Canada Carbon, Inc.TSXV: CCB

Bolero drills 110 feet of 0.106% Mo (0.177% Mos2) at Bald Butte

· Issued by Canada Carbon, Inc.

VANCOUVER, Oct. 17 /CNW Telbec/ - Bolero Resources Corp. (the "Company" or "Bolero"), (TSX-V: BRU) is pleased to announce the analytical results for the first four diamond drill holes of the 2007 exploration program at the Company's Bald Butte molybdenum project in Montana. All holes were designed to test the continuity and limits of mineralization defined in the NI 43-101 compliant report dated December 12, 2006 which has been filed on Sedar. This data will confirm the confidence that Bolero has in the resource. Upon completion of the present drill program, the Company will calculate an updated NI 43-101 compliant resource which is scheduled for completion by the end of the first quarter 2008.

The attached table shows the significant intercepts resulting from holes BB07-1, BB07-2, BB07-5, and BB07-10. We have used a 0.04% Mo cut-off for the significant intercepts and have therefore only listed those intercepts that are at least 20 feet in thickness and have grades of 0.04% Mo or greater.

SIGNIFICANT INTERCEPTS, CORE HOLES BB07-1, 2, 5, AND
10, BALD BUTTE MOLYBDENUM PROJECT, LEWIS AND CLARK COUNTY,
MONTANA UNITED BOLERO DEVELOPMENT CORP., OCTOBER 7, 2007


Hole        From       To  Intercept   Avg Mo%
Number      Feet     Feet  Thickness
----------------------------------------------
----------------------------------------------

BB07-1       188      238         50    0.040
             238      268         30    0.072
             268      298         30    0.123
             298      408        110    0.048
             578      598         20    0.041
             778      798         20    0.176
BB07-2        30      150        120    0.060
             150      170         20    0.140
             170      200         30    0.044
             200      230         30    0.090
             230      310         80    0.045
             310      360         50    0.064
             360      470        110    0.106
BB07-5       160    189.3       29.3    0.045
           189.3      240       50.7    0.064
             260      370        110    0.068
             370      400         30    0.104
             400    509.2      109.2    0.085
           509.2      530       20.8    0.122
             530    629.5       99.5    0.072
           629.5      670       40.5    0.047
             690      720         30    0.077
BB07-10      229      299         70    0.049
             349      389         40    0.045
             389      409         20    0.088
             479      499         20    0.046
             529      559         30    0.048
             559      579         20    0.060
             749      779         30    0.042

The inclination of the four holes and their total depths are as follows:

Hole Number   Inclination   Total Depth (feet)

BB07-1       -70 (degrees)              1,398
BB07-2       -90 (degrees)              469.5
BB07-5       -90 (degrees)              1,400
BB07-10      -90 (degrees)                799

Three of the four new holes were drilled to the depths planned but hole BB07-2, which we had planned to drill to a depth of 1,000 feet, encountered a broken zone that forced abandonment of the hole at a depth of 470 feet. The last 110 feet of hole BB07-2 averaged 0.106% Mo. We plan to drill another hole in the immediate area of BB07-2 in the hope of testing the projection of this high-grade zone to depth.

These first four holes have established continuity of the upper (main) zone of mineralization as projected in our preliminary modeling and have better defined the limits of a deeper zone in the northeastern portion of the mineralization which may represent a structurally controlled feeder zone. The best intercepts in these holes occur in strongly altered Proterozoic Helena Formation at the contact with the Bald Butte quartz monzonite stock of Eocene age.

We are especially pleased with the results in the upper portion of hole BB07-2 where our preliminary projections suggested that ore-grade mineralization would only start at a depth of approximately 210 feet below surface. In fact, this hole encountered a zone averaging 0.06% Mo starting just 30 feet below surface. As shown in the attached table, hole BB07-2 encountered ore-grade material from 30 feet to its termination at 470 feet. The Company will be updating the shareholders with more drill results in the weeks ahead.

John Childs, Ph.D., Registered Geo (AZ) is the "qualified person" (as such term is defined by NI 43-101) responsible for the preparation of the technical information in this release.

Bolero Resources Corp. is a well funded exploration and development Company which holds 100% interests in 2 significant molybdenum properties located in Montana, USA. The Company is listed on the TSX-Venture Exchange under the symbol BRU, as well as the Frankfurt Exchange under U7N. For more information, please visit www.unitedbolero.com or call toll-free 888-945-4770.

On behalf of the Board of Directors

"R. Bruce Duncan"

President & CEO

The TSX Venture Exchange does not accept responsibility for the adequacy

or accuracy of this release.