been ratified and, after delays due to unseasonal weather, the drill rig was dispatched and shipped to Nigeria. The containers holding the crawler mounted diamond drill rig and the ancillary equipment required for the contract arrived in Lagos port in late December and are awaiting customs clearance, which is expected shortly. Arrangements have already been put in place to transport the drill rig and associated equipment to site after which the main exploration and resource drilling programme will commence.

The Turkish drill crew have been assigned, as have the supervisors and regional managers in charge of the drill crews. Visa applications will be made to get these personnel into Nigeria as soon as possible and in time for the clearance of the equipment from customs.

Spektra has a highly skilled, experienced and competent team of staff and technicians who also operate and maintain their rigs. They have almost 25 years of background in the drilling industry and are currently operating mainly in the mineral resource industry. Spektra has drilled, and is currently drilling, for various national and multinational companies all around the world and is operating in: Morocco; Algeria; Serbia; Turkey; Azerbeijan; Iran; Pakistan; Yemen and Turkey.

Sufficient drill sites have been prepared in advance to cater for both the local drilling rig and the commencement of the Spektra rig.

The trenching and sampling is continuing. Batch samples have been sent to Accra in Ghana for lab assay and results are expected early in 2008.

Reviews of additional properties in Nigeria with mineral potential have also been undertaken during the quarter.

CORPORATE

---------

On 22 November 2007 CGA closed its private placement of 48,200,000 ordinary shares in the capital of the Company and 25,000 units (with attaching warrants) for a total capital raising of US$65M. The proceeds, in combination with a US$65 million senior debt facility being arranged by BNP Paribas, are planned to be used to fund the construction of the Company's Masbate Gold Mine in the Philippines.

During the quarter, CGA issued 2.025M employee options under the Employee Option Plan. The issue was made in connection with a number of key appointments made to establish both the development and operating team in the Philippines.

During the quarter 805,000 options were exercised for total cash proceeds of $491,250.

NATIONAL INSTRUMENT 43-101 COMPLIANCE

-------------------------------------

National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") is a rule developed by Canadian Securities Administrators, which establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects.

Mr Geoff.G.Jones, F.Aus.I.M.M.CP Mng, is acting as the Qualified Person in compliance with NI 43-101 with respect to this announcement. He has prepared and or supervised the preparation of the scientific or technical information in this announcement. Mr Jones is a fellow of the Australasian Institute of Mining and Metallurgy (AusIMM), and a consultant to CGA.

The information of a technical nature in this report is based on information compiled by, or under the supervision of, and approved by Mr Geoff G Jones. The drilling results were assayed by Genalysis Laboratory Services Pty Ltd in Perth, Western Australia.

Mr Jones has sufficient experience which is relevant to the style of mineralization and type of deposit under consideration and is recognised as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Resources' and is a Qualified Person under National Instrument 43 - 101. Mr Jones consents to the inclusion in the report of the matters based on their information in the form and context in which it appears.

CAUTIONARY NOTE REGARDING FORWARD LOOKING STATEMENTS

----------------------------------------------------

This announcement includes certain "forward-looking statements" within the meaning of Canadian securities legislation. All statements, other than statements of historical fact, included herein including, without limitation, statements regarding anticipated dates for construction and production, and other milestones related to the Masbate Gold Project and other projects; estimates of capital and operating costs, recovery rates, production estimates and estimated economic return; and CGA's future operating or financial performance, are forward-looking statements. Information concerning mineral reserve and resource estimates including statements regarding the conversion of inferred resources to reserves also may be deemed to be forward-looking statements in that it reflects a prediction of the mineralization that would be encountered if a mineral deposit were developed and mined. Forward-looking statements involve various risks and uncertainties and are based on certain factors and assumptions. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from CGA's expectations include uncertainties related to fluctuations in gold and other commodity prices and currency exchange rates; uncertainties relating to interpretation of drill results and the geology, continuity and grade of mineral deposits; uncertainty of estimates of capital and operating costs, recovery rates, production estimates and estimated economic return; the need for cooperation of government agencies in the development of the Masbate Gold Project; the need to obtain additional financing to develop the Masbate Gold Project; the possibility of delay in development programs or in construction projects and uncertainty of meeting anticipated program milestones for the Masbate Gold Project; and other risks and uncertainties disclosed under the heading "Caution Regarding Forward-Looking Statements" in CGA's Annual Information Form for the year ended 30 June 2007 filed with the Canadian securities regulatory authorities on the SEDAR website at www.sedar.com.

                             Appendix 5B

              Mining exploration entity monthly report

Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001.

Name of entity
-------------------------------------------------------------------------
CGA Mining Limited
Note: This is the first report for the Company in US dollars following a
change in the functional and reporting currency of the Company from
Australian to US dollars at 1 December 2007.
-------------------------------------------------------------------------

ABN                                         Month ended ("current month")
-----------------------------              ------------------------------
88 009 153 128                                             December 2007
-----------------------------              ------------------------------

Consolidated statement of cash flows

                                                   ----------------------
                                                                    Year
                                                                 to date
                                                    Current         (six
Cash flows related to                               quarter       months)
 operating activities                               US$'000      US$'000
                                                   ----------------------

1.1  Receipts from product sales and
      related debtors                                     -            -

1.2  Payments for (a) exploration and evaluation     (1,646)      (3,856)
                  (b) development                   (26,916)     (28,025)
                  (c) production                         -             -
                  (d)administration                 (810)(x)      (1,318)
                                                                       -
1.3  Dividends received                                   -            -
1.4  Interest and other items of a similar
      nature received                                   497          982
1.5  Interest and other costs of finance paid        (3,729)      (3,729)
1.6  Income taxes paid                                    -            -
1.7  Other -Business development                          -            -
                                                   ----------------------
     Net Operating Cash Flows                       (32,604)     (35,946)
-------------------------------------------------------------------------
    (x) Includes annual audit, tax and shareholder
        reporting costs.
-------------------------------------------------------------------------

     Cash flows related to investing activities
1.8  Payment for purchases of: (a)prospects               -            -
                               (b)equity investments
                               (c) other fixed assets
1.9  Proceeds from sale of:    (a)prospects               -            -
                               (b)equity investments      -            -
                               (c)other fixed assets      -            -
1.10 Loans to other entities
1.11 Loans repaid by other entities
1.12 Other (provide details if material)
                                                   ----------------------
     Net investing cash flows                             -            -
                                                   ----------------------
1.13 Total operating and investing cash flows
      (carried forward)                             (32,604)     (35,946)
-------------------------------------------------------------------------

-------------------------------------------------------------------------
1.13 Total operating and investing cash flows
      (brought forward)                             (32,604)    (35,946)
-------------------------------------------------------------------------
     Cash flows related to financing activities
1.14 Proceeds from issues of shares, options, etc.   39,500       39,527

1.15 Proceeds from sale of forfeited shares               -            -
1.16 Proceeds from borrowings                        25,000       25,000
1.17 Repayment of borrowings                              -            -
1.18 Dividends paid                                       -            -
1.19 Other (provide details if material)                  -            -
                                                   ----------------------
     Net financing cash flows                        64,500       64,527
-------------------------------------------------------------------------
     Net increase (decrease) in cash held            31,896       28,581

1.20 Cash at beginning of quarter/year to date       22,909       25,914
1.21 Exchange rate adjustments to item 1.20             151          461
                                                   ----------------------
1.22 Cash at end of quarter                        54,956(x)    54,956(x)
-------------------------------------------------------------------------
(x) Filminera Resources Corp. has an additional $5.5m in cash.


Payments to directors of the entity and associates of the directors
Payments to related entities of the entity and associates of the related
entities

                                                        -----------------
                                                         Current quarter
                                                                 US$'000
                                                        -----------------
1.23 Aggregate amount of payments to the parties
      included in item 1.2                                           406
                                                        -----------------
1.24 Aggregate amount of loans to the parties
      included in item 1.10                                            -
-------------------------------------------------------------------------

1.25 Explanation necessary for an understanding of the transactions
     --------------------------------------------------------------------
     Payment of salaries, bonus, taxes, and superannuation.
     --------------------------------------------------------------------

Non-cash financing and investing activities

2.1  Details of financing and investing transactions which have had a
     material effect on consolidated assets and liabilities but did not
     involve cash flows
     --------------------------------------------------------------------
     -
     --------------------------------------------------------------------
2.2  Details of outlays made by other entities to establish or increase
     their share in projects in which the reporting entity has an
     interest
     --------------------------------------------------------------------
     -
     --------------------------------------------------------------------

Financing facilities available

Add notes as necessary for an understanding of the position.
                                                -------------------------
                                                     Amount
                                                  available  Amount used
                                                    US$'000      US$'000
                                                -------------------------

3.1  Loan facilities                                      -            -
                                                -------------------------
3.2  Credit standby arrangements                          -            -
-------------------------------------------------------------------------

                                                            -------------
Estimated cash outflows for next quarter                         US$'000
                                                            -------------
4.1  Exploration and evaluation                                    3,391
                                                            -------------
4.2  Development                                                  35,685
-------------------------------------------------------------------------
     Total                                                        39,076
-------------------------------------------------------------------------

Reconciliation of cash
                                                -------------------------
Reconciliation of cash at the end of the
 quarter (as shown in the consolidated                Current   Previous
 statement of cash flows) to the related              quarter    quarter
 items in the accounts is as follows.                 US$'000    US$'000
-------------------------------------------------------------------------
5.1  Cash on hand and at bank                          51,983      1,728
                                                -------------------------
5.2  Deposits at call                                       -          -
                                                -------------------------
5.3  Bank overdraft                                         -          -
                                                -------------------------
5.4  Other (provide details)
     AUD Account                                        2,781     21,159
     AUD Deposit                                          192        117
-------------------------------------------------------------------------
     Total: cash at end of quarter (item 1.22)         54,956     23,004
-------------------------------------------------------------------------

Changes in interests in mining tenements
                     ----------------------------------------------------
                                    Nature of   Interest at  Interest at
                         Tenement    interest  beginning of       end of
                        reference   (note (2))      quarter      quarter
                     ----------------------------------------------------
6.1  Interests in
      mining
      tenements
      relinquished,
      reduced or
      lapsed                    -            -            -            -
                     ----------------------------------------------------
6.2  Interests in
      mining
      tenements
      acquired or
      increased                 -            -            -            -
                     ----------------------------------------------------


Issued and quoted securities at end of current quarter
Description includes rate of interest and any redemption or conversion
rights together with prices and dates.

                     ----------------------------------------------------
                                                             Amount paid
                                               Issue price        up per
                                              per security      security
                          Total       Number   (see note 3)  (see note 3)
                         number       quoted        (cents)       (cents)
-------------------------------------------------------------------------
7.1  Preference
      +securities
      (description)
                     ----------------------------------------------------
7.2  Changes during
      quarter
      (a) Increases
      through issues
      (b) Decreases
      through returns
      of capital,
      buy-backs,
      redemptions
-------------------------------------------------------------------------
7.3  +Ordinary
      securities      210,554,976  210,554,976
                     ----------------------------------------------------
7.4  Changes during
      quarter
      (a) Increases
      through issues
      (b) Decreases
      through returns
      of capital,
      buy-backs        48,200,000   48,200,000
-------------------------------------------------------------------------
7.5  +Convertible debt
      securities
      (description)
                     ----------------------------------------------------
7.6  Changes during
      quarter
     (a) Increases
     through issues
     (b) Decreases
     through
     securities
     matured,
     converted
-------------------------------------------------------------------------
7.7  Options
      (description
      and conversion
      factor)
                     ----------------------------------------------------
7.8  Issued during
      quarter           8,500,000            0            0            0
                     ----------------------------------------------------
7.9  Exercised
      during
      quarter             805,000      805,000         0.61         0.61
                     ----------------------------------------------------
7.10 Expired
      during
      quarter
-------------------------------------------------------------------------
7.11 Debentures
      (totals only)
-----------------------------------------------
7.12 Unsecured notes
      (totals only)        25,000            0
                     --------------------------

Compliance statement

1   This statement has been prepared under accounting policies which
    comply with accounting standards as defined in the Corporations Act
    or other standards acceptable to ASX (see note 4).

2   This statement does give a true and fair view of the matters
    disclosed.

Sign here: (Signed)                                Date: 31 January 2008

(Company secretary)

Print name: Hannah Hudson...............................................

Notes

1   The quarterly report provides a basis for informing the market how
    the entity's activities have been financed for the past quarter and
    the effect on its cash position. An entity wanting to disclose
    additional information is encouraged to do so, in a note or notes
    attached to this report.

2   The "Nature of interest" (items 6.1 and 6.2) includes options in
    respect of interests in mining tenements acquired, exercised or
    lapsed during the reporting period. If the entity is involved in a
    joint venture agreement and there are conditions precedent which will
    change its percentage interest in a mining tenement, it should
    disclose the change of percentage interest and conditions precedent
    in the list required for items 6.1 and 6.2.

3   Issued and quoted securities

    The issue price and amount paid up is not required in items 7.1 and
    7.3 for fully paid securities.

4   The definitions in, and provisions of, AASB 1022: Accounting for
    Extractive Industries and AASB 1026: Statement of Cash Flows apply to
    this report.

5   Accounting Standards

    ASX will accept, for example, the use of International Accounting
    Standards for foreign entities. If the standards used do not address
    a topic, the Australian standard on that topic (if any) must be
    complied with.

CGA Mining Limited on 6ix

Earlier from CGA Mining

Later from CGA Mining

All CGA Mining news releases