Replay available

Vow (Oslo:VOW) Q3 2026 Earnings Call

Vow (Oslo:VOW) reported Q3 2026 results on this call. Replay available.

Wed, November 18, 2026 at 3:00 AMendedReplay
Vow (Oslo:VOW) Q3 2026 Earnings Call
Company
Vow ASA (OSL:VOW)
Period
Q3 2026 earnings call
Date
Wed, Nov 18, 2026, 3:00 AM ET
Replay
Watch the replay on this page · 41 min

On 6ix: 6ix.com/event/vow-asa-sshpf-q3-2026-earnings-call

Replay

Transcript

Automated transcript · Written by software from the replay's audio. It can mishear names and figures; the replay is the record.

0:00 Good morning and welcome to WAO's third quarter presentation. Unfortunately, our CEO, Gunnar Pedersen, is down with the flu. So we have had to make some changes to today's presentation plan. I'm very pleased to be joined today by our EVP of Maritime Solutions, Ivar Homme, and our CTO, Per Carlsson, who will present the business update section and provide insights into recent developments. Let me start with the key highlights from the quarter. Following three very strong quarters, Q3 was softer, mainly related to a period with lower equipment deliveries in the maritime solutions segment.

0:47 Combined with an unfavourable mix of legacy versus new contracts in the quarter, this weakens the margins in maritime and the group. After sales showed steady growth and continued the positive margin development. Industrial Solutions had had an update on the large projects at Fallow and Rhode Island. We see growing sales pipeline and improved performance in heat treatment. The first phase of the DNB refinancing was completed in September with extended facilities and a covenant waiver for the quarter. The order intake in the quarter was 186 million, leaving a backlog of 1.6 billion, plus 162 million in options.

1:36 Subsequent to the quarter, we published a firm cruise contract of 7.7 million euro for equipment deliveries to two vessels, with options for additional three vessels worth 13.1 million euro. We would like to share some other updates with you as well before I dive into the numbers. We have close dialogue with the key customers in all segments and Ivar and Per will come back to this. Meetings with our customers confirm our revised strategy. And let me remind you what this revised strategy is. We will strengthen our maritime business, our offerings towards both new builds and in the after-sales market. And we will secure that our prices are competitive, reduce cost and deliver according to the customer's expectations.

2:34 In industrial solutions, we have a more selective approach. While heat treatment continues to address its existing markets, our selected focus areas for circular solutions are end-of-life tires and biocarbon for metallurgic industries. And we will deliver the core technology, not turnkey. At ETIA, we are adapting the organization to the current activity level, while the strategic review of the food safety business is ongoing. The profit improvement program continues across the group. At the Q4 presentation in February, we informed that we planned a legal separation of the maritime and industrial activities in Scanship, which is the largest entity in the group. This is a natural next step after the new organizational structure was implemented in January. The carve-out is now being executed, with effect from the 1st of December.

3:32 Industrial activities are transferred to the 100% owned entity VAU Industries, which she has evidenced as subsidiary. After the carve-out, Scanship will continue as a pure maritime player, and VAU Industries will be a dedicated platform for future growth for industrial solutions. I will now give you an overview of the financial performance for the third quarter, highlighting the key development and the most important financial metrics. The reporting currency is Norwegian kroner. So let's start with the development in revenue. As shown on the chart on the left hand side, third quarter revenue amounted to 191 million, down 24 million compared with Q3 last year, and below the levels reported in recent quarters.

4:27 The softer revenue performance was primarily driven by the maritime solution segment, represented by the middle section of the stacked bars. Following several quarters of exceptionally high delivery activity, the segment has entered a period of lower equipment deliveries and correspondingly lower revenue recognition, reflecting timing and phasing of project execution. Activity levels are expected to increase again from the summer of 2017. The after-sales segment, shown at the bottom of the stacked bars, continues to provide a stable and resilient revenue base, supported by a growing installed base of vessels in operation with scanship equipment on board, and increasing recurring business. This segment has delivered structural year-on-year growth and remains an important contribution to both profitability and cash generation.

5:25 In industrial solutions, shown at the top of the bars, Commissioning activities towards handover for the two large circular solution projects have taken longer than anticipated. This has resulted in updated cost-to-completion estimates, which have negatively impacted revenue recognition during the quarter. Moving to the chart in the middle, adjusted EBITDA for the quarter was 9 million. This compares to negative 29 million in Q3 last year. While the year-on-year improvement is significant, it should be noted that the results last year were heavily impacted by a major cost revision related to the two circular solution projects. While adjusted EBITDA was lower than in the previous quarter, we believe that the underlying development remains encouraging with improved execution and that we are moving in the right direction.

6:20 The chart on the right shows the order backlog development at quarter end. The order backlog has increased year on year, supported by contracts secured during the quarter for equipment deliveries to the three Neibolt cruise vessels I mentioned earlier. So at quarter end, the backlog was 1.6 billion and providing good visibility in the periods ahead. So let's take a closer look at the operational key figures. If you focus on the Q3 column in the chart on the left-hand side, I will walk you through the numbers.

7:07 Revenue in the third quarter of 191 million is down 24 million from Q3 last year. Despite a decline in revenue in the quarter, gross profit increased by 33 million. The gross margin increased from 6% in Q3 last year to 24% in this quarter. but is held back by a higher share of legacy contracts in the quarter, a stronger NOC and a cost update in the industrial solutions. While the year-on-year comparison on gross profit benefit from the significant cost revision last year, the improvement also reflects that business fundamentals continue to strengthen. Employee expenses and other operating expenses are in total 5 million lower than one year earlier, which gives an adjusted EBITDA of 9 million for the quarter, up 38 million from last year.

8:02 The non-recurring items the EBITDA is adjusted for are strictly related to management changes and the downsizing earlier this year. EBITDA excluding non-recurring items were 6.5 million, up 38 million from one year earlier. Lower personnel and operating expenses combined with improved project execution and a more disciplined operating model demonstrates that actions implemented over the last year are starting to gain traction. And looking at the year-to-date column, you will notice that the gross profit of 107 million is up 111 million from last year, while adjusted EBITDA of 64 million is up additional 18 million.

8:48 So to sum it up, we see a decline in revenue in the quarter, but business fundamentals continue to strengthen. Before moving over to the financial performance, I would like to say that as a project-driven business, quarterly activity will vary. Our after-sales segment provides strong and stable earnings, while continued focus on operational flexibility and profit improvement initiatives, backlog growth and customer offerings remain key to drive long-term profitable growth. So as you can see on the bottom row of this table on the left side, results before tax in the quarter ended at negative 25 million.

9:37 The EBITDA of 6.5 million is substantially up from one year earlier, but not enough to carry depreciation and amortization and financial costs. Depreciation and amortization remain stable with the expected increase in amortization of intangible assets offset by reduced lease depreciation following the Profit Improvement Program as the use of leased assets has declined. Net financial items are negative 20 million in the quarter compared to negative 13 one year earlier. Interest expenses are 2 million lower than in Q3 last year, but the net unrealized foreign exchange loss of 11 million following a stronger knock against euro in the quarter weighs down on the result.

10:24 We have not yet implemented a formal FX hedging program, as our priority has been to establish a clear understanding of the group's net currency exposure over the life cycle of our projects. Given the significant level of natural hedging, gross exposures do not necessarily reflect the group's actual risk. FX exposure, including the potential impact on Covenant Headroom, is also being assessed as part of the ongoing refinancing process. Last quarter, I was pleased to report that we were back in black numbers. The results this quarter are clearly below our ambitions, but they also reflect the reality of our project-driven business.

11:12 Importantly, The operational improvements we have implemented have started to show traction and we continue to execute on the revised strategy, firmly believing that we are on the right track. Moving over to the cash flow, the chart on the left side illustrates the development since Q2. I will comment on some of the larger movements. We started the quarter with 118 million in available liquidity. And as you probably recall from the Q2 presentation, we had a liquidity strain related to a large maritime project with deliveries and payments to our suppliers in May and milestone payments from the customer 30 and 60 days after delivery.

11:58 This was mitigated with a temporary increase in the overdraft facility. The milestone payments have been received and the extra overdraft facility of 60 million was repaid in the quarter. The operating cash flow in the quarter was positive amounting to 37 million. Cash flow to investing activities remained low, which is consistent with the stricter capital allocation policy which we introduced last year. At the same time, I would like to note that much of our R&D effort is now carried out through the operational activities supporting continued technology development while maintaining a disciplined cash profile.

12:43 The cash flow from financing activities is mainly related to payments of installments and interest, which amounted to 31 million in the quarter, reflecting our continued focus on deliberation and meeting our financial obligations. We ended the quarter with 63 million in available liquidity. Cash at hand stems from the smaller companies in the group. The larger companies are covered by the overdraft facility. Moving over to the balance sheet, you can see that total assets decreased from 1 billion and 66 million at year end 25 to 855 million at quarter end, primarily reflecting a reduction in working capital as contract assets and trade receivables related to completed project deliveries were invoiced and collected.

13:37 Interest-bearing debt remained broadly unchanged compared with year 2025, as higher utilization of the overdraft facility offset term loan installments. Trade payables decreased significantly during the period, reflecting lower activity levels and settlement of supplier obligations. The equity ratio at the end of the quarter was 21%, which is broadly in line with the same level as end 2025. To strengthen the balance sheet continues to be a key concern for me as CFO. Over the last year, we have initiated measures to improve liquidity and cash collection across the group. We have built a strong partnership with DNB, and we have good and constructive dialogue.

14:25 The refinancing process has taken longer than anticipated, but remains on track to be completed before year-end. Following the extension of existing loan facilities and covenant waivers secured during the quarters, we are now working to establish a financing structure that supports our strategic priorities. This includes validating long-term forecasts, consolidation of other external debt within the D&D financing framework. I would like to mention especially the French loans which we are looking into. Optimizing the balance between long-term debt and liquidity facilities and assessing the covenant implications of planned FX hedging activities.

15:13 So this was a walkthrough of the key financial development in the quarter. Now Ivar and Per will give you a business update, starting with Ivar.

15:32 Thank you, Cecilie. So good morning everyone. My name is Ivar Homme. I'm the EVP of Maritime Solutions. I joined Scanship in 2017 and I have been working mostly within project management and operational management until I was appointed the position now January this year. Before we run into the core of Maritime Solutions, I would like to give you a brief market and business update, which is more general across the three different business segments. We have had exceptionally high activity in equipment deliveries over the first half of 2026, with focus on delivering according to the customer's plan and expectations.

16:17 I'm truly pleased to see that we actually did it this year with improved delivery position, less transportation costs and less CO2 emissions from our transportation. We met with several yards and cruise lines during the quarter, maintaining a close dialogue with the customers. The cruise market is strong, yards are booked for 10 years and we have never seen this before. There is active dialogue on new technologies, their strategy and expectations to us as a supplier and as their vision of zero emission vessels, partnering and more. Part of our management just visited a new ship about to enter operation, a ship with 50% less CO2 emissions than previous series.

17:08 The cruise lines focus on reduced energy consumption but also less food waste and so on. We have also had meetings with our main industrial customers to learn about their strategies and plans and needs going forward. So, looking into the details of Maritime Solutions. Equipment deliveries varies over time in accordance with delivery schedule from the arts, and Q3 saw lower delivery volumes and revenue. Combined with an increased share of legacy contracts and a stronger NOC, the margins weakened. However, the year-to-date margin ended at 14.8%. Order intake was 152 million and the order backlog ended at 1.5 billion before the 7.7 million euros order was formalized in October.

18:06 Revenue in the maritime segment accounted for 51% of the group's revenue year to date. From the graph on the right hand side you can see how the project mix have developed and how we expect it to develop further. As of YTQ3, 36% of revenue came from legacy contracts, however the share was 52% in the quarter alone. The last option that was defined as a legacy contract was exercised in Q3. This increased the legacy share of the backlog and impacted on the upcoming periods. However, this has been somewhat offset by orders and secured after the close of Q3.

18:57 So, for the maritime order backlog composition and current pipeline. The left hand graphics show how it translates into revenue. Q4 and 2027 combined make up 34% of the backlog. Center graph shows number of vessels in the backlog as options or actively being bid for, and the horizontal axis represents the year the ship is entering into operation. Equipment deliveries are normally 18 to 24 months ahead of this. In short, the market is very strong and provides good visibility. And as we can see on the right hand here, we have a picture of the vessel MSC Poesia.

19:42 This is from the so-called Musica class. It's a vessel with a total of 4,600 people, crew and passengers. It was built in 2008 and it was then back then delivered with the ScanShip waste disposal system. This year it was retrofitted with our wastewater systems. As presented in previous quarters, we remain a trusted technology provider for the shipyards and cruise lines. All major cruise lines and shipyards are our customers. Left and center graphics show the main deliveries and commissioning for the respective shipyards and cruise lines planned for 2026.

20:32 As of Q3, we delivered 12 out of 13 main system deliveries and we have commissioned 8 out of 11 ships year to date. In Q3, we signed contracts for three vessels, options executed at 13.6 million euros. Subsequent to Q3, we signed contracts for two vessels at 7.7 million euros, plus three options at 13.1 million euros. The initial equipment delivery stage is starting late 2027. So, a brief update also for Aftersales.

21:17 Aftersales consists of spare parts, chemicals and technical services. The segment represents stable recurring revenue as can be seen on the right-hand graphics. Growth is primarily driven by new ships and entering service. Further, the right-hand graphics show that we have been working to improve the margins over time and they are now at a healthy level. As seen on the left hand pie chart, revenue in the after-sales segment accounted for 27% of the group's revenue year to date. And I will now hand over the presentation to my colleague Per, who will provide an update on behalf of Industrial Solutions. Thank you.

22:05 Thank you Ivar and good morning everyone. My name is Per Carlsson. I joined the company as vice president of innovation in 21 and transitioned into my current role as chief technology officer in 24. I'm here to bring you an update on the industrial solution segment. We are seeing that the complexity of the circular solutions projects referring to Fallen Phase 1 in Rhode Island are nearing the end of commissioning and we are seeing increased costs compared to earlier projections but we are also seeing that the costs are smaller compared to same time last year. Issues are being resolved in collaboration with our clients and collaboration partners.

23:03 Within the heat treatment segments, we are seeing that we are well positioned for growth. But we see an increasing in the pipeline, but we are also seeing that we need to strengthen in the transition from pipeline to backlog. But still, and repeating, the heat treatment segment is well positioned for growth. The total backlog now represents 111 million NOC, a decrease from 212 last year, and we expect a reduction before picking up again with the revised strategy and new management in Fredrikstad at CH Jevensen.

24:00 The industrial solution segment now represents 161 million in the company on a revenue basis equivalent to 22%. Our collaboration partners, Arbion, Daniel Ikoros and Murfits, and the collaboration and continued development of the projects and future projects represent significant opportunities for us. When we focus specifically on Follum Phase 1, a highlight is the performance test that was achieved for all four lines where they passed a performance test related to both capacity and quality of the biocarbon.

24:57 We are working closely now with Arbion to see how we can support them in future projects and how we need to prepare for that. Early stages of 27, we are looking at commissioning on the large-scale reactor for production of biocarbon at Fallen Phase 2. Installation is ongoing and we are looking at commissioning early next year. Again, we are seeing still a large potential for biocarbon in the metallurgical industry. For the food safety segment, we have communicated earlier that a strategic review is ongoing.

25:42 And as soon as that is concluded, we will communicate this to the market. ELT, there has been several management meetings with the MRFIT industries on how to develop existing projects and future projects. We're still awaiting final investment decision from MRFITs here. In the heat treatment, in the traditional heat treatment segments, the sales pulse pipeline has been growing as industries want more electric solutions or hybrid solutions with electric and gas. With that, I would like to leave the word back to Cecilia for some concluding remarks. Thank you.

26:30 Thank you, Per and Ivar, for stepping in at such short notice. That's impressive. So, to sum it up. The maritime solution segment remained profitable in the quarter despite lower volumes and we have a strengthened backlog with three new build contracts and also subsequent contracts. After sales continue to deliver margin improvements and stable earnings. The industrial solutions segment was impacted by project revisions, but reached a key milestone, with all four lines at Fallen Face 1 passing the performance test.

27:17 Looking ahead, we see a strong cruise market that supports future demands and after-sales growth. The maritime order backlog has visibility until 2034. The delivery volumes will increase again, or is expected to increase again, from the summer of 2027. The profit improvement program delivers and the second refinancing phase is targeted to be completed before year end. With the legal separation, Scanship will become a pure play maritime company and VAU Industries positioned as a growth platform for the industrial segment. So with that, I think we can move over to the Q&A part.

28:02 And I would like to welcome Ivar and Per back on stage. Thank you. We are now ready to open for questions from the audience and we welcome our online audience to post questions on the screen in front of you. We have already received several questions. Many of them have been commented on by the presenters. We will start from the top. Well, first, there's a question about the corporate structure. Will that structure will be reflected in the way you report to the market going forward? I can take that. There will be no changes in the way that we report to the market.

28:51 And just also to clarify, the after-sales segment is today purely related to the maritime business, and future after-sales business in industrial solutions will be held within those companies. There's a follow-up question, I guess, to you, Cecilie. How much of the improvement in the gross margin to 24.3% is attributable to sustainable improvements in contract margins, and how much is due to project mix and timing effects? Well, I'm sorry that I can't go into details of that. We haven't disclosed that. And margin will vary between the quarters due to the mixture of legacy contracts and new contracts. That share is decreasing, but it was a bit up this quarter, also due to the currency impacts.

29:54 But I'm sorry, I can't go into further details on that. Another one for you. Would you say that your liquidity reserve and bank facilities are sufficient to support ongoing projects and what you have in the backlog? And do you expect to complete refinancing without new equity? Yes, that was actually two questions. Well, we are targeting to complete the refinancing now and obviously we are looking at, as I also mentioned, the total need for the long-term financing in that process and the The share of long-term versus the liquidity facilities.

30:39 So I'm pleased with the progress that we have with DNB. And as I said last time, that we plan to do this with a bank loan. So we have been taking a lot of steps since I started to increase the liquidity. We see clear improvements. We see that the profit improvement measures have attractions in the numbers. So I have no other comments on that. Moving on to the maritime business, are there now any remaining legacy options that can still be exercised or do you now have full visibility on the final runoff of legacy contracts?

31:29 No to the first part, yes to the last part. We have now exercised, our customer has now exercised the last legacy option that was available. So of course we have to execute on that contract now in the coming periods, but there are no more legacy options now in the pipeline or the backlog. Also, one viewer has observed that Chinese shipyards now seem to be entering the cruise industry. How do you see the role of Chinese shipbuilders in the industry? And what is your position with those yards?

32:06 I think there is a very natural reason why the cruise owners are looking towards China now. As I mentioned in the presentation, the traditional European shipyards that we work with, their slots are fully booked for up to 10 years now. So when the ship owners want to accelerate the building of the new built fleet, they are of course looking naturally into available slots in China, for example. We have actually been working with the Chinese shipyard now for five to six years on two vessels already. So we're used to that setup. Moving on to industrial and the projects at Follum and Rhode Island.

32:54 You've taken another cost to completion adjustments on these in the quarter. Why should investors believe this is the final cost adjustment?

33:05 I think it's important to recognize that Fallen Phase 1 was established in 21 and has been work performed in parallel with the development, specifically Line 7, the early production line, and various transitions in both, should we say, Pure location and how the system should be configured. As we are reaching the end stages of commissioning, we are seeing that small adjustments need to be made. This is only natural considering the long development time for this project. But compared to 2025, we are seeing that changes that are needed are significantly less than before.

33:54 And more on volume, what exactly remains before final customer acceptance and handover? And when do you expect that to happen?

34:04 We're seeing in, as I said, this is smaller, should we say, adjustment to existing works that needs to be addressed. I would not go into technical details regarding this, but we are seeing that we are maintaining the timelines that has been established by the joint projects and working together with Arbion to resolve small remaining punch that remains. Then to the food segments. There is no conclusion, you said, on the strategic review. But when do you expect to conclude and what alternatives are being considered? Well, when we informed about the strategic review, actually it was on the Q4 presentation, we didn't actually expect it to take this long, but it does.

35:00 And one of the things that makes it The complexity of the ETIA business. We have the food safety business which is undergoing the strategic review but it shares some IP with the technology important for our core technology within end-of-life tires. So it is important to do this right and to really support the growth both of the food business and the end-of-life tires business. So we hope to give you an update now on the Q2 presentation and we will let you know when we have more to share. But we are really focusing on this.

35:48 Then there are a few questions about the chart showing ongoing bidding and tenders. One viewer observed that there seem to be fewer tenders on the most recent chart than we've seen before. Is this because you have lost any significant contracts? And the related question, how would you consider your competitive edge today compared to other players in the industry?

36:23 Regarding the pipeline in the graph, of course, when we have had these sessions over the years, we have basically reported on all the ongoing bids that are ongoing in bid stage. Some of those bids are related to for example ferries, which are not our really core compared to the main cruise building business. So we have revised some of the numbers there in terms of the actual potential prospects. So I would say that the graph now represents the absolute core of this country business, which is the cruise new building segment.

37:09 So it's more relevant now than before, I would say, actually. It seems we're now nearing the end of the Q&A session. There are a few more questions. We will take any final questions currently in the queue and then keep lines open for a few minutes more before we close. There is a question specifically on the ELT segment. Is the FID decision at Murphitts the only thing missing before a contract the way you see it?

37:50 That's a difficult question because there is always work to be done. Now I would say that the project has reached a level of engineering that is necessary to take an FID. But of course the information needs to be evaluated by the client and this takes some time. And that's basically what I can answer to that. I can also just add that we do see progress on this cooperation with Merfit. Binself had a couple of meetings with the top management on this. And so we are really progressing.

38:39 But it is an important decision also for the customer. And we are doing what we can to help them to get to the right decisions. And finally, have you commissioned the large reactor at Follum and is it performing as anticipated?

38:58 As mentioned in my presentation, it's in early stages of commissioning now. We are expecting to finalize commissioning early next year and working together with Arbion to maintain the project plans and so on and support Arbion's ambitions. Finally, there are questions on two projects or pilots talked about before. One is with Repsol and the other one in Japan regarding paralysis of sludge.

39:39 ETIA has an agreement with Kobelco, this is long-standing, and that work continues to develop as a sub-supplier to them of our equipment. In terms of Repsol, that was previously developed within an EU project, Repsol has currently abandoned that project and that's the stage of that currently. Thank you and there are no further questions in our queue. Our quarterly presentation is coming to an end. But before we close the call, we hand the word back to the presenters. Any final words?

40:24 Yes. Well, thank you all for attending. And I also would like to say an extra thanks to Ivar and Per for joining today. If you have other questions, please contact us.

Follow Vow ASA into a list and get an email when it puts out news.

Latest news releases

Companies on this call

Speakers

Per Carlsson

Chief Technology Officer

Ivar Homme

EVP Maritime Solutions

More from Vow ASA