Asset results confirm further mineralisation at Lei
Filed with ASX · · 12 pages · English
+ Spodumene has been intersected in samples taken from the north of the primary Lei pegmatite, extending the mineralised body vertically, with BYLDD010 returning: − 7.0m @ 0.84% Li2O from 294m + Development of a Phase 3 infill and extensional program at Lei is nearing completion with drilling expected to commence Q2 2023 Lithium Plus Minerals Limited (ASX: LPM) (Lithium Plus or the Company) is ple
Lithium Plus Minerals Ltd. on 6ix
Earlier from Lithium Plus Minerals
- Second shallow Pegmatite discovered at Lei
- Further High Grade Lithium intercept returned at Lei Prospec
- Diamond Drilling recommenced at Lei Prospect
- High Grade Lithium intercepts returned at Lei Prospect
- Investor Presentation
Later from Lithium Plus Minerals
- Significant number of new Pegmatite Systems & Drill Targets
- A $4.5 Million Placement to accelerate expanded exploration
- Wide Pegmatite interval intercepted in first Phase 3 Diamond
- Drilling result - Thick High Grade mineralised intersections
- Drilling commenced Kings Landing area, Bynoe Lithium Project
Follow Lithium Plus Minerals into a list and get an email when it puts out news.
Follow Lithium Plus Minerals