Tutor Perini (NYSE:TPC) Q4 2018 Earnings Call

Tutor Perini (NYSE:TPC) Q4 2018 earnings call, held 2019-02-27. Watch the replay and read the transcript on 6ix.

Wed, February 27, 2019 at 5:00 PMendedReplay
Tutor Perini (NYSE:TPC) Q4 2018 Earnings Call
Company
Tutor Perini Corporation (NYSE:TPC)
Period
Q4 2018 earnings call
Date
Wed, Feb 27, 2019, 5:00 PM ET
Replay
Watch the replay on this page · 50 min

On 6ix: 6ix.com/event/tutor-perini-corporation-tpc-q4-2018-earnings-call

Replay

Transcript

Automated transcript · Written by software from the replay's audio. It can mishear names and figures; the replay is the record.

0:00 Good day, ladies and gentlemen, and welcome to the Tutor Perini Corporation fourth quarter and full year 2018 earnings conference call. My name is Sherry, and I will be your coordinator for today. At this time, all participants are in a listen-only mode. Following management's prepared remarks, we will be opening the call for a question and answer session. As a reminder, this conference call is being recorded for replay purposes. If anyone should require operator assistance during the conference, please press star zero on your telephone keypad. I will now turn the conference over to your host for today, Mr. Jorge Casado, Vice President of Investor Relations. Please proceed.

0:38 Hello, everyone, and thank you for joining us today. With us on the call are Ronald Tutor, Chairman and CEO, and Gary Smalley, Executive Vice President and CFO. Before we discuss our results, I will remind everyone that during today's call, we will be making forward-looking statements which reflect management's current assessment of existing trends and information. There is an inherent risk that our actual results could differ materially. You can find our disclosures about risk factors that could potentially contribute to such differences in our 10-K, which we are filing today. The company assumes no obligation to update forward-looking statements, whether as a result of new information, future events, or otherwise, other than as required by law. With that said, I will turn the call over to Ronald Tutor.

1:21 Thanks, Jorge. Good afternoon and thank you for joining us. We delivered excellent fourth quarter results highlighted by strong operating margins across all segments, particularly improved performance in the specialty contractor segment, and a very large volume of new awards that enabled us to grow our backlog by 28% year over year, setting a new record of 9.3 billion. Further, we added 2 billion of new awards in the fourth quarter, and a total of 6.5 billion of new awards for the entire year resulting in a book-to-burn ratio of 1.45.

2:06 Our strong backlog growth in the fourth quarter was broad-based across all three segments and was driven in particular by the $800 million Minneapolis Southwest Light Rail project, $245 million of funding For a technology project in California, $244 million of various electrical and mechanical projects in New York City and $100 million military facility for the Air Force in Saudi Arabia. In addition, we generated solid operating cash of $56 million in the fourth quarter.

2:51 The outlook for continued backlog growth in 2019 is excellent, as we expect to and in fact are booking over $2.5 billion of identified awards during the first quarter of 2019. The largest of these is the $1.4 billion Purple Line Section 3 Stations Project, which connects to the already awarded Purple Line 3 Tunnels Project, which we received last year. And that goes to the board for final approval tomorrow, which will be routinely processed. In addition, we see a sustained high level of demand in the pipeline of large civil works projects.

3:43 Our growing backlog provides the foundation upon which I expect to deliver Revenue growth and increased earnings over the next three to five years. We continue to be selective and disciplined in our bidding approach. As I've said previously, there are significantly more major civil works projects hitting the bid pipeline than we have the physical ability demand. The competition is limited at best. So we are selectively choosing those projects that give us the best opportunity to succeed. As I've said previously, quite frankly, there are so few companies with the resources and experience to successfully undertake these projects that it's an interesting phenomenon facing the civil works industry today.

4:44 and we have both the track record and the reputation of successfully executing these projects. We will be bidding in the next 60 days the $400 million Eighth Avenue train control project similar to the Culver Line we were awarded at $250 million earlier this year. Both projects are a part of the major works that New York City Transit continues to undertake to modify their antiquated signal systems throughout the entire transit system. If that were not enough in New York, we were recently appraised of the Mayor of New York City committing to a $52 billion infrastructure refurbishment program that will take place over the next four years.

5:44 Further, other large upcoming civil bids that we are committed to bid within our organization are the $3.5 billion bus depot for the Port Authority of New York and New Jersey in downtown Manhattan, the $2 billion Brooklyn-Queens Expressway in New York City, the $1.4 billion portal swing bridge replacement in New Jersey, and $1.5 billion... What are those ones in LaGuardia? There are two feeder lines, one each at LaGuardia and at Newark.

6:36 They're called peeper movers. They're a billion and a half dollars each, and those will also hit the street, I believe, by the end of 2014. Since the civil opportunities far outweigh our capacity, we will have to be selective in those we pursue. The building segment's larger opportunities include two convention center projects, One in Los Angeles, another in Las Vegas, collectively valued at $1.2 billion. A $700 million airport cargo facility called the Air Glades Perishable Air Cargo Complex, and a $300 million project in Miami.

7:23 There is a $300 million Los Angeles Civic Center P3, and a $250 million Healthcare Project in California. More importantly, the building segment has already one billion of pending awards that we expect to enter into backlog in 2019, including the Choctaw Resort and Casino expansion and two other hospitality and gaming projects. The specialty contractor segment is in the process of bidding over $500 million of mechanical and electrical projects in the next two to three months. And the bidding pipeline is robust to a point of, again, testing our capacities in that arena.

8:14 Next, I will provide some details on the more significant projects that contributed to our fourth quarter results, beginning with the civil segment. On the West Coast, we continue to ramp up our work on Purple Line Section 2 in Los Angeles with the construction of the tunnel launch pit commencing in Century City. After it's completed, we will begin the tunnel boring machine assemblies, followed by the start of tunneling in January. In Beverly Hills, we are beginning the relocation of utilities. in advance of commencing with the Wilshire Station in Beverly Hills later this year.

8:59 In British Columbia, Frontier Kemper is progressing work on the Kamano Second Tunnel project. We also remain busy with work on California High Speed Rail and are still anticipating volume of work increasing substantially by this summer. Work also continues to progress on the San Francisco Central Subway project with a targeted completion in the first half of 2019. In the Midwest, London Construction has been active with its work on the I-74 bridge project between Iowa and Illinois, as well as many other projects contributing to their significant backlog.

9:46 and is starting work on the Minneapolis Light Rail. In the Northeast, which is essentially New York, our most active projects include CMO-7 and CQ-33 for New York Transit and of course the billion, $400 million Newark Airport Terminal 1, which is advancing wealth. In Seattle, we completed the SR-99 tunnel Last year, and it has been turned over and traffic is using a completed tunnel. The building's project's largest contributors in the fourth quarter included that technology campus that we don't refer to the owner of, the Rosewood Miramar Beach Hotel for Caruso Enterprises, the Newark Airport Terminal 1 in New Jersey for the Port Authority in New York, and the Precision Cancer Medical Building at the University of California San Francisco Medical Center.

10:52 The specialty contractor segment has a substantial volume of Newark higher margin work being performed over the next period of years. Recall that on the Newark Airport Terminal 1 project, Five Star Electric and WDF Mechanical hold contracts exceeding $360 million for the electrical and mechanical pieces of that $1,400 million project. In addition, they have added $244 million of new electrical and mechanical projects in the fourth quarter, positioning our segment for double-digit revenue growth in 2019. Now let me provide you with a brief update on our unbilled receivables and claims.

11:42 We continue in negotiations on three major claims, have received significant offers on two of them, although not adequate. We continue to talk. We hope to bring those to conclusion over the next 90 days, but we have not been able to conclude any as of yet. We believe that with continued progress in these negotiations, we have the potential to settle in the next half a year. Overall, we anticipate strong double-digit revenue growth and higher operating margins across all segments, with noteworthy margin improvement expected in the specialty contractors segment and margin improvements in the civil and building segment. Based on our current backlog and forecast, we are establishing our earnings per share guidance for 2019 at the range of $2 to $2.30.

12:49 As in 2018, we expect that our earnings in 2019 will be significantly weighted toward the second half of the year, particularly due to the extreme weather we have suffered across the country in the first quarter. With that, I will turn the call over to Gary Smalley to present the financial results.

13:15 Thank you, Ron. Good afternoon, everyone. I will start by discussing our results for the year after which I'll review the fourth quarter. I'll then provide some comments on our balance sheet, cash flow, and our 2019 guidance assumptions. Revenue for 2018 was $4.5 billion. Down slightly compared to last year, mainly because revenue from new projects that started up in 2018 did not fully replace revenue from projects that completed or were nearing completion solely due to timing. Civil segment revenue was $1.6 billion, building segment revenue was $1.9 billion, and specialty contractors revenue was $1 billion, all down compared to the prior year, again due to the timing of revenue burn for new work.

14:03 Gross margin for 2018 was 10.2%, the highest annual gross margin percentage since 2014. G&A for the year was $263 million, down modestly compared to last year, mainly due to lower compensation-related expenses. Our income from construction operations was $192 million, up 7% compared to 2017, despite the volume reduction. due to improved margins in our specialty and building groups and the lower G&A that I mentioned. Civil segment income from construction operations was $168 million, down 12% compared to 2017, principally due to a $17.8 million pre-tax charge in the first quarter of 2018 for the unexpected adverse outcome of an arbitration decision on a project that was completed several years ago. The segment's operating margin was 10.6% for the year compared to 12% for the prior year with the decrease primarily due to the 2018 first quarter charge.

15:13 Building segment income from construction operations was $44 million, up 28% despite a modest revenue reduction mainly due to contributions from the Newark Airport Terminal 1 project and a favorable closeout adjustment on a courthouse project in California. The building segment's operating margin was 2.4% for 2018, up from 1.8% in 2017. Specialty contractors' income from construction operations was $43 million, more than double last year's result, mainly due to the overall improvement in the performance of various mechanical projects. As a result of these factors, the segment's operating margin was 4.3%, for 2018, a significant improvement compared to 1.6% in 2017.

16:07 Recall that we target an operating margin range of 5 to 7% for this segment, which we expect to achieve in 2019. Other income in 2018 was $4 million compared to $44 million in 2017. The significantly larger amount last year was primarily due to a $37 million gain associated with a legal settlement. Interest expense in 2018 was $64 million compared to $69 million in the prior year. The reduction was primarily because of non-cash extinguishment costs recognized in 2017 related to our debt restructuring transactions. Our effective tax rate for 2018 was 26.3%, positively impacted by the lower federal statutory rate with the enactment of the Tax Cuts and Jobs Act.

16:59 Net income attributable to Trudeau Perini in 2018 was $83 million, or $166 per diluted share, exceeding the upper end of a revised guidance for the year. Net income in 2017 was $148 million, or $2.92 per diluted share, and was favorably impacted by a tax benefit of $53 million, or $1.05 per diluted share, associated with the one-time revaluation of our deferred tax assets and liabilities in connection with the Tax Act. The prior year also benefited from the pre-tax gain of $37 million or 43 cents per share for the legal settlement that I just mentioned. Now for the fourth quarter results.

17:45 Revenue for the quarter was $1.2 billion level compared to the fourth quarter of last year. Segment revenues were $489 million for civil, 469 million dollars for building and 225 million dollars for specialty. Civil segment revenue was up 14 percent compared to the fourth quarter of last year primarily as a result of progress on the Newark Airport Terminal 1 project which started in 2018 and increased activities on the Kamano Tunnel project in British Columbia. Building segment revenue was up modestly compared to the fourth quarter of last year as progress on newer projects More than offset volume reductions from projects that completed or are winding down. Specialty contractors' revenue was down 26% compared to the fourth quarter of 2017, mainly due to reduced activities on certain electrical projects in California, Washington, and New York.

18:41 Gross profit for the fourth quarter of 2018 was $158 million, up 21% compared to the fourth quarter of last year, with the corresponding gross margin of 13.3%, Our highest quarterly gross margin ever, and this compares to 10.9% for the comparable quarter of 2017. GNA for the fourth quarter was $67 million, down 6% compared to the fourth quarter of 2017. The decrease was principally due to reduced compensation-related expenses. Income from construction operations for the fourth quarter was $91 million, up $53 million, up 53% compared to $59 million for the fourth quarter of last year due to strong margin improvement across all segments.

19:31 Civil segment income from construction operations was $75 million in the fourth quarter, up 17% compared to the same quarter of last year due to the higher volume in the quarter and improving operating margin, 15.3% versus 14.9%. The stronger operating margin was due to favorable progress and productivity experience in the quarter on a broad range of projects. And as discussed previously, we have been anticipating operating margins to gradually increase with the new work that we have been awarded over the last year, and this is beginning to be reflected in our results. However, I would note that while we're pleased with the strong fourth quarter silver margin, we don't expect a 15% margin to be the norm, at least not yet. On an annual basis, we now expect civil operating margins to be at the upper end of the 10% to 12% margin range that we have historically seen in the civil group, if not slightly higher. Building segment income from construction operations was $16 million, up 76% compared to $9 million in the fourth quarter of last year.

20:34 The increase was largely due to contributions from the Newark Airport Terminal 1 project and a technology project in California. as well as favorable adjustments associated with the closeout of a courthouse project in California and progress toward completion on a healthcare project also in California. These factors resulted in somewhat elevated operating margin of 3.4% for the quarter compared to 2% for the fourth quarter of 2017. Specialty contractor segment income from construction operations was $17 million more than quadrupled the $4 million reported in fourth quarter of last year reflecting overall improved performance on various mechanical projects as well as favorable adjustments associated with progress toward completion on certain electrical and mechanical projects.

21:21 The segment's fourth quarter operating margin was strong at 7.6 percent compared to 1.2 percent for the same quarter last year and exceeded the 5 to 7 percent range we target for the segment. Contributions from higher margin projects added to backlog over the past year are now beginning to have a positive impact on the specialty segments operating results. Interest expense for the fourth quarter of 2018 was $16 million, about level with the prior year's fourth quarter. Tax expense for the fourth quarter was $20 million. The effective tax rate for the quarter was 26.3%, the same effective tax rate as for the full year of 2018. Net income attributable to Tutor Perini for the fourth quarter was $49 million or 98 cents per diluted share compared to $81 million or $1.60 per diluted share for the fourth quarter of last year, which again included the $53 million or $1.05 per share tax benefit.

22:21 Shifting gears, let's discuss our balance sheet and operating cash. Our project working capital grew slightly in the fourth quarter, principally because of an increase in unbilled costs and the decrease in billings in excess of costs. We continue our focus on reducing our unbilled costs and expect more progress to be made in 2019 as Ron noted earlier. We generated $56 million of operating cash in the fourth quarter and $21 million for the full year of 2018. While our fourth quarter operating cash was strong as a result of strong collections, the amount generated in the quarter was insufficient to overcome the cumulative shortfall for the year that resulted from the growth in unbilled costs. However, we believe that our operating cash generation in 2019 will be substantially improved and we are again targeting operating cash for the year to be in excess of net income as it was in both 2016 and 2017. Our total debt as of December 31st, 2018 was $762 million compared to $736 million at the end of 2017, reflecting a modest increase in our revolver from its zero balance at the end of 2017.

23:33 Now let me review our assumptions related to the 2019 guidance. While we do not provide specific revenue guidance, as Ron mentioned, we are expecting strong double-digit revenue growth in 2019. Also, as I noted earlier, we anticipate that the civil segments operating margin for 2019 will be at the upper end of our historical range of 10 to 12%. The building segments operating margin for 2019 should exceed 2%, which has been our normal benchmark. For the specialty contractor segment, we believe that the operating margin should be in the 5% to 7% range in 2019. We anticipate an effective tax rate for 2019 of approximately 27% to 28%.

24:18 We also expect that there will be approximately 51 million diluted shares outstanding for the year. Interest expense for 2019 is estimated to be around $63 million. And of this amount, $13 million will be non-cash. We anticipate approximately $20 million of general and maintenance capital expenditures for 2019. In addition, keep in mind that for certain of our large civil projects, we purchase equipment that is entirely owner-funded. 2019, we estimate that this amount will be approximately $70 million. Depreciation amortization expense for 2019 is estimated at $62 million, We expect that our GNA dollars will be modestly higher in 2019 compared to last year. But given our strong anticipated revenue growth, our GNA margin for 2019 should be quite a bit lower than in 2018. We also anticipate that non-controlling interest in 2019 will be approximately $30 to $35 million.

25:24 Lastly, I'd like to comment as to the expected pace of earnings generation in 2019. We expect that our first quarter EPS will be rather light and far lower than the other quarters in 2019 due to the significantly worse weather, more rain and snow than usual to date in California, British Columbia, the Midwest, and New York, and also due to the timing of when new projects will begin to burn revenue of any significance. More specifically, our forecast calls for first quarter EPS to be only slightly better and last year's first quarter EPS after adjusting for the 25 cent charge we took last year. Earnings momentum in 2019, however, is expected to increase substantially each quarter as the year progresses.

26:12 With that, Ron, I'll turn the call back over to you.

26:15 Thanks, Gary. Obviously, I'm very pleased with our strong fourth quarter performance, particularly with respect to the record backlog that continued through the first quarter.

26:26 of 2019 with the additional award.

26:31 In addition, the continuing pipeline of major work I discussed previously continues to grow with owners and locations where we have great strength with very little competition to put it bluntly. There is no reason our backlog should not continue to grow in 2019 and the only thing that stops the momentum will be our own analysis of our intellectual and physical capacity. As I've said before, evidenced every day by the minimum competition in the billion dollar plus projects, there are very few companies in the United States that can successfully build billion dollar plus infrastructure projects and as such, there are very few bidders as we go forward.

27:26 We continue to recruit and focus on adding to our organization and training engineers in our training programs, but I would be definite to once again state that is the one governing factor that will limit our growth to what we feel comfortable with. As a reminder, the projected margins on our new awards from last year in the backlog on average are considerably higher than the existing margins that we have earned over the past years. And we expect that margin to increase as, frankly, we raise our margins given the lack of competition.

28:13 So over time, as the older work with lesser margin burns off and is replaced by higher margin new work at an accelerated pace, we feel there is an opportunity for significant increases in both operating income and earnings per share. We look forward to delivering improved results in 2019. some resolves of the curse of our unbilled receivables, and continued earnings growth as well as operating cash. With that, I will turn the call over to the operator for questions. Thank you. Thank you. At this time, we'll be conducting a question and answer session.

29:00 If you would like to ask a question, please press star 1 on your telephone keypad. A confirmation tone will indicate your line is in the question queue. You may press star 2 if you would like to remove your question from the queue. And for participants using speaker equipment, it may be necessary to pick up your handset before pressing the star keys. Our first question is from Tahira Afazo with KeyBank Capital Markets. Please proceed with your question.

29:28 Hey, guys. This is Alex Dwyer on for Tahira. Congrats on the quarter, guys. Thanks. So I guess my first question is based on your range of guidance and the things you've mentioned, What areas do you see you guys having the most visibility or concerns on what may help you reach the upper end of guidance? Are there any issues and segments or any specific projects you would like to highlight in 2019?

29:50 No, I don't think there's any. This is Ron Tutor. I don't think there's any question we have an opportunity to reach the higher levels of our guidance, but it will depend to a great extent. We're in the midst of negotiations on three of our major claims where significant offers have been made. We have not accepted those because it does not meet our expectations. And one of the concerns and probably the only real concern I have is if we reach a point to where it's close to what we want and there's a few million dollars separating their final offer with our final demand, there's no question that we're going to have to start settling and collecting that cash, which could generate some write downs in operating margins. I think we have taken those into consideration within the range of these expectations.

30:49 But we have a very substantial, as I've said before, number of claims teed up in negotiations. And we feel the potential to be concluded in 2019. And the real issue will be very candidly whether I'm willing to take a reduction in what we believe we're entitled to to close them out and collect what is obviously a very substantial amount of cash. So if I have one concern, that's about it. We continue to frankly get one major civil award after another in our key markets between New York, which is exploding, and California, which is equally so.

31:36 If I really put down on paper the opportunities that are tailor-made for our civil group between our two strengths in New York and California, I don't even know how we could possibly even handle it. There are so many major projects teeing up for the next 12 to 18 months in an industry where nobody's left. I keep saying it, but the truth is in the pudding. We have now got three straight large projects for the MTA, $1.3 billion, $400 million tunnel, and $1.4 billion stations. Three straight contracts that total $3 billion for the LAMTA, $1.4 billion job in Newark where we're the only bidder.

32:25 And as I advise our owners, if you don't make these contracts far more contractor friendly, you're not going to get bids even including us. and the fact of the matter is an owner today is fortunate if he gets two bids and really extraordinary if he gets three. That's the market we're in. Having said that, we still have our limits physically and intellectually about how much more we can take, even regardless of the margins entailed within them.

32:58 Alex, if I could just add, I think you understand this, but our accounting positions were recorded at the probable amount of recovery, but Like Ron's saying, if we get close to what we're looking for rather than prolong the dispute with litigation or something like that where we could get the amount that's recorded and take another two or three years to get it, that's what we're talking about in this case.

33:26 Okay, thanks. That was helpful. Also, so we continue to monitor the possibility of a large infrastructure bill this year in Washington. Are you hearing anything new on this? And if a bill like this gets passed, where do you see the spending going and what areas of your business would most likely have the opportunity to benefit from this?

33:43 I think there's no question that they're going to have to constitute an infrastructure bill in Washington because the Democrats and Republicans, it seems to be the only thing they agree on. However, setting aside Washington, the truth of the matter is New York State, which is one of our two major geographical places of operation, just announced $52 billion in New York City of funded work. All of our New York City operations are working at 120% of capacity, electrical, mechanical, building, and civil. And with the reduction in size of Skanska, our largest competitor in New York, and the failures of some of our New York peers, We find ourselves increasing and increasing that New York backlog to a point I've had all of our subsidiaries have to get my approval before they bid any more work. Because our backlogs in New York are records, both electrically, mechanically, and civilly. So when you talk about government and government funding, frankly, the only thing we're interested in is civil work.

34:58 The building business continues to be a low margin, relatively low risk, and a business that, in my opinion, increased government spending doesn't affect us because we're simply not going to pursue significant growth in a business that at best generates 2% pre-tax margins, when in fact our civil business, we're anticipating 10 to 12% and potentially increases in that because of the lack of competition. New York City has this enormous backlog. Governor Cuomo has stated for everyone to hear that he expects to generate even more in infrastructure construction in the state and New York City.

35:44 And California is booming. We meet regularly with the principals of Los Angeles MTA. And with that sales tax proposition that passed They're talking about $10 billion in civil work going out into the marketplace over the next 12 to 15 months, and there isn't two or three companies that even have the potential to bid it. So it is really quite an interesting time of enormous growth in opportunities in a depleted industry.

36:20 Thanks, that was very helpful. I'll jump back in the queue. Our next question is from Brent Seelman with DA Davidson. Please proceed with your question.

36:31 Great. Thank you. Congrats on the quarter.

36:34 Thanks, Brent.

36:35 Ron, on the outlook for 2019, can you just remind us or walk us through which are going to be the most kind of critical projects ramping up in the second half to kind of get you to that guidance range?

36:49 I think the Newark terminal is ramping up significantly. We're erecting structural steel as we speak. I would expect the steel to be fully erected by sometime in the third quarter and then finish trades and significantly more cost associated with that terminal. And remember, it's a 39-month job and we're there now approximately 10 months. So you've got over a billion, 200 million of spend going on over the next essentially 24 months. Not only that, Purple Line 2 is ramping up dramatically. We will start the Wilshire Rodeo Station this year. We are finishing the launch pit this year.

37:34 We expect to put the tunnel machines in the hole. So that will be a significant ramp up. Purple Line 3 will be awarded tomorrow. We probably won't get a notice to proceed until April or May. But initially this year, there's still $100 million of high margin costs associated with Purple Line 3. In addition, the London job at the light rail has started. That should generate revenue and essentially five-star FISC and WDF have the largest backlogs they've ever had. As an example, in Purple Line 3, we were awarded the contract at approximately $1,371,000,000.

38:23 And of that, we subcontracted over $250,000,000 to Fisk Electric, Beko Drilling, and Desert Mechanical with their appropriate margins. So these jobs have a profound impact on our operation. as long as we can get them from the design phase into the construction phase and generate the cost that make for the profits. So we're just very optimistic about what the future commencing really now has in store. The only thing that concerns me at all is reaching a point where is it in our interest to take settlements and write downs on claim settlements generating significant levels of cash, however taking reductions in settlements.

39:20 Heretofore in the past we have never done it and have a record of always achieving our booked amounts, but then again we've never had a billion dollars in unbilled receivables. So that's really the only pressure on us. We continue to operate strongly in spite of the unbilled receivables. We think Purple Line 3 will, as Purple Line 2 did, generate significant cash flow. Newark continues to generate substantial cash flow. And high-speed rail, with all its problems and delays, continues to promise to be a very successful project.

39:59 Okay, and I wanted to touch on that. Ron, can you kind of update us where high-speed rail is at at this point? Are you beyond the right-of-way issues here, and is that kind of free and clear once you get some weather in your favor?

40:11 Well, high-speed rail is a constant dilemma, and I'm in touch literally on a weekly basis with the principals of the agency in Sacramento as well as the job site. We continue to have delays in right-of-way issues. and third party agreements that they have taken responsibility for. And their commitments to turn us loose in March now look like more like June or July. However, I'm also in the midst of negotiations on over $400 million of extra work that they would like us to perform. So obviously those are very positive. I've said and they have concurred that we will not start any extra work without an agreed entitled change order and an agreed price.

41:02 So there are very positive aspects of high-speed rail. The negative is we are stymied in many areas, continue to be, and I expect to have a meeting in the next two weeks and try to in some manner determine when we can gear back up. because although they're a state agency, they continue to struggle to do their job. And their job, as defined by our contract, is to get their right-of-ways out of the way, get their third-party agreements out of the way, and get out of our way the way the contract states they would. So it's just a struggle. But in fairness, they deal with us with integrity. They pay us when they owe us. They step up. So it's It's just a continuing travail that we think in the long run will turn out well, but in the short run, it's very difficult because we can't earn money on costs we don't spend.

42:03 Okay, I appreciate that, Tyler.

42:05 And I will say one thing I'd add on high-speed rail, there's a lot of talk about are they going to go on? Is it going to continue? Will they ever finish it? The reality is, you got to remember, it's a state of California agency. And no matter what the federal government does, it pulls back, it doesn't pull back. First, there's never been an instance in my 50 years of consequence that the federal government ever clawed back or was able to claw back committed funds. So my census is blunt. This is rhetoric from our president. and against the political direction of our state. And it will be determined whether or not that realistically can be done irrespective of it can be done or not. This is the state of California, which is like a country onto its own. The state will step up and fund any gaps and fight with the federal government later. They have made it very clear that they are not going to go any further than connecting our job to Merced and there's a short reach connecting to downtown Bakersfield on the other end.

43:18 Their goal is to finish this work by 2025, which is particularly emphasized on the contracts behind us. But that means they've got to conclude all our extra work, our delays, everything associated with making us in agreement whole and probably portray a completion of our job in 2021 or 22 because remember to completed 2025 requires them to buy railroad cars put in track signals electrification etc so they have a plan they've shared it through me that's logical and then what they would hope is that sometime during that time frame to uh Put it bluntly, create more credibility for the agency's operation, go back to Sacramento somewhere around 2025, and hopefully generate a way forward to move on to the next reach.

44:21 But they really are in no position to abandon 100 miles of elevated structures and embankments in the middle of the state and walk away. That's about the only thing everybody seems to agree on.

44:37 Okay, Ron, I appreciate it. I'll pass it on to someone else. No problem. As a reminder, it is star one on your telephone keypad if you would like to ask a question. Our next question is from Stephen Fisher with UBS. Please proceed with your question.

44:54 Hi, guys. Hi, Stephen. Hey, Ron. Just curious, what kind of flexibility do you have within your covenants to take any of those

45:04 I don't think we have any restrictions, but better to let Gary answer that specifically.

45:14 Yeah. First of all, Steve, we're not anticipating large amounts, if any. And then we have plenty of headroom within the calculations already where we don't think it's an issue. But also, we've built in, let's say, a contingency plan where we have for judgments that go against us and that are non-cash in nature where the cash had already been spent, then those are excluded from the covenant calculation. And we're currently talking about settlements and including those in the same type of consideration in an amendment. That's not yet final, but the bottom line is we don't think it's going to impact us even without the amendment based on the headroom that we currently have and the outcomes that we anticipate.

46:07 But worst case scenario, it still shouldn't impact us.

46:12 Okay, that's helpful. And then can you maybe just give us your confidence that the unbuilds won't go up from here now in 2019?

46:20 Oh, let's put it this way, it shouldn't. We're being very harsh on our subsidiaries on the use of unbilled receivables to a point where I'm telling them if you can't get my personal approval, you won't be able to utilize it. I do allow them to bill their legal and support costs for ongoing unbills against it, but I don't know what more we can do other than absolutely restrict access to the unbills. and that's where we are and it's a battle every quarter but the biggest single element is we need to make a very substantial reduction and a very significant amount of our unbilled total as I've said previously and as we reviewed in-house comes due to put it bluntly or I don't know how else to define it in the next 12 months.

47:22 So we simply have to get those Resolves to a reasonable settlement figure that's acceptable and close them and dramatically reduce the unbills. It can't continue to go up. I couldn't agree more.

47:41 And can you just frame maybe the amounts of what's under discussion for the next 90 days, maybe kind of a range of possible outcomes?

47:53 There is approximately, let me take a good There's approximately $280 million in various exchanges of offers ongoing right now.

48:11 Steve, I was just going to say that doesn't count, of course, things after the 90 days also. There are other things that are staged later in the year.

48:21 There's that much again before the end of the year.

48:26 That's right, that's what I was going to get at. I assume SR-99 is later this year?

48:32 No, SR-99 isn't one of those because with all the goddamn crooked lawyers appealing and delaying and delaying and appealing so they can generate more legal fees, that's been put off to 2020.

48:44 Okay, well congrats on the bookings and we'll catch up with you guys later.

48:53 Thanks, Stephen. Ladies, gentlemen, we have reached the end of our question and answer session. I would like to turn the call back over to management for closing remarks.

49:07 Thank you, everybody. We're very pleased, obviously, with our continued backlog growth in the future of the company. The only hitch remains us getting through these unbills and bringing the money back to the company. We will continue to work day and night to make that happen and keep you apprised as it takes place. Thank you. This concludes today's conference. You may disconnect your lines at this time and thank you for your participation.

Follow Tutor Perini Corporation into a list and get an email when it puts out news.

Latest news releases

Companies on this call

Speakers

Alex Dwyer

Analyst at KeyBank Capital Markets

Ronald Tutor

Chairman and CEO

Brent Seelman

Analyst at DA Davidson

Jorge Casado

Vice President of Investor Relations

Gary Smalley

Executive Vice President and CFO

Stephen Fisher

Analyst at UBS

More from Tutor Perini Corporation