Period ended December 31, 2005.
MONTREAL, March 31 /CNW Telbec/ - Gold production at the Kalana Mine
increases 100% to 14,923 ounces in 2005 and a follow up diamond drill program
to drill define the recently discovered high-grade mineralization zones on the
Kalana Permit commenced in November
Results
Gold production at the Company's Kalana Mine increased by 100% from 7,396
ounces in 2004 to 14,923 ounces in 2005 and cash costs reduced to $484 per
ounce of gold sold, down from $791 per ounce sold in 2004. Gold production in
quarter four was 5,222 ounces, the highest quarterly gold production since the
mine started in 2004. The increase in production is due to higher underground
grade mined and higher gold recoveries in the plant.
Avnel Gold Mining Limited ("Avnel" or the "Company") recorded a net loss
of $7.1 million ($0.29 per share) for the twelve months ended December 31,
2005 and a net loss of $1.7 million ($0.03 per share) for the fourth quarter
compared to net losses of $5.4 million ($58.00 per share) and $1.9 million
($19.27 per share) respectively for the same periods of 2004. The high loss
per share for the year 2004 results from there being only 200,000 shares
outstanding prior to the Initial Public Offering on June 30, 2005 when a
further 47,193,605 shares were issued.
Exploration: Avnel commences to drill define two recently discovered
high-grade mineralization zones
Following on the success of the June 2005 percussion drill program at the
387 km2 Kalana Exploitation Permit in southern Mali, the Company has completed
a technical report which concluded that a follow-up diamond core and RC drill
program would be justified in order to drill define and expand the
newly-discovered, high-grade gold zones at Grid 8. A diamond drill program
began in November 2005 and results will be available in April 2006. It is
planned to continue a RC drilling on Grid 8 in quarter two, 2006.
The Djirila Main zone is interpreted as a NE-trending, fault-controlled,
quartz-vein-stockwork zone located on the NW side of Djirila hill. This zone
is characterised by high-grade gold mineralisation and produced high gold
assay intervals (e.g. 73.6g/t over 2m from 70 to 72m in RC-09a, and 45.9g/t Au
over 4m from 114 to 118m in RC-15). In addition, the Djirila Main zone also
contains significant widths of lower grade intersections (e.g., 5.4g/t Au over
36m from 64 to 100m in RC-09a).
The Djirila South zone is interpreted as a NE-trending, fault-controlled,
quartz-vein-stockwork zone located on the SE side of Djirila hill. This zone
is characterised by wide intersections of lower grade mineralisation and
produced several significant gold assay intervals (e.g., 4.1g/t Au over 6m
from 17 to 23m in RAB-090, and 8.3g/t Au over 22m from 35 to 57m in RAB-118).
Operations
The Kalana Mine was initially developed and mined by SOGEMORK from 1985
to 1991. The mine was then put on care and maintenance until SOMIKA (80%
subsidiary of Avnel Gold, Limited) commenced production in 2004. The mine has
limited developed ore reserves and it is planned to complete the necessary
shaft sinking and haulage development to enable the mine to achieve an annual
production rate of 60,000 tonnes and an average 26,000 ounces of gold over an
initial 8 years period. During 2006 underground production will increase as
new mining areas are exposed by ongoing development.
Production data for the Kalana Mine for the periods ended December 31,
2005 and 2004 are as follows:
The following table shows the production from the Kalana Gold Mine:
<<
------------------------------------------------------------------------
2005 2004
-------- --------
Tonnes milled 34,885 35,667
------------------------------------------------------------------------
Gold grade - grams per tonne (g/t) 15.5 9.4
------------------------------------------------------------------------
Recovery rate - % 86.1% 68.6%
------------------------------------------------------------------------
Gold production - ounces 14,923 7,396
------------------------------------------------------------------------
Cost per tonne milled $155 $144
------------------------------------------------------------------------
Operating cost per ounce of gold sold $484 $791
------------------------------------------------------------------------
>>
Tonnes milled in 2005 were 2% below the production achieved in 2004 and
20% below the budgeted production. Gold production at 14,923 ounces was 1%
below budget reflecting higher grades and gold recovery. During 2005,
underground production has mainly come from mining of a new ore reserve block
below the lowest haulage level (100m below surface). The ore reserve block is
being developed down dip and rock is scraped up dip to the haulage level. This
mining method will limit the production capacity of the mine until ore can be
gravitated to new haulages being developed on the 150 and 180 levels lower in
the mine. Productivity of the underground crews is improving, but at a slower
rate than anticipated.
The gold grade of underground ore mined of 17.12 g/t in 2005 was 62%
higher than that obtained in the previous year (10.58g/t). The grade was also
3.35g/t higher than budget of 13.77g/t because average stoping widths were
reduced and actual grades of ore mined was significantly higher than that
indicated by the reserve model. The mill grade of 15.5g/t (2004 - 9.4 g/t)
obtained was lower than the underground grade as it was reduced by the
processing of 4,614 tonnes of coarse sand (2004 - 4,604 tonnes) at 4.9 g/t
(2004 - 4.7 g/t). In the fourth quarter, 8,442 tonnes, including 235 tonnes of
coarse sand, were milled at a mill head grade of 21.96 g/t. Gold recovery was
87.6% and 5,222 ounces were produced
Gold recovery in 2005 also exceeded both the prior year and the budgeted
rate. This was because of improved performance in the recovery section, lower
than budgeted throughput and higher than budgeted head grades. When ore
production increases in future, it is expected that the recovery rate will
decrease to between 79% and 84%, depending on head grades and plant
performance. Gold production increased to 14,923 ounces, approximately double
the production achieved in 2004.
Mine development totalled 249 metres in 2005 compared to 168 metres in
2004. Underground development increased to 103 metres during quarter 4 2005
but progress was unsatisfactory at No 2 Shaft. The shaft is being sunk from
125 metres below surface to a final depth of 200m below surface. Shaft sinking
has advanced 61 metres but only 8 metres was achieved during the fourth
quarter. During the quarter the station steelwork and a mid shaft loading
facility was installed at the 150 level shaft station. The mid shaft loading
facility will enable the 150 level haulage (previously named the 250 level) to
be developed while sinking of the shaft and development of the 180 level
station is completed. The 150 level was advanced 17 metres. The development of
the 150 level is 5 months behind schedule. The main factor delaying the shaft
sinking was inexperienced mining crews and turnover of the expatriate staff.
The expatriate staff for mine development has been increased from two to six
and the Malian mining crews have been increased.
Avnel's principal asset is an 80-per-cent interest in SociDetDe
d'Exploitation des Mines d'Or de Kalana (SOMIKA). SOMIKA is the holder of an
exploitation permit encompassing 387.4 square kilometres around the operating
Kalana gold mine in southern Mali.
The Annual Financial Statements and Annual Information Form are available
on Sedar (www.sedar.com) and the Avnel Gold website (www.avnelgold.com).
Caution Regarding Forward Looking Statements:
Statements regarding the corporation's plans with respect to the Kalana
Mine and exploration of the Kalana Permit are forward-looking statements.
There can be no assurance that the planned ongoing development of the Kalana
Gold Mine will be completed as forecast or that the exploration program on the
Kalana Permit will identify minerals resources.
The TSX has neither approved nor disapproved the form or content of this
information release.
%SEDAR: 00021819E
Avnel Gold Mining Limited (AVK: TSX) announces 2005 annual results
Earlier from Avnel Gold Mining
- Press Release and Early Warning Report required under the following statutes - Re: Avnel Gold Mining Limited
- Avnel appoints new Chief Financial Officer
- Avnel Gold Mining Limited Announces Interim Report - Period ended Sept 30, 2005.
- Avnel Gold Mining Ltd. plans to drill define two high-grade mineralization zones recently discovered at the Kalana Exploitation Permit, South Mali
- Avnel Gold Mining Limited announces interim report - Period ended June 30, 2005
Later from Avnel Gold Mining
- Avnel Confirms and Extends Zone of Significant Gold Mineralisation in a Diamond Core Drill Programme at the Kalana Property, South Mali
- Avnel Gold Mining Limited (AVK: TSX) announces first quarter 2006 results period ended march 31, 2006
- Avnel Gold Outlines Additional Prospective Drill Targets from a Soil Geochemistry Program at its Kalana Exploitation Permit, South Mali
- Avnel Gold Completes Phase IV RC Drill Program at the Kalana Exploitation Permit, South Mali
- Avnel Gold Mining Limited (AVK: TSX) Announces Second Quarter 2006 Results, Period ended June 30, 2006
Follow Avnel Gold Mining into a list and get an email when it puts out news.
Follow Avnel Gold Mining