24 March 2026
Acquisitions CapitaLand Ascendas REIT
Agenda
01
CLAR's Portfolio Rejuvenation Strategy
02
Overview of Acquisitions
03
Rationale and Benefits of Acquisitions
04
Appendix
Disclaimer
This presentation may contain forward-looking statements. Actual future performance, outcomes and results may differ materially from those expressed in forward-looking statements as a result of a number of risks, uncertainties and assumptions. You are cautioned not to place undue reliance on these forward-looking statements, which are based on the current view of management regarding future events. No representation or warranty express or implied is made as to, and no reliance should be placed on, the fairness, accuracy, completeness or correctness of the information or opinions contained in this presentation. Neither the Manager nor any of its affiliates, advisers or representatives shall have any liability whatsoever (in negligence or otherwise) for any loss howsoever arising, whether directly or indirectly, from any use of, reliance on or distribution of this presentation or its contents or otherwise arising in connection with this presentation.
This presentation is for information only and does not constitute or form part of an offer, invitation or solicitation of any securities of CLAR in Singapore or any other jurisdiction nor should it or any part of it form the basis of, or be relied upon in connection with, any contract or commitment whatsoever.
The value of Units and the income derived from them, if any, may fall as well as rise. Units are not obligations of, deposits in, or guaranteed by, the Manager or any of its affiliates. An investment in Units is subject to investment risks, including the possible loss of the principal amount invested.
Investors should note that they will have no right to request the Manager to redeem or purchase their Units for so long as the Units are listed on the SGX-ST. It is intended that Unitholders may
CapitaLand Ascendas REIT
only deal in their Units through trading on the SGX-ST. Listing of the Units on the SGX-ST does not guarantee a liquid market for the Units.
The past performance of CLAR is not necessarily indicative of the future performance of CLAR.
All figures in this presentation unless expressed differently or otherwise stated are rounded off to one decimal place.
This presentation has not been reviewed by the Monetary Authority of Singapore.
Capitalised terms used herein, unless otherwise defined, shall have the meaning ascribed to them in the announcement dated 24 March 2026 titled "The Acquisitions of (A) a 100% Interest in and Leaseback of a Logistics Asset Located in Singapore, (B) a 50.0% Interest in a Business Space Property Located in Singapore and (C) a 49.0% Interest in a Data Centre Located in Japan".
SG Portfolio Acquisition refers to the acquisition of a portfolio consisting of 2 Pioneer Sector 1, a ramp-up logistics property, Tuas Connection, a light industrial property, and 9 Kallang Sector, a high-specifications industrial property. US Logistics Acquisition refers to acquisition of DHL Canal Winchester, a modern Class A logistics property located at 8695 Basil Western Road, Canal Winchester, Ohio 43110, United States. Spain Portfolio Acquisition refers to acquisition of a portfolio consisting of six modern Class A logistics properties, being Sant Feliu I to IV in Barcelona, Spain and Torrejon I and II in Madrid, Spain. Together, they are referred to as Prior Acquisitions.
Note: Any discrepancies in the charts between the listed figures and totals thereof are due to rounding. Where applicable, figures and percentages are rounded to one decimal place.
3
01
CLAR's Portfolio Rejuvenation Strategy
4 4
CapitaLand Ascendas REIT
Rejuvenating CLAR's portfolio with accretive acquisitions of quality logistics, business space and data centre assets in developed markets with healthy fundamentals
25 Loyang Crescent, Singapore
Consolidating CLAR's Positioning as a Global REIT Anchored in Singapore
Acquisitions (~S$1.4 billion1)
Singapore | Japan | ||
Property | 25 Loyang Crescent | Ascent, 2 Science Park Drive | Japan Data Centre |
Asset Type | Logistics | Business Space | Data Centre |
Acquiring interest (%) | 100 | 50 | 49 |
Purchase Price / Agreed Property Value (S$ m) | 504.2 | 245.02 | 620.73 (¥76.4 B) |
Occupancy (%) | 100 | 90.7 | 100 |
NPI Yield4 (%) | 6.9 | 5.6 | 4.3 |
Japan Data Centre Greater Osaka, Japan
Ascent, 2 Science Park Drive, Singapore
Refers to total purchase consideration and on proportionate interests.
Based on 50% of the agreed property value and inclusive of S$15.0 million deferred consideration payable latest 15 months after the completion of the acquisition.
Based on 49% of the purchase price at an illustrative exchange rate of JPY100 : S$0.8120, used for all conversions from Japanese Yen amounts into Singapore Dollar amounts in this presentation.
NPI yields quoted are pre-transaction costs. 5
02
6
Overview of Acquisitions
1
SG Logistics Acquisition (100% interest)CapitaLand Ascendas REIT
25 Loyang
Crescent
Changi Airport
Multi-asset logistics and industrial complex in Loyang, East of Singapore
Name and Location | 25 Loyang Crescent, Singapore 508988 |
Purchase Consideration | S$504.2 million1 (2.7% discount to valuation) |
Acquisition and Other Estimated Fees | S$32.7 million |
Total Acquisition Cost | S$536.9 million |
Seller | Toll Offshore Petroleum Services (Toll) |
Valuation (as at 1 Jan 2026) | S$518.0 million1 |
Gross Floor Area (GFA) / Net Lettable Area (NLA)2 | 165,711 sqm (current plot ratio ofi 0.52) / 197,800 sqm |
Occupancy | 100% |
Weighted Average Lease Expiry (WALE)3 | 13.4 years (built-in annual rent escalation ofi 2.5%) |
Master Lessee | Toll |
Initial NPI Yield | 6.9% (6.4% post-transaction costs) |
Estimated Completion Date | 3Q 2026 |
Features a modern four-storey ramp-up logistics building, 13 standalone industrial buildings mainly used for warehousing, terrace workshops and open yard space
Remaining land lease tenure of 27.7 years
Sale and leaseback to Toll on an absolute triple-net lease for 12 years with built-in annual rent escalation of 2.5%
Includes upfront land premium of S$46.35 million.
NLA exceeds GFA due to the inclusion of leasable yard space. 7
Based on revenue.
CapitaLand Ascendas REIT
NUS
2
SG Business Space Acquisition (50% interest)Name and Location | Ascent, 2 Science Park Drive, Singapore 118222 |
Purchase Consideration | S$245.0 million (50% interest, inclusive ofi S$15 million defierred consideration1 ) (1.7% discount to average valuation) |
Acquisition and Other Estimated Fees | S$16.0 million (50% interest) |
Total Acquisition Cost | S$261.0 million (50% interest) |
Seller | CapitaLand Singapore (BP&C) Pte. Ltd. |
Valuation (as at 1 Nov 2025) | JLL: S$496.0 million and CBRE: S$501.0 million Average: S$498.5 million (100% basis) |
GFA / NLA | 51,560 sqm / 43,000 sqm |
Occupancy2 | 90.7% |
WALE3 | 2.4 years |
Key Tenant(s) | J&J, Dyson, Merck |
Initial NPI Yield | 5.6% (5.2% post-transaction costs) |
Completion Date | 23 March 2026 |
A global sovereign wealth fund holds the remaining 50% interest
Remaining land lease of 55.5 years which is longer than the
average in Singapore's industrial property market
BCA Green Mark Platinum certified building
NUS
NUHS
Kent Ridge MRT
2 Science Park Drive
SSP1
One-north
Payable latest 15 months after the completion of the SG Business Space Acquisition.
As at 31 December 2025. 8
Based on gross rental income.
3
Japan Data Centre Acquisition (49% interest)Kyoto
Osaka (CBD)
~10km
Nara
Tier III hyperscale data centre in Greater Osaka
Name and Location | Japan Data Centre, Greater Osaka, Japan |
Purchase Consideration1 | S$620.7 million / ¥76.4 billion (49% interest fior the data centre only) (2.6% discount to valuation) |
Acquisition and Other Estimated Fees | S$6.9 million (49% interest) |
Total Acquisition Cost | S$627.6 million / ¥77.3 billion (49% interest) |
Seller | Unrelated third party |
Valuation (as at 10 Mar 2026) | S$1,299 million / ¥160.0 billion (100% basis) |
GFA / NLA | 42,998 sqm / 41,198 sqm |
Occupancy2 | 100% |
WALE2,3 | 14.2 years (built-in annual rent escalation ofi 1.0%) |
Key Tenant(s) | One of the global investment grade data centre hyperscalers |
Initial NPI Yield | 4.3% (4.2% post-transaction costs) |
Estimated Completion Date | 2Q 2026 |
A fund managed by a subsidiary of Mitsui S Co, a leading conglomerate in
Japan, holds the remaining 51% in the data centre
Freehold Tier III hyperscale data centre completed in 2023 with IT capacity of 40.5MW (with a potential expansion capacity of 5.4MW)
Fully occupied by a blue-chip tenant, long lease of ~14 years with built-in annual rent escalation of 1.0%
An illustrative exchange rate of JPY100 : S$0.8120 is used for all conversions from Japanese Yen amounts into Singapore Dollar amounts in this presentation.
As at 31 December 2025. 9
Based on gross rental income.
03
Rationale and Benefits of Acquisitions
10
Rationale and Benefits of the Acquisitions
01
Continuing to anchor the portfolio in Singapore while strengthening CLAR's market leadership
02
Diversifying CLAR's global footprint across developed markets with healthy fundamentals - strategic expansion
into Japan's data centre market
03
Enhancing CLAR's portfolio with strategically located, quality assets
04
Stable income streams from established tenants in properties with high occupancy rates
05
Attractive NPI growth and DPU-accretive acquisitions
11
1
Continuing to anchor the portfolio in Singapore while strengthening CLAR's market leadershipPre-Acquisitions1 Post-Acquisitions2
Value of CLAR's portfolio asset under management (AUM) increases to
UK/Europe
10%
US 12%
Japan UK/Europe 3%
9%
US 11%
S$19.9 billion
CLAR's portfolio remains
Singapore-centric (66%
Australia 11%
Asset Value
S$18.5 B
Singapore
67%
Australia
11%
Asset Value S$19.9 B
of total portfolio AUM or
S$13.2 billion)
Logistics 25%
Data Centres 11%
Logistics 27% S$5.3 B
Asset Value
S$18.5 B
Business Space 36%
Life
Data Centres 13%
S$2.6 B
Asset Value S$19.9 B
Singapore 66% S$13.2 B
Business Space 34%
Life Sciences 7%
Logistics segment increases to 27% (S$5.3 billion) of total portfolio AUM
Data Centres segment increases to 13%
Industrial
20%
Sciences 8%
Industrial 19%
(S$2.6 billion) of total
portfolio AUM
As at 31 December 2025 and including US Logistics Acquisition which was acquired on 29 January 2026 as well as Spain Portfolio Acquisition which was acquired on 27 February 2026 on pro fiorma basis. 12
Assuming the Acquisitions were completed on 31 December 2025.
1
Continuing to anchor the portfolio in Singapore while strengthening CLAR's market leadership 25 Loyang CrescentLegend
25 Loyang Crescent
Expands CLAR's logistics
footprint in Singapore to
22 properties1
Singapore 508988
Changi Logistics Centre
71 Alps Avenue
90 Alps Avenue
With a total AUM of
S$2.2 billion1
GFA of
Singapore Changi Airport
1.0 million sqm1
LogisTech
15 Changi North Way
and an occupancy rate of
97.7%1
1. Assuming SG Logistics Acquisition was completed on 31 December 2025 on a pro fiorma basis. 13
1
Continuing to anchor the portfolio in Singapore while strengtheningLegend
Nucleos Galaxis
One-north MRT
Fusionopolis
Neuros V Immunos
Biopolis
Reinforces CLAR's competitive position as one of the largest private sector owners of business space and life sciences assets in SSP, a key technology and RSD hub in Singapore
with
Park Drive,Singapore 118222
NUS
0.8km away
AI Corridor
Lorong AI
Nexus @one-north
>350
multinational corporations, global
NUHS
Kent Ridge
MRT
The Shugart
Kampong AI
Mediapolis
Grab HQ
leading digital and technology
companies, as well as laboratories
2 Science
Geneo (1, 1A, 1B V 5
Science Park Drive)
SSP1
S$2.3 billion1
The Capricorn
Park Drive 12, 14 V 16
Cintech I V II
The Alpha
The Aries, Sparkle V Gemini
Science Park Drive
Cintech III V IV
The Rutherfiord V Oasis
CLAR's total AUM in SSP
with an occupancy rate of
SSP2
The Galen The Kendall
88.4%1
Assuming the SG Business Space Acquisition was completed on 31 December 2025 and based on the acquisition of 50.0% interest in the SG Business Space Asset. 14
2
Diversifying CLAR's global footprint across developed markets with healthy fundamentals - strategic expansion into Japan's data centre marketPre-Acquisitions1 Post-Acquisitions2
In line with CLAR's strategy to expand data centre portfolio in
The
France Switzerland 9% 2%
France Switzerland
The 7% 2%
Netherlands
developed markets with healthy fundamentals
Netherlands
10%
UK 26%
Asset Value S$1.9 B Asset Value S$1.9 BSingapore 53%
Modern 24%
7%
UK 20%
Asset Value S$2.6 BJapan
24%
Asset Value S$2.6 BSingapore 40%
Modern 43%
CLAR's S$2.6 billion data centre portfolio spans across 6 developed countries. Majority in key established data centre hubs
Increases modern data centre assets to 43% of CLAR's data centre portfolio
As at 31 December 2025. 15
Assuming the Japan Data Centre Acquisition was completed on 31 December 2025.
2
Diversifying CLAR's global footprint across developed markets with healthy fundamentals - strategic expansion into Japan's data centre market✓
Japan: largest data centre market among developed countries in Asia Pacific (APAC)
Total operational capacity of approximately 1.5 gigawatts
Growth in Japan's IT capacity from 2025 to 2030 is expected to be driven by:
AI-related investments from major international and local hyperscalers
Continued cloud expansion
Japan Data Centre IT Capacity Growth (megawatts)
Osaka: second largest market in Japan and one of the fastest-
growing established data centre markets in APAC
Data centre performance in 2025 was supported by stable fundamentals and continued interest from operators and investors
Live colocation vacancy was 11.0% in 1H 2025 with none of the vacant sites capable of supporting hyperscale requirements
Occupancy rates in Osaka are projected to rise above 90% by 2028 due to strong
hyperscale demand and capacity constraints
2025 to 2030
CAGR: 24%
1,488
2,801
2025 2030E
Source: Cushman & Wakefield, PwC, Structure Research, JLL, CBRE. 16
25 Loyang CrescentSingapore 508988
Legend
25 Loyang Crescent
B
Changi Logistics Centre
A
71 Alps Avenue
90 Alps Avenue
~15 minutes drive to Changi Airport and the future Changi East Industrial Zone which will support aviation-related logistics and boost Singapore's cargo-handling capacity
-
Situated in Loyang (east Singapore), a key industrial and logistics hub home to MNCs from aerospace, marine and engineering sectors. Enables seamless logistics efficiency by enabling air-land-sea logistics coordination within a single base with waterfront facilities, warehouses, offices and amenities
C LogisTech
15 Changi
Singapore Changi Airport
North Way
~15 minutes drive to Pan Island Expressway and Tampines Expressway
17
Ascent,
2 Science Park Drive,
Singapore 118222
NUS
0.8km away
NUHS
B B
C
Lorong AI
One-north MRT
Fusionopolis AI Corridor
D
Kampong AI
Biopolis
Mediapolis
A• Strategically located at the gateway of SSP 1, directly across the road from Geneo, the new life sciences and innovation cluster jointly developed by CapitaLand Development and CapitaLand Ascendas REIT
B• Within walking distance to Kent Ridge MRT Station, National University Hospital and National University of Singapore
C• Next to one-north district, a research and business park with biomedical
SSP2
A
2 Science
Park Drive
SSP1
sciences, info-communications technology and media companies, as well as science and research institutes,
D• Kampong AI and Lorong AI in one-north, Singapore's first integrated AI startup community with both work and living spaces
18
Kent Ridge
MRT
B
Japan
Data Centre
Greater Osaka, Japan
Osaka (CBD) B KyotoB
A
B
NaraA• Situated within one of the main data centre hubs in Greater Osaka and home to multiple major global and regional data centre operators. It is in a high disaster resilience area with robust infrastructure for excellent access to high-capacity power and fibre connectivity
B• Approximately 30 km from Osaka and Kyoto and 10 km from Nara which provides excellent access to infrastructure networks
19
SG Logistics Acquisition SG Business Space Acquisition Japan Data Centre Acquisition
Features a modern ramp-up logistics building, terrace workshops, and open yard space
A diverse range of logistics and industrial space to cater to various uses
Premium business space property completed in 2016 with remaining land lease tenure of ~55 years
BCA Green Mark Platinum certified
Newly built in 2023 with earthquake absorbing structure for seismic intensity level 7
TRUE (Total Resource Use and Efficiency) certified as of 2025
r t I i r t I i
Remaining land tenure of ~28 years Remaining land tenure of ~55 years Freehold
20
2