Business
Bathurst Metals Announces Completion of Geophysical Surveys at the Peerless Project, Gold Bridge Mining Camp, British Columbia
Vancouver, B.C. – TheNewswire - June 10, 2026 – Bathurst Metals Corp. (TSX-V: BMV OTC: BMVVF) ("Bathurst" or the "Company") is pleased to announce the

About this update from Bathurst Metals Corp
Vancouver, B.C. – TheNewswire - June 10, 2026 – Bathurst Metals Corp. (TSX-V: BMV OTC: BMVVF) ("Bathurst" or the "Company") is pleased to announce the completion of detailed geophysical surveys at its Peerless Gold-Silver Project located in British Columbia's prolific Gold Bridge Mining Camp. The survey program consisted of 50 line-kilometres of ground magnetometer surveying and 25 line-kilometres of VLF-EM surveying completed on 25-metre spaced lines across the Company's principal exploration target area (Figure 2). The surveys were designed to define the extent of ultramafic units, identify key structural controls, and delineate zones of hydrothermal alteration associated with gold mineralization. The survey grid covers the main area of coincident gold and antimony soil geochemical anomalies as well as all known gold occurrences identified on the property. Interpretation of the survey data is currently underway and will be integrated with existing geological and geochemical datasets to refine drill targets. Following interpretation of the geophysical results, the Company plans to initiate a Phase 1 diamond drilling program focused on the Alpha and Beta Zones. These targets occur where east-west trending ductile shear zones intersect thrust-bounded ultramafic units and mafic volcanoclastic rocks, a geological setting considered prospective for high-grade gold mineralization. Bathurst's inaugural drill program at Peerless, completed in February 2024, intersected 5.1 g/t gold over 6.3 metres (core length) within the targeted structural corridor. The Company is currently evaluating an expansion of the proposed drill permit area to include additional coincident geochemical and geophysical anomalies extending northeast of the previously tested zones. In addition to the work completed at Peerless, field crews will conduct similar geophysical surveys and collect approximately 100 to 200 soil samples at the Company's Merry May Project, also located within the Gold Bridge Mining Camp. Lorne Warner P.Geo, President of Bathurst Metals Corp. States: "The geophysical surveys completed at Peerless represent an important step in advancing our understanding of the geological and structural controls on gold mineralization across the property. The results will help refine drill targeting and support the expansion of our exploration efforts into several highly prospective ...
View stock analysis, news, and events for Bathurst Metals Corp