Anson Commences Paradox Lithium Project Drilling
Filed with ASX · · 3 pages · English
Summary by 6ix AI
The drilling will target four Clastic Zones, with samples to be sent for assaying to determine lithium and other mineral content. A bulk brine sample will also be processed in a bench top plant, with the first lithium carbonate production expected in the near future.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Anson Resources Limited on 6ix
Story so far
Earlier from Anson Resources
- Anson Completes Drill Site Preparations
- Anson Closes 20m Share Placement With Strategic Investor
- Anson Commences Drill Pad Earthworks
- Anson Moves Closer to First Production
- Anson Remains on Schedule to Commence Drilling
Later from Anson Resources
- Anson Reaches Sampling Depth in Gold Bar Unit 2 Drilling
- Anson Successfully Samples Clastic Zone 31 Brine
- Anson Acquires Oil Well for Planned Lithium Production
- Anson to Commence Brine Sampling at Cane Creek 32-1
- Anson Confirms Supersaturated Brines in Gold Bar Sampling
Follow Anson Resources into a list and get an email when it puts out news.
Follow Anson Resources