Vikram Solar (NSE:VIKRAMSOLR) Q2 2027 Earnings Call
Vikram Solar (NSE:VIKRAMSOLR) Q2 2027 earnings call, held 2026-11-16. Watch the replay and read the transcript on 6ix.

- Company
- Vikram Solar Limited (NSE:VIKRAMSOLR)
- Period
- Q2 2027 earnings call
- Date
- Mon, Nov 16, 2026, 6:19 AM ET
- Replay
- Watch the replay on this page · 52 min
On 6ix: 6ix.com/event/vikram-solar-limited-vikramsolr-q2-2027-earnings-call
Replay
Transcript
Automated transcript · Written by software from the replay's audio. It can mishear names and figures; the replay is the record.
0:00 Ladies and gentlemen, good day, and welcome to Vikram Solar Q2 FY 'twenty seven Earnings Conference Call. As a reminder, all participant lines will be in the listen only mode, and there will be an opportunity for you to ask questions after the presentation concludes. Please note that this conference is being recorded. I now hand the conference over to Mr. Sashank Ganesh from Thank you, and over to you, Mr. Ganesh. Thank you very much. Good morning to all the participants on the call. Before we proceed to the call, let me remind you that the discussion may contain forward looking statements that may involve known or unknown risks, uncertainties and other factors. Therefore, it must be viewed in conjunction with the business risks that could cause further result performance or achievements that differ from what is expressed or implied. To take us through the results and answer your questions today, we have the Senior Management of VIKRA Solar Limited, represented by Mr. Sameer Nappa, Chief Executive Officer Mr. Ranjan Jindal, Chief Financial Officer Mr.
1:01 Arun Mittal, CEO of BSL PowerHive Private Limited and Mr. Reenal Shah, General Manager, Corporate Finance. We would appreciate your cooperation in restricting this as to two questions to allow participants an opportunity to interact. If you have any further questions, you may join the queue and we will be happy to respond to them if time permits. With that, I would like to hand over the call to Mr. Sameer Akbaj. Over to you, sir. Thank you, Sushant. Good morning, everyone, and thank you for joining us today. I hope you and your families had a joyous Diwali. On behalf of all of us at Vikram Solar, I wish you a bright and prosperous year ahead. Before the quarter, I would like to briefly talk about the demand scenario as that underpins our confidence in the years ahead.
1:51 The Central Electricity Authority expects peak power demand to rise from two eighty nine gigawatt to four fifty nine gigawatt by FY 'thirty six. To meet this, India's solar capacity must roughly triple from about 170 gigawatt per day to five zero nine gigawatt. Every segment has contributed to this growth. PM Solar added 23.5 lakh systems, roughly seven gigawatt in the first half of this financial year compared with 16.5 lakh in the whole of last financial year FY 2026. As the Prime Minister noted on November 2, 21 lakh households now pay zero electricity bills under this scheme.
2:42 In utility scale, solar centering rose 61% quarter on quarter. PM Kusum, the new agrovoltaics policy and the INR 5,000 crore PM Surya Sarovaryojuna for floating solar are opening further markets on farmland and on water. Commercial and industrial users account for 51% of India's power consumption, but have amongst the lowest solar penetration. Data centers will add significantly to this demand. India's data center capacity is projected to grow 4x to six gigawatts by 2029. These facilities run around the clock and their operations are under growing pressure to source clean power. Supplying one gigawatt of data center, the ground the clock renewable power typically requires four to five gigawatt of solar along with storage.
3:36 This is a new source of large long term C and I demand and a natural market for our key accounts business. The grid is being built to carry this power. On September 30, the Union Cabinet approved 1.86 lakh crore Green Energy Corridor Phase III, which will evacuate up to 135 gigawatts of renewable energy. This addresses the transmission constraints that held back some of our IPV customers this quarter. Coming to this quarter, quarter two was a tough quarter for us. Volume was at five ninety one megawatt and revenue at crores, both lower than in Q1. For reasons I will explain shortly.
4:24 We did, however, make progress on three priorities that matter for the long term. First one is order flow. Order flow at 1.7 gigawatt was more than double the previous quarter. Our key accounts business brought in 1.3 gigawatt and our mid market segment, which was set up two quarters ago, added 400 megawatt. Second, EBITDA per watt rose 37% sequentially from INR 1.25 per watt peak to 1.71 per watt. Thirdly, our distribution and DCS volumes grew strongly. Coming back to the volume drops. There are two factors which drove this drop in volume.
5:11 First, our IPC customers deferred uptake of existing orders because of evacuation, land availability and other constraints they were facing. The monsoon added to this and industry inflations also fell 25% sequentially. Second, clarity on the ALMM-two extension for C and I came only on July 18. This delayed customers' decisions and moved C and I update into quarter three. Distribution by contrast grew strongly. This channel is central to our strategy, particularly in the PM Surika segment. It has historically served smaller C and I customers, and we are now extending it to residential rooftop.
6:01 Our distribution volume rose about 80% from 145 megawatt to two fifty nine megawatt backed by TCR growth, And we expect this momentum to continue over the next few quarters. The network continues to expand and now we work with 133 distributors, up from 119 last quarter and more than seven fifty dealers and system integrators. This richer mix drove the improvement in EBITDA per watt peak. We also used the quarter to extend cost optimization beyond value engineering with a sharper focus on manufacturing efficiency. Talking about the order book, the 1.7 gigawatt of new orders are spread across PM Khusum, C and I and IPB customers.
6:51 The 10 largest orders accounted for 1.1 gigawatt and smaller orders for the remaining 600 megawatt. This spread reduces concentration risk and smaller orders typically carry better payment terms. A further regulatory change in The U. S. Has affected our export orders. The U. S. Section two thirty two circular of August 6 introduced a minimum import price and additional 15% valorem duty bill and enforcement deadline of December 4. As a result, one gigawatt of U. S. Export order, which we were carrying in our order book is no longer viable. We have removed these orders and our closing order book stands at 8.2 gigawatt.
7:38 Let me now talk about our upcoming sell facility. Our nine gigawatt top month plus sell facility remains on schedule. We expect first sell out in December, after which the lines will be commissioned in sequential manner over the following three months with project COD in March 2027. Once in commercial production, the facility will give us our own VCF and supply supporting both volumes and margins. To reduce the risk of ramp up, we have added an extra layer of technical supervision and relocated our senior leadership to the site. Over the medium term, as our top one plus cells go into our modules, we expect to offer a product whose efficiency few manufacturers can make at scale.
8:30 Our aim is to turn that technology lead into market share in the segment that value it most and to expand margins as captive cells replace the purchased ones. Longer term, our goal is a fully integrated platform from ingot to module. The Board approved nine gigawatt wafer and ingot project is the next step. The of wafer ingot was completed in August on the same site as the sales app. And we are now working on Phase I of the infrastructure plan. The project will be commissioned in phases, time to the policy mandate and to demand. Together with a measured base on this, this keeps capital and management attention on the sale project in FY twenty twenty seven.
9:25 To close my comments, I will say that Q2 volumes were lower, but we entered H2 with better unit economics, a broader customer base and a strong order book. External assessments are unchanged. We are on Bloomberg's NEF's Tier one list. India Rating has affirmed our India plus stable rating and we have retained EPO orders platinum for a second consecutive year. Our priorities for S2 are to convert the order book into revenue, scale the distribution further, raise module plant utilization and commission the self-service with discipline. With that, I will hand over the call to Sri Arun Mittalji for an update on our best business.
10:11 Thank you, Sameerji. At the outset, let me wish you all a very good morning and happy Diwali. Let me give you a little update on the battery business of Vikram Solar. As we know that the Central Electricity Authority has estimated that the Indian best market will cross more than 300 gigawatt hour by 2035 supported by the various schemes of the Government of India, primarily covered by the liability gap funding scheme for more than 70 gigawatt hour and the ACC PLI scheme of INR 18,100 crore, which is promoting the setting up of 50 gigawatt hour of battery manufacturing in the country.
11:00 Now to address this market need, PowerHype made up a plan of setting up 15 gigawatt hour of integrated cell based system in two phases. In the first phase, we will set up a 7.5 gigawatt hour of base assembly plant followed by a similar capacity of battery cell making plant. So let me share the commercial road map of Phase one plant. As we speak in this quarter, our equipments are going under factory acceptance test at the OEM premises and the equipments will be shipped in this quarter to our plant in Chennai.
11:51 In the next quarter, we plan to stabilize the assembly plant and roll out our first container and also complete our certifications, which are mandatory for selling out these containerized solutions. In quarter one of next year, we plan to start our commercial operations for the 7.5 gigawatt hour of base assembly. We have also started our work for setting up the 7.5 gigawatt hour of battery cell manufacturing. And we will get live by the year twenty twenty nine-thirty. Now the product portfolio, what we plan to introduce from our assembly factory are five and six point two five megawatt hour of base containers and the C and I systems like two sixty one kilowatt hour and four eighteen kilowatt hour of base systems.
12:48 In addition, we have also launched our customer centric brand, VEON, which addresses the low voltage requirements of the Indian market. And we have, in the last nine months, been able to establish more than 300 distributors who are selling our low voltage products under the brand name of Beyond for both residential storage and L3, which is the eVisa mobility market. This is a business which will grow over time and will be brand Vyond. This was the update on the battery side.
13:36 Now I hand it over to our CFO, Mr. Ranjan Jindal. Thank you, Arunjit, and good morning, everyone. Let me also add my own wishes for the festive season. I hope Diwali brought you and your families much happiness. As Samirjit said, Q2 was a low volume quarter, and our absolute earnings reflect that. Three points stand out. The unit economics have improved, the reasons for the decline in the profit are clear, and the levers to reverse it are already moving. And third, our balance sheet is well placed to fund the next phase. India added 8.9 gigawatt of solar capacity in Q2, down by 25% from 12 gigawatt in Q1, taking the installed base to 171 gigawatt as on the close of the quarter.
14:24 The seasonal slowdown was fastest in utility projects where ground mounted additions fell 31% from 6.4 gigawatt to 4.4 gigawatt. Our Q2 results reflect the same slowdown in volume, but stronger in unit economics. Revenue from operations was $10.77 crores, EBITDA at 101 crores with a margin of 9.4% and profit at INR 6 crores. EBITDA per watt rose 37% from one point two five to one point seven months. The main driver was mix. The Distribution segment, our higher margin channel rose to 44% of volume and our high efficiency product portfolio supported better relations across channels. Cost optimization and value engineering across procurement, bill of materials and plant operations continued in the quarter to deliver savings.
15:16 The sequential decline in PAT reflects lower absolute EBITDA, which fell from 126 crores in Q1 to 101 crores in Q2 as volume fell about 40%. The levers within our control moved in the right direction. Within distribution, DCR volume grew 71% quarter on quarter, which lifted realizations. Finance costs fell 13% sequentially to 43 crores. Other expenses fell 25%, partly because of lower volumes and partly because of the savings from cost optimization and value engineering. Together, all these offset much of the impact of lower volumes. For H1 'twenty seven, revenue grew 18% year on year to INR 2,641 crores, while volume rose 3% to INR $15.96 megawatt.
16:07 The difference is realization, a richer channel mix and a higher Visha share raised average realization per watt by about 15% over H1 FY 'twenty six. H1 EBITDA, however, was INR $2.27 crores against INR $4.77 crores in H1 'twenty six, reflecting the industry shift. I turn to next. FY 'twenty seven has seen a large buildup of module manufacturing capacity, while the module only non DCR market is narrowing ahead of the transition of PLM List two. The resulting price competition has weighed on margins across the industry. We have been through such cycles earlier. As Sameerji outlined, our response is to build a lasting advantage in cell manufacturing, which we expect to support margin expansion and market share over time.
16:57 We see four levers for our margin recovery. One, the mix. This has started to deliver and will deepen as distribution scales further. Second, the cost. Optimization across sourcing, logistics and raw material yields, together with better inventory cycles, will deliver larger savings as volume grows. Third, the capacity inflation. This is the largest near term lever. As the 8.2 gigawatt order book and the post July C and I orders convert in H2, fixed cost will be spread over a much larger base. And fourth, the integration. Progressive backward integration, starting with our own sales, will structurally improve margins for FY 'twenty eight. Capital allocation remains disciplined and sequenced.
17:45 The Gangai Gundam project comprising six gigawatt of modules and nine of cell at a project cost of INR 5,800 crores is funded roughly onethree our equity and twothree of our debt. Till date, we have spent some INR 1,300 crores largely to complete the module plant and advance the cell project. Another INR 3,800 crores is planned to be infused in H2, mostly for the sale project. Spending for wafer ingot and the best projects, as Arun explained, are being faced, so capital stays concentrated mainly on the sale project. At the end of Q2, gross debt stands at INR $6.32 crores and net at INR $5.47 crores, thereby retaining the net debt to equity ratio at 0.17. For H2, we expect EBITDA per watt peak to hold at around current levels with volumes substantially higher than what we did in H1 as the order book converts.
18:39 In FY 'twenty eight, with our nine gigawatt top pound plus self subsidy commission, a significant share of our volume will move to the higher margin DCL segment, which we expect to lift our margins meaningfully. Beyond that, the move into vapors and ingress will let us capture value across more of the chain. The order book is in place, the balance sheet and fund our integration road map with the various asset and the sell side is weeks away from the first output. With that, we'll be happy to take your questions. Thank you. Thank you. We will now begin the question and answer session. The first question comes from the line of Shivam Bhuradi with ICIC Securities. Please go ahead.
19:42 Hi. Thanks for the opportunity. I have two questions. Firstly, how much of the current 8.2 gigawatt order book is from DCR? And what is the expected time over which the order book will be executed? The 8.2 gigawatt order book, which is primarily non DCR, based on the visibility we have at this point of time, 60% to 70% of this order book will get executed over next twelve to eighteen months. Okay, sir. And second would be is how much of benefit in spread we can get if possible once the cell... Nine gigawatt cell capacity gets commercialized, if you can quantify?
20:38 So it will not be right for us to quantify today with the capacity being discussed. But, yes, with the captive cell coming in, the present DCR from the production margin will almost double to what we sell from our own sales. Thank you. Mr. Borade, please rejoin the queue for more questions. Next question comes from the line of Sahil Seth with Anandwati Institutional Equities. Please go ahead. Hi, sir. Thank you for taking my question. So for the first question, on our previous disclosures, the favorite IP, we have maintained about 12 gigawatt of capacity across in the wafer cell. And in the current investor presentation, we are mentioning about nine gigawatts.
21:25 So I just wanted to know what is the the CapEx plan we are looking the change in the CapEx plan and how much would it be debt funded versus internal accruals? So our overall plan for 12 remains intact. In the current presentation, we have maintained it nine for cell, wafer and ingot. Yes. Could you hear me or should I repeat the answer? Yes. So my question was the change in our plan for ingot wafer cell from 12 to nine gigawatts and the change in CapEx, if you could throw some light on it. No, I was just saying that. So our whole plan for 12 gigawatt for the entire value chain continues to remain intact. In the first phase, we intend to complete nine gigawatt for cell, back by a nine gigawatt wafer ingot. Provision for the balance three of cell wafer and ingot and the same side has already been made. The right time with the new technology coming in will be updated to all of it.
22:26 Okay, sir. And sir, for the nine gigawatt integrated capacity, what kind of CapEx are we looking at? And how much of that would be debt funded versus internal accruals? So nine gigawatt cell would require a project cost of about INR 4,500 crores, well within the range of 500 crores per gigawatt, majorly added at equity of three:one. Okay. Got it. And sir, on the BEST side, with the China technology curve on the export technology export curves, are we facing any delays on the best side commissioning? So first of all, there is no export control on the best assembly side.
23:15 So in the Phase one, 7.5 gigawatt hour capacity, what we are setting up is for the best assembly. So export control has no significance. Also, this export control is on certain aspects of equipments and materials for the cell project, which is a couple of years down the road, and we have definite plans of addressing each of those controls in an active way manner. Sir. And so for Dev... Sorry for interrupting, we have more people to ask questions. Can you please rejoin the queue for more questions? Okay. Okay. Got it. Thank you. Thank you. Next question comes from the line of with Choice International Limited. Please go ahead.
24:07 Yeah. Hi. Thank you for the opportunity. I just have one question. I understand I see New Energy is the supplier of the top line for the EU, and this has a high dependence on China. I understand, particularly, there is no outcome of... From the Chinese government where how much of export technology would be carved from exporting. Probably all the equipments have already been procured out in India already, but the wind force, I just wanted to understand that if there are further expansion as far as referring what is concerned, what is the management part about? Or, like, are you already thinking about German producers, or how does the economics change for your CapEx and particularly IRR basically if you move to German technologies?
25:11 Any color on that will be really helpful. See these restrictions which are still being drafted and are in discussion in China have no bearing on the cell line. So that is not impacted by this. As far as referring that is concerned, we are watching this and monitoring the developments. And based on the final outcome of those developments, we will take our decisions. Is it possible for you to provide any color in case you have to move to German, like German technology? How does your IRR, like how does the economics change? Can you provide some color on that? At this point of time, we do not have any update on this.
25:59 As the situation develops and if this becomes real, then we will provide you the color. Okay. Thank you, sir. Thank you. Next question comes from the line of Deepak Pulswani with Swan Investments. Please go ahead. Yeah. Thank you for the opportunity. So firstly, wanted to check it out on the volume front. Given the decline in this quarter and delay in uptake of some of the clients, how should we see volume for the entire year as a whole this year? See, this decline in volume we experienced in quarter two was we consider it as a temporary decline. It was a combination of different factors, which I outlined in my remarks.
26:59 We are already seeing that some of those issues have been addressed and the offtake is normalizing, both in IPP customers and in C and I customers. So we expect H2 offtake to be in line with our expectations. Okay. So would it be fair to say they will be back to the one gigawatt plus kind of volume in the coming quarters? Sorry. I didn't get the number. Can you repeat that, please? Would it be fair to say in the coming quarter, we will be back to the one one gigawatt plus kind of volume? That would be a fair estimate to make. Okay. And secondly, on the slide number six, there is also a distribution which is given in in terms of the contribution to the 22%.
27:55 And about this, there is also a distribution volume which has been given, and contribution is mentioned at 44. I just wanted to take it on what is the difference between BPR and distribution. Because I I believe distribution is also a part of DTR only. So just wanted to get the clarification on. Yeah. So in our case, historically, our distribution was catering to small C and I, which was primarily a non DCR market. Over the last couple of quarters, we have reoriented that distribution as we got access to the DCR sales. And while DCR, which goes into PM SolarWare is being ramped up, at the same time, our distribution continues to cater to small C and Is, which are non DCR.
28:52 So our strategy on distribution is too strong. One is to ramp up in PM Suresha segment and also continue to maintain our share in the small C and I segment. Okay. And finally, I just wanted to take it out on the Sorry for interrupting, Mr. Pulswani. We have more people in the queue to ask questions. Can you please rejoin the queue to ask more questions? Okay. You. Next question comes from the line of Sahil Seth with Anantwati in Social Equities. Please go ahead. Seth, please go ahead. Yeah. Am I audible? Yes. You are. Please go ahead. Yeah. So I just wanted to follow-up on my previous question on the CapEx.
29:45 On the cell, you said around 4,500 crore of CapEx for the nine gigawatts. Also, if you could provide the figure for ingot vapor and CapEx on the best side, too. Thanks, Al, for the question, and I'll take that up. So for the wafer and ingot, the present estimate for the nine gigawatts stands at about INR 5,600 crores within about INR $6.20 crores per gigawatt. For the best, the 7.5 gigawatts are, we have made an estimate for about INR 3,600 crores over to spend over the commissioning dates with some of the and Arun Jay explained us. Okay. And so what time line are we looking for the at this CapEx?
30:33 Serious investment will start from the first from the next fiscal to catch up with the timelines regulated by the Ministry for ALM3. The year following, which is 02/30, we'll see the commissioning of the 15 gigawatt of vessel. Okay. Got it. And sir, just one more question. In our book, I see 1% of our order book is from IPP. But if I look at the split in terms of revenue mix, only 1% contribution is from the IPP this quarter. Is there any particular reason why there's a slowdown on the IPP side? Yes. So as the CEO mentioned in his remarks, this quarter particularly, the IPPs on our order book had specific land evacuation...
31:32 Land availability as well as evacuation delay, which is why they had deferred the offtake. That is the reason for the discord, but we still form a significant chunk of our order book, and we are already starting to see a normalizing of offtake in this quarter and the next from the IPV segment. And if you can disclose, is there is this land issue related to any specific geographical area or state? These are specific to those customers and their contracts. We won't be able to comment on that. Okay. Got it. That was helpful. Thank you, sir. Thank you. Thank you. Next question comes from the line of Sanj Adia with Resurgence Capital. Please go ahead.
32:26 Hello. Yeah. Thank you for this opportunity. I would just like to ask that can you please give us some sort of revenue growth guidance and the margin guidance that what are we targeting for FY twenty seven, like the H2? Thanks, Frans, for the question. As Sameer explained, H2, we see the order book really expected to convert into real volumes seriously. We have also seen H2 always delivering more than what H1 does. So volume will depend mainly on how this IPPs really have the uptick at the site. On the margin front, we have also mentioned that we'll be maintaining the margin per watt peak as we did in Q2 with more of penetration into the market.
33:13 So all clubbed together, h two seems far better than what we did in h one. But if you could put within percentage from the... There is any sort of numerical guidance of that possibility, sir. Can you just repeat it, please? Can you, like, put it in numerical terms? Like, can you get a number for the growth or the margins that it will grow at 10% to 12% or something? So difficult to quantify it, but as I told the volumes and the volumes will jump and EBITDA per watt peak will maintain at the increased level already achieved. Okay. And sir, the second question I have for you is what is the current capacity utilization and how much are we aiming to improve it?
34:06 I think the COF is a function of the volumes offtake. All of our current lines across the four facilities are completely ramped up. And in line with the offtake planned with scheduled deliveries for Q3 and Q4, you will see significant improvement in the utilization. Okay. Thank you. Thank you. Thank you. Next question comes from the line of Atul Jobi with Prosperity Wealth. Please go ahead. Yeah. Thank you for the opportunity. So can you give us some idea on when are you expecting ALM to approval after the solar plan... Solar cell plan commercialization?
34:58 This has been planned in the quarter four of fiscal 'twenty seven when sequential commissioning of our lines begin. So we expect the enlistment inspection to happen, and then it takes thirty to forty days for the list result to come in. Next question comes from the line of Karan Kubetia, an individual investor. My question is Please go ahead. The... My question is about the revenue. Why it fell to on to on year on year?
35:45 Basically, it fell tier on tier drastically. I think so. And how about the margins also? They are not sustaining as of now. How will it recover after cell manufacturing? Any idea? And how much can it recover back? About the growth, how much growth you are targeting for the forward looking? These are my questions. Thank you, Karan, for the question. As you explained and I also had in my remarks, the impact of the reduction in volume by 40% in Q2 has led to fall in revenue, but not to the same extent because more of this year has come into the volumes. On a year to year basis at H level, the revenue has actually gone up.
36:35 If you ask me as to what the revenue would look like for H2O the current fiscal, as I told in the previous answer, volumes are something we are expecting a serious jump to come in. EBITDA will remain at the same level. Things will drastically change in FY 'twenty eight. The captive sales coming in, we'll be penetrating into the retail market more with our own sales. So let's wait and watch. And one more question about the uncertainty about the world is going on, the crude oil, how much it is affecting the overall business in terms of raw material cost? Any solution for that you are handling it? So crude has now luckily has come down to some 90 levels.
37:21 This did affect our rate and the logistics movement in Q2 to some extent. We had inventory from our previous quarters. So on the production side, we never had an issue with regard to logistics. Going forward, as I told, with crude coming down, we'll be seeing the fall in the overall logistics cost also. Next question comes from the line of Mukesh Agarwal with Turbo. Please go ahead. Yes. Thanks for giving the opportunity. I want to understand, like, by what time the cell capacity of nine gigawatt will be fully operational commercially?
38:16 So as we said, our first sellout will happen in December and the lines will then get sequentially commissioned till March. And then over the next few months, sequential ramping up will happen. So that ramping up typically takes four to six months. And in that timeframe, we should be fully ready for commercial production in all the lines. So you mean to say that by quarter two, it will be fully nine gigawatt cell lines will be fully operational. Am I correct? That's right. Quarter to twenty seven twenty eight, sorry. That's right. But the commissioning, as I said, ramping up up will happen in phases. So some lines will get ramped up much faster.
39:04 This time frame is for the last time to get ramped up. So the production will start much earlier and it will get converted into sales also much earlier. Okay. Thank you. Thank you. Next question comes from the line of with Equities Securities. Please go ahead. Yeah. Hi. Thank you very much for the opportunity. My question is on the other current assets. So we have seen start increasing to other current assets from almost INR $3.60 crores to INR $6.20 crores. So what are the reasons for that? And second, on the emphasis of regarding the safeguard duty and receivables of INR 50 crores received by the customer.
40:01 So by when do we expect the resolution on the same? Thank you, Vikram, for the question. And on the increase in current assets, can only assign one reason was advances being paid for the ongoing CapEx vendors. And also as we move more towards DCR, the deposits and advances to DCR supplies also comes into picture. But all this will convert into recovery in Q2 and Q3 and Q4 going forward. With regard to the specific question on the safeguard duty for INR 150 crores, that is something which we have been following up. Consultants and our advisers are hopeful of closing that sooner. We'll keep you posted with any positive progress on that issue. Sure. Thank you.
40:49 Thank you. Next question comes from the line of Bala Muralikrishna with Oman Investment Advisors. Please go ahead. Hi. Good morning. Sorry, I missed the opening remarks. The question is related to it. Allow me to. So regarding volumes, so these are down to your. So what do you expect in the q three, q four and even after December when we get our own services? So how do you see the volume shift? Thank you, Bala. As CFO mentioned, we expect a significant jump in the volumes as the new order intake. You would see 1.7 gigawatt of order intake this quarter itself, which had a good mix of smaller mid market orders, which typically have a shorter execution cycle as well as the IPP and C and I orders, C and I that have December deadline for non ECR exemption.
41:55 As a result of which, we expect a significant jump in Q3 and Q4 volumes. We wouldn't be able to assign a number to it at this point, but we do expect volume to improve and profitability to sustain because of the improvement in the revenue mix that we have achieved this quarter. Yes. Thanks for that. So do you think so when the volumes increase, so do you think by at least by Q4, we would able to reach that at least 15% of EBITDA margin? Subhana, again, quantifying that with the number could be difficult. Our focus continues to remain the same on optimizing our cost, retaining the per unit EBITDA level and ensuring maximum capacity utilization as we spoke just now.
42:49 Yes. Yes. One more last question on the volumes. So you have a good order book actually around eight meter water. So what is it driving to the volume to restrict to the the point five gigawatt number? So in market, what's happening? So why the volume... Even though we have a good order book, why the sales gigawatt terms are not shooting up? So I had mentioned this in my opening remarks. In this quarter, our the order book which we had, our IPP customers faced some issues on their land acquisition and evaluation, and they deferred the offtake. And that was the primary reason why the schedule offtake could not happen, and we saw a drop in volume.
43:38 The situation since then has normalized, and we are already seeing in Q3, the offtake has resumed. And combine that with the C and I offtake because of the December deadline, we are seeing a good normalization of the volumes. Yes, that's great. Going forward, how the order book will shake up between VIKRAMSOLR non VIKRAMSOLR and we will have VIKRAMSOLR supplier and also our sales also going to stream online by the January. So how... What would be the current mix and how how you'll think that this mix will shape up in effect on date order book size?
44:25 So in terms of order book, our Q2 order book was primarily non DCR. The DCR segment, we are primarily catering is channel and PMSOLRITA because we are currently procuring DCR cells and the quantum and the pricing allows us limited participation. Also C and I was exempt in December, and if there is no change in that regulation, we expect that DCR demand from the C and I segment will significantly ramp up next quarter. And that is when our order book will also show a high percentage of DCR. Okay. Thank you. That's all. Next question comes from the line of Akshay Mane with Nuwama.
45:18 I just have a couple of questions. One is, can you give me CapEx guidance for the next two years? And how much CapEx was spent in FY 'twenty seven till late? So actually, FY 'twenty seven, up till now, we have spent about INR 1,700 crores. The major spending in SG will happen towards the cell plant CapEx for about INR 3,800. FY 'twenty eight and FY 'twenty nine, we'll see the spending coming in for the wafer and the the numbers we discussed a while ago. We intend to commission the wafer ingot made of FY 'twenty nine, matching it to the ALM and C date, followed by the best 7.5 gigahertz into two phases to add up to 15.
46:09 Okay. And lastly, just one small thing. What was the module production for for this quarter? I think you provided the module sales number of 0.59 gigawatt. What would be the production in this quarter? Okay. Okay. Sure. Thanks. Thank you so much. Thank you. Next question comes from the line of with HUS. Please go ahead. Oh, sir. I'm audible? Yes. You are. Please go ahead. Yeah. So, sir, in last q one, if I remember correctly, the management has said that they are keeping up some orders for non DCR due to ALMM requirements, and they are not bidding for those orders.
47:03 So has normalcy returned to that segment of the order book? And can we see that uptick in upcoming quarters regarding those order book that have been regarding those orders that have been not being bid in the last Q1? So I think you are referring to the impact of ALMM2 on C and I segment, where when that was announced in June, everything was moving to TCR. But subsequently in July, there was a notification that C and I can continue with non DCR till December. So that segment resumed their decision making post that announcement, and we have seen very fast and significant amount of decisions being taken. And we have participated in that segment.
48:02 And our order book of 400 megawatt is primarily from that segment. In addition, there are also larger C and I in our overall order book that constitutes good chunk. So that segment had resumed, yes. So and sir, one more follow-up question. Can you confirm if the numbers that we are seeing in per EBITDA margin and the guidance that you have provided for H2 that it should remain the numbers that we have seen in Q2. Can you confirm if there will be more uptick in FY 'twenty eight from Q1 of FY 'twenty eight basically? When the cell commissioning will ramp up, I think materially by Q1 next year, FY 2028?
48:52 See once our cell line gets commissioned and gets ramped up and the cells begin to flow into our modules for this year application, we will begin to capture cell margin. So to that extent, you will see an update, yes. Okay. Thank you. Thank you. Next question comes from the line of Mosin Alam, an individual investor. Please go ahead. Sir, my question is regarding the first sell out. So as we have communicated to the same that we will do that in phases. So my question is how that phases are looking like, whether it means phase of three gigawatt or something else?
49:41 So the when we say phases, it is a continuous phase. It is not into chunks, but because we have number of cell lines, we will get one after another. And they will get then get ramped after one after another. So that is what we need by this. So it will not a single commissioning, but there are no breaks between these sequential commissioning. Okay. And my second question is that regarding the Chinese curve. So how dependent we are on Chinese engineers regarding the installation of cell line and whether they need MOFCOM registration as of now? That is my question, yes.
50:29 So as far as MOFCOM is concerned, we do not see any impact of that on our cell line. As far as Chinese engineers are concerned, yes, that is a requirement. We have seen that there is a easing of Visa from what we saw in the past. But nevertheless, we have made alternative plans and we have appointed another technical consultant, a layer in the above the suppliers Chinese technical manpower to ensure that any risk related to the ramp up is mitigated through this non Chinese technically competent manpower. Okay. Thank you.
51:20 Ladies and gentlemen, that was the last question for today. We have reached the end of question and answer session. I now hand the conference over to the management for closing comments. Yes. Thank you, everyone, for a very interactive participation. We tried to answer all the questions. But if you still feel anything is left unanswered, you can approach us through the email, and we'll try to address all the queries. Thank you for taking our time for this call. Thank you, everyone. Thank you. On behalf of Vikram Solar, that concludes this conference. Thank you for joining us. You may now disconnect your lines.
Follow Vikram Solar Limited into a list and get an email when it puts out news.
Latest news releases
- NSE:VIKRAMSOLR — Vikram Solar Limited has informed the Exchange regarding a press release dated November 14, 2026, titled "Vikram Solar Reports Q2 & H1 FY27 results, EBITDA per watt improves by 37% QoQ,… · Sat, Nov 14, 2026
- NSE:VIKRAMSOLR — Vikram Solar Limited has informed the Exchange regarding a press release dated October 27, 2026, titled "Vikram Solar Secures Major 289.87 MWp Order for Grid-Scale Solar in Rajasthan from… · Tue, Oct 27, 2026