CGA Mining LimitedTSX: CGA

CGA Mining announces new high grade drilling results at its Segilola Gold Project,including 4m @ 105.15g/t

· Issued by CGA Mining Limited via CNW
/NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR RELEASE TO US NEWS
WIRE SERVICES/

                           1 SEPTEMBER 2009

       ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE AND
       ------------------------------------------------------
                       TORONTO STOCK EXCHANGE
                       ----------------------

           The new high grade drilling intercepts include:

    4m @ 105.15g/t; including 3m @ 135g/t and 1m at 15.6g/t
   41.8m @ 3.76g/t; including 2.6m @ 12.32g/t and 16m @ 6.88g/t
                 7.8m @ 5.71g/t; including 1m @26.05g/t
                12.5m @ 9.95g/t; including 2.5m @ 32.24g/t
                10.7m @ 7.29g/t; including 3.7m @ 12.03g/t
                   6m @ 11.58g/t; including 1.8m @ 34.55g/t
                  15m @ 5.38g/t; including 3m @ 18.85g/t
                11.3m @ 6.59g/t; including 1m at 37.7g/t
                  10m @ 7.25g/t; including 2m @ 16.1g/t, and
               18.35m @ 3.71g/t; including 2m @ 20.4g/t

VANCOUVER, Sept. 1 /CNW/ - CGA Mining Limited ("CGA", "the Company") is earning a 51% interest in the Segilola Gold Project in Nigeria, a project considered to be the most advanced gold exploration project in the country. It is held by Segilola Gold Limited ("SGL") in joint venture with our partner Tropical Mines Limited ("TML"), a Nigerian company owned by local investors and the Nigerian Government.

Location

The Segilola Gold Project is located at the village of Iperindo-Odo Ijesha, near the city of Ilesha in Osun State, Nigeria. The project site is situated within 600m of a sealed road, 18km south of the regional centre Ilesha, the local government centre, with a population of 300,000, which is itself located on a sealed dual carriage way, 120km north east of Lagos (the principal international entry port and major commercial centre of Nigeria, estimated population, 16 million).

Nigeria has a well established petro-chemical industry based in the Niger River delta and the government of Nigeria, is now in its second term of democratic rule. The Government has recently established the Ministry of Mines and Steel Development to administer all mineral assets occurring in Nigeria other than oil and natural gas.

South Western Nigeria Showing the Segilola Project Site and the Ijebu
Igbo Licence Area
To view map, please visit: http://files.newswire.ca/578/CGA_Mining.doc

Licences

The project is the subject of a Mining Lease, ML41 (changed from ML19706)) that covers an area of 46 hectares within an Exploration Licence EPL39/40 (changed from EPL 13205) covering 16km(2).

SGL also successfully acquired the Ijebu Igbo license area, located on the same geological trend south west of the Segilola licenses, and is currently reviewing other potential areas in Nigeria.

Geology

The geological setting is described as basement gneiss and Proterozoic schist belt. The known mineralised zone has been extended to over a strike length of approximately 1500m. The gold mineralisation is in the form of quartzite veins. The veins are invariably steep dipping and are commonly associated with fractures and shear zones. What is commonly called the Iperendo reef is not one vein but comprises a vein system of several parallel-silicified zones within the Ile-Ife-Ilesha schist belt.

The gold mineralisation is known to be closely linked to silification and phyllic alteration, and to occur together with pyrite and molybdenite. The gold mineralisation is bound to the vein sections and to the altered wall rocks thus forming a drillcore indicated ore body with a thickness between 5m and 28m (average approximately 10m). The gold contents changes along strike as well in dip, grades encountered in the cores vary between (less than)1g/t and 136g/t.

The concentration of the gold in quartz veins and silicified zones along major faults and fracture zones is attributed to the Pan Africa thermotectonic event. The major fractures and shear zones, most with an overall NNE-SSW trend appear to be a feature of the region. The regional setting is very similar to the Ashanti and Sefwi systems in nearby Ghana, which have hosted gold production in excess of 20 million ounces.

Project Area Geology - Segilola Prospect
To view map, please visit: http://files.newswire.ca/578/CGA_Mining.doc

Resource Potential

An assessment by a leading Australian geological firm in October 1995 included an assessment of the potential ore reserves at the project.

A drill indicated gold mineralisation zone has been shown to exist for over 1500m along strike and to 150m in depth. The drilling to date suggests a grade in excess of 5g/t may be achievable.

The Company has commissioned a technical report on the Segilola Project, and will soon be in a position to present a resource estimate and a 43-101 compliant technical report.

CGA has reviewed the previous databases and determined a common grid and produced plans and sections detailing all previous drilling and excavations.

It is apparent that both the up and down dip extensions and those beyond the 1500m strike length have not been tested so the prospectivity for those areas within the tenements is considered strong. It is also quite possible for parallel systems to be present and the existence of these have yet to be adequately tested.

Recent Assay Results

The Turkish drilling company we introduced to the project, Spektra Jeotek, has now completed the current drilling campaign and a total sum of 119 holes have been drilled from almost 12 000m of diamond core drilling. The drill core is sent to SGS Laboratories Ltd at Tarkwa in Ghana for sample prep and assay. The most recent set of assay results since those presented in the June 2009 quarterly report are set out below.

TABLE 1 - Recent Assay Results at the Segilola Gold Project
To view table, please visit: http://files.newswire.ca/578/CGA_Mining.doc

Additional results are added to the resource model and CGA has now engaged the services of an independent professional to develop a resource model based on these results. It is expected that a resource, compliant to both NI 43-101 and JORC guidelines, will be published in the near future. It is this resource that will form the basis for a feasibility study.

Additional Potential

Additional trenching and soil sampling of the area has also been undertaken to look at a wider area. It is expected that additional sampling and drilling may extend the known mineralised strike length further.

Metallurgical Testing

Additional metallurgical testwork (bottle roll test) has been completed which confirms previous results of high extraction rates ((greater than)94%) using the cyanide process.

Detailed metallurgical testwork has now commenced at Ammtec Ltd, Perth, to determine the design criteria for a process plant.

ABOUT CGA MINING LIMITED

CGA is listed on both the Toronto Stock Exchange and Australian Securities Exchange. The Masbate Gold Project is the largest gold project in the Philippines and was successfully developed with first gold poured on 12 May 2009. The project, which is currently ramping up to full production, has a total indicated resource base of 4.55M ounces, total inferred resource base of 3.22M ounces with a probable reserve of 3.03M ounces of gold. The project is currently forecast to produce over 200,000 ounces per annum.

The 4Mtpa plant was constructed by Leighton Contractors Asia Limited ("Leighton") without one lost time injury. The mining contract for the Masbate Gold Project has been awarded to Leighton, the largest mining contractor in the world. CGA is completing a scoping study for the expansion of the plant throughput at Masbate.

CGA has a disciplined acquisition program focused on acquiring new gold projects with a substantial initial resource with the capacity to grow materially and where the development and operational experience of CGA can be applied to enhance shareholder value.

NATIONAL INSTRUMENT 43-101 AND JORC COMPLIANCE

Mr Geoff.G.Jones, F.Aus.I.M.M.CP Mng, CGA's Consulting Engineer, is acting as the Qualified Person in compliance with NI 43-101 and JORC reporting requirements with respect to this announcement. He has prepared and or supervised the preparation of the scientific or technical information in this announcement and confirms compliance with NI43-101 and JORC requirements.

Further information relating to the Masbate Project is included in the technical report entitled Technical Report on the Mineral Resources of the Masbate Deposit, Masbate Province, Republic of the Philippines for CGA Mining Limited prepared by Mining Associates Pty Ltd and available on SEDAR at www.sedar.com, lodged 8 July 2008.

Andrew James Vigar of Mining Associates Pty Ltd, a qualified person, has verified the resource statement for the Masbate Project as disclosed in this announcement, including sampling, analytical and test data underlying the estimate. Verification of the data included numerous site visits, database validation of historical drill results and review of sampling and assaying protocols. The qualified person was satisfied with the verification process.

A NI 43-101 compliant report has been lodged on www.sedar.com verifying and supporting the new reserve statement made for the Masbate Project. Mr Daniel Tuffin of Lower Quartile Solution Pty Ltd, a qualified person, has verified the reserve statement for the Masbate Project as disclosed in this announcement, including sampling, analytical and test data underlying the estimate. Verification of the data included database validation of historical drill results and review of sampling and assaying protocols. The qualified person was satisfied with the verification process.

Mr Geoff.G.Jones, F.Aus.I.M.M.CP Mng, CGA's Consulting Engineer, is acting as the Qualified Person in compliance with NI 43-101 and JORC reporting requirements with respect to this announcement. He has prepared and or supervised the preparation of the scientific or technical information in this announcement and confirms compliance with NI43-101 and JORC requirements.

Further information relating to the Masbate Project is included in the technical report entitled Technical Report on the Mineral Resources of the Masbate Deposit, Masbate Province, Republic of the Philippines for CGA Mining Limited prepared by Mining Associates Pty Ltd and available on SEDAR at www.sedar.com, lodged 8 July 2008.

Andrew James Vigar of Mining Associates Pty Ltd, a qualified person, has verified the resource statement for the Masbate Project as disclosed in this announcement, including sampling, analytical and test data underlying the estimate. Verification of the data included numerous site visits, database validation of historical drill results and review of sampling and assaying protocols. The qualified person was satisfied with the verification process.

A NI 43-101 compliant report has been lodged on www.sedar.com verifying and supporting the new reserve statement made for the Masbate Project. Mr Daniel Tuffin of Lower Quartile Solution Pty Ltd, a qualified person, has verified the reserve statement for the Masbate Project as disclosed in this announcement, including sampling, analytical and test data underlying the estimate. Verification of the data included database validation of historical drill results and review of sampling and assaying protocols. The qualified person was satisfied with the verification process.

CAUTIONARY NOTE REGARDING FORWARD LOOKING STATEMENTS

This announcement includes certain "forward-looking statements" within the meaning of Canadian securities legislation. All statements, other than statements of historical fact, included herein including, without limitation, statements regarding anticipated dates for construction and production, and other milestones related to the Masbate Gold Project and other projects; estimates of capital and operating costs, recovery rates, production estimates and estimated economic return; and CGA's future operating or financial performance, are forward-looking statements. Information concerning mineral reserve and resource estimates including statements regarding the conversion of inferred resources to reserves also may be deemed to be forward-looking statements in that it reflects a prediction of the mineralization that would be encountered if a mineral deposit were developed and mined. Forward-looking statements involve various risks and uncertainties and are based on certain factors and assumptions. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from CGA's expectations include uncertainties related to fluctuations in gold and other commodity prices and currency exchange rates; uncertainties relating to interpretation of drill results and the geology, continuity and grade of mineral deposits; uncertainty of estimates of capital and operating costs, recovery rates, production estimates and estimated economic return; the need for cooperation of government agencies in the development of the Masbate Gold Project; the need to obtain additional financing to develop the Masbate Gold Project; the possibility of delay in development programs or in construction projects and uncertainty of meeting anticipated program milestones for the Masbate Gold Project; and other risks and uncertainties disclosed under the heading "Risk Factors" in CGA's Annual Information Form for the year ended 30 June 2008 filed with the Canadian securities regulatory authorities on the SEDAR website at www.sedar.com.

CGA Mining Limited on 6ix

Story so far

Earlier from CGA Mining

Later from CGA Mining

All CGA Mining news releases