Replay available

Velocity Composites (LSE:VEL) — Final Results

Final Results hosted by Velocity Composites (LSE:VEL) on Investor Meet Company, held 2025-01-30.

Thu, January 30, 2025 at 4:00 AMendedReplay
Velocity Composites (LSE:VEL) — Final Results
Company
Velocity Composites PLC (LSE:VEL)
Date
Thu, Jan 30, 2025, 4:00 AM ET
Replay
Watch the replay on this page · 40 min
Results news release
Audited Final Results to 31 October 2024 · Wed, Jan 29, 2025

On 6ix: 6ix.com/event/velocity-composites-plc-vel-final-results

Replay

Transcript

Automated transcript · Written by software from the replay's audio. It can mishear names and figures; the replay is the record.

0:02 Good morning, ladies and gentlemen, and welcome to the VELOCITY COMPOSITES PLC full year results investor presentation. Throughout this recorded presentation, investors will be in listen only mode. Questions are encouraged. They can be submitted at any time via the q and a tab that's just situated on the right hand corner of your screen. Please just simply type in your questions and press send. The company may not be in a position to answer every question it receives during the meeting itself. However, the company can review all questions submitted today and we'll publish those responses where it's appropriate to do so. Before we begin, as usual, we would just

0:32 like to submit the following poll. And if you could give that your kind attention, I'm sure the company would be most grateful. And I would now like to hand you over to the executive management team from VELLOCITY COMPOSITES PLC. John, good morning, sir. Good morning. Good morning, everyone. And again, welcome to our sort of FY 'twenty four year end presentation. We've got a slide deck prepared to take everyone through, and, I'll, make a start, on the, the results of the, last year. So your usual presentation team, you've got Rob next to me here, CFO, myself here in Burnley, Mandy joining us, our chairman from from Manchester.

1:21 Essentially, start with the usual format of presentation. So in summary, clearly an important year as the industry starts to recover. As we talk in a moment, there has been some sort of challenges within the industry, probably very well publicized ones, which we can discuss and sort of cover off in terms of the impact of those. But in summary, revenue up 40% driven by some increases in Europe, but mainly from increases in the revenues from our facility in The U. S. As that project continues to onboard, but also have full year effect of the programs that are already onboarded. A lot of work within the business and all the teams really to drive in terms of getting the gross margin back to the levels that we desired.

2:16 Really, we'll talk about that in a moment, but a lot of effort and, again, multi reasons for that. But again, a really positive step forward. But in turn, it's driven significant swings both in the adjusted EBITDA and the reduction in the loss, which again is another big step in the right direction and sufficient cash reserves to carry on with our plans as we move forward. So I think it's important just to cover off some of the industry issues that we saw last year, but also look forward to see what the resolution of those and what the public information out there is in terms of the aircraft production rates, which in turn leads to higher volumes required from our customers and obviously higher volumes of our products into our customers proportionately.

3:10 So 2024, pretty much twelve months ago now, a chain of events started really with Boeing. And again, not not sort of direct impact, but again, indirect impact because of, you know, customers who support both Airbus and Boeing platforms and, you know, customers that we were engaged within North America as well particularly. But essentially what yeah. I'm sure most of you saw what happened, there was issues with particular flight that led to significant oversight. It meant that production rates that were planned last year, particularly around the key seven thirty seven program weren't allowed to happen.

3:56 And then to in in sort of response to that, Boeing announced that they were requiring Spirit Aero Systems, probably the largest tier one in the world, previously part of Boeing. But in the meantime, while it was a private company, it also it was involved in a lot of Airbus work as well. So then there was a period of sort of disentangling that Airbus work and, you know, getting Airbus happy with the you know, where that work is moved to, but then also, you know, everyone pretty much focused on either doing that disentanglement or or managing the post takeover. So that led to a lot of sort of distraction within that sort of direct side of business. But also, you know, customers we were talking to, you know, as we say, we're supporting those programs who didn't see the expected rate increases.

4:45 So again, that sort of influences their decisions in terms of, you know, the key outsourcing projects like ours where you know really to support growth or efficiency or you know areas where they need more capacity or floor space.

5:05 Apologies, I'm just can't quite read the screen. So Rob's screen is still in there. And then of course, as we announced back in September, there was an expected rate increase on A350, which was moved to the right. Again, customers had already started their activities to support that. We were supporting customers in that rate increase, but moving it to the right essentially meant that then there's a period of customers dealing with any width and inventory that had been built for that rate increase that we sort of have to work through sort of end of the year to manage that. So I think all in all, again, I'm also missed off towards the end of the year as well. There were some labor strikes in Boeing, which actually stopped production of the seven thirty seven program for a period of time as well. So I think all in all, a difficult but interesting year in terms of 2024.

6:04 But fundamentally, we still see those rate increases planned. We still see obviously aircraft being sold and the OEMs wanting to drive up production rates. And so really as we look into 2024, you've got expected that Spirit takeover to conclude. And I think, you know, Boeing results this week sort of forecasting that to be sort of midyear. Coupled with that, in that same results, they were, again, giving us a bit more guidance on 737 production rates when they start to see them increase. Also rate increases discussed there on 787 going from five to seven aircraft a month, again 20% significant increase there.

6:54 And also key project in Europe for us is the A350 where we support multiple customers in The UK. And again, we're starting to see rates forecast to move from sort of six a month in total across both variants to around adding towards nine, particularly the dash 1,000 variant going from rate one to rate three. So hopefully, and, you know, all indications are that 2025 is when issues are resolved and those rates start to come back and actually get back to sort of the levels they were pre COVID and beyond. Just a bit of a summary on the sort of progress within the organization through last year.

7:40 We obviously talked a lot in the year around the sort of first article processes we onboard our customers programs from the facility in North America. That progress has continued and we did give you an update back in September where the FAI process for the final suite of programs has been delayed due to, well, it seems various reasons, but essentially the sort of OEM availability and then some sort of elapsed time issues, which meant that certain parts had to be redone. Nothing that we've seen so far has been on any issues with our kits or our FAI plan or anything in what we do, really just procedural issues around what is quite a very intensive FAI process for a narrow engine OEM and, again, quite a flight safety critical component. So as you'd expect, a lot more detail involved in some secondary structure.

8:47 But again, that is progressing. The real repeated FAIs happening as we speak and the customer builds parts with our kits and then that part gets assessed by the OEM and then we're approved to supply kits on that program. So again, nothing we've seen there is giving us any concern other than obviously the ops time, but these things will take the time that they're needed. We have very good support from both the customer and the OEM approvals. And as it states in the presentation as

9:21 well, you know, a big difference from the FBI that was done last year is we are in direct contact with the OEM now and helping to shape and drive the whole project management of that FAI process to completion. So that's positive. It's great that both the engineering teams in The UK and The U. S. Are supporting that. And we expect that to complete in the first half of this year. One other thing that again gives us a lot of sort of satisfaction in terms of the pride of the team and how they're working is around And we now see The U. S. Facility operating to the same quality and delivered performance of The UK sites. Again, testament to everyone's hard work in terms of managing that data and knowledge transfer.

10:08 And then that site, whilst it is still awaiting completion of the the third package of FAI, it is still sustaining those first two packages, again, to the very high levels of of quality and delivery performance. So again, great great cooperation with the customer and, you know, great sustained delivery there from the local team. And then in terms of new business, obviously given some of the challenges we talked about on the previous screen, irrespective of that, work has continued at a reasonable pace there. And we have business cases that are part with some of the civil programs. But then we also talked about last year moving the focus on to defense programs. And again, work has progressed well through there.

10:54 And as always, we'll update everyone when that progresses through to contractual completion. But clearly, lots of, you know, defense spending, not just on military aircraft, on, you know, defense systems, missiles, drones, the whole suite is COMPOSIT based. And particularly in North America, there's an awful lot of larger non civil aerospace organizations doing a lot of business with COMPOSITES. In Europe, again, we talked about at the half year in our market update, a lot of activity in terms of some contract renewals where we have some price renegotiations around some of the inflationary factors that we've seen over the previous three years.

11:43 Again, we've probably benefited as we've gone outside from a period of low interest rates and low inflation. Clearly, that's changed in the previous contract window. And two things really, one is we needed to right size that with what has been we've experienced, But also move to a more an annual price agreement. So, you know, we may sign three, five year contracts which, you know, tend to roll and become, you know, once we're performing these services, they sort of continue indefinitely as long as we perform. But actually move to, within those, an annual price agreement where we can cover off both for us and our customer benefit any inflationary pressures in year to match their sort of budgeting window and ours as well. So I think that's been a very positive step.

12:30 Glad to get that concluded. And again, it sort of makes a lot more sense for all of us to do that in a much smaller timeframe rather than wait till the end of the contracts. One thing that we also talked about previously is when we went live with our facility in North America, we implemented our ODU based MRP system from day one to avoid having to implement one and then update it with the planned switch to to the ODDO based system. That's worked really well in The US. It's been, obviously, I now own Perfective. They're using that day to day. Then as part of the sort of standardization there, we're implementing that in in UK as well to give us much consistency, but obviously better data on the sort of normal transactional parts of the business alongside some of the sort of bespoke VELOSITI owned IP software around, you know, more of the sort of manufacturing efficiency, nesting, material management, all the clever stuff that we do as part of our service offering.

13:41 In Europe, new business was focused on existing customers. And again, progress there both in The UK and Mainland Europe. And again, as always, we'll update as those move through to contractual stages. And in terms of existing business, as we said previous, clearly the A350 ramp up is key with multiple customers in The UK. And we talked about the issues last year. January has started a little bit differently in terms of starting to see those rates move forward in line with the expectations that we've been flowing down from Airbus. So again, key program to ramp up.

14:23 Interestingly, the sort of delayed ramp up, we've not seen anything to suggest that any of that was to do with any composite suppliers. It was sort of non composite reasons we've seen various causes of that delay ramp up, be it engines or metallic components, but with composite seems to be able to ramp up and meet those demands quite well.

14:51 I'll hand you over now to Rob who will take you through the financials in a bit more detail. Yes. Good morning, everybody. I'm just going into a deep dive on the income statement first. As previously mentioned, our revenue increased by 40% in the year. And that was mainly as The US side ramped production on its programs for our main customer over there. We were particularly pleased with the progress made on margins. Gross profit improved to 25.9%, up from 18.8% in the previous year. This was a significant achievement and there were a number of factors. The key ones being a better mix of sales.

15:42 The contracts in The U. S. Were negotiated at better pricing. So we were benefited from that increase in sales in The U. S. Mix helped us there. The inflation adjustments that John has just talked about helped on The UK business. And we saw improved operational efficiencies. Again, in The U. S, we had better labor utilization, which helped rise to profitability. But we also focus on many day to day yield improvements, handling improvements and so on to continually look to improve our margins. Administrative expenses in The U. S, we saw the first full year.

16:32 That has now reached a sustainable level, and we would not expect a shift in the administrative expenses going forward.

16:42 Adjusted EBITDA resulted for the first time since COVID-nineteen. We saw an adjusted EBITDA of 374,000 although clearly we are still loss making at the bottom line, but the loss significantly reduced. Moving on to the balance sheet. We had a relatively quiet year in terms of fixed asset investment and with depreciation playing through, the non current assets came down. Turning to the current assets. Inventories reduced from £2,700,000 to £2,500,000 and that despite a 40% increase in business.

17:33 So that was a major improvement in inventory turns and reflected the initial take on stage in 2023 of our contracts in The U. S. Where we acquired material from our customer and we worked very hard through the year to get the inventory turns up. Likewise, trade receivables, although we saw an increase in trade receivables on the back of the 40% growth, we were much more efficient in our collections and we moved from seventy one days receivables down to fifty three days at the end of twenty twenty four. Trade payables reduced, and that was in part as the improvement in inventory, better yields and so on. We actually need to buy less so the trade payables will come down naturally.

18:29 Noncurrent liabilities include CBILS, and they reduced by $500,000 during the year, and there was a net reduction in assets obligations under finance lease that came down by 300,000 Looking at the cash flow. As we continue through our growth cycle, there is a very close scrutiny on cash and cash management. This in part, I explained when we looked at inventory, getting our inventory turns up to the 10 times per year level from what our customers would have experienced previously at about four times a year is a key part of that.

19:16 Monitoring our spend, on administrative expenses, making sure that we are efficient as possible and we pay and we receive our cash from our customers on time is key. We did have net cash inflow from operations of 370,000. That was helped by tax receipts from r and d tax credits. And we actually received two years' worth in the year because 2023, unfortunately, the submission didn't go off in time. And so we had a bit of catch up in 2024. We utilized cash from operations partly in investing activities, and that is largely capitalization of R and D expenditure and in servicing finance, which is repayments of loans, repayments of lease obligations and

20:18 interest payments. All in all, cash reduced from the GBP 3,200,000 to GBP 1,700,000. But on top of the GBP 1,700,000, we have undrawn facilities, which are contracted up at $3,000,000 with our bankers in The UK. So we have a fairly large headroom, which we monitor against. Having said all that, we continue to work very hard to make sure that we have sufficient cash in the business. You'll notice the table on the bottom right there. Our net debt was had the gross cash of £1,700,000 and single loans of just under £1,000,000 giving us 700,000 net cash.

21:09 The position that we put on our announcement yesterday, the RNS announcement

21:15 in January is we have about $1,600,000 cash and net cash of $800,000 So the cash position is largely unchanged from year end and we're operating cash neutral at the moment. However, we do need the facilities we have and the real cash generation will start once we onboard the final phase of The U. S. Contract.

21:48 I think that probably covers that slide off. Thank you. I'll hand you back to John. Thanks, Rob. So just to sort of summarize what we're sort of looking forward to in FY 'twenty five. As we said, I think the A350 program rates are key. And to start to see them move forwards will be important not only for existing business, but also, you know, future businesses. Customers get busy, their facilities fill out, and

22:17 they look to ways to meet that increased demand and free up floor space and, you know, all the other benefits that the VELOSITI bring. Obviously completing the final contracted program for that facility in The U. S. Is important. As Rob said, the there's been a sort of a company wide you know, real drive in terms of efficiency at every level in terms of not just our material efficiency, our stock turns, you know, our overhead spends really to support that improvement in margin.

22:52 We did pass, obviously, some of our labor inflation and energy inflation on, but we also have to be mindful that customers are looking for us to play our part as well in terms of driving that. But again, we think we've struck a really good balance there in terms of being more efficient ourselves, but also managing the inflationary issues of the previous couple of

23:15 years. Those that know the company will know that we're only talking about our service inflation. The material that we purchase and sell is fully controlled from not only specification but also price. So any material inflation is automatically passed on as part of contracts anyway.

23:35 Business development, you know, we have some part, shall we say, opportunities, which, you know, as the civil aerospace market sort of resolves and the rates increase, which can resurrect, but also some defense sector opportunities as well, which, again, is another significant utilizer of COMPOSIT materials. And again, the drive really is around

24:02 managing the business post COVID as the rates recovered to sort of pre COVID levels. We have targets around margin, EBITDA and ROC. And again, we've made significant inroads into achieving those and continuing to build those into the business as we expand and look at different opportunities wherever we operate.

24:27 And I'll hand you over to Andy now with a final summary, and I'm sure after that, we'll we'll go through the questions. Thanks, John. Thanks, Rob. Fantastic. So just reflecting on this last year, the key highlight for me and for the board is that we achieved another year of 40% growth.

24:52 And even with that, the current contracts still offer significant upside. If you look in The US, we've got a major program which we're onboarding. In that facility, there is other opportunities opportunities around defense to onboard programs in the future as well. And when I reflect on Trump coming into power, I can see onshoring back into The States and into that facility potentially offering even more opportunity for us as we are based ourselves in The US next to that major facility for that tier one customer.

25:27 And if you look in The UK, our biggest program that we're exposed to in Airbus is the a three fifty. And Airbus' own forecasts say that they want to ramp up from production of six aircraft a month to 12 aircraft a month for the next couple of years. This year, they're trying to get up from six to nine. We'll see how that goes. And if they can achieve that, then then that gives us again a major upside within our own business. The strength in the board, bringing Rob on, you've heard him today, great focus on cash, very experienced in manufacturing. Everyone's really enjoying working with Rob and all his experience and strengthens the board, as I say.

26:14 And those business opportunities, I know everyone's waiting to see if we can land another major contract. We do work on those big contracts.

26:23 They do take time. And we do believe that, you know, that we will land other large contracts in the foreseeable future, ideally in the shorter term. But even if we they are more modest, we can definitely grow this business significantly over the next three or four years. And the key point now is that we're hitting that margin of over 25%, which means that growth will be more profitable. Cash generation is starting to come through. And, therefore, overall, we feel very positive about the future of the business, very positive about what achieved in the last year and the outcome and the outlook for the business. So I'm gonna pass you back to questions and answers, and we'll try to answer all your questions.

27:24 Perfect. Andy, Rob, John, if I may just jump back in there. And thank you very much indeed for for your presentation this morning. If I may, just will bring back up your cameras there for the Q and A. Ladies and gentlemen, please do continue to submit your questions just by using the Q and A tab that's situated on the right hand corner of your screen. But just while the company take a few moments to review those questions that were submitted already, I'd just like to remind you that a recording of this presentation along with a copy of the slides and the published Q and A can all be accessed via your investor dashboard. Guys, as you can see there, we have received a number of questions, and thank you to all of those on the call for taking the time to submit their questions. But, John, Andy, Rob, this point, if I may just hand back to you just to read out those questions and give your responses where it's appropriate to do so. And if I pick up from you at the end, that'd be great. Thank you. Great. Thanks again.

28:10 I'll ask the questions, and I think, John and Rob, you can answer them. I think the first question is really just for you, John, and Rob, you can chip in, is really saying, well, what is our order book? How does that work? The visibility. And is there any capacity constraints in that current order book at all? Yeah. Thanks, Sandy. So obviously with our customers, we have agreements. And then in terms of how that order book is slowed down to us, we tend to work to a twelve month rolling forecast, which is reviewed monthly and sort of, you know, very detailed commercial reviews between the two organizations.

29:01 When that gets to sort of the six month horizon, we tend to look for a more sort of focused forecast with a plus or minus figure attached to it because that's the sort of window that we use to order the material. And clearly, want to make sure there's enough material, obviously not too much. And that's driven really by the raw material lead times for the program. And then the sort of next horizon is probably a two to four week fixed window where that allows us obviously to plan our manufacturing operations and respond to the customer demand in full. So you've got this sort of rolling three horizon twelve month window pretty standard across all customers and obviously that's based on what they're told from or requested from their customers as well.

29:50 So where we saw last year where that moved, yeah, the OEMs, unfortunately, on a very rare occasion can do that and move those rate increases to the right. And so that's why we work with our customers to to plan out the the any impact of that and and smooth that, you know, particularly the material supply pipeline, but also, meeting their operational needs and getting the kits to them as they need them. I think we're also realists and we've worked in the industry a long time. So we're also working with the customer, give the customer the opportunity to bring in any kits at short notice that they require and any kits where they may find that there's a defect in the material or a problem during their manufacturing process and they need replacement supplies.

30:41 So that short term demand is also managed very closely to serve the customer effectively. Great. Well, thanks, John. Next question, I think a good one for you to answer, Rob, and it's a good question. You pointed out in the presentation that for the first few months of this year, roughly the first quarter, that we've broken even on a cash basis. I think you meant that after repayment of debt as well. And the question is really, is that the current run rate for the next couple of quarters? Will it improve as we ramp up production in the second half of the year? What's your visibility there, Rob? Thank you, Andy. Yes, we indeed, that cash breakeven was after debt repayment.

31:32 Our short term forecast is that we will be around the cash breakeven mark. Payments are fairly lumpy during the month, but on an underlying basis, we should be cash breakeven over the during the first half of this year. And then moving into the second half as those new as the additional work packages slow down from our U. S. Customer, we will move into cash generation. Great. Thanks, Rob. The next question is what percentage of our revenues, roughly the balance between The UK or Europe, or it's mainly The UK and US?

32:19 And the question specifically is how much they they expect The US market could generate revenues over the forecasts that are out there. Yeah. And it probably picks up on another point. I sort of missed off your earlier question around capacity as well. So capacity wise, we see about 70,000,000 of absolute capacity across all three sites if we run three shifts twenty four seven. You know, clearly getting up to those levels has its challenges, but it's a it's a good market to say, you know, the absolute ultimate capacity. US and Europe, we're probably looking to split fifty fifty where we can. But as as people know that when when we onboard new programs, they can be quite positively lumpy in terms of the the, you know, the the size of them and the way they're sort of digested.

33:12 So, you know, that might swing a little bit either way. But, you know, capacity wise, it's split pretty much fifty fifty across Europe and and North America, and that's what we want to utilize. Brilliant. Thanks, John. So the next question is actually a has come in as similar ish question, but it's really just saying, do we have sufficient capacity for the new opportunities that you described? And I think the you've answered that question, really, haven't you, John, in saying that it is actually about filling that capacity, $6,070,000,000 that we've got at the moment before major investment in any new facilities. So I think, Rob, you pointed out that, you know, we've made a major investment over the last few years in that capacity, and, you know, we've not had to add to that in the last sort of six months.

34:03 We don't we don't have any significant capital expenditure plans. There'll be bits and pieces and replacement renewals, but no major drawdown in requirements to spend on new facilities. The opportunities in the pipeline will be serviced from the existing premises with existing equipment. We will clearly need more people, but no fixed asset expenses. There's no big ramp ups in capital expenditure over the coming years, obviously, currently. Yeah. I think we tend to add some freezer capacity, don't we, as we grow as well. But that we can even lease that sort of if we needed to. That's correct. And in relative terms, adding a freezer is a lot less expensive than standing up a whole new plant. So that's possibly the only minor constraint. But it it it freezes are available commercially short term.

35:12 So it's not a a particularly challenging constraint, if you call it a constraint at all. Brilliant. Okay. So the the last question I've got at the moment here is more strategic one, John. It's really saying, look, as you see this upturn in in production rates, do you think it's more likely that customers will need or want to outsource work to us? Yeah. I mean, it's a very good question. I think, absolutely, we saw it pre COVID. Obviously, COVID has been a bit of a leveler for everyone in the industry in terms of period of low low production rates. But as those rates recover, you know, customers have lost capacity. They've lost people know how and, you know, contracted in their sort of footprints as well.

36:02 So as they build back with those, you know, doubling the rates really over the next few years, then, absolutely, that's when, you know, we we offer that ability to to meet that rate increase without having to go and find all those people and build more floor floor space and and everything else and, you know, allow our customers to focus on meeting and do meeting the parts. Perfect. John, Andy, Rob, if I may just jump back in there. Thank you very much indeed for being so generous of your time there and addressing all of those questions that came in for investors this morning. But, Andy, perhaps before really just looking to redirect those on the call to provide you with their feedback, I which know is particularly important to yourself and the company. If I could please just ask you for a few closing comments just to wrap up with, that'd be great.

36:50 Great. Well, thanks. Thanks, everyone. And thanks for listening to our presentation, which is on the 2024 results. And we should just reflect that the industry had a few issues last year, yet we still grew at 40%. We had to adjust our forecast later in the year because Airbus, in particular, had to change its production plans. We did that as quickly as possible, and we had to work with customers to help through some surplus inventory as well. And that's all part of the service we look to provide to the customers, but it doesn't deflect from the long term opportunity. There's a long term growth here in this business.

37:38 Yes. There'll always be little ups and downs. But when you look back on what we've achieved in the last couple of years, two years of near 40% growth year on year, and we're very optimistic for further growth this year based on the contracts. And if we can see that uplift being achieved by the OEMs, which they need to achieve, then we'll see further growth in the current contracts. Add on top of that new business opportunities and expanding customers that we're working with, and this a great opportunity for this business. I still believe, you know, one day we'll measure this we can measure this business in the hundreds of millions rather than the tens of millions. It takes time, but what a a great opportunity this business has when you look at its end markets.

38:29 How many of The UK manufacturing businesses have that sort of opportunity and are already achieving this sort of growth in the environment that we're in today and can promise that type of growth in the future. So I really thank the team that we have and management and the board and all their support and investors' support and understanding. We are always open for investor visits, engagement within our investors, and listening to your thoughts and ideas as well. But, you know, we're very confident about the future. Perfect, Andy. That's great. And thank you once again for updating investors this morning. Could I please ask investors not to close this session as you'll now be automatically redirected for the opportunity to provide your feedback in order that the management team can really better understand your views and expectations?

39:24 This will only take a few moments to complete, but I'm sure it'll be greatly valued by the company. On behalf of management team of VELOSITES PLC, we would like to thank you for attending today's presentation. That now concludes today's session. So good morning to you all. Thank you.

Follow Velocity Composites PLC into a list and get an email when it puts out news.

Latest news releases

Companies on this call

Speakers

Jon Bridges

CEO at VELOCITY COMPOSITES PLC

Rob Smith

CFO at VELOCITY COMPOSITES PLC

Andy Beaden

Non-Executive Chairman at VELOCITY COMPOSITES PLC

More from Velocity Composites PLC