Sunstone Metals LtdASX: STM

Bramaderos - first drill hole completed

· Issued by Sunstone Metals Ltd

Filed with ASX · · 3 pages · English

The first drill hole at the Limon target, LMDD001, was completed on April 25 at a depth of 490.6m. Drilling averaged ~40m per day with no safety or environmental incidents. The drill rig is now moving to the second Limon drill hole, LMDD002, and drilling is expected to commence this week. Logging and sampling of hole LMDD001 are well advanced. Samples from the first 201m of LMDD001 have been despa

Sunstone Metals Ltd on 6ix

Story so far

Earlier from Sunstone Metals

Later from Sunstone Metals

All Sunstone Metals news releases