Black Diamond-Drilling Intersects continuous 93.5m pegmatite
Filed with ASX · · 15 pages · English
Summary by 6ix AI
The second hole drilled intersected a significant width of pegmatite, including a large spodumene crystal, indicating the potential for further discoveries in the area. The company is currently awaiting results from additional drilling, which is expected to provide further insights into the mineralization of the project.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Earlier from Iris Metals
- 78m @ 1.03% from 19m Confirms Major Lithium Discovery
- Response to ASX Query Letter
- Multiple Wide, High-Grade and Shallow Lithium Intersections
- Completion of maiden RC drilling program at Beecher
- Outstanding Surface Results 44.13m at 1.02% Lithium
Later from Iris Metals
- Lithium Results Continue to Grow the Beecher Discovery
- A$7.5m Placement to Accelerate Lithium Development in USA
- 51 Meter @ 1.26% Intercept achieved at Beecher
- S&P DJI Announces March 2024 Quarterly Rebalance
- Wide and High Grade Lithium Results of Black Diamond
Follow Iris Metals into a list and get an email when it puts out news.
Follow Iris Metals