Replay available
Tonbo Imaging India (NSE:TONBO) Q2 2027 Earnings Call
Tonbo Imaging India (NSE:TONBO) Q2 2027 earnings call, held 2026-11-06. Watch the replay and read the transcript on 6ix.

- Company
- Tonbo Imaging India Limited (NSE:TONBO)
- Period
- Q2 2027 earnings call
- Date
- Fri, Nov 6, 2026, 7:46 AM ET
- Replay
- Watch the replay on this page · 1 h 9 min
On 6ix: 6ix.com/event/tonbo-imaging-india-limited-tonbo-q2-2027-earnings-call
Replay
Transcript
Automated transcript · Written by software from the replay's audio. It can mishear names and figures; the replay is the record.
0:00 Ladies and gentlemen, good day, and welcome to Tonbo Imaging India Limited Q2 and H1 FY 'twenty seven Earnings Conference Call. As a reminder, all participant lines will be in the listen only mode, and there will be an opportunity for you to ask questions after the presentation concludes. Please note this conference is being recorded. We are pleased to have with us the senior management team led by managing director and chief executive officer, Arvind Lakshmi Kumar sir, and chief financial officer, Srivatsan Shiva Shankar sir, who will share his perspective on the company's performance for the quarter and the key business developments during the period.
0:50 Before we begin, I would like to remind everyone that certain statements made during this call may be forward looking in nature. These statements are based on current expectations and are subject to risks and uncertainties that could cause actual results to differ materially from those expressed or implied. I now hand the conference over to mister Arvind Kumar... Arvind Lakshmi Kumar, sir. Thank you, and over to you, sir. Thank you. Good morning, everyone, and thank you for joining Tonbo's first analyst call since our listing. Since this is our first call, I'd like to take this opportunity to introduce the company and set the context. I'll cover why defense is changing, what Tonbo builds, the technology behind it, our products and our track record, and how our business model works.
1:41 Tonbo's CFO, Shiva, and chief commercial officer, Suskindia, will then take you through the financial results. And Tonbo's chief business officer, Ankit, will walk you through the scale of opportunities that we have for our business. Following this, we'll open for questions. So let me just start with the problem we solved. Right? You know, warfare is changing fast, and the economics has flipped. Right? So if you look at a cruise missile or a ballistic missile, it costs about a million and $0.5 for a single mission. A loyalty mission costs about $500, but it can scout, target, and strike. Manned fighter is about $100,000,000, and unmanned combat aircraft cost just $5,000,000 with no pilot at risk. When you look at a main battle tank, it costs about 7,000,000, carries four crew, autonomous ground vehicle cost less than $1,000,000, maybe one operator to run it, and he can run, like, six to 10 of them simultaneously.
2:32 Right? To intercept a drone, a kinetic missile will cost anywhere between $30,000 to $3,000,000 a shot and the magazine runs out. Our directed energy weapon cost less than 0.5 a dollar for a shot. Right? So the conclusion is very simple. The decisive edge for any battlefield today is better sensors, better edge artificial intelligence, and more autonomous platforms. But, you know, while the platforms have changed, the subsystems inside them are not. Right? The sensors inside these platforms are still very expensive and heavy. The processing system is power hungry and grows anywhere between 30 to 80 watts. Radio links can be jammed in seconds. Size, weight, power, and cost are the biggest technical bottleneck today. Right? The second problem is access. Right? By our estimate, suppliers in The US, Israel, and Europe control over 90 of this frontier defense technology.
3:27 Export tools such as ITAR and government to government approvals limit who can buy it often with years of delay. Countries that are modernizing and rearming cannot get what they need. So what does Tonbo do? Right? We are the intelligence stack for autonomous systems. We design and build the soft systems that autonomous warfare needs, sensing, processing, communication, guidance, and utilization. That means high performance infrared imaging systems for sensing, low power computing for real time AI at the edge, optical communication for jam free high bandwidth links, small, light, initially stabilized platforms for guidance and control, and RF based direct energy weapons for long range utilization.
4:14 Together, all of these technologies, they cover the battlefield, the discounted soldier, land vehicles, surveillance platforms, aerial reconnaissance ponds, naval vessels, missile systems, and the entire integrated c four ISR suite. Right? And our promise is very simple. Right? Our promise is to democratize autonomy at the performance level military's need and at a cost that enables global scale. Now everything we run runs on technology cell, runs on technology we own. Right? We have 100% proprietary IP built over more than fifteen years of r and d. We have over 130 engineers in r and d today. We are completely free of ITAR export restrictions, which matters to military that want modern capability without export control dependence.
5:01 We are completely fabulous. We manufacture through certified partners. So all our capital goes into design and intellectual property and not into building factories. Now our track record is proven in real. Right? More than 28,000 of our systems are in service across more than 24 countries. Over 20,000 of our thermal sites are in Indian service, 50,000 thermal sites in European service. Israeli French special forces use our night vision binoculars, and we have won programs across Armenia, Morocco, and Jordan in open global competitions. Right? Now we report our business in two lines, optical systems, which is essentially the sites and the binoculars a soldier carries, and platform systems, which are, you know, gimbals, fire control systems, weapon stations, and seekers.
5:50 Now directed energy is the third, still in development, and our approach is really global first. Prove the product overseas and then drive the adoption in India. Right? So I'll talk a little bit about our strategy, technology, and r and d. Right? Our our strategy has four key parts to it. First is we build, validate, and sell every layer of the stack. Right? The science and the intellectual property, the imaging modules, the electronic boards, and the end systems. Now each of these layers is proven through customer sales before we fund the next, and that's how we derisk our r and d completely. Second, we own the core intellectual property, optics, sensor electronics, low power embedded vision, precision stabilization, RF sources, and control systems are all technologies that we own and we have built in house.
6:44 Third is we expand geographies. In some geographies, we bid directly, and in some other geographies, we offer OEM subsystems that are white labeled by our domestic partners in that region. And the fourth is we scale through partners because our model is completely fabulous. So it's a fabulous model with multiple sub... Simplified matching and shipping partners, and it lets us add capacity without building plants. Now in terms of r and d itself, right, the next phase of our r and d is the directed energy system. Now results that cost millions of dollars are being used against drones that cost hundreds of dollars. High power microwave essentially allows us to break that cost asymmetry. We estimate that the directed energy market outside of India are currently talking about roughly $500,000,000, and it's gonna grow to close to $4,000,000,000 by 2030. Right? It's a growth of nearly 50% per year. India itself is expected to add close to $300,000,000 by 2030 with both army and navy roadmaps calling for about ninety and forty, you know, microwave systems.
7:49 Our base strike product is at technology readiness level four right now. Right? We have signed letters of intent for 11 units, five for the Indian Navy as a minimum order quantity, and six for a European customer. We will keep investing in directed energy over the next three to four years. Now you need to treat this as an option that we are building, not a short term revenue. Right? So I'll talk a little bit about our, you know, h one f y twenty seven results. Shiva, of course, covered this in detail, but let me give you a quick high level summary. Right? H one FY twenty seven performance has met our expectations with revenue reaching about 219 crores supported by a very strong second quarter and encouraging order flows of about $1.88 crores. Our current order book of about $2.50 crores together with contracts under negotiation of about four zero eight crores and a qualified pipeline of opportunities support a positive outlook for FY twenty seven and the medium term.
8:44 Now products based defense businesses like ours need to be looked at from the lens of a three to five year perspective, and our business performance tracked on an annual basis. Revenue volatility quarter on quarter has been seen historically, and that should be considered part for the course. Right? Over the last fifteen years, sustained investment in r and d has helped us to build a broad portfolio across tactical systems and platforms. While tactical systems contribute about 70 to 80% of our business, we expect platform systems to account for a larger share over time. So we will continue to invest in proprietary technology, including the development of direct energy weapon systems over the next three to four years while pursuing both domestic and export opportunities.
9:32 Last month, we secured a strategic export order from a European state owned company for first order of production units. This is for our multisensors stabilized seeker, essentially marking its entry into an export loitering munition program. On acceptance of the FOPM units, the customer has an option to order up to €13,000,000 worth of systems. Now this reflects our investment in imaging stabilization and tracking is carrying Tonbo from sensors into precision guidance. So we expect increased adoption of our platform subsystems and the DAW platforms, both domestically and globally to smooth out into your volatility and also provide sustained growth for the business. Thank you. I'll now hand it over to Shiva and Cecilia to go our financials.
10:25 Good morning, friends. This is Shiv Sankai here. I'm the Chief Financial Officer of the company, and joining me is Cecilia, the Chief Commercial Officer of Konbo. Thank you all of you for joining us. We have met some of you during the IPO roadshows and perhaps we are meeting some of you on this call for the first time. Let me take you through the financial highlights for the first half of financial '27. Revenue from operations for the first half of this year stood at INR219 crores, which is significantly higher than the INR77 crores registered in H1 of the previous financial year. While the year to date revenues this year have been higher, it may be noted that the first quarter had revenues of only INR 36 crores, while Q2 was much higher at INR 183 crores.
11:21 The quarter on quarter volatility is not specific to this financial year. It has been observed in the past as well. For example, in FY 2026, a significant portion of the revenues was booked in the second half. The revenue recognition in H1 was 22%, while the revenue contribution of H2 was 78%. While we are not giving a revenue guidance at this stage, we believe that H2 revenues for this financial year are likely to be materially better than H1. This is based on the INR $2.50 crore order book that we have, the contracts under negotiation and the pipeline opportunities which could convert into orders in the next two to three months. In terms of the composition of our exports of our revenue, export was about 35% in H1, while domestic revenues comprised 65%.
12:21 Moving to gross margins. The gross margin was INR 75 crores in the first half and roughly 87% higher compared to the INR40 crores that we saw in H1 FY twenty twenty six. The gross margin percentage was 34.62% in H1. It was lower than the 51% seen in FY twenty twenty six due to the product mix. Moving on to EBITDA. EBITDA for H1 stood at INR31.15 crores with an EBITDA margin of 14.2%. This compares well with the EBITDA of INR11.75 crores in H1 last year. If I just look at the quarter alone, EBITDA for Q2 stood at INR 44 crores with an EBITDA margin of 24.11%.
13:10 The largest cost below the gross margin line is the employee cost. Since employee costs are largely fixed from quarter to quarter, EBITDA margins were low for H1, but are expected to improve for the full year since revenues in H2 are expected to be higher than H1. Profit after tax was INR 5.8 crores for H2 with a PAT margin of 2.61%. Profit after tax for this quarter alone was INR 23.5 crores with a PAT margin of 12.71%. Given the variation in quarter on quarter revenue recognition, we think that the financial metrics of the business as well as its prospects are best measured on an annual basis and neither quarterly or semi annual would do justice to evaluating the merits of the business.
14:04 Coming to the balance sheet. The company continues to maintain a strong balance sheet. The net worth of the company was INR $5.64 crores as on 09/30/2026. Bank borrowings was about INR 169 crores, essentially for funding working capital, which is self liquidating in nature. In a post September 30 update, one of our banks has increased the cash credit from INR 30 crores to INR 50 crores after the quarter end, and we are working to increase our cash credit limits with the other two banks as well. Our order book today stands at about INR $2.50 crores as of September. Our contracts under negotiation are about INR408 crores. And we have a set of pipeline opportunities, both in tactical and in platform that we hope to convert in the next two to three months.
14:53 As Arvind mentioned, the business momentum appears strong for the medium term. We have an intellectual property led products business. Revenue recognition varies significantly depending on timing of order receipt and order execution. Our approach towards building the business is that if we continue to innovate and invest in R and D, we have the ability to have nonlinear growth at some point. While the market direction is clear that there will be increased acceptance and demand for products that enable battlefield autonomy, it is very difficult to predict timelines. So you would see that in the investor presentation that we have shared, we have given numbers to the extent that we can. But for a lot of our platform opportunities, for example, we will only know over a period of time as opportunities convert.
15:50 But the opportunity space itself is a large space. With that, I would hand over the mic to Ankit who will talk about some of the opportunities that we are working on. Thank you, Shiva. Good morning, everyone. I am Ankit Kumar. I'm the chief business officer for Tonbo, and I look after domestic and global sales and business development for Tonbo. I thank you all for joining us. Let me spend a few minutes on where we see the opportunity for Tonbo. Tonbo has built a large portfolio of electrical products under one roof covering tactical land, naval, airborne and missile applications. The first opportunity is in Tactical Systems. This is the most established part of our business.
16:38 The stated requirement just in India includes around 80,000 thermal weapon sites, handling thermal images combined alongside approximately about 27,000 image intensifier sites to be procured in India. These quantities represent only a part of the Indian Army's overall requirement. Procurement is already underway and we expect activity of procurement to continue over the next six to eighteen months. Some categories of procurement move faster than the others. Some of them are through capital procurement. The capital procurement programs generally involve more rigorous testing and take longer time. Internationally, we are pursuing near term opportunities for approximately 10,000 thermal sites and monoculars combined.
17:26 These figures indicate the scale of potential procurement. Final quantities will depend on tenders and contract awards. For Tonbo, the opportunity is to compete for this demand with products we already know how to build and supply in volume. The second opportunity is in platform systems. These are products integrated into land, naval, airborne and design platforms. They include see through armor for BMPs, light tanks, wheel armored platforms and similar vehicles, as well as electro optical and fire control systems for them. We've already begun several of these integrations. Platform programs do take time to mature and much of the work has begun a few years ago and some of it has already started to show results. Most of... Most most are still small seed programs as of now, but they have room to expand as the platform themselves enter wider service.
18:22 For example, we've upgraded thermal imagers in Ghana sites on legacy platforms for an overseas army in past, and now we are working on similar opportunities in India. We are upgrading the thermal imagers for Concours anti tank missile launchers, both on BMPs and ground based launchers. We are also supplying electro optical fire control systems for remote control weapon stations on our June platform and and exporting these systems to partners in several countries. In counter drone applications, we are developing electro optical file control systems that can detect a threat and maintain precise video track. That position is particularly very important when system is used to intercept the drone. Electro optics can compete and complement radar and radio frequency detection systems. We are developing panoramic thermal imaging systems, wide field of view systems, as well as long range cameras for air defense applications.
19:18 Stealth aircrafts are designed to reduce the radar signature to evade radar detection, but it still produces a thermal signature, and that's the opportunity for us. Recent conflicts have also shown highlighted the role of thermal imagers in air defense applications. Our traditional gimbals were very large, high precision systems. Today, a lot of drone manufacturers are asking for smaller, lightweight, and more affordable sibling systems. We are we are developing these for loitering munition and for rotating and fixed wing reconnaissance aircrafts. We are seeing demand from drone and loitering munition manufacturers both in India and overseas. On the naval side, we successfully replaced imported civilized gimbals on naval vessels with systems of our own. These are well suited for FPVs, FICs, and many other marine platforms.
20:08 Developing this equipment has taken time and we have learned a lot through the engineering work itself. In precision guidance, our work includes low cost, lightweight, electro optical and for seekers for anti time guided missiles and multi munitions. These AI enabled seekers in fire and forget mode follow the target and maneuver the missile or the multi munitions towards the target. A seeker places much tighter demands on civilized systems than our regular ISR gimbals. It must keep tracking the target as the platform moves and passes information to the guidance system with very little delay. We've developed that capability and we continue to improve it. We are pursuing both domestic and international programs on precision guidance using UIR. And initial supply made us initially cover a few units, but we are under testing phase and there are much larger opportunities around the corner once these are successfully integrated with these platforms.
21:03 The third opportunity is in direct energy, particularly high power microwave systems for counter drone applications. We've been we've been... Our focus has been on high powered microwave systems designed to disrupt or disrupt or kill the drones onboard electronics. Under the Indian Navy's IDEC authority contracts, we're developing a very long range system for naval use. We're also developing systems for Indian Army's stated requirements as well as shorter range variance for airborne requirements. So we're building three different types of platforms there. For investors, following Tonbo, this is an opportunity which spans manned and unmanned platforms. Tactical systems generate revenue today and platform of TronX has started to grow with many fee programs already underway.
21:51 We serve a broad range of applications and continue to improve our technology so that we can bring it to more platforms. We've we've had to be patient all this while and our investors so far have also been patient. Building these products has taken us time and perseverance and acceptance of failures and as well as success. We have learned from the programs that went well and we have learned from that have taken longer than we expected as well. In platform at TONEX, our timetable also depends on readiness of vehicles, vessels, aircrafts our partners are developing. Procurement and delivery schedules can move revenue between quarters, which is why we assess generally our performance annually. Immediate priorities as of today are to deliver the orders we have, compete for the next round of tactical and platform requirements, and keep investing in products that our customers constantly require.
22:42 Thank you. I'll I'll I'll pause here, and I I think we welcome your questions from our side, Vida. Thank you very much. We will now begin the question and answer session. Anyone who wishes to ask a question may press star and bun on their touch tone telephone. If you wish to remove yourself from the question queue, you may press star and 2. Participants are requested to use handsets while asking a question. Ladies and gentlemen, we will wait for a moment while the question queue assembles. The first question is from the line of Ashish Ajith Gulhecha from B Venture LLP Fund.
23:32 Please go ahead. Yeah. Hi, sir. Thanks for the opportunity. Wonderful numbers and congratulations to the whole team. Am I audible? Hello? Yes. Yes. You are. Yes, sir. Am I audible, sir? Yes. Hello? Yes. You are Yeah. Yes. Sir, the question is for, sir, the main person. Like, in the November 2026 date, it's clearly said that the directed energy terms are roughly $2.90 US million by CEO calendar 30 across 100 plus systems. Analyst call, it was mentioned about three pricing price of more, what will get from 200 karat to this is roughly 17 to 25 per watt? This is my first question.
24:37 Second question, I'll come, and the first question is answered. Thank you. K. So to to understand the difference in terms of the directed energy systems market size versus what is that in 2030, right? We are building the directed energy system. So the first directed energy system that we are going to have in production, which we deliver to customers will start in 2029, 2030. The price that we have for the Indian directed energy system, the one we are selling to Indian Navy, we quoted prices at about INR 200 crores a system. And what we have for our international customers is at about $25,000,000 a piece. Now the Indian requirement... So the the the size of the market in India, overall size of the market, right, and this is not the twenty thirteen size.
25:22 Overall size is about roughly 140 systems when you think about it each at 200 crores. That adds up to 28,000 crores. Now out of the 28,000 crores in India, what we expect is that by FY thirteen, the number will be much smaller. And what you see in '2... About two ninety million roughly corresponds to the FY thirty number, not the overall size of the market. The overall size of direct to energy weapon market in India is, you know, 200 crores roughly into the 140 systems. That is 28,000 crores. Okay. Got it. So my second question is, in the deck, the... There is a separately side which said that we have a 3,820,000,000 global DAW TAM by calendar year 2030 at 50% CAGR.
26:09 Wanted to understand how is Tonbo's addressable share compared with Aperam who is valued at 5,000,000,000 and sub four kilometer range, given that Tonbo always claims that into three to five kilometer multi range, klystron range. Thank you. So our our only credible competitor that we have where there is credible data. Right? So first is, let's just look at the countries which have capabilities for directed energy weapon. In The US, you have Everest, of course, and you also have Lockheed and Raytheon, which are building smaller variants. Russia has got a system which is in the sub one kilometer range. China, we don't know what it has, and Turkey also has something in the one kilometer range. India currently does not have anything in the three to five kilometer range. So our really credible competitor is Epirus.
26:56 Now Epirus' technology, so when you look at the global market, so once we are ready with our multi beam Tristrom, which can address three to five kilometers, the the Epirus is restricted largely to US DoD and in some variants to the Five Eyes countries. So the same Five Eyes countries whom Epirus takes its systems to, Tonbo will take our systems to those countries. So we are already in discussions with. So for instance, you know, we've we've spoken to Japan about it. Our order we have currently in terms of the LOI that we have is from Europe. So all the countries Epirus goes to, we will go there, and we won't have any restrictions. Epirus is restricted in terms of what it can offer to those countries. So we will compete with Epirus on those markets. Okay. Sir, you would be knowing that through your own words, energy systems are at TRL four and the market opportunity.
27:48 So wanted to understand total cumulative investments today and expected CapEx and R and D option with respect to Director Energy Systems, if you could throw some light. Thank you. This is my final question. Directed so directed energy, as I mentioned, that the first delivery of these systems will not happen before 2930. So that... There are three comps. So what what what what essentially determines the success of the program. Right? First is, you know, the the fundamental technology. Right? What is the technology that we are building? So we've been working on this technology for the last two, three years where, you know, technology on the multiveam klystron technology on the pulse compressor, technology on antenna designs, all of that are technologies that we are working on. So from a technology point of view, they are reasonably far ahead. The second thing is that the capital to be able to build it.
28:36 Right? So what we expect that the whole system that we are gonna build, the rough cost of capital to build it is about 160 crores. Now the 160 crores is being funded partly by a loan which is coming in from ex... Exync. Exync is sanctioned about 120. We have an IDEX Aditi grant, which accounts for another 25 crores, and the balance 15 crores comes from our own balance sheet. So the capital to build the first system that we already have this. The third is customer intent and, you know, a firm sense of commitment assuming that we can build it to the spec. We have customers who are willing to buy it at an appropriate price point. So that's why we signed on customers up in advance. Right? So think of directed energy weapon to be very similar to, like, your electric car. The first time an electric car came out, you had people... I mean, you had to ensure that, you know, electric car battery works.
29:25 You have to ensure that it can actually give that range. And then you sign on customers who say, I'm willing to buy it, provided it can meet these requirements. So we found customers who are willing to put and sign on and say, look here, signed LOIs. And if you build it and you are ready with the spec, we will buy it at this price. So that's the third part which is sorted out. Right? And so now what we're gonna do right now is the fourth part which we are actually working on is the product engineering part of it. Right? And so it's CRM four because there is a product engineering risk and testing risk with... And what we expect to do between now till f y twenty nine is essentially mitigate that risk and cross that hurdle. Yeah. Thank you, sir. I have no further questions. I'll come in later. Thank you so much, sir. All the best to you. Thank you. Thank you. Thank you. Ladies and gentlemen, in order to ensure that the management is able to address questions from all the participants, please limit your questions to two per participant.
30:21 The next question is from the line of Poorva Tawedi from Ionic. Please go ahead. Yeah. Hello. Hi, sir. Good morning, sir. Hello. Good morning. Yeah. Yeah, sir. So, sir, I have a couple of questions, sir. So, sir, I wanted to, you know, get a sense of the difference in gross and EBITDA margins for technical business versus a platform business. So... And in the exports business as well, what is the gross margins for technical versus domestic business for tactical? And similarly, for platform as well, gross gross margin difference for platforms when you export versus domestic? Do I take that question, Arvind? Yes, sure. It's all yours. Okay. So starting with the tactical systems, the gross margins in the domestic business are they can vary from year to year, but they're broadly in the 40% to 45% area.
31:21 For platform systems, it is higher. It will be in the 45% to 50% area for domestic. In the case of exports, the gross margins, I won't differentiate between tactical and platform at this stage, will be anywhere in the 60% to 65% area on the export side. All right, sir. And sir, I also wanted to ask you, sir, regarding the if we have an optionality of, I think, 13,000,000 order, which can come from the European contract, which we recently signed for EUR 65,000. So does that include in the contract and the negotiations of 400 crore order book, which we have currently? Yes, it is included as part of the INR $40.08 crores contracts under negotiation.
32:09 It is not included in the order book of INR $2.50 crores. Alright. So so so you mean to say €13,000,000 order, which is an optionality that is included in your €400 order book, if I'm not wrong? That is correct. Because we expect that we we believe that, you know, so long as we deliver the product to the specifications that the customer has stipulated, there is more than a fair chance that he will go ahead with the order. Alright, sir. And then just last revision, sir. Sir, what is the average time it takes us for, you know, us to convert the order book into the revenue? The whole order book, including the technical and. So in the case of tactical systems, the delivery can take place within three months if we have all the long lead items as part of our inventory.
33:02 So generally speaking, I would say it is three to six months from the time we receive an order. In the case of platform systems, it can take anywhere between six to eighteen months to deliver on a platform system. Having said that, I think the way we try to do things is a lot of the subsystems that go into these tactical systems are common across categories. And therefore, we... Not only do we have the raw material, we have some of the subsystems assembled and kept in place. So even orders that we get, let's say, by December this year for tactical systems, we would be in a position to convert it into revenues in three to four months. Alright, sir. So just to follow on this, follow-up on this, sir. So currently, we have 400 crores of order book under negotiation. So, sir, out of that, how much would be for platform and how much would be for tactical, sir, if you can... Can you just bifurcate that? It would be really helpful.
34:05 I would say about... Just just give me a second. $1.68. About $2.50 of that would be tactical, and the balance would be platform. Yes, sir. So thank you. Thank you so much, sir. Thank Next question is from the line of Vivek Ganguly from TCG AMC. Please go ahead. Thank you for the opportunity. A couple of questions. So usually, in India, a lot of the products, the specs are designed and maybe the initial results are done by DRDO and then it is given out to the private sector for them to take to the market as well. The impression that I get is in the case of the directed energy weapons, you are doing it everything from on your own.
35:03 All the parts are on your, it is not a DRDO subset that you are working on. Is that impression right? So a couple of corrections. One is that that is how it traditionally in India. Right? DRDO was supposed to build the frontier technology, and then public sector companies or private companies as in current case would take it from DRDO and build it. Our model is completely different. Right? And we are a product company. And our emphasis is that the technology specs that we can create based on our experience selling these products to international customers is far superior to what comes out today as part of localized specs. So our model, we do we do not we do not build a product based on the audio specs. We create the specs based on our discussions with our customers, make sure the customer understands, you know, the the performance price comparisons of the specs. We build the product and we sell the product to the end customer. So this is true of our tactical systems, this is true of our platform systems, and it's true of our direct to energy weapon. So as an example with our tactical systems, I'll tell you, right, for instance, before we started building our weapon sites, the typical, you know, size of a thermal weapon site, which was based on DRDO technology or Israeli technology transferred to Indian public sector, used to weigh about 1.2 to 1.5 kgs.
36:26 Now one point to 1.5 kgs makes sense if you're putting this on a tank, not on a on a k 47 or a negative or a dragon off. Right? So what that requires is a 400 gram or a 500 gram site. So what we said is what makes sense is the lightweight site. It needs to last eight hours. It needs to engage a target at one kilometer. That's the spec we create. We showed it to the customer. We showed prototypes to the customer. We proved it by selling it internationally, and then the Indian customer put it in their RFP, right? And that's the model that we follow. And that's what we do for all our products. Right. No, that's very helpful. The second one is on the HPN. So it's something that you're taking the risk on and developing entirely on your own and with the debt funding, IDEX funding and some part coming from your own balance sheet.
37:15 Is that the way we are looking at it? So every product follows the same philosophy, right, not just HPM. So for instance, when we build the Gimbals, the Gimbal which exists in the market today, we said, look, you know, this is what exists. What we think the market needs is completely different. We will take the risk because, you know, as an R and D company who wants to create sovereign capabilities, you need to create that. You need to take that risk to be able to build it. So historically, we have taken that risk. We have been successful in some. We have failed in some, but that's the model we'll take. I think let me just take this one second. Let me just want to add something. This is Shubar here. So while we are investing in R and D, there are a couple of things that you should bear in mind.
38:02 A, we design we choose which product to design and develop based on extensive conversations that we have customers with customers. So it's not completely blue sign research, right? So we do have a good idea of what the product what the customer is looking for in terms of product specification. Second is in terms of the business model, we are not operating on a binary zero or one. Either the HPM works at the end of two, three years or it doesn't. That's not the model we do. For example, Aravind mentioned a few components of what goes into a high power microwave. But one of the things that is required is a detection system for detecting whether something which is coming in is a swarm of drones or a swarm of birds.
38:47 Now this product, which is called as T Rex in the product portfolio that you may have seen, has been developed by us more than two years back. We have sold 20 systems in an international market. We have sold a couple of systems in India as well, which can detect objects at a 40 kilometer distance in the dark. So the drone detection system is already in place. When you have a high power microwave, you also need a positioning system which can direct the energy towards the the sky and at an exact location. We are already in the process of developing the positioning system for a Middle East customer, right? So there are two components that we are in one that already works. One, we are already in the process of developing and at the PRN level higher than PRN4.
39:35 So all of these subsystems, which go into a high power microwave, we'll keep developing it, and we will have an opportunity to sell each of these subsystems as well in addition to the final product, which will come two, two point five years down the line. Got it. Okay. No, that's very helpful. Thank you. That's all from my side. Thank you. Next question is from the line of Pranayru Chatterjee from Berman Capital Management. Thank you for the opportunity, and congratulations on a great set of numbers. So my first question was on the Q2 revenues. We saw that about INR 51.5 crores of revenues came from you guys. I just wanted to understand whether this is on... More on the tactical side or more on the platform system side, and and are we supplying directly to, you know, The US Government or, like, the subsystem aggregators there?
40:40 So these are platforms. We are not at liberty to talk about the customers, so I'll, you know, avoid that. But these are platforms subsystems. Platform subsystems. Understood. Sir, on the new product categories in the platform systems, you mentioned quite a few interesting products, the most specifically on the smaller Gimbals for for UAVs and local munitions. I just wanted to, you know, understand what are the, you know, stated, like, the procurement plans of the Indian government for these categories of systems? And and do you will see a large inflow of orders coming in in the, like, the next one to two years for for this particular category, or is it going to take, you know, a longer period of time similar to, let's say, HPMs to to convert and get actual purchase orders here?
41:31 Ankit, do you wanna take it? Yeah. I'll I'll take that one. So, yeah, like like you said, right, I mean, traditionally, we've been building heavier systems more, you know, with better position, better accuracy. These are lightweight gimbals for the current demand, and we are already doing pilot integrations with some of our partners in in the country and as well as outside. So it it is it is it is already along the lines where the programs have been treated. Now it will depend upon, you know, when our partners, when those programs, you know, their timelines and their their procurement cycle, it'll it'll, you know, plainly depend on that. But otherwise, from a product perspective, they're all receiving and all the... You know? So in in terms of comparing to SPM, we are far ahead in terms of the other level, and it has already been exceeded.
42:21 Understood. And here, since you mentioned that you are working with your partners in in terms of pilots, I'm assuming here you are working with let's say, the larger system aggregators who is supplying the full end product like a or a UV, and you are probably supplying the EUIR guidance system. Is that the right way to understand this? That is correct. Understood. Sir, one more question if I can squeeze in. You know, specifically on the, let's say, you and your for for ATGMs. What I understand is that on a couple of programs, we are we are the sole provider, especially with, you know, some of the state owned entities like. I just wanted to understand whether whether you have, you know, actually supplied these products as part of your, you know, confirmed views or or... And you expect to get a large order in here in the next one to three years, or is it more in the prototype and the pilot is similar to, let's say, UAVs and all the technicians?
43:23 So both both the loitering munitions and seekers... Sorry. Go ahead, Ankit. Go ahead. Go ahead. Ahead. Ahead, Ankit. Go ahead. So both both the MP ATGM seeker, the command launcher unit, and the seekers that we put on loitering munitions are are far beyond prototype. Right? They have been field tested. Some of them have gone into larger quantities as many as subsystems. And they essentially... So essentially, we look at an MP ATGM. That's a system which has been validated. Right? It's been validated for shock, validated for accuracy, validated across, you know, stationary and moving targets. Right? Both for in their terminal guidance and MPAT GMs all through the phase of their flight. So... And, you know, the the the systems that we have supplied to both, you know, domestic customers and some of our international customers are essentially being field tested and validated. So even if we're doing production orders, the production orders will come in right now. So there's no technology risk, so to speak, either of them.
44:25 Understood. Sir, then I'm just sort of getting a bit confused since, you know, large part of current order book, quality, you know, about 200 crores out of $2.50 crores. That's it that's it's in, you know, the platform systems. So so is that more oriented towards, let's say, the... Let's say, older technology, the larger dimples for for, you know, larger manned vehicles? Is that the right way to wanna send this, or does that also include, you know, purchase order for our newer systems, like, you know, these and and, let's say, UAVs, counters, those systems, that sort of categories? It includes both. It includes both. Understood. Understood. Alright, sir. Thank you for answering my question, and best of luck for future. Thank you.
45:11 Thank you. Next question is from the line of Darshul Jabiri from Crown Capital. Please go ahead. Hello. Good morning. Thank you so much for taking my question. Firstly, for the answer and for their listing, sir. Sir, just wanted to understand, like, our order book is is for platform and this both, right, tactical systems. Right? So how can... Well, for beating our h one revenue, we'll nearly have to convert a full order book into revenue. Right? So are we sure we'll be able to complete it in the six six months? Let me take that one. Want to take it or? Yeah. If you want to take it. Yeah. So there are three boxes that you need to look at.
45:59 The first box is the order book where we have INR $2.50 crores. You're right, that has got some platform systems and the execution of some of the platform systems can will likely go into next year. So there is a portion of the INR $2.50 crores, which will get executed this year. The second is the contracts under negotiation, which is about INR 400 crores. And if you remember the earlier part of the call, I had said about INR 150 crores will be platform systems out of the zero eight and about $2.50 odd will be the tactical systems. So the contracts under negotiation, assuming that they come through by December, we should be able to convert it into revenues in this financial year.
46:45 The third is the opportunities, and you would see three, four slides in the investor deck. There are various programs which are currently going on where RFPs have already been circulated, where field trials are going on, where there is a set of orders which are expected both this month and next month. So we could have order execution from our current order book from the contracts under negotiation as well as orders from the opportunity set that we are able to convert into firm orders before December or January. I will ask Ankit to to give you some color on the opportunities that can convert at the shorter time frame. Thanks, Shivam.
47:31 Yeah. Like, Shivam mentioned that, you know, there are many programs which are in very advanced stage. When initially, I mentioned that the opportunity is about 80,000 in some of the sites. A large part of it is through a procurement cycle, which is, you know, pretty quick in terms of procurement cycle. And some of those cycles are already in motion and that's how traditionally also it has been with Tonbo that we've been on programs and lot of programs that start to get seeded in the first quarter of the year, the second quarter of the year, we generally second quarter of the year, generally, these start to convert into purchase orders and third and fourth is when a lot of execution happens. So it's along the same lines.
48:16 There there are a lot of them right now which are very close to, you know, the finish line. Okay. Fair fair enough, sir. And so I just wanted to know in terms of our margins, sir. So I think h one year around 14% margins. I understand there's a cyclicality. We should look at it annually only. So annually, could we do margins that we did last year if for the last two, three years? Like, that's still the average margin we can take for our annual revenue? Should I take that? Yeah. Go ahead. Yeah. So I I I think, you know, there are two or three components to this. Right? One is the gross margin. Now that depends upon the product mix that we have and the contracts that we negotiated at a certain point in time.
49:12 In the second half of the year, we do expect a higher export component, which would help in terms of the gross margins. As I mentioned earlier in the call, we do expect the H2 revenues to be materially higher than H1. So if you look at it in terms of the EBITDA line, below the gross margin, the largest component of the expense is the employee expense. So when you have employee expense as a percentage of revenue that would be high in H1, it would be relatively lower in H2 when we deliver higher revenues. And therefore, the EBITDA margins will kind of go up simply because we will deliver higher revenues.
50:02 So a combination of higher gross margins because of a change in product portfolio and change in the domestic export mix, as well as the fact that operating at a higher revenue level should take the EBITDA levels to be higher than the 14% that you saw in h one. Can we quantify that? Range will also be fine, sir. No. I I don't think they won't be giving any guidance either on revenue or or margins at this stage. You just need to bear in mind that we have IPO quite recently just a couple of weeks back. So there are certain restrictions in terms of what kind of guidance we can give at this stage. Okay. Fair. And just last question from my end, sir. What would be our targeted order book, you know, closing order book for the year? Like, what's our target? Because I think we'll be mainly consuming our current order book.
50:57 I understand there are 400 crores of orders also, but any notional target, like, you know, maybe you want to have for five twenty eight of the order book search for all these. And what is the pipeline like other than these orders that you're looking for, sir? Okay. Let... I'll just give you the opening remark on that, and then then I will ask Ankit to to add. As I said, you do need to look into the fact that there are three boxes. Not look at it in terms of just saying that the existing order book will get exhausted. Because some of the contracted because of contracts under negotiation of INR 400 crores. As I mentioned, a portion of that is anyway going to be for next year, right?
51:44 And the third set, which is what you need to focus on, the opportunities, there are certain procurements being done by both commands under the OPPP program as well as the Ministry of Defense, where there is a lot of procurement being done both in the immediate short term, which means in the next two to three months as well as in a more medium term of nine to twelve months. Let's just focus on the immediate short term, right? So we are looking at if you see the slide on tactical systems in the investor deck, right, we are indicating 75,000 thermal weapon sites, 5,000 thermal images and 27,000 image intensifiers, etcetera, etcetera. So that's a large number. So just to give you some perspective on this number, right, Arvind, in the beginning of the call mentioned that, you know, in terms of the total weapon sites which are installed in in India, it's, you know, some number between twenty and thirty thousand.
52:50 The quantity that the government, you know, between the Ministry of Defense and Commands is looking to procure this year is several times that number over the next twelve months. So some of this, as I said, we expect a lot of these to convert into orders in the next two to three months. We will be able to execute some in this financial year. And there will be a large part, which will be an overflow, which will go into the next financial year. So the answer to your question, what will be the order book that we will have in March 27? Whatever orders that we get in under the OCTP program or some of the other programs that Ankit referred to, we will probably execute $102,100 crores this year.
53:36 And whatever we we get in excess of that will be the opening balance for next year. Okay. That... That's it from us. I'm no person who will join back in the queue. Thank you so much for all the message. Thank you. Next question is from the line of from Wealth Mill Securities Private Limited. Please go ahead. Hi. I just want to take a macro level outlook for... Given the kind of the rising geopolitical issues at this point of time and also the defense spending that's going up. How far in the next couple of years or the coming quarters your company is going to take the advantage of these?
54:22 And what are the factors that influence your revenues? That's what I want to know for you at a macro level. So... Okay. I'll I'll I'll listen and, of course, I'll have... Shivani, I'll take a follow-up with this. So, you know, at a macro level, unfortunately, the world that we live in, wars are not going away. Right? There are problems. Right? So, you know, someone might look at it as a short term view. And and, you know, there is there is always this whipsaw effect happening right now that the US midterm elections did not go in favor of Republicans. So people assume that defense budget is gonna get cut. Therefore, US defense stocks come down. Right? Over a long term, you know, since... Of course, when you look at it from... For for for us, two, three core area countries of interest to us. One, of course, is India. Right? India, I mean, we are not dependent on this geopolitics.
55:11 We need to arm ourselves. We put together a plan. The TPCR lays out what we need to do for the next ten years. So I think barring any crazy changes in India, I would imagine that India would continue the same way. Right? So from a macro perspective, India's technology procurement in line with the TPCR will continue unabated. The second place that our business which we look at is Europe. Right? And Europe right now, Europe has realized that it won't take it won't take too long for the scenario to go back to how it was before that they... Their dependence on US will cause a constraint to their own, you know, sovereignty and national security. So US... Europe, from all our knowledge and what we understand, is gonna continue to rearm better... And they have a $800,000,000,000 budget put out for rearming right now over the course of the next five to ten years. There's nothing that says for anything contrary to that. So I presume that that's gonna go on as well. Right? So when you look at these two markets, India and Europe, where we are supplying today, from a from a current short term changes in geopolitics, I don't think that's changed the long term outlook, which is, let's say, the next three to five year outlook on how these countries are gonna procure?
56:24 Just... This is a specific question. Are you exporting anything to The US at this point of time? Just want to know. No. Can't do that. We can't can't comment on that. Okay then. Thank you. Thank you. Next question is from the line of Manish Goyal from Thinkwise Wealth Managers LLP. Please go ahead. Yeah. Thank you so much, and congratulations on very good set of numbers, sir. One question on competition from BEL Optronics. I believe it's a subsidiary of BEL. And just would like to know, like, what kind of competition we see from them in... Do they really compete with us? Because last year, they had a 100 odd crores revenue, which actually had come down from $1.80 crores from the previous year.
57:18 And they probably had got funding or grant from the Indian government to for the product development in last before a few years and also to set up facility. So maybe if you can give us perspective on the competition from the year end and maybe any other Indian company. That was my first question. So I think to address competition, so I address competition in two ways. Right? One is competition within India and the competition internationally from any Indian competitor. Right? So the competition internationally from an Indian competitor doesn't exist because no other Indian competitor, you know, sells these countries or sells these kind of systems right now to these countries that we sell to. Right? Competition within India, yes, we do have... So we... I... And, you know, we have competition across different lines of business and different competitors in, you know, the the the area of business which constitutes most to our revenue, which is our tactical systems. Our competition typically is Bharat Electronics, Tata, Alpha, type of companies. Now the fundamental difference between Bharat Electronics, I mean, any of them and us is that in in in... When you look at the complete value chain of, you know, thermal weapon sites, right, we are one of the few people who own the intellectual property across the maximum part of that value chain. Right? So in in a sense that whether whether it is the optical designs, whether it is sensor electronics, whether it is video processing electronics, whether it is fire control electronics,
58:48 we own the intellectual property, right, as opposed to some of the others who partner with other people and because of their partnerships and what they buy from others, they are... You know, either their price points are higher or their ability to configure to a very dense spec is very low. Right? So in that sense, we think we are better placed. Now, I mean, I I said that, we... And, you know, the comp... Competition will exist. I mean, like, it's not that we're gonna win 100% of the programs that we have here. Historically, when you look at tactical systems, there are about 30,000 tactical thermal weapon sites which have been deployed in the country today, out of which 20,000 have come from us. Right? So more more than 65% of market share in terms of thermal weapon sites. The programs which are coming in India needs to grow from whatever 30,000 thermal weapon sites to maybe 300,000 weapon sites. Right? So what we have to expect is that there will be competition.
59:40 Maybe we'll not be 65%, maybe we'll be 50%, maybe we might be 50%, but we'll have a fairly large percentage compared to... And and and historically, that's what we have done. Now when it comes to platform systems, the kind of platforms that we make right now, right, which is the gimbals, the, you know, remote control weapon station sites, other people in the country don't pay. For instance, Bharat Electronics is also a customer of us. Bharat Electronics has got BellOp, which makes optronics. But the electro optic system, which goes on to the remote control weapon station for the Ajun mark one a tank, they... Is Tonbo's and not a BellOp system. So even though they do have some subsystems, they don't have the kind of portfolio that we have across tactical and platform. So it puts us in a better position compared to our existing Indian competitors. In the directed energy weapon, we don't have any competitors in India.
1:00:32 Sure. Thank you so much. And on on this thermal insights, like, what Ankit mentioned that there is a 80,000 units opportunity. So just want to know, like, ideally, it's like... Are these products under serial production, like, approve... Like, approval, and then it also goes through the the p and l procurement of the defense, or it is under capital procurement? Just want to know, like, how is it planned over a period of time that so much needs to be produced in a particular year and delivered? Just want to get a question. Ankit, do you want to answer that? Yes, I'll take that. So two parts of your question, right, that whether we are geared up to supply such volumes.
1:01:17 I think that's fairly straightforward. We've been supplying very large volumes over many years now. And we are one of the largest manufacturers of thermal imaging sites in the country. So we are not very concerned and also how our model of production is manufacturing is very much, you know, like Sorry. Sorry, Ankit. What I was trying to understand is that usually, a defense process have a three year plan... Forward plan, and maybe a lot of this procurement would be qualified under serial production or, say, this year, next year. So Oh, okay. Is it already under that category, or how how should we understand? Yeah. So So see, what's happening right now is that a lot of thermal weapon side procurements are happening under OCPP.
1:02:08 I'm not sure if you're aware of the OCPP head, which is other than capital procurement procedures, where commands have powers to upgrade existing platforms. And a lot of weapon upgrade programs which are going on, there is in fact a very large list of programs that was released by SIDM a few months back, capturing most of the approved SIDM approved OCTP procurement. And OCTP is not multiyear. It is the timeline is not more than twelve months from the time they envisage the procurement to delivery. And so there is a large number of large volume of sites, which are going to get secured And under this then there is capital. Capital will take time.
1:02:54 Capital is still to kick in. We are still dealing with some RFIs right now with Infantry, and we are expecting RFPs to come out soon, but that can take a year, year and a half for the trial, the testing procedure itself to complete. So that is where your second point is valid that it may take time and it may be delivered also over a few years, but OCT1s are very fast. So so this 80,000 is under o c c... OCTP, or how is it? It's both. It's mix of both. Okay. And last question on the r and d. Like, we have a strategy of put... Limiting to the p and l as well as capitalizing some amount. And I believe what you had explained earlier in the IPO time was that, like, directed energy system till you probably see revenues flowing in, you would not capitalize. Just want to know, like, what is the number for current year and how much is going to be, you know, both on p and l and on the capitalization, sir. Okay. So, Shiva, I'll talk about the numbers. I'll give you a context in terms of how to think about capitalization.
1:03:59 Right? Capitalization is not when revenue starts to flow in. When there is visibility of revenue, which means that the blue sky research part of the technology development is complete, and you know that there is a customer intent put in either in terms of LOIs or you know that, yes, you know, there... The uncertainty technology risk has been derisked. Right? Engineering risk of product development risk is the one which is there. That's the time when you start capitalizing. So historically, what we have done, like, for instance, directed energy weapons, development of technology which goes into, let's say, the, which is the RF source, that gets expensed because that is still Blue Sky Research, which we are experimenting. But product development taking the Tlystron and making it into a product, which is the HPM source, that will get capitalized because you know that there's a customer intent. The 11 units which are there both from India both from India and from Europe. Right? So the capitalization, I mean, and and and and and it goes back to Indian accounting policies that if if if it is Blue Sky Research, we cannot capitalize it. We need to expense it. So, Shivam, maybe you can just give color on the numbers that we intend to do for this year and next year.
1:05:10 Yeah. So let's break up into into two. Right? One is the the research that we do for tactical platform and the other is the research that goes into the high power microwave system. Think in the first half of the year, there's a spend that we had on R and D with order of magnitude about INR 16 crores, of which about INR 3 crores or so went into P and L and the rest of it was capitalized. I would expect the same kind of trend to be there for H2 as well. So the total R and D spend that we would have order of magnitude will be about INR 30 crores, of which the capitalized amount would be about INR 25 crores or so.
1:05:58 This is on the R and D excluding HPM. As far as HPM is concerned, the total project cost is about 160 crores or so, where the hard cost, which is the cost of materials that would need to be procured is about INR 120. The rest of it is soft cost, which will include the interest during construction. It will include the pre operating costs like testing and so forth. It will also include the salaries of the people that we will have on our roles. That order of magnitude over the next two and a half years will be about 20 crores. The employee expenses capitalized for the HPM project will be about 20 crores, and that's a subset of the $1.60.
1:06:46 Okay. And this product, what you develop would be eventually sold. Right? So what you will be... So when you say r and d, you incur of $1.60 crores. So it is... Basically, you will be the building that particular product, and it will get sold. How how should it it reflect? Yeah. So what... Yeah. So the product that we built by itself can be sold. But what can likely happen is that once we have a product, we may be using it for demonstrations and stuff like that. So the first unit that we produce may not get sold. It may just get accepted by the customer and we will produce a few more units of that kind. Answering your question, the entire INR 160 crores is not a debit to the P and L in the sense it is not a cash burn. Some portion of the INR 160 crores is represented by a hard asset, like a multi beam klystron or a pulse concentrator or or an antenna or whatever else.
1:07:48 Okay. Okay. Fair point, sir. Thank you so much, and all the best. You. That was the last question for today. I now hand the conference over to mister Arvind Lakshmi Kumar, sir, for closing comments. Thank you. Thank you, everyone, and those were insightful questions. I appreciate you taking the time understanding our business. You know, we, you know, we... You know, this this is our first call post our listing. So, hopefully, we answered all your questions, and you have a good grasp of what you set out to build. Thank you, everyone. Thank you. On behalf of Tonbo Imaging India Limited, that concludes this conference. Thank you for joining us, and you may now disconnect your lines.
Follow Tonbo Imaging India Limited into a list and get an email when it puts out news.