Replay available

Tutor Perini (NYSE:TPC) Q3 2020 Earnings Call

Tutor Perini (NYSE:TPC) Q3 2020 earnings call, held 2020-11-04. Watch the replay and read the transcript on 6ix.

Wed, November 4, 2020 at 5:00 PMendedReplay
Tutor Perini (NYSE:TPC) Q3 2020 Earnings Call
Company
Tutor Perini Corporation (NYSE:TPC)
Period
Q3 2020 earnings call
Date
Wed, Nov 4, 2020, 5:00 PM ET
Replay
Watch the replay on this page · 40 min

On 6ix: 6ix.com/event/tutor-perini-corporation-tpc-q3-2020-earnings-call

Replay

Transcript

Automated transcript · Written by software from the replay's audio. It can mishear names and figures; the replay is the record.

0:00 Good day, ladies and gentlemen, and welcome to the Tutor Perini Corporation third quarter 2020 earnings conference call. My name is Paul, and I will be your coordinator for today. At this time, all participants are in a listen-only mode. Following management's prepared remarks, we will be opening the call for a question and answer session. As a reminder, this conference is being recorded for replay purposes. If anyone should require operator assistance during the conference, please press star zero on your telephone keypad. At this time, I will turn the conference over to your host, Mr. Jorge Casado, Vice President of Investor Relations. Please proceed.

0:38 Hello, everyone, and thank you for joining us today. With us on the call are Ronald Tutor, our Chairman and CEO, and Gary Smalley, Executive Vice President and CFO. Before discussing our results, I will remind everyone that during today's call, we will be making forward-looking statements, which are based on management's current assessment of existing trends and information. There is an inherent risk that our actual results could differ materially. You can find our disclosures about risk factors that could potentially contribute to such differences in our most recent Form 10-K, which was filed on February 26, 2020, and in the Form 10-Q that we are filing today. The company assumes no obligation to update forward-looking statements, whether as a result of new information, future events, or otherwise, other than as required by law.

1:24 And with that, I will turn the call over to Ronald Tutor.

1:27 Thanks, Jorge. Good afternoon and thank you, everyone, for joining us. As expected, this year is continuing to progress extremely well, despite the impact of COVID-19 that we have been experiencing during the entirety of the year. In the third quarter, COVID-19 had a lessening impact on our business as the vast majority of our projects have been considered essential and are still working. And I will try not to dwell on COVID-19 as a part of our life, but we are prospering despite it. This has allowed us to progress our work subject only to the timeliness of manpower reductions when one of our workers contacts COVID-19 and then we quarantine those workers that work in his area or associated with those employees.

2:18 As a result, the impact on our workforce so far has not been significant as whenever we've been losing people to COVID, we've replaced them from the unions and been able to work accordingly. However, as an aside, most of our public agencies, in particular the transit authority agencies, have recognized COVID as a cost-reimbursable event and are preparing to pay us the direct costs, namely layoffs, cost of sick leaves, etc. I don't know that we'll get reimbursed for impacts on schedule or loss of revenue. I doubt it. However, we are being paid some of the direct cost. Moving on, we delivered another set of solid results this quarter with particularly strong performance from our civil and building segments.

3:11 Our revenue grew 21% year-over-year in the third quarter, driven by double-digit growth across all segments. We continued executing substantial work on several large civil projects, including California High Speed Rail, Minneapolis Southwest Light Rail Transit, Purple Line's two and three stations, as well as Purple Line three tunnels in Los Angeles, and the Newark Airport Terminal One, as well as on large building projects such as the Choctaw Casino in Oklahoma and another large hospitality and gaming project and a large technology building project in California. I don't mention those specific names because they're under confidentiality, but they are what they are. Our revenue growth through the first nine months of this year has been equally strong at 21%.

4:08 In fact, we delivered the highest third quarter revenue growth since 2014 and the highest revenue growth for the first nine months of any year since the merger in 2008. We generated $73 million of operating cash in the third quarter, another great result that followed the $92 million of operating cash generated in the prior quarter. More importantly, we generated $131 million of operating cash through the first nine months of 2020, which also set a new record since our merger in 2018. This was consistent with our expectations for continued strong cash flow in the second half of this year. We anticipate that we will again produce a healthy cash result for the fourth quarter, concluding what should now be a record year of operating cash.

5:01 Our operating cash this quarter was largely driven by collections associated with major civil jobs and continued progress made on certain settlements. Strong cash generation in the third quarter keeps us well ahead of expectations for operating cash through the first nine months of 2020. Operating income of $83 million was another highlight of our third quarter results. It was the highest third quarter results again since the merger in 2008 and was up 73% compared to the same quarter last year. The significant increase was the result of continued progress on several high-margin civil jobs that I mentioned earlier, as well as a favorable arbitration ruling that we announced a few weeks ago. Our operating income this quarter would have been significantly higher had it not been for that $15 million charge we were required to take in the specialty contractor segment due to an adverse legal ruling we received pertaining to a completed mechanical project in California that was concluded four to four and a half years ago.

6:13 In a moment, Gary will review all the financial results of the quarter, including specifics around the COVID-19 impacts year to date. But I will reiterate that our results for the third quarter were very strong and particularly outstanding for operating income and operating cash. Our major design-build projects are all advancing well, which gives me confidence we'll continue to see strong growth and profitability this year and next. Our backlog remains solid at $9.2 billion at the end of the third quarter. And importantly, the backlog is of longer duration than what you might expect. Thank you for joining us. combined with a relatively low volume of new awards during the first six months of the year compared to last year. That lack of awards is simply projects being stopped, work not going out to bid while all our agencies try to determine how they're going to fund all of their growth desires.

7:37 These are all delayed until I believe after the election and there's a direction going forward and at the very least rescue packages by the federal government. We booked $625 million of new awards and contract adjustments in the third quarter of 2020. The most significant of these included $121 million for our share of the South Coast Light Rail Project in Massachusetts where we're in a joint venture with Middlesex, a local contractor in the area. $75 million of additional funding at Rudolph and Slutton for various building projects in California, a $54 million mixed-use building project in California, and a $47 million military facility for black construction.

8:28 Speaking of black, they not only have an extraordinarily successful year, But the future bodes extremely well because all of the discussions for many years of the Marines moving from Okinawa to Guam is absolutely taking place with bidding opportunities in the range of over $2 billion over the next 18 months on the island of Guam sponsored by the U.S. Navy. Black's revenue and profits are growing at nearly double any prior previous years. with an extraordinary increase in all the construction on Guam where we've been dominant for the last 40 years. We believe that our backlog still has the potential to grow over the next few quarters as we have already submitted several bids for new large projects that are pending customers' decisions and contract awards in the coming months.

9:22 For example, we are awaiting the outcome and next steps related to the bid our team submitted for the Honolulu Rail Transit T3 project. We are also awaiting decisions regarding our submitted bid for the early stage work on what will eventually be the $8 billion Sepulveda Transit Corridor T3 project in Los Angeles. In addition, we anticipate bidding in early December the LAMTA's $450 million LAX Airport Metro Connector project with an award expected by the first quarter of 2021, as well as bidding on several large civil segment projects during the first half of 2021. As we noted last quarter, several major bid opportunities over the next year have been deferred while public agencies await federal supplemental funding and budgetary certainty.

10:20 Once we move past the election results, we are optimistic that the sorely needed federal funding for infrastructure will be authorized sooner than later. Most in our industry continue to expect that the federal government will approve a substantial supplemental funding package aimed at supporting state and local transportation agencies' critical infrastructure needs, as well as their tremendous revenue shortfalls necessary for them to continue to function. Other large forthcoming bids include the $2 billion Newark Airport Air Train, the $2 billion JFK Airport Landway Development Project, The $1.4 billion portal bids replacement in New Jersey, which we now expect to bid in the third quarter next year.

11:12 And the $1.2 billion Metro North Penn Station access in New York. It also appears that in the third quarter of 2021, we expect to bid the $2 billion Bay Area Rapid Transit Silicon Valley Phase II extension, which is a very large tunnel in the excavation in support of Two stations. Further out on the horizon, we are looking forward to the $4 billion West Santa Ana Transit Corridor and the $1.5 billion East San Fernando Valley Corridor, both for Los Angeles Metropolitan Transit Authority. In New York, we have been following, as we've spoken to previously, the $3.5 million Port Authority Bus Terminal and, of course, the $2 billion LaGuardia Air Train.

12:04 Our building segments larger prospective opportunities include approximately $2.1 billion for six large hospitality and gaming projects in Virginia, California, Louisiana, and North Carolina, an $800 million new hospital in Northern California, the $500 million Burbank Airport Terminal replacement, and a $265 million veterans home facility in Northern California. In fact, we were provided a notice of intent within the last few days by a confidential customer for one of those six hospitality projects with a value of approximately $350 million, the construction of which is expected to begin in the second quarter of 2021. In all, we are tracking approximately $30 billion of project opportunities, literally $20 billion of which are civil, bidding over the next 18 months and more than $10 billion of building projects, bidding or proposing over the next 12 months, with significant work envisioned to be formed on many of them by our specialty contractors units.

13:17 As you can tell, as we've been asserting for some time, the volume of prospective projects remains unprecedented despite the funding challenges presented by COVID-19. Our large civil opportunities are likely to grow even more once the federal government finally authorizes the long-anticipated infrastructure program. Finally, though our year-to-date earnings per share results are ahead of budget expectations and we have been able to offset all of the impacts of COVID-19 to date, we remain cognizant of the uncertainties and as such, based on our current assessment of market conditions and our forecast for the remainder of the year, we will maintain our 2020 earnings per share guidance in the range of $1.80 to $2.10.

14:08 With that, I turn the call over to Gary Smalley to present the details of our financial results. Thank you.

14:14 Gary Smalley Thank you, Ron. Good afternoon, everyone. I will start with the discussion of our results for the third quarter, including cash flow. followed by some commentary on our balance sheet and then our latest 2020 guidance assumptions. Revenue for the third quarter was $1.4 billion up $253 million or 21% compared to $1.2 billion for the same quarter last year. And as Ron mentioned, it was our highest quarterly revenue more than 10 years and featured double digit growth across all segments. The strong growth was driven by increased activities on the large infrastructure projects that Ron referred to earlier, as well as on certain building projects in California and Oklahoma. The COVID-19 pandemic only had a minor impact revenue of approximately $40 million in the third quarter, well under the $130 million revenue impact in the second quarter.

15:10 The impact in the third quarter was largely associated with the single building project where our customer requested that we slow our pace of progress probably until the beginning of 2021. Civil segment revenue for the quarter was $612 million, up a strong 17% year over year, driven by contributions from the same larger infrastructure projects. Revenue for the building segment increased significantly to $508 million, which is up 22% compared to the same quarter of 2019, also predominantly due to the California Oklahoma building projects I just referred to. Specialty contractor segment revenue was $322 million, up an impressive 29% year over year, primarily due to increased activities on the Newark Airport project and a hospitality and gaming project in California.

16:01 Income from construction operations for the third quarter was $83 million, an increase of 73% compared to $48 million for the same quarter of last year. The significant increase was due to contributions associated with the significant volume growth we experienced this quarter across all segments, along with reduced G&A expense due to the impact of the favorable arbitration decision that we announced recently. The third quarter COVID-19 impact income from construction operations was only approximately $3 million compared to $9 million in the second quarter, with about $2 million of the $3 million of third quarter impact being in the building segment. We are hopeful that barring any significant worsening of the pandemic's effects upon our operations, the largest impacts are behind us.

16:49 As Ron mentioned earlier, we took a charge of $15 million in the specialty contractor segment due to an adverse legal ruling on a mechanical project in California. So our income this quarter included approximately $5 million of net positive impact resulting from the favorable arbitration ruling and the adverse legal ruling. Civil segment income from construction operations was $70 million compared to $51 million for the same quarter of last year. The segments income grew 39% year over year, primarily because of strong contributions from our large mass transit projects in California. This growth in the civil segments income was even more impressive when considering that it was reduced by $8.4 million of incremental non-cash amortization expense in the quarter related to the increased equity interest in the joint venture that we acquired in the fourth quarter of last year.

17:47 Even with this additional amortization expense, the civil segment's operating margin was once again strong at 11.5% for the third quarter of 2020, compared to 9.7% for the same quarter of last year. So civil segment operating margin remains at the high end of the 10 to 12% margin range we have historically seen for the segment. Building segment income from construction operations was $16 million, more than double the results for the third quarter of last year. The strong increase was mostly driven by contributions from certain projects in California and Oklahoma. The building segment's third quarter operating margin was 3.1 percent compared to 1.8 percent for the same quarter last year, with the increased margin reflecting contributions from certain higher margin projects.

18:39 Building segment operating margin for the full year of 2020 is still expected to be in the 2 to 3 percent range. Specialty contractors' income from construction operations for the third quarter was $10 million, up 34% compared to $7 million for the same quarter of last year. The increase was primarily due to the segment's volume growth as well as the net positive impact mentioned earlier that resulted from the favorable arbitration decision and adverse legal ruling, partially offset by various other immaterial adjustments to project estimates. We remain optimistic that as the specialty segment's newer, higher margin projects continue to advance, its operating results will improve significantly. Other expense in the third quarter was $8 million compared to other income of $2 million in the third quarter of 2019. The other expense for this year's third quarter included a charge related to the resolution of a dispute pertaining to a past business acquisition.

19:42 Interest expense for the third quarter of 2020 was $26 million compared to $17 million for the same quarter of last year with the increase primarily due to non-cash debt extinguishment costs related to our debt restructuring transactions in August of this year, the majority of which we had budgeted for the fourth quarter. We had a very nominal income tax expense of $37,000 for the third quarter of 2020 compared to income tax expense of $5.6 million for the third quarter of 2019. The nominal expense in this year's third quarter primarily resulted from benefits associated with the CARES Act, which was enacted in March of this year. Under the CARES Act, the net operating loss, or NOL, that we generated in 2019 may be carried back up to five years, as under previous rules, NOLs were only allowed to be carried forward. This allowed us to realize the benefit of the tax rate differential by carrying back the NOL to tax years when the federal tax statutory tax rate was 35% rather than the current rate of 21%.

20:44 The majority of the NOL benefit was recorded in the third quarter of 2020 when the final tax return information was received from our joint venture partners. Net income attributable to Tutor Perini for the third quarter of 2020 was $36.8 million or 72 cents per diluted share compared to $19.3 million or $0.38 per diluted share for the same quarter of last year. This near doubling of net income in EPS in this year's third quarter was due to the facts I mentioned that drove the increases in revenue and income from construction operations as well as the tax benefits I discussed. As Ron indicated earlier, on a year-to-date basis, our EPS of $1.43 is ahead of budget and this is even after a 21 cent per year to date EPS unfavorable impact from COVID-19, as well as 12 cents of net unfavorable impacts that resulted from a couple of adverse rulings, one in the second quarter, one in the third quarter, which were partially offset by the favorable arbitration decision in the third quarter.

21:51 Next, let's discuss operating cash, which was definitely one of the major highlights of our third quarter. Our operating cash generation for the quarter was $73 million, a very solid result for us. Even more impressive is that our operating cash generation year-to-date through September 30, 2020 was $131 million, which, as Ron mentioned, was the highest result for the first nine months of any year since our merger in 2008. Strong cash contributions associated with increased project execution activities on certain higher-margin projects driven by our near-record backlog at the end of last year were enhanced by progress made on the resolution and collection of certain disputed balances. Our year-to-date operating cash is well ahead of our budgeted expectations and 18% better than operating cash performance through the first nine months of last year.

22:40 As Ron mentioned, we expect to finish the year strongly and anticipate that we will set a new record for operating cash in 2020. Lastly, we anticipate operating cash to comfortably exceed net income for 2020, which will mark the fourth time in the last five years that we have accomplished this goal. Our net debt as of September 30, 2020 was $673 million, up modestly compared with $641 million at the end of 2019. During the third quarter, we refinanced our debt, replacing our former $350 million credit facility with a new $175 million revolver and securing a $425 million term loan fee. The financial markets were favorable at the time we executed the refinancing and as a result, demand for a term loan B was robust.

23:31 This enabled us to upsize the term loan B and at the same time drive more favorable interest rates in other terms than expected. We used a portion of the proceeds from the term loan B to repurchase $130.1 million of our convertible notes and placed $69.9 million of the proceeds into a restricted account which will be drawn upon to repurchase or retire our remaining outstanding convertible notes at or before the maturity date in June of next year. As a result for a strong cash generation in the third quarter, our new revolver had a zero balance as of September 30, 2020, so we had ample liquidity for our anticipated business needs. As many of you know, our previous credit facility included spring forward maturity provision whereby it would have matured on December 17, 2020 if our convertible notes were still outstanding at that time.

24:25 We were very pleased with the outcome of our refinancing, which eliminated this issue that had been a source of concern for some investors. In addition, our refinancing enabled us to extend our debt maturities and provided us with increased liquidity under more favorable terms compared to our prior debt facilities. We are well within the limits of and in compliance with our debt covenants at the end of the third quarter, and we anticipate that we will continue to be comfortably within our covenant limits in the future. As Ron stated earlier, we are maintaining our 2020 EPS guidance range at $1.80 to $2.10 per share based on our strong year-to-date results and our expectations for continued solid performance for the remainder of the year.

25:11 Now let me provide an update of some of the assumptions in our guidance. G&A expense for 2020 is now expected to be approximately $235 million, which is lower than previously anticipated, mostly due to the impact of the favorable arbitration decision in the third quarter. Interest expense is now expected to be about $76 million, of which $20 million will still be non-cash and includes approximately $8 million of debt extinguishment costs. Our effective income tax rate for 2020 is now anticipated to be approximately 15% to 16%, with the reduced tax rate driven by the tax benefits we realized in the third quarter. Finally, capital expenditures for the year are now expected to be approximately $55 to $60 million, of which about $40 to $45 million will be for owner-funded, project-specific equipment. Apart from these, all other assumptions remain unchanged from last quarter.

26:09 With that, Ron, I'll turn the call back over to you.

26:14 Thanks, Gary. In summary, we delivered a very strong quarter underscored by double-digit revenue growth across all segments, obviously excellent operating income with particularly good margins in the civil and building segments, and most importantly, very strong operating cash flow, all of which were within line or exceeded our expectations. As we said before and over and over, we're hopeful that the impacts of COVID-19 will continue to diminish and we will continue to monitor the developments and any potential impacts of COVID-19 on our business. Furthermore, I believe our business will continue to grow into 2021 and beyond.

26:59 Not only based on our solid backlog, but the number of large project opportunities ahead that we have been monitoring, some of which we've already bid and others that we expect to submit bids over the next 12 to 18 months. As a reminder, we are still seeing limited competition for many of the larger projects that we are pursuing and expect that this will continue to be the case well into the future. Our marketplace continues to be the largest and most complex infrastructure projects in the country where we believe we have the best opportunity to succeed. We continue to believe we are in a multi-year period of solid growth and increasing profits and more importantly the collection of our unbilled receivables.

27:49 And importantly we are delivering on our goal to significantly improve cash generation, something which we will sustain into the future. Thank you, and with that, I'll turn the call over to the operator for questions. Thank you. At this time, we would like to take any questions that you may have. If you would like to ask a question over the phone, please press star 1 on your telephone keypad. The confirmation tone will indicate that your line is in the question queue. You may press star 2 if you would like to remove your question from the queue. For participants using speaker equipment, it may be necessary to pick up your handset before pressing the star keys. One moment, please, while we poll for questions. Thank you. Our first question is from Steven Fisher with UBS.

28:48 Please proceed with your question.

28:51 Good afternoon, guys. Hi, Steven. Gary, thanks for some of the input on the Q4 guidance. Maybe just a few other points there. Just curious how you approached that guidance. I think it's about a 36 to 66 cent range, if I have that right. What are the key swing factors operationally for that guidance? How should we think about the margins? Is it the same proportion of profitability you expect from the segments in Q4 as you achieved in Q3?

29:30 There really shouldn't be any change. We had a number of Thank you. Thank you.

30:06 What do you guys have on the docket for potential resolution and collections from that process in the fourth quarter versus just ongoing operational cash flow?

30:21 I am confident that we've got two or three ongoing resolves on projects. We've been settling everything amicably with no lawyers. I expect the fourth quarter to be another positive quarter. Cash flow result, I'm reluctant to say to what extent, but it will not be small. We will have a very positive cash flow fourth quarter.

30:44 Okay, fair enough. And I guess I'm wondering if you can maybe weigh in on a bit of a debate that we observe in the marketplace as we're hearing mixed messages about I would say maybe as it relates to you guys, the building construction market where things kind of been picking up over the summer and it's hard to tell that just kind of peak construction season along with some pickup following shutdowns during the pandemic versus other folks that are saying there's just not a lot of visibility. We're seeing project deferrals and cancellations. and I'm curious where you guys stand on that.

31:29 I know you mentioned $10 billion of building opportunities. I'm just kind of curious if you're seeing enough positive momentum to call this the start of the next cycle or is it just sort of a lot of inquiry activity and just not clear of what's actually going to move forward? I'm curious for your perspectives on that based on your customer discussions.

31:52 Well, as you know, Stephen, the building businesses hardly are... Focus. However, we do have a large building operation. My feelings about the building business are that it's been decent. There continues to be new work. We continue to have many public sector opportunities in the building business to continue to grow. I don't see it as a growth sector. It's hard for me to get confident that it has even a smidgen of the potential that the civil group has. However, our people have shared with me they believe they'll be able to sustain our levels of revenue, and since we have no aspirations of growing the building business, I don't see it as an issue, but I don't see it as a potential for growth that has to take place in infrastructure and civil work.

32:44 Okay, and then maybe just shifting to the civil side, since the large projects were A nice meaningful contribution here. How do we think about what is the timing of peak profitability on those projects? And then, you know, when do you by when do you need to replace that backlog? And how smoothly do you think that process is going to go? I'm just kind of curious, since we haven't resolved the election yet. Hard to know the timing of of when those state DOT bailouts or support may come. So how do we think about when we might peak on the profitability contribution of the current backlog that you're seeing nicely now versus the need to replace that?

33:32 Well, the reality is if you take Purple Line's two, three, the Purple Line three tunnels and high-speed rail, which probably constitutes 4 billion of our backlog, all high margin. Those are just beginning to peak in revenue. As you all know, we earn from costs and that work is peaking. We will see peak revenue over the next three years and then it'll wind down toward completion in year four. So I think we have a very solid high margin revenue package in civil over the next three years. One of the obvious things is, of course, the civil beating pipeline can't be shut down indefinitely.

34:18 I anticipate from all of the agencies I've talked to and their principals that we're not going to see any heavy activity until the second or third quarter next year. Once they're assured they're going to have a rescue package from the government, their revenues have stabilized, then we can have a better handle on how and when we replace it. are major works backlog in the sumo business. As I pointed out also, our competition continues to be minimal. There's a handful of contractors willing to bid the large work that we do. So we continue to see that as a great future. However, before we can replace backlog, we got to get the owners to get them out into the marketplace. And I see a lull over the next six months.

35:08 Okay, thanks a lot, Ron. Appreciate it. Sure. Thank you. Our next question comes from Brent Thielman with DA Davidson. Please proceed with your question.

35:27 Yeah, thanks. On the civil business, a lot of growth this year. We still have a pretty large Backlog is sitting on at the end of the third quarter. Ron, do you need some more key wins in that segment over the next couple quarters in order for the business to grow next year? Do you still feel like you have what you need to grow into 21?

35:49 Well, as I said earlier, the existing work will ramp up in revenue. The only one we still continue to struggle with delays is, of course, high-speed rail. that is just what it is but the balance of them will increase in revenue so I think we'll be able to sustain a level of growth over the next couple of years but make big no hands ifs or buts we've got to start replacing that backlog for the year 2022 and 3 and that's why I'm hopeful and assuming that the government will release funds so that all of the a dozen major projects that we've been talking to owners about for years and telling you about that are ready to go out on the marketplace will in fact go into that marketplace.

36:34 But I would say that with our existing backlog and run rate the next two years look good but we need obviously to replace that backlog with new work.

36:45 Yep, okay. And then on the everyone on the building segment from a different perspective are there great levels of profitability for the business at least Any other opportunities like Newark out there that you're going after that can do with that business or that project done for the segment?

37:03 Yes, there's another large project actually larger than Newark that we're looking at and talking about. There are periodic very large building projects that we happen to have a particular appetite or skill for. and there seems to be a couple of those on a national basis. But they're the exception, they're not the rule. The building business is what you typically see, a 2-3% margin business where we generate a relatively consistent level of revenue and with a few ups and downs, that's where it falls. The secret is when we get those large opportunities that are profitable because of their size and risk. And those do happen, but not too often.

37:47 Okay. And you mentioned Guam, $2 billion in work you'd go after over the next, I think, next 18 months. You mentioned you're the dominant player there. I mean, any sense, what you think is realistic that we could expect for you?

38:01 Well, we've doubled our revenues this year and doubled our profits. The highest revenue we ever had and the highest profits we have, unless I'm missing my own numbers, we doubled them. And next year should be bigger. We're literally flooded with work to do there, and we are the only construction company with a major presence on the island of Guam. We have dominated it since Mr. Black founded the operation in 1960. I bought Black in 1995. It's an extraordinary operation, and we're overwhelmed with work. There is a limit, but how much more can we do? We are already sitting with $600 million in proposals and waiting for the Navy to make a decision. Our backlog in Guam, between Guam and the Philippines and Diego Garcia, sits at $490 million.

39:00 The operation has just dramatically increased size, revenue, profitability, and it will probably continue to. until we just reach a limit to our own capacity.

39:12 Yeah. And that $600 million, Ron, I mean, imagine that. Bids are staggered over the next, or awards are staggered.

39:19 No, those are bids that we're sitting that we've turned in, and God forbid they award them all to us. and one of our biggest complaints with the Navy is they did these projects and they sit on them and look at them for six months. We have no idea whether we're going to get overwhelmed with a whole slew of new work or we'll get one or two of them. So that's the challenge to try to manage the amount of work we do there. But right now it's just been phenomenally successful and we continue to support them and move people there to help execute the work.

39:55 That's great. Thanks for taking the questions. I'll pass. Sure. Thank you. There are no further questions at this time. I would like to turn the floor back over to Ronald Tutor for any closing comments.

40:10 Thank you, everybody, and we'll see you next quarter. that concludes today's conference you may disconnect your lines at this time thank you for your participation and have a great day

Follow Tutor Perini Corporation into a list and get an email when it puts out news.

Latest news releases

Companies on this call

Speakers

Jorge Casado

Vice President of Investor Relations

Ronald Tutor

Chairman and CEO

Gary Smalley

Executive Vice President and CFO

Steven Fisher

Analyst, UBS

Brent Thielman

Analyst, DA Davidson

More from Tutor Perini Corporation