40.9m of Spodumene-Bearing Pegmatite Intersected Mavis Lake
Filed with ASX · · 12 pages · English and French
Multiple pegmatite dykes totalling 40.9m intersected within step out hole MF22-116, including • 24.1m spodumene mineralisation from 53 to 77.1m downhole • 8.15m spodumene mineralisation from 89 to 97.15m downhole • 8.65m spodumene mineralisation from 112.75 to 121.4m down hole MF22-116 is located 80m east along trend from the nearest previous drilling, in an area not previously tested, demonstrati
Earlier from Critical Resources
- Assay results uncover additional mineralisation Halls Peak
- Assays Confirm High Grade Lithium up to 1.91% at Mavis Lake
- Executive Changes
- Further Mavis Lake Assays Include 7.63m at 1.35% Li2O
- Inaugural 5,000m Drilling Program Completed at Mavis Lake
Later from Critical Resources
- Oman Block 4 and Block 5 Exploration Licenses Update
- 28.25m of Spodumene-Bearing Pegmatites Intersected at ML
- 29.9m of Spodumene-Bearing Pegmatites Intercepted Mavis Lake
- Assays Confirm Further High-Grade Lithium up to 2.15% Li2O
- Phase 3 Drilling Program follows continued success MavisLake
Follow Critical Resources into a list and get an email when it puts out news.
Follow Critical Resources