Bold Head Maiden Mineral Reserve Estimate
Filed with ASX · · 67 pages · English
Summary by 6ix AI
The estimate includes a high-grade probable reserve and indicates an overall increase in the total probable reserves for the project. The company plans to mine the Bold Head deposit in parallel with the Dolphin operation, enhancing production capabilities. This announcement is part of a prefeasibility study that complies with industry reporting standards.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Earlier from Group 6 Metals
- SPP update and release of supplementary prospectus
- First Tungsten Concentrate Produced at Dolphin
- Share Purchase Plan- Prospectus
- Reinstatement to Quotation
- Production set to begin supported by $30m capital raise
Later from Group 6 Metals
- Commercial Production of Tungsten Concentrate Achieved
- G6M raises $3.7M via share purchase plan
- First Shipment of Tungsten Concentrate Dispatched from DTM
- Production Ramp Up at Dolphin Tungsten Mine
- Investigator 22 and 24 Exploration Drilling Report
Follow Group 6 Metals into a list and get an email when it puts out news.
Follow Group 6 Metals