- The agreement covers the supply of a complete railway signalling system, with equipment certified to the highest international level of reliability
- The solution will enhance safety and operational efficiency in the yard by improving control of train movements, providing real-time visibility of track occupancy and supporting more efficient train allocation
- The new Mauá Norte Yard, located between Mauá and Capuava stations on Line 10-Turquoise, was built by CPTM and includes six new tracks for shunting, train formation and stabling of trainsets
- The project includes installation, testing, commissioning and integration with the existing systems in adjacent areas and will be completed in 18 months
15 July 2026 - Alstom, global leader in smart and sustainable mobility, announces the signing of a contract with Companhia Paulista de Trens Metropolitanos (CPTM) for the supply and implementation of the railway signalling system for the new Mauá Norte Yard, which is part of Line 10-Turquoise. The yard, located between Mauá and Capuava stations, was built by CPTM and includes six new tracks for operational shunting, train formation and stabling of trainsets outside operating hours.
