Sorby Hills Project

Development Ready


  • Tier-1 Jurisdiction, Located 50km northeast of Kununurra, Western Australia, sealed road to Wyndham Port (150 km)

  • Large scale and well defined 47.3Mt Silver-Lead Resource

    (123g/t AgEq)1 including 53Moz contained Silver

  • DFS & FEED Studies Complete for stage 1 Operations NPV8 A$910M and IRR 62% at current macroeconomics2

  • High-Quality Processing Plant secured from Sandfire Resources DeGrussa project for use at Sorby Hills

  • Environmental Approvals received (EPA & EPBC)

  • Forecast annual Silver production of ~2.2Moz, positioning Sorby Hills among the top silver producers in Australia

  • Exceptional Silver Exposure - Operating costs covered by lead revenue delivering an AISC negative US$14/oz Ag

  • Strong Financing & Partnerships - Trafigura offtake agreement in place with US$30M prepayment. Advanced discussions with debt financiers progressing

  • Targeting a Final Investment Decision ("FID") Q4 2025

  • Significant Growth & Exploration Upside - Resource expansion and Mine life extension at Sorby Hills in addition to 100% owned regional strategic projects

Figure: Location of the Sorby Hills Project

  1. See Appendix for Resource breakdown and Metal Equivalent Assumptions

  2. See Slide 4 for current macroeconomic assumptions

3

Boab Metals Limited ASX: BML



4



Boab Metals

Investment Thesis

The Sorby Hills Project provides investors development ready exposure to rising silver prices

leveraging off robust project economics underpinned by a historically stable lead price

SILVER SNAPSHOT: THE CROSSROADS OF INDUSTRY AND INVESTMENT

  • Industrial demand:Unmatched conductivity make silver critical for solar panels, EV electronic and central to the global energy transition.

  • Supply squeeze:With primary mine output declining, most silver now coming only as a by-product, and recycling stuck at ~20%, supply cannot keep pace - entrenching a structural deficit.

  • Value storage & safe-haven:As a monetary metal, silver is a store of value, moving with gold during inflationary or geopolitical uncertainty.

  • Speculative kicker:gold-silver ratio, investor flows to silver EFTs, and leveraged futures trading all leading to amplified volatility - giving silver greater upside torque in bull markets.

1,164Moz Demand in 2024

  • 58% Industrial Demand

  • 23% Jewellery & Silverware

  • 16% Coins and Bars

    1,015Moz Supply in 2024

  • 22% Primary Silver Mines

  • 58% as a by-product metal

  • 19% Recycled Silver

Added to the U.S Government draft Critical Minerals List

(August 25)

Boab Metals Limited ASX: BML





Source: Silver Institute 2025 Survey



5



Boab Metals

Investment Thesis

The Sorby Hills Project provides investors development ready exposure to rising silver prices

leveraging off robust project economics underpinned by a historically stable lead price

LEAD SNAPSHOT: THE ORIGINAL BATTERY METAL

  • Enduring Demand:A lead-acid battery is typically replaced two to three times in a Light Vehicle's average lifetime of around 12 years supporting a demand tail that will stretch decades.

  • Indian Lead Demand: Indian consumption of refined lead is forecast to

    grow 5% YOY through to 2030.

  • Silver Lining:High demand for silver bearing lead concentrates is delivering record low Concentrate Treatment Charges (negative US$65/t)

  • Price Stability: A mature secondary market provides a buffer against price shocks, limiting the Lead price to a relative tight and predictable range.

13,185kt Demand in 2024

  • 41% Replacement batteries

  • 13% New batteries

  • 34% Industrial batteries

  • 12% Non-battery uses

    13,141kt Supply in 2024

  • 32% Primary Lead

  • 68% Recycled Lead

Market to remain tight as growth in production slows by more than in consumption

Boab Metals Limited ASX: BML





Source: CRU 2023-2025



Sorby Hills Project

When Silver Runs, Boab's Share Price Runs Harder

6

BML outperforming Silver

30 Day Average Daily Change

USD Silver 30-day Avg Daily % Change

% daily change in USD Silver price & BML share price

US$ Silver

ASX:BML

-2.00%

Jan-25

Jan-24

Jan-23

Jan-22

Jan-21

-4.00%

Jan-20

-1.50%

-2.00%

-1.00%

2.00% 4.00% 6.00%

BML 30-day Avg Daily % Change

-0.50%

0.00%

0.00%

-6.00% -4.00% -2.00% 0.00%

0.50%

2.00%

1.00%

4.00%

1.50%

2.00%

BML share price outperforming silver metals returns

6.00%

*30 Day Rolling Average



  • Since the acquisition of the Sorby Hills Project in June 2018, Boab's share price has exhibited a strong correlation with movements in the price of Silver.

  • Positive movements in Silver price correspond to leveraged positive movements in the Boab share price

6

Boab Metals Limited ASX: BML



7

Sorby Hills Project

Cost structure delivering "free Silver"

Operating Costs covered by a non-volatile Lead Price Operating margin fully leveraged to Silver price movements.

US$/lb Pb

US$/oz Ag

Viewed differently, the Sorby

Sorby Hills FEED Study AISC

ex-Silver Credits

US$0.81/lb Pb

52% Margin

10-Year average Lead Price1 US$0.94/lb Pb

+/-US$0.10/lb Pb standard deviation

Sorby Hills Net Silver Credits* US$0.74/lb Pb

2.0

Increasing Silver Price

50

Hills Project may be considered a low-cost silver producer

Sorby Hills AISC ex Lead "Credits" US$51/oz Ag

AISC = negativeUS$14/oz Ag

Sorby Hills

Net Lead "Credits"

US$65/oz Ag

AISC = negative US$14/oz Ag

1.0 0

0

Project Costs Project Revenue

7

Sorby Hills Project Costs are more than covered by the 10-year average1 Lead Price

-50

Sorby Hills - A low-cost Silver Producer?

*Based on Spot Price of US$52.9/oz Ag

1 As at 20 October 2025

Boab Metals Limited ASX: BML

AISC = All in Sustaining Cost or "Breakeven" cost



8

Sorby Hills Project

DFS & Front-End Engineering & Design (FEED) Complete



2024 FEED Study Highlights

A$264M pre-production Capex (material cost reduction anticipated resulting from DeGrussa acquisition)

Average Annualised Production

C1 cash cost US$0.36/lb payable Pb

Incl. net Silver credit of

US$0.37/lb payable Pb

2.25Mtpa

Spot Macroeconomics

As at 20 October 2025

  • Lead: A$3,030/t

  • Silver: A$81.3/oz

  • FX: 0.65 AUD:USD

  • Spot Lead TC: minus US$65/t1

    103kt Lead-Silver concentrate 68kt Lead and 2.2Moz Silver

    Initial 8.5 Year

    Mine Life

    NPV8 = A$910M

    NPV8 A$411M

    IRR 37%

    Strong pre-tax economics

    A$1.1BOperating Cash Flow

    A$126M p.a.Average EBITDA

    IRR = 62%

    1. Average of Spot TCs published by CRU and WoodMac for May 2025

    Shallow high gradeand Low Strip Oredelivering strong low risk

    early cashflowsand rapid payback

    FEED Study Macroeconomic Assumptions

    Pb: US$2,252/t (A$3,312/t), Ag: US$27.4/oz (A$40.4/oz), FX: 0.68, Lead TC: US$125/t

    8

    Boab Metals Limited ASX: BML



    Sorby Hills Project

    Poised to be a Major Silver Producer

    Company

    Asset

    Silver Production (koz)*

    S32

    Cannington

    10,292

    Glencore

    Mt Isa, George Fisher

    3,909

    MMG

    Rosebery

    2,414

    Boab Metals

    Sorby Hills

    2,191

    Avg annualised production

    MMG

    Dugald River

    1,853

    Glencore

    McArthur River

    1,760

    BHP

    South Australia

    913

    29 Metals

    Golden Grove

    882

    Evolution

    All Assets

    827

    Forecast Sorby Hills silver production versus established silver producers within Australia

    9

    Sorby Hills Revenue Split

    A$3,030/t Pb and A$81.3/oz Ag

    546kt Payable Lead

    54%

    46%



    A$1.7B Revenue

    17.2Moz Payable Silver

    9

    A$1.4B Revenue

    Boab Metals Limited ASX: BML

    *Source FY24 and FY25 Annual Reports List is not exhaustive



    10

    Sorby Hills Project

    Progressing toward a Final Investment Decision

    Recent achievements provide Boab with significant momentum heading into FID

    2022 - 2023

    • Completion of the Sorby Hills Definitive Feasibility Study("DFS")1.

    • Heads of Agreement to source power from the Ord-River Hydroelectric Plantexecuted with Horizon Power2.

    • Port Access Agreementexecuted with port operators Cambridge Gulf3.

    • 178-person Accommodation Facility acquired and relocated to site4.

2024 - 2025

  • Completion of a Front-End Engineering & Design Study

    ("FEED Study") delivering improved project economics1.

  • Executed Agreement to acquire 100% Sorby Hillsupon Final Investment Decision2.

  • Executed Binding Offtakeand US$30 Million

    Prepayment Facilitywith Trafigura3.

  • EPA Part IV and EBPCapprovals recieved4,6.

  • Executed Agreement to Purchase the DeGrussa Processing Plantfrom Sandfire Resources5.

  1. ASX Release 19 January 2023

  2. ASX Release 22 April 2022

  3. ASX Release 31 March 2022

  4. ASX Release 15 September 2022

Boab Metals Limited ASX: BML

  1. ASX Release 6 June 2024

  2. ASX Release 23 September 2024

  3. ASX Release 10 December 2024

  4. ASX Release 23 December 2024

  5. ASX Release 30 April 2025

    10

  6. ASX Release 3 September 2025



Attention: This is an excerpt of the original content. To continue reading it, access the original document here.