Alpha Exploration Ltd.TSXV: ALEX

Alpha Further Expands Footprint of Anagulu Copper-Gold Porphyry Prospect and Discovers New Nightjar Target Zone Measuring 1 x 0.15km

· Issued by Alpha Exploration Ltd. via Newsfile

Calgary, Alberta--(Newsfile Corp. - June 24, 2026) - Alpha Exploration Ltd. (TSXV: ALEX) ("Alpha" or the "Company") is pleased to announce recently available sampling results from shallow Rotary Air Blast ("RAB") drilling at the Anagulu Copper-Gold Porphyry Project. To date results are now available for a total of 4,738 metres of an ongoing RAB drilling program being conducted to follow up from initial termite mound sampling copper anomalies. The reconnaissance RAB drilling program is designed to expand and define the target footprint of the Anagulu Copper-Gold Porphyry where it is concealed under immature soil cover. This new batch of results reported here relate to 2,609 metres in 335 holes with an average depth of 7.8 metres in the ongoing program.

This project is located within its 100% owned, 514km² Kerkasha Project located in Eritrea. The Anagulu copper-gold porphyry was discovered by the Alpha team through surface sampling and mapping with follow-up drilling. Previously reported drilled intercepts include 108 metres @ 1.24 g/t gold and 0.60% copper including 49 metres @ 2.42 g/t gold and 1.10% copper, and 120 metres @ 0.47 g/t gold and 0.30 % copper in drill holes AND001 and ANRD049 respectively. The project is located some 7 kilometres south of the Company's shallow, Aburna Gold Project and these projects are two of three significant discoveries made by the Alpha team on the Kerkasha licence.

HIGHLIGHTS OF ONGOING ANAGULU COPPER-GOLD PORPHYRY RECONNAISSANCE RAB DRILLING

  • Shallow RAB drilling delivers new Nightjar Target Zone measuring some 1 kilometre along trend and 125-150 metres in width with top of bedrock copper samples ranging from 3,390 parts per million (ppm) (0.33%) to 310 ppm copper

  • Nightjar Target Zone is located some 2 kilometres northeast from the main area of drilled porphyry copper-gold mineralization, is located near a magmatic-hydrothermal breccia, and could represent a second intrusive porphyry centre

  • Camel Target Zone expanded and defined to over 1 kilometre along trend and 125-250 metres width with top of bedrock copper samples in RAB Area 5, ranging from 3,274 ppm (0.33%) to 300 ppm copper

  • The width and grade of the Camel Target increases to the southwest and overall appears to have higher copper values than the comparable Discovery target zone based on the RAB sample results

  • Camel Target remains open to the southwest where RAB drilling is ongoing in an area with anomalous termite mound sampling results

John Wilton, CEO of Alpha, stated: "We are very pleased with this second batch of shallow RAB drilling copper results from the ongoing exploration field activities at our Anagulu Porphyry Copper-Gold Prospect. These results have delivered the new Nightjar target zone located some 2 kilometres northeast of Alpha's original Anagulu discovery area and expanded the Camel target zone to over 1 kilometre along trend. In general, both the width and grade of the Camel target increases towards the southwest, and these top of bedrock copper values exceed those of the comparable Discovery target zone.

These new and expanded target zones have significant scale footprints of over 1 kilometre along trend and some 125 to 250 metres in near surface widths. Importantly the Camel and Nightjar target zones were concealed under areas of shallow but immature soil cover, precluding them from conventional soil sampling detection. These new copper-gold target zones further indicate the large size footprint and shallow depth potential of the Anagulu Porphyry Copper-Gold Prospect. These zones will be tested by follow up reverse circulation and core drilling."

ANAGULU COPPER GOLD PROJECT: RAB SAMPLING RESULTS

Alpha's ongoing RAB drilling program at the Anagulu Project has to date completed 595 holes for 4,738 metres with an average depth of approximately 7.96 metres per hole. This shallow RAB drilling program is deployed as a rapid and cost-effective reconnaissance exploration method to initially test and define copper anomalies generated by termite mound sampling in areas of predominantly immature, transported soil cover. The RAB holes provide valuable top of bedrock and weathered bedrock geological and geochemical information. Representative material from the deepest two, one-metre, samples of each RAB drill hole are analysed by pXRF with the peak copper value, one metre sample reported, and as this shallow drilling method is intended to identify and define near-surface copper anomalies its relationship to the targets true thickness is unknown at this time (see QA/QC section for more details).

Figure 1 shows the location and outline of the Nightjar, Camel and other recently identified RAB target zones based on an approximately greater than 400 ppm copper contour. The significantly expanded target footprint of the porphyry copper-gold mineralization is clearly illustrated within and to the boundaries of an overall 4 by 2-kilometre prospective area that had already been defined by the Alpha team by drilling and recognised from copper in soil data to extend for some 2 by 0.5 kilometres.

The new Nightjar target is located some 2-kilomteres northeast of the previously discovered copper-gold mineralization. This Nightjar target alone extends over 1 kilometre along a north-north-east trend, has an approximate near-surface width of some 125 to 150 metres and occurs in an area of mapped magmatic-hydrothermal breccia. The top of bedrock RAB sample results within the interpreted target zone range from 3,390 ppm copper (0.33% copper) to 310 ppm copper.

The location of the Nightjar target, its appreciable size and proximity to magmatic-hydrothermal breccia mapped in outcrop suggests that it could represent a second fertile porphyry centre recognised, to date, on the property.

Figure 1 also shows how the recent Area 5 RAB results have expanded and defined the Camel target zone to over 1 kilometre along its southwest to northeast trend. The Camel target has a near-surface width of some 125 metres in the northeast, expanding to approximately 250 metres in the southwest where it currently remains open into an area of anomalous copper samples in termite mounds.

It is also apparent that the overall copper tenor of the Camel target increases towards the southwest. Within the Camel target, RAB sample values from the top of bedrock range from 3,274 ppm copper (0.32% copper) to 300 ppm copper.

In addition, these recent results from the Area 5 RAB drilling have outlined a zone of anomalous copper values southwest of Alpha's historical Anagulu discovery for some 500 metres in an area of only limited RC and core drilling. This newly defined Discovery zone target from the RAB drilling has a width of up to 250 metres, with top of bedrock copper values ranging from 1,406 ppm to 300 ppm copper. This new data will be integrated into Alpha's surface mapping and drilling database to determine if this target motivates more drill testing of the mapped quartz-eye diorite unit known to host most of the currently known copper-gold mineralization at Anagulu.

Figure 2 illustrates how the Camel target zone has been generated to date by the RAB program to over more than 1 kilometre, with in general, increasing near-surface, width and copper grade towards the southwest. It is also importantly noted that the Camel target zone appears to have an overall higher copper grade than the comparable RAB drilled area of the Discovery target zone (see Figure 1).

Figure 1: Map Showing New and Expanded RAB Drilling Target Zones, Termite Mound Sampling Results, with Previous Reported Selected Drilling Results.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8361/302659_7d370071e4743889_002full.jpg

Figure 1 notes: RAB drill sampling results reported are from representative material from the deepest two, one-metre, samples of each RAB drill hole which are analysed by pXRF with the peak copper value, one metre sample reported, and as this drilling method is intended to identify and define near-surface copper anomalies its relationship to the targets true thickness is unknown at this time. Previously reported results in Alpha Exploration news releases; Alpha Expands the Footprint of the Anagulu Copper-Gold Porphyry and New Camel Target Zone Measures at Least 1 x 0.25km, April, 2026, Alpha Exploration announces final 2024 drilling results at Aburna Gold and Anagulu Gold Copper prospects and updates exploration plans for 2025, March 21st 2025., Alpha Exploration Reports 95m of 1.30 g/t AuEq from Anagulu Porphyry Gold-Copper Prospect, Kerkasha Project Eritrea, December 9, 2021, and NI 43-101 Technical Report for the Kerkasha Project, Eritrea, RSC Mining & Mineral Exploration, 21 June 2021.

Figure 2: Composite Cross Section View Looking Northeast Through lines SS-23, SS-40 and SS-45 Showing Expanded and Defined Camel Target in Context of Previously Reported Drill Hole Results.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8361/302659_7d370071e4743889_003full.jpg

Figure 2 notes: RAB drill sampling results reported are from representative material from the deepest two, one-metre, samples of each RAB drill hole which are analysed by pXRF with the peak copper value, one metre sample reported, and as this drilling method is intended to identify and define near-surface copper anomalies its relationship to the targets true thickness is unknown at this time. Previously reported results in Alpha Exploration news releases; Previously reported results in Alpha Exploration news releases; Alpha Expands the Footprint of the Anagulu Copper-Gold Porphyry and New Camel Target Zone Measures at Least 1 x 0.25km, April, 2026, Alpha Expands Anagulu Porphyry Mineralisation with Drill Intercept of 120 metres grading 0.30% Copper and 0.47 g/t Gold, February 24, 2026, Alpha Exploration announces final 2024 drilling results at Aburna Gold and Anagulu Gold Copper prospects and updates exploration plans for 2025, March 21st 2025., Alpha Exploration Reports 95m of 1.30 g/t AuEq from Anagulu Porphyry Gold-Copper Prospect, Kerkasha Project Eritrea, December 9, 2021, and NI 43-101 Technical Report for the Kerkasha Project, Eritrea, RSC Mining & Mineral Exploration, 21 June 2021.

Table 1: Selected RAB Drilling Sample Results Area 3

Area 3 RAB Hole Id

Depth From
(m)

Depth To
(m)

Sample
Id

Cu ppm
pXRF

Area 3 RAB Hole Id

Depth From
(m)

Depth To
(m)

Sample
Id

Cu ppm
pXRF

ANRBA3-R17-007

9

10

802694

3390

ANRBA3-R02-003

12

13

802677

600

ANRBA3-R08-005

9

10

802451

1595

ANRBA3-R13-004

6

7

802397

589

ANRBA3-R08-003

2

3

802449

1373

ANRBA3-R07-002

8

9

802578

578

ANRBA3-R13-003

3

4

802398

1372

ANRBA3-R13-004

5

6

802396

556

ANRBA3-R08-005

8

9

802450

1138

ANRBA3-R09-003

1

2

802438

555

ANRBA3-R12-004

2

3

802401

1119

ANRBA3-R12-006

9

10

802405

532

ANRBA3-R15-003

5

6

802378

1119

ANRBA3-R13-003

4

5

802399

507

ANRBA3-R16-006

7

8

802702

1041

ANRBA3-R11-005

2

3

802423

504

ANRBA3-R18-007

9

10

802690

981

ANRBA3-R07-002

9

10

802579

503

ANRBA3-R16-006

8

9

802703

972

ANRBA3-R15-002

3

4

802380

497

ANRBA3-R08-003

1

2

802448

931

ANRBA3-R11-006

5

6

802421

492

ANRBA3-R10-005

3

4

802424

912

ANRBA3-R12-005

3

4

802402

477

ANRBA3-R05-005

14

15

802617

872

ANRBA3-R07-003

8

9

802581

473

ANRBA3-R15-002

4

5

802381

847

ANRBA3-R16-001

5

6

802367

458

ANRBA3-R15-003

6

7

802379

821

ANRBA3-R18-006

6

7

802688

457

ANRBA3-R10-005

4

5

802425

792

ANRBA3-R05-003

11

12

802620

448

ANRBA3-R18-006

7

8

802689

780

ANRBA3-R16-001

4

5

802366

440

ANRBA3-R18-007

10

11

802691

778

ANRBA3-R10-006

8

9

802427

438

ANRBA3-R12-006

8

9

802404

766

ANRBA3-R04-001

9

10

802637

435

ANRBA3-R17-006

4

5

802697

729

ANRBA3-R11-005

1

2

802422

428

ANRBA3-R05-005

13

14

802616

690

ANRBA3-R05-003

12

13

802621

422

ANRBA3-R09-003

2

3

802439

689

ANRBA3-R07-004

5

6

802583

403

ANRBA3-R12-004

1

2

802400

687

ANRBA3-R10-006

7

8

802426

402

ANRBA3-R17-006

3

4

802696

640

Table 2: Selected RAB Drilling Sample Results Area 5

Area 5 RAB
Hole Id

Depth From(m)

Depth To(m)

Sample Id

Cu ppm pXRF

Area 5 RAB
Hole Id

Depth From(m)

Depth To(m)

Sample Id

Cu ppm pXRF

ANRBA5-R10-009

7

8

802901

3274

ANRBA5-R05-001

3

4

802764

714

ANRBA5-R12-010

7

8

802959

2725

ANRBA5-R12-011

10

11

802961

701

ANRBA5-R12-010

6

7

802958

2492

ANRBA5-R14-006

5

6

803005

693

ANRBA5-R14-007

5

6

803007

2228

ANRBA5-R11-008

5

6

802925

689

ANRBA5-R04-010

5

6

802731

2194

ANRBA5-R12-008

7

8

802954

689

ANRBA5-R04-010

4

5

802730

2035

ANRBA5-R12-013

4

5

802967

680

ANRBA5-R10-010

6

7

802902

2007

ANRBA5-R11-001

2

3

802939

672

ANRBA5-R05-001

4

5

802765

1927

ANRBA5-R14-006

4

5

803004

671

ANRBA5-R10-011

6

7

802904

1710

ANRBA5-R12-002

2

3

802941

669

ANRBA5-R10-009

6

7

802900

1660

ANRBA5-R08-001

3

4

802824

666

ANRBA5-R14-007

4

5

803006

1560

ANRBA5-R12-006

4

5

802950

665

ANRBA5-R11-002

1

2

802936

1538

ANRBA5-R04-002

4

5

802712

647

ANRBA5-R05-009

6

7

802748

1522

ANRBA5-R07-011

8

9

802803

643

ANRBA5-R09-011

9

10

802860

1446

ANRBA5-R11-002

2

3

802937

634

ANRBA5-R03-001

4

5

802706

1406

ANRBA5-R13-007

6

7

802978

634

ANRBA5-R06-010

6

7

802786

1399

ANRBA5-R09-008

7

8

802867

633

ANRBA5-R10-010

7

8

802903

1394

ANRBA5-R11-007

7

8

802926

619

ANRBA5-R07-010

6

7

802804

1379

ANRBA5-R12-002

1

2

802940

605

ANRBA5-R05-009

7

8

802749

1347

ANRBA5-R12-003

4

5

802945

603

ANRBA5-R05-002

8

9

802763

1344

ANRBA5-R12-003

3

4

802944

601

ANRBA5-R11-010

7

8

802919

1324

ANRBA5-R11-006

5

6

802929

597

ANRBA5-R13-008

7

8

802977

1265

ANRBA5-R05-007

7

8

802753

594

ANRBA5-R05-002

7

8

802762

1233

ANRBA5-R09-001

1

2

802882

594

ANRBA5-R08-010

7

8

802845

1210

ANRBA5-R14-005

4

5

803002

587

ANRBA5-R08-010

6

7

802844

1206

ANRBA5-R07-011

7

8

802802

584

ANRBA5-R14-001

1

2

802994

1199

ANRBA5-R02-002

2

3

802705

580

ANRBA5-R06-010

7

8

802787

1160

ANRBA5-R09-003

2

3

802878

570

ANRBA5-R12-007

6

7

802952

1147

ANRBA5-R04-003

5

6

802715

559

ANRBA5-R13-008

6

7

802976

1147

ANRBA5-R04-001

3

4

802710

551

ANRBA5-R14-001

2

3

802995

1135

ANRBA5-R04-002

5

6

802713

547

ANRBA5-R09-010

7

8

802863

1120

ANRBA5-R03-002

6

7

802708

546

ANRBA5-R09-011

10

11

802861

1054

ANRBA5-R11-007

8

9

802927

540

ANRBA5-R09-010

6

7

802862

1033

ANRBA5-R02-002

1

2

802704

539

ANRBA5-R07-010

7

8

802805

1025

ANRBA5-R06-001

4

5

802769

537

ANRBA5-R09-009

6

7

802864

1020

ANRBA5-R12-013

3

4

802966

534

ANRBA5-R13-002

1

2

802990

1017

ANRBA5-R04-001

4

5

802711

532

ANRBA5-R11-010

6

7

802918

1011

ANRBA5-R14-002

3

4

802996

529

ANRBA5-R12-009

4

5

802956

986

ANRBA5-R07-008

7

8

802809

513

ANRBA5-R12-009

5

6

802957

938

ANRBA5-R11-006

4

5

802928

508

ANRBA5-R14-008

6

7

803010

937

ANRBA5-R04-004

8

9

802717

507

ANRBA5-R13-006

4

5

802981

921

ANRBA5-R13-005

4

5

802983

504

ANRBA5-R03-001

5

6

802707

892

ANRBA5-R06-001

3

4

802768

500

ANRBA5-R10-011

7

8

802905

890

ANRBA5-R08-006

4

5

802836

484

ANRBA5-R07-009

5

6

802807

886

ANRBA5-R07-004

4

5

802818

471

ANRBA5-R09-008

6

7

802866

885

ANRBA5-R11-009

4

5

802922

471

ANRBA5-R09-009

7

8

802865

884

ANRBA5-R09-001

2

3

802883

469

ANRBA5-R10-002

4

5

802885

877

ANRBA5-R10-008

4

5

802896

469

ANRBA5-R14-008

7

8

803011

873

ANRBA5-R03-002

7

8

802709

466

ANRBA5-R08-001

4

5

802825

869

ANRBA5-R08-003

4

5

802828

466

ANRBA5-R14-005

5

6

803003

848

ANRBA5-R12-006

5

6

802951

465

ANRBA5-R14-009

8

9

803013

843

ANRBA5-R07-008

6

7

802808

464

ANRBA5-R07-009

4

5

802806

841

ANRBA5-R04-003

4

5

802714

457

ANRBA5-R13-001

1

2

802992

841

ANRBA5-R07-004

5

6

802819

456

ANRBA5-R06-007

7

8

802781

823

ANRBA5-R09-002

4

5

802881

452

ANRBA5-R07-002

4

5

802823

821

ANRBA5-R06-004

5

6

802775

451

ANRBA5-R12-011

9

10

802960

815

ANRBA5-R13-009

7

8

802975

450

ANRBA5-R13-001

2

3

802993

814

ANRBA5-R08-006

5

6

802837

448

ANRBA5-R13-006

3

4

802980

810

ANRBA5-R05-010

8

9

802747

446

ANRBA5-R12-007

7

8

802953

789

ANRBA5-R14-003

1

2

802998

446

ANRBA5-R08-009

4

5

802842

787

ANRBA5-R13-002

2

3

802991

438

ANRBA5-R13-007

7

8

802979

780

ANRBA5-R11-009

5

6

802923

436

ANRBA5-R12-008

8

9

802955

776

ANRBA5-R06-005

4

5

802776

432

ANRBA5-R10-002

2

3

802884

765

ANRBA5-R07-005

7

8

802817

428

ANRBA5-R05-011

6

7

802742

746

ANRBA5-R11-001

1

2

802938

424

ANRBA5-R13-003

1

2

802988

745

ANRBA5-R05-004

3

4

802758

422

ANRBA5-R07-002

3

4

802822

726

ANRBA5-R13-009

6

7

802974

417

ANRBA5-R08-009

5

6

802843

723

ANRBA5-R05-011

7

8

802743

415

ANRBA5-R14-009

7

8

803012

718

ANRBA5-R08-003

5

6

802829

410

ANRBA5-R05-007

6

7

802752

717

ANRBA5-R07-005

6

7

802816

405

QUALITY ASSURANCE AND QUALITY CONTROL

The RAB drilling and related results were managed by Alpha Exploration's field team with the field operations conducted in-line with the standard operating procedures implemented at this project. Representative material of bedrock and weathered bedrock for the deepest two, one-metre, samples of each RAB drill hole, were screened to provide approximately 200 grams ("g") of minus 75-micron material. Termite mound samples are collected and processed in-line with the standard operating procedures implemented at this project. Four sub-samples of each mound are sampled collecting approximately a 2kg sample. This sample is gently pulverized to break up any soil clods and sieved to -75um to obtain a uniform representative sample. For the RAB and termite mound samples an aliquot is collected using a scoop and a sub-sample analysed with QA/QC samples inserted every 25th field sample analysed by Portable X-ray Fluorescence ("pXRF") within the Company's field laboratory in Asmara, Eritrea. The pXRF is routinely monitored by the QA/QC sample results to check its calibration. The pXRF instrument used is an Olympus Vanta M-series VMR with a 50Kv, 0.2mA tube.

Table 3: RAB Drillhole ID, Azimuth, Dip, End of Hole Depth, Collar Coordinates

Hole Id

Azimuth

Hole Dip

EOH

X_UTM_37N

Y_UTM_37N

Elevation

ANRBA3-R17-007

0

-90

10

342831

1647335

885

ANRBA3-R08-005

0

-90

10

342731

1646884

885

ANRBA3-R08-003

0

-90

3

342631

1646885

888

ANRBA3-R13-003

0

-90

4

342781

1647134

876

ANRBA3-R08-005

0

-90

9

342731

1646884

885

ANRBA3-R12-004

0

-90

3

342731

1647085

878

ANRBA3-R15-003

0

-90

6

342881

1647234

876

ANRBA3-R16-006

0

-90

8

342781

1647285

885

ANRBA3-R18-007

0

-90

10

342831

1647385

880

ANRBA3-R16-006

0

-90

9

342781

1647285

885

ANRBA3-R08-003

0

-90

2

342631

1646885

888

ANRBA3-R10-005

0

-90

4

342730

1646985

881

ANRBA3-R05-005

0

-90

15

342731

1646734

881

ANRBA3-R15-002

0

-90

5

342831

1647234

878

ANRBA3-R15-003

0

-90

7

342881

1647234

876

ANRBA3-R10-005

0

-90

5

342730

1646985

881

ANRBA3-R18-006

0

-90

8

342781

1647385

880

ANRBA3-R18-007

0

-90

11

342831

1647385

881

ANRBA3-R12-006

0

-90

9

342831

1647085

880

ANRBA3-R17-006

0

-90

5

342781

1647335

884

ANRBA3-R05-005

0

-90

14

342731

1646734

881

ANRBA3-R09-003

0

-90

3

342631

1646934

882

ANRBA3-R12-004

0

-90

2

342731

1647085

878

ANRBA3-R17-006

0

-90

4

342781

1647335

884

ANRBA3-R02-003

0

-90

13

342631

1646585

883

ANRBA3-R13-004

0

-90

7

342831

1647135

874

ANRBA3-R07-002

0

-90

9

342581

1646835

889

ANRBA3-R13-004

0

-90

6

342831

1647135

874

ANRBA3-R09-003

0

-90

2

342631

1646934

882

ANRBA3-R12-006

0

-90

10

342831

1647085

881

ANRBA3-R13-003

0

-90

5

342781

1647134

876

ANRBA3-R11-005

0

-90

3

342731

1647035

880

ANRBA3-R07-002

0

-90

10

342581

1646835

889

ANRBA3-R15-002

0

-90

4

342831

1647234

878

ANRBA3-R11-006

0

-90

6

342781

1647034

890

ANRBA3-R12-005

0

-90

4

342780

1647085

884

ANRBA3-R07-003

0

-90

9

342631

1646834

888

ANRBA3-R16-001

0

-90

6

342831

1647284

887

ANRBA3-R18-006

0

-90

7

342781

1647385

880

ANRBA3-R05-003

0

-90

12

342631

1646735

880

ANRBA3-R16-001

0

-90

5

342831

1647284

887

ANRBA3-R10-006

0

-90

9

342781

1646985

881

ANRBA3-R04-001

0

-90

10

342531

1646684

883

ANRBA3-R11-005

0

-90

2

342731

1647035

880

ANRBA3-R05-003

0

-90

13

342631

1646735

880

ANRBA3-R07-004

0

-90

6

342680

1646835

894

ANRBA3-R10-006

0

-90

8

342781

1646985

881

ANRBA5-R10-009

0

-90

8

341689

1644362

862

ANRBA5-R12-010

0

-90

8

341685

1644267

860

ANRBA5-R12-010

0

-90

7

341685

1644267

860

ANRBA5-R14-007

0

-90

6

341487

1644169

859

ANRBA5-R04-010

0

-90

6

341934

1644664

864

ANRBA5-R04-010

0

-90

5

341934

1644664

864

ANRBA5-R10-010

0

-90

7

341736

1644366

857

ANRBA5-R05-001

0

-90

5

341487

1644617

868

ANRBA5-R10-011

0

-90

7

341783

1644363

868

ANRBA5-R10-009

0

-90

7

341689

1644362

862

ANRBA5-R14-007

0

-90

5

341487

1644169

859

ANRBA5-R11-002

0

-90

2

341338

1644314

868

ANRBA5-R05-009

0

-90

7

341888

1644618

865

ANRBA5-R09-011

0

-90

10

341839

1644414

860

ANRBA5-R03-001

0

-90

5

341533

1644713

868

ANRBA5-R06-010

0

-90

7

341886

1644565

868

ANRBA5-R10-010

0

-90

8

341736

1644366

857

ANRBA5-R07-010

0

-90

7

341837

1644515

863

ANRBA5-R05-009

0

-90

8

341888

1644618

865

ANRBA5-R05-002

0

-90

9

341534

1644617

867

ANRBA5-R11-010

0

-90

8

341738

1644316

861

ANRBA5-R13-008

0

-90

8

341534

1644220

861

ANRBA5-R05-002

0

-90

8

341534

1644617

867

ANRBA5-R08-010

0

-90

8

341836

1644464

869

ANRBA5-R08-010

0

-90

7

341836

1644464

869

ANRBA5-R14-001

0

-90

2

341184

1644164

864

ANRBA5-R06-010

0

-90

8

341886

1644565

868

ANRBA5-R12-007

0

-90

7

341535

1644266

863

ANRBA5-R13-008

0

-90

7

341534

1644220

861

ANRBA5-R14-001

0

-90

3

341184

1644164

864

ANRBA5-R09-010

0

-90

8

341788

1644416

862

ANRBA5-R09-011

0

-90

11

341839

1644414

860

ANRBA5-R09-010

0

-90

7

341788

1644416

862

ANRBA5-R07-010

0

-90

8

341837

1644515

863

ANRBA5-R09-009

0

-90

7

341737

1644414

860

ANRBA5-R13-002

0

-90

2

341241

1644214

867

ANRBA5-R11-010

0

-90

7

341738

1644316

861

ANRBA5-R12-009

0

-90

5

341634

1644267

862

ANRBA5-R12-009

0

-90

6

341634

1644267

862

ANRBA5-R14-008

0

-90

7

341537

1644165

861

ANRBA5-R13-006

0

-90

5

341437

1644217

862

ANRBA5-R03-001

0

-90

6

341533

1644713

868

ANRBA5-R10-011

0

-90

8

341783

1644363

868

ANRBA5-R07-009

0

-90

6

341787

1644514

867

ANRBA5-R09-008

0

-90

7

341685

1644414

862

ANRBA5-R09-009

0

-90

8

341737

1644414

860

ANRBA5-R10-002

0

-90

5

341338

1644367

872

ANRBA5-R14-008

0

-90

8

341537

1644165

861

ANRBA5-R08-001

0

-90

5

341390

1644468

868

ANRBA5-R14-005

0

-90

6

341390

1644165

860

ANRBA5-R14-009

0

-90

9

341586

1644167

859

ANRBA5-R07-009

0

-90

5

341787

1644514

867

ANRBA5-R13-001

0

-90

2

341190

1644213

878

ANRBA5-R06-007

0

-90

8

341736

1644565

863

ANRBA5-R07-002

0

-90

5

341438

1644516

870

ANRBA5-R12-011

0

-90

10

341733

1644266

868

ANRBA5-R13-001

0

-90

3

341190

1644213

878

ANRBA5-R13-006

0

-90

4

341437

1644217

862

ANRBA5-R12-007

0

-90

8

341535

1644266

863

ANRBA5-R08-009

0

-90

5

341786

1644463

868

ANRBA5-R13-007

0

-90

8

341485

1644220

859

ANRBA5-R12-008

0

-90

9

341586

1644266

862

ANRBA5-R10-002

0

-90

3

341338

1644367

872

ANRBA5-R05-011

0

-90

7

341984

1644616

867

ANRBA5-R13-003

0

-90

2

341287

1644213

863

ANRBA5-R07-002

0

-90

4

341438

1644516

870

ANRBA5-R08-009

0

-90

6

341786

1644463

868

ANRBA5-R14-009

0

-90

8

341586

1644167

859

ANRBA5-R05-007

0

-90

7

341784

1644613

864

ANRBA5-R05-001

0

-90

4

341487

1644617

868

ANRBA5-R12-011

0

-90

11

341733

1644266

868

ANRBA5-R14-006

0

-90

6

341436

1644167

858

ANRBA5-R11-008

0

-90

6

341642

1644312

860

ANRBA5-R12-008

0

-90

8

341586

1644266

862

ANRBA5-R12-013

0

-90

5

341834

1644265

859

ANRBA5-R11-001

0

-90

3

341296

1644315

874

ANRBA5-R14-006

0

-90

5

341436

1644167

858

ANRBA5-R12-002

0

-90

3

341286

1644266

869

ANRBA5-R08-001

0

-90

4

341390

1644468

868

ANRBA5-R12-006

0

-90

5

341486

1644267

864

ANRBA5-R04-002

0

-90

5

341534

1644665

868

ANRBA5-R07-011

0

-90

9

341887

1644516

868

ANRBA5-R11-002

0

-90

3

341338

1644314

868

ANRBA5-R13-007

0

-90

7

341485

1644220

859

ANRBA5-R09-008

0

-90

8

341685

1644414

862

ANRBA5-R11-007

0

-90

8

341588

1644317

859

ANRBA5-R12-002

0

-90

2

341286

1644266

869

ANRBA5-R12-003

0

-90

5

341335

1644264

865

ANRBA5-R12-003

0

-90

4

341335

1644264

865

QUALIFIED PERSON

All scientific and technical information in this press release, including the results of the Aburna drill program and how these results relate to the ongoing exploration at the Kerkasha Project has been reviewed, verified, and approved by John Wilton CGeol FGS, CEO & Director of Alpha and a "qualified person" for the purposes of National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

ABOUT ALPHA

Alpha (TSXV: ALEX) is an exploration company that is rapidly advancing a number of important gold and base metal discoveries it has made across the 100% owned, 514 km2 Kerkasha Project in Eritrea.

The Aburna Gold Prospect is an exciting new gold discovery where recent drilling has confirmed a high-grade mineralized system, with grades including 18m @ 15.33 g/t Au, 16 m @ 14.07 g/t Au, 9 m @ 10 g/t Au and 23 m @ 6.74 g/t Au.

The Anagulu Gold-Copper prospect with recent drilling intersections of 108 m @ 1.24 g/t Au and 0.60% Cu including 49 m @ 2.42 g/t Au and 1.10% Cu, and 109 m @ 0.79 g/t Au and 0.35 % Cu within a porphyry unit drilled over 2kms along trend, and with an overall and expanding exploration target footprint of some 4 by 2kms.

The Company is managed by a group of highly experienced and successful mining and exploration professionals with long track records of establishing, building and returning value to stakeholders from a number of world class gold and base metal discoveries in Eritrea and across the wider Arabian Nubian Shield.

For further information go to the Alpha webpage at www.alpha-exploration.com or contact:

John Wilton

CEO

Alpha Exploration Ltd.

Email: John@alpha-exploration.com

Tel: +44 207 129 1148

Cautionary Notes

This press release is intended for distribution in Canada only and is not intended for distribution to United States newswire services or dissemination in the United States. Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

Forward-Looking Statements

Certain statements and information herein, including all statements that are not historical facts, contain forward-looking statements and forward-looking information within the meaning of applicable securities laws. Such forward-looking statements or information include but are not limited to statements or information with respect to future dataset interpretations, sampling, plans for its projects (including the Anagulu prospect), surveys related to Alpha's assets, and the Company's drilling program. Often, but not always, forward-looking statements or information can be identified by the use of words such as "estimate", "project", "belief", "anticipate", "intend", "expect", "plan", "predict", "may" or "should" and the negative of these words or such variations thereon or comparable terminology are intended to identify forward-looking statements and information. With respect to forward-looking statements and information contained herein, Alpha has made numerous assumptions including among other things, assumptions about general business and economic conditions and the price of gold and other minerals. The foregoing list of assumptions is not exhaustive.

Although management of Alpha believes that the assumptions made and the expectations represented by such statements or information are reasonable, there can be no assurance that forward-looking statements or information herein will prove to be accurate. Forward-looking statements and information by their nature are based on assumptions and involve known and unknown risks, uncertainties and other factors which may cause actual results, performance or achievements, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information. These factors include, but are not limited to: risks relating to Alpha's financing efforts; risks associated with the business of Alpha given its limited operating history; business and economic conditions in the mining industry generally; the supply and demand for labour and other project inputs; changes in commodity prices; changes in interest and currency exchange rates; risks relating to inaccurate geological and engineering assumptions (including with respect to the tonnage, grade and recoverability of reserves and resources); risks relating to unanticipated operational difficulties (including failure of equipment or processes to operate in accordance with specifications or expectations, cost escalation, unavailability of materials and equipment, government action or delays in the receipt of government approvals, industrial disturbances or other job action, and unanticipated events related to health, safety and environmental matters); risks relating to adverse weather conditions; political risk and social unrest; changes in general economic conditions or conditions in the financial markets; changes in laws (including regulations respecting mining concessions); risks related to the direct and indirect impact of COVID-19 including, but not limited to, its impact on general economic conditions, the ability to obtain financing as required, and causing potential delays to exploration activities; those factors discussed under the heading "Risk Factors" in the Final Prospectus; and other risk factors as detailed from time to time. Alpha does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/302659

View original source (Newsfile)Company analysis

Earlier from Alpha Exploration

All Alpha Exploration news releases