SUDBURY, ON, July 5 /CNW/ - Canadian Arrow Mines, Ltd. (CRO: TSX-V) The Company reports assay results from the 100% owned Kenbridge Nickel Deposit located near Kenora, Ontario. The eighteen holes reported in this release were drilled on five drill sections, at a section spacing of 30 metres. Significant results include 0.65% nickel and 0.17% copper over 116.7 metres including 3.30% nickel and 0.50% copper over 6.7 metres. The five contiguous sections are situated along 150 metres of the central and northern portions of the Kenbridge Deposit. A listing of significant intersections is compiled in the table below.
------------------------------------------------------------------------- Hole No. From To Length %Ni %Cu Section ------------------------------------------------------------------------- KB-07-22 25.6 32.0 6.4 0.20 0.22 12436N ------------------------------------------------------------------------- KB-07-23 8.5 18.0 9.5 0.44 0.29 12436N ------------------------------------------------------------------------- KB-07-23 40.0 48.1 8.1 0.31 0.28 ------------------------------------------------------------------------- KB-07-24 3.5 14.1 10.6 0.92 0.16 12436N ------------------------------------------------------------------------- KB-07-24 85.1 90.0 4.9 0.24 0.09 ------------------------------------------------------------------------- KB-07-25 24.0 29.0 5.0 0.34 0.10 12466N ------------------------------------------------------------------------- KB-07-25 59.1 73.0 13.9 0.31 0.18 ------------------------------------------------------------------------- KB-07-26 6.6 12.0 5.4 0.22 0.22 12466N ------------------------------------------------------------------------- KB-07-26 23.0 35.6 12.6 0.43 0.16 ------------------------------------------------------------------------- KB-07-27 No significant results 12466N ------------------------------------------------------------------------- KB-07-28 31.0 48.0 17.0 0.58 0.34 12466N ------------------------------------------------------------------------- (including) 31.0 38.0 7.0 1.07 0.71 ------------------------------------------------------------------------- KB-07-28 88.5 94.1 5.6 0.67 0.35 ------------------------------------------------------------------------- KB-07-29 No significant results 12497N ------------------------------------------------------------------------- KB-07-30 5.6 37.2 31.6 0.24 0.11 ------------------------------------------------------------------------- (including) 5.6 13.0 7.4 0.52 0.24 12497N ------------------------------------------------------------------------- KB-07-30 71.0 77.0 6.0 0.30 0.22 ------------------------------------------------------------------------- KB-07-30 138.5 153.0 14.5 0.93 0.27 ------------------------------------------------------------------------- (including) 144.0 148.0 4.0 2.10 0.39 ------------------------------------------------------------------------- KB-07-31 13.5 41.0 27.5 0.32 0.11 12497N ------------------------------------------------------------------------- (including) 13.5 20.0 6.5 0.66 0.21 ------------------------------------------------------------------------- KB-07-32 23 30.5 7.5 0.37 0.23 12405N ------------------------------------------------------------------------- KB-07-33 12 60.3 48.3 0.47 0.23 12405N ------------------------------------------------------------------------- (including) 32.7 37.2 4.5 2.68 1.15 ------------------------------------------------------------------------- KB-07-34 3.75 27.0 23.25 0.31 0.14 12405N ------------------------------------------------------------------------- (including) 6.0 10.25 4.25 0.88 0.42 ------------------------------------------------------------------------- KB-07-35 No significant results 12375N ------------------------------------------------------------------------- KB-07-36 26.55 51.7 25.15 0.80 0.24 12375N ------------------------------------------------------------------------- (including) 46.85 50.3 3.45 3.75 0.76 ------------------------------------------------------------------------- KB-07-37 1.5 8.7 7.2 0.47 0.18 12375N ------------------------------------------------------------------------- KB-07-37 55.0 75.45 20.45 0.31 0.21 ------------------------------------------------------------------------- KB-07-38 2.1 118.8 116.7 0.65 0.17 12375N ------------------------------------------------------------------------- (including) 2.1 52.9 50.8 1.005 0.23 ------------------------------------------------------------------------- (including) 2.1 6.0 3.9 2.36 0.53 ------------------------------------------------------------------------- (including) 43.5 50.2 6.7 3.30 0.50 ------------------------------------------------------------------------- (including) 113.35 118.0 4.65 1.86 0.50 ------------------------------------------------------------------------- KB-07-39 10.0 26.9 16.9 0.78 0.26 12375N ------------------------------------------------------------------------- (including) 13.85 20.15 6.3 1.79 0.43 -------------------------------------------------------------------------
Kenbridge mineralization consists of three higher grade sulphide zones hosted within a 65 m wide gabbro body. The intersections tabled above represent intersections of the three zones at relatively shallow levels.
SRK Consulting, (Canada) recently completed a National Instrument 43-101 Resource Estimate on the Kenbridge Deposit (May 4, 2007, on SEDAR). The total Inferred Resource estimate for Kenbridge was 3.2 million tonnes of 0.73 percent nickel and 0.35 percent copper. The Resource was subdivided into two inferred resources IF1 and IF2. The IF1 Mineral Resource considered amenable to open pit mining consists of 2.1M tonnes averaging 0.58% nickel and 0.26% copper. It extends to a depth of 150 metres, the initial consideration on limits of an open pit mining operation.
Kim Tyler, President of Canadian Arrow Mines commented, "The first phase of drilling at Kenbridge is intended to confirm the geometry and continuity of the near-surface IF1 Resource estimate to a satisfactory level that it may be upgraded to a Measured/Indicated classification. The eighteen holes tabled in this release represent the initial results of a robust drill program that will continue at Kenbridge through the summer and fall. A second drill has been mobilized to the site and will commence the evaluation and upgrading of the underground portion of the resource estimate. Opportunities still exist to expand the resource at its extents. Kenbridge remains open at depth"
"Although confirmation and upgrading of the Kenbridge Resource is our first priority, early stage exploration has already begun on our outlying claims. Future drilling programs will expand outwards to follow up on existing and new exploration targets."
The table below details drill hole survey and directional data.
---------------------------------------------------------------- Hole No. Northing Easting Elevation Dip Azimuth ---------------------------------------------------------------- KB-07-22 12436 6057.0 1521 -45 307.2 ---------------------------------------------------------------- KB-07-23 12436 6085.4 1521.0 -42.9 307.7 ---------------------------------------------------------------- KB-07-24 12436 6117.0 1518.0 -48 307.2 ---------------------------------------------------------------- KB-07-25 12466 6117.7 1519.5 -47.9 316.9 ---------------------------------------------------------------- KB-07-26 12466 6084.0 1519.5 -46.1 310.1 ---------------------------------------------------------------- KB-07-27 12466 6055.6 1520.0 -45.2 311 ---------------------------------------------------------------- KB-07-28 12466 6133.6 1521.0 -46.1 310.4 ---------------------------------------------------------------- KB-07-29 12497 6093.8 1518.0 -44.7 311.3 ---------------------------------------------------------------- KB-07-30 12497 6095.3 1518.0 -86.4 315.6 ---------------------------------------------------------------- KB-07-31 12497 6119.5 1520.0 -45.7 308.4 ---------------------------------------------------------------- KB-07-32 12405.5 6049.2 1520.0 -47.3 306.9 ---------------------------------------------------------------- KB-07-33 12405 6073.8 1520.5 -45.8 305.2 ---------------------------------------------------------------- KB-07-34 12405 6118.0 1518.0 -47 312.2 ---------------------------------------------------------------- KB-07-35 12375 6045.2 1519.0 -47.1 305.7 ---------------------------------------------------------------- KB-07-36 12375 6063.5 1520.0 -45.9 291.6 ---------------------------------------------------------------- KB-07-37 12375 6084.3 1520.0 -45.8 307.8 ---------------------------------------------------------------- KB-07-38 12375 6117.0 1518.0 -47.6 296.5 ---------------------------------------------------------------- KB-07-39 12344 6045.0 1519.5 -48 290.4 ----------------------------------------------------------------
The exploration program is being carried out under the direction of The Company's Vice President of Exploration, Todd Keast P. Geo., a qualified person as defined by National Instrument 43-101. The information in this release was prepared under the direction of Kim Tyler, P. Geo., President of the Company, a qualified person as defined by National Instrument 43-101.
About Canadian Arrow Mines, Ltd.
Canadian Arrow Mines, Ltd. is an established Canadian exploration and development Company committed to developing and advancing base metal deposits close to existing infrastructure through exploration, development and acquisition. Shares of Canadian Arrow Mines trade on the TSX Venture Exchange under the symbol "CRO".
If you would like to receive press releases via email please contact:
Catarina@chfir.com
THIS PRESS RELEASE WAS PREPARED BY MANAGEMENT WHO TAKES FULL
RESPONSIBILITY FOR ITS CONTENTS.
THE TSX VENTURE EXCHANGE NEITHER APPROVES NOR DISAPPROVES OF THIS PRESS
RELEASE.
This news release may contain certain "Forward-Looking Statements" within the meaning of Section 21E of the United States Securities Exchange Act of 1934, as amended. All statements, other than statements of historical fact, included herein are forward-looking statements that involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company's expectations are disclosed in the Company's documents filed from time to time with The TSX Venture Exchange, Canadian Securities Commissions, and the United States Securities & Exchange Commission. Not to be construed as an offer to buy or sell securities of this company.
%SEDAR: 00008534E