Replay available
J.Kumar Infraprojects (NSE:JKIL) Q2 2027 Earnings Call
J.Kumar Infraprojects (NSE:JKIL) Q2 2027 earnings call, held 2026-11-16. Watch the replay and read the transcript on 6ix.

- Company
- J.Kumar Infraprojects Limited (NSE:JKIL)
- Period
- Q2 2027 earnings call
- Date
- Mon, Nov 16, 2026, 7:40 AM ET
- Replay
- Watch the replay on this page · 46 min
- Results news release
- press release for the Un-Audited Standalone and Consolidated Financial Results · Fri, Nov 13, 2026
On 6ix: 6ix.com/event/jkumar-infraprojects-limited-jkil-q2-2027-earnings-call
Replay
Transcript
Automated transcript · Written by software from the replay's audio. It can mishear names and figures; the replay is the record.
0:00 Ladies and gentlemen, good day, and welcome to the J. Kumar Infra Projects Limited Q2 and H1 FY 'twenty seven Earnings Conference Call. Before we begin, a brief disclaimer. The presentation which J.Kumar Infraprojects has uploaded on the stock exchange and their website, including the discussions during this call, contain or may contain certain forward looking statements concerning JKumar Infraprojects, business prospects and profitability, which are subject to several risks and uncertainties, and the actual results could materially differ from those in such forward looking statements. As a reminder, all participant lines will be in the listen only mode, and there will be an opportunity for you to ask questions after the presentation concludes.
0:56 Then zero on your touch tone phone. Please note that this conference is being recorded. I now hand the conference over to mister Kamal Gupta, MD, JKumar Infraprojects Limited. Thank you, and over to you, sir. Good afternoon, everyone. On behalf of J. Kumar Infraprojects Limited, I warmly welcome you all to our Q2 and H1 FY twenty seven earnings conference call. Joining me today are Nalim Gupta, Managing Director and our Investor Relations Partner, Ryazan Capital. I trust you have all had the opportunity to review our earnings presentation and press release available on the stock exchanges and our corporate website. We are pleased to report a strong Q1 Q2 FY twenty twenty seven performance, reflecting our execution excellence, operational efficiency and focus on profitable growth.
1:52 Our performance was supported by sustained project execution, disciplined cost management and strong operational momentum across key projects. We also maintained a net cash position of INR69 crores, underscoring the strength of our balance sheet and providing the flexibility to pursue future growth opportunities. We continue to see encouraging opportunities across our core infrastructure segment supported by a strong order book, healthy order pipeline and robust execution capabilities. These factors provide us with strong revenue visibility and confidence in our growth outlook. Looking ahead, we remain focused on accelerating execution, enhancing operational efficiency and delivering sustainable value creation. Backed by our strong financial position, healthy order book and dedicated team, we believe FY twenty twenty seven will be an important year in our growth journey.
2:42 Coming to the performance highlights of Q2 FY twenty twenty seven, revenue from operations for Q2 FY twenty twenty seven has increased by 15% to INR $15.39 crores. Operating margin for Q2 FY 'twenty seven has increased by 18% to INR $2.29 crores. The EBITDA margin for Q2 improved at 14.9% as compared to 14.5% of the preceding year. Back for q two, FY twenty seven has improved by 25% to 113 crores. The order book position as of September 30 okay, coming to the H1 FY twenty seven, the revenue for operations for H1 FY twenty seven increased by 8% to INR 3,050 crores.
3:31 The EBITDA for H1 FY twenty seven has increased by 8% to $4.43 crores. And the PAT for H1 has increased by 9% to $2.21 crores. Net debt as on September 30 stands at negative 69 crores. The working capital days for H1 twenty seven stood at one hundred days as compared to ninety nine days for FY '26. Our order book as on 09/30/2026 stands at 22,711 crores. The order book includes metro projects contributing 7%, elevated corridors contributing 47%, road tunnels contributing to 19%, others contributing to 26%. We shall now begin the question and answer. Thank you. We will now begin with the question and answer session.
4:29 Participants are requested to use handsets while asking a question. Ladies and gentlemen, we will wait for a moment while the question queue assembles. The first question comes from the line of Varun Agrawal, an individual investor. Please go ahead. Hi, sir. Thank you for taking my question. I wanted to begin with asking the general state of the InfraMarket, actually. Are you seeing the bidding activity? How are you seeing the bidding activity? And how is the competition now versus any appropriate? Well, so, Arun, I would say the competition level is quite competitive, I would say, as of now. I wouldn't deny to it. And but looking at because there were some in the last two years that had been limited order inflows that we could see. But as of now, there have been lot of good orders that are there in the pipeline.
5:28 And more than around INR 50,000 to INR 100,000 worth of projects are planned only in Maharashtra alone. So it's like we are seeing a lot of traction in the order book that's going to be seen over the period of next ten to twelve months. And should the competition as the order keeps coming in, the order... The competition level would also loosen with... Loosen up is my feeling. So as of now, there is lot of orders that we are expecting in the current pipeline. Also, if you see, Varun, like, you know, MRT as a ministry has made the conditions now more stringent. So, like, you know, if you see, like, the prequalification conditions, the network conditions have been been made more stringent now. So, you know, they have realized because if they want to maintain the quality and all, they had some quality issues in some of their projects.
6:25 So they are making the PQ conditions more tighter. So looking to that, like, you know, the the competition will be lesser in some of the niche projects. So we are also exploring some of the hand projects where the competitions will be much lesser. Okay. I got it, sir. Can we get an update on the order book guideline? Like, you mentioned that in the last call, we are expecting like INR 8,000 crores to INR 10,000 crores for this financial year. So what kind of order book are we looking at additionally in the second half of this year? So as of now, the company has already backed orders of INR 5,540 crores as of H1, and we are quite confident that we should be able to bag orders close to around INR 8,000 to INR 10,000 crores in the coming H2.
7:14 So totaling to INR 8,000 crores to INR 10,000 crores is what I want to say. Okay, understood. And sir, any what is the status of the L1 of Delhi Metro? You mentioned that the order would get converted in Q1 and the Q2 is the last We have canceled the order. The it didn't get converted into order book because there is some change in the project that they are doing and because of which the project cost is also likely to go up. And in the ten to fifteen days' time, they should come up with a fresh tender. Understood. But it be only restricted to the number of bidders who had bidded for the job. So it will be limited tender for only those bidders.
8:03 Okay. Okay. Understood. And what is the current bid pipeline that we have, sir, in terms of, like... I wanted to understand in terms of the projects that we are bidding and the location of these projects. So we have already submitted bids worth around INR 3,000 crores, which are being submitted. And there are around INR 30,000 crores worth of projects, which we are expecting to bid in less than six months' time, which includes elevated corridors and elevated corridors, roads, fly was worth around INR 10,000 crores, metros would be around INR 15,000 crores and building works around INR 5,000. So altogether, like, 30,000 crores worth of project in the next six months' time. Got it. And can we get an update on the FY '28 top line guidance?
8:54 FY 'twenty seven top line? 'twenty eight. Yes. So we had given a guidance of having a growth of around 15% on the last year's top line. And currently also, if you see the Q2, we were able to achieve 15%. Though Q1 was not that great, we had a flattish top line. So currently, we stand at 8%. So with the H2 that we are seeing that it should ramp up, and we are quite confident that we should be able to achieve the 15% growth that we are that we are targeting. Okay. And can we get an update on the big ticket projects that we have, like Chennai and GMLR specifically? What is the execution timeline? So for GMLR, we are running...
9:42 I mean, as if you look at the original time period, which was five years for the project, And the project was... The land for the project was handed to... Over to us around two years later. But we have ramped up the progress, and we are able to, like see that with instead of two years delay, we should be able to complete it in less than one year before time. So but so around before end of twenty nine, we'll be able to complete. One tunnel has already gone around more than 300 meters inside, and the other TVM has also started drilling, and it has already entered the ground around eight meters. So both the machines have been functional. One is running in the normal course, and second is doing the initial drilling.
10:37 Unfortunately, we have almost completed 70, 75% of the foundation work, and we've casted... Recast segments of around 2,900 number. We're expected to complete it by December 28 or January 29. The work is going in Okay. Fine. Okay. Thank you, sir. Those are my questions. Thank you. The next question comes from the line of with Dollar Capital. Please go ahead. Hi, sir. Couple of questions. Sir, when... Now we are seeing the 15% growth for this year.
11:26 So that means the... It would be the q three also we should be seeing a significant. So, ideally, we should be seeing a a significant growth on a y o y because the base was low. So just a simple thing is this quarter, we have done fifteen thirty six odd crores. So the q three logically should be a $100,150 crores higher than the q two in terms of the revenue. So that's the logical way to to look at it. Yes, Sharma. So what you're saying is right because q three q four has to be better than the previous year and and more than 15% of the growth, then only we'll be able to achieve that 15. So we are on that target only, and we are hopeful to achieve that. Okay.
12:13 No. So last year, obviously, the base was low 1,300. I'm trying to understand on a sequential. So this quarter was $15.36 crore. So this quarter, third quarter, should logically be a $100,150 crore of q q improvement that way one can look at? Yes, sir. It will be higher than that. Like, you know, of course. And if you want exact numbers, my financial team will pass you. Doesn't matter. Yeah? No. No. No. No. I I was directionally just trying to understand that we will be seeing the sequential growth. That's the You're you're you're right. You're right, sir. Okay. Okay. Got it. And then for for next year, the the... What we have previously said, the 15%, so kind of a 7,500 or kind of a revenue for FY '28, so that our guidance remains intact.
13:03 Yeah. So we are now targeting, like, know, for 10,000 total revenue by FY thirty. So which will be, like, 15% growth. Yeah. Okay. Got it. Got it. And and and you you have already mentioned in terms of the margins, this year will remain the same, and then we will keep on seeing the improvement to 15, 16% in maybe next month or this quarter, Shivan. Yes. Yes. Definitely. Definitely, sir. Sir, just a couple of things on the one is on the depreciation front. So for us, our TBM has started. But for this quarter, actually, we have seen a INR 4 pi crore lower depreciation versus 1Q. So just trying to understand from third quarter, how one can look at the depreciation for us?
13:57 From third quarter, the depreciation is going to be higher than what is in the q h one. Since the TBM is launched in the recently at the Diwali festival time, so the depreciation on the TBM will be start from this quarter onwards. So it will be on a higher side from coming Yeah. Definitely. But yeah, but the the... Will the range of this quarter was a 47 odd crores? So will it be a kind of a $60.62 crore, or it could be a a a incremental even fourth quarter will be even further high? But it will be near about $50.52 crores something like think the exact details if you want the nitty gritty of depreciation, you can contact the financial team and they can do it offline. Okay. Okay. Got it. Got it. That we have already guided is the number.
14:47 Okay. Got it. And I just have... On on the mobilization advance, retention money, and unbilled revenue as on September, sir. Yeah. So what do you want? The balance figure of of mobilization advance? Yeah. Yeah. Yes, sir. Mobilization, retention, and unbilled revenue as on September. So the current mobilization advance balance as of today is around 627 crores. Unbilled is $5.02 crores and security deposit is around $4.90 gurus. Sir, can you repeat? I was not able to hear. The unbilled amount is $55.72 crores. Mob advance balance as of date is $6.27 crores.
15:35 And security deposit is $4.90 crores. $4.90 odd crores. Okay. Okay. And the CapEx, 80 crores that we have done and for full year, $1.50 odd crores. Previously, we said this year next year, so that will remain broadly the same. Yeah. It will be broadly the same. You're right. Sure. Okay. Yeah. And and, sir, one one project or any any any kind of update there? Yeah. So that one project we already mobilized... Started mobilizing and, like, you know, like, the work for service has already started there, the excavation, the ground clearing. The survey has been done. So the work is taking shape now there. Like... So it should... There should not be an issue in.
16:26 So we'll start the revenues from, like, you know, this January... December January from there. Okay. And, sir, order info, you said you are looking at 5,500 crore we are already there. Another 8,000 to 10,000 crore in second half or thousand crore is another 3,000 to 5,000 crore order book additional for h two is what we are planning. So taking the entire order book to 8 to 10,000 crores for current financial year. Okay. Okay. Okay. Okay. Got it. Got it, sir. Thank you, and all the best, sir. Thank you. The next question comes from the line of with Family Office. Please go ahead. Hi, sir. I think so the previous participant just answered this, but little further on this, the FY $3,010,000 crore revenue target. So by that, an improving margin.
17:26 So do you think we can probably cause a 20% threshold on the EBIT margins for when we achieve that target? And can you, like, give us, like, a a a kind of a breakup of what kind of projects will this be? So currently, I think so, like, between the metro and the road, will it be a road heavy or a metro heavy kind of execution pipeline we'll be looking at? And my second question is with regards to the projects which are getting completed in the current f five. So any any medium marquee project which will be completing by this... With... By this year, and then probably we'll have to look for some bigger projects going forward in the next year. Yes, JKumar. So if you see, JKumar is always focused on profitable growth. Alright?
18:13 So first of all, if you see our order book, which is 22,700 as of now, so we are, like, you know... We are not, like, thirsty for orders. You know? So we don't put project at any rate. We are quoting project at our margins. So going forward also, like, you know, at FY '30 when we are looking for a 10,000 crores of revenue, we are looking for an operating margin. Like, right now, we are at 14 to 15%. So we are trying to take it 100 basis points up in the range of 15 to 16%. And we are confident of achieving this in another one or two years. So of course, margins will be very important to us. And about the projects will be which will be completed this year will be... Yes.
18:59 One... This year means, like, I'm talking about March 27. Sorry. Yeah. '27. In the year calendar '27. One is your connectivity from Worli to New Airport. So that means the Worli Shibri connector will be done. Then from Shibri to Nabi Mumbai Airport, that will be completed. So these two projects will be for sure done in this calendar year FY '27. Also, the metro line 2B that we are that we are executing, that also will be completed up from Avery till Bandra, Rafi Junction. So that metro line 2B, which is currently running from Meera Road to Avery, will be connected till Bandra on the Link Road and SV Road.
19:46 So these are the projects that we are seeing, which we'll see completion in this fiscal year. And of course, as far as the marquee projects, JKumar only takes up projects which are of prestigious nature and, you know, technically complex jobs. So that's how we are doing this, you know, Lagoon Bridge, which is, again, a complex cable stay bridge over the... In Malad area in Mumbai, which is a 1,600 crore project with a more... By long height of more than 125 meter with 800 tons of cable stay that's involved in it. So, again, we are doing coastal road from Gurigao to Malart. We are doing GMLR projects. So we are doing Anand Nagar, Sake, Chennai Elevated Corridor. So we take up projects which are complex in nature, so they are all marquee projects.
20:42 So... And there are many more such projects which I wouldn't like to share the details as of now, but there are some good projects that are coming up. Is one of them to get an idea of... For you where it is, again, a coastal road elevate... Elevated road extension ahead of. So there are a lot of projects which are there in pipeline, and we are qualifying for it. So we'll be looking at it. Okay, sir. And, sir, just a small thing. I just wanted to know that is there any execution problem because of, like, a very severe drought, like, situation in Maharashtra wherein usage of water and everything is probably restricted for certain projects, or is that is that is not the case with us? That is absolutely not the case.
21:28 All the resources and things are in place, and the works are going on smooth. And that's how you can instead of what I say, I think you can look at the result of Q2, which speaks better, where we were able to achieve a 15% growth. And again, Q3 and Q4, we expect to do much better from Q2. So I don't know. This information, I don't find it to be really true. It's not affecting the work. Sure. Thank you very much, sir, and all the best for the coming quarter. Thank you, Dominik. The next question comes from the line of Varun Agrawal, an individual investor. Please go ahead. Hi, sir. Just a quick follow-up. I wanted to understand, like, a lot of contractors are facing delays in payments from the government in various states.
22:15 So are we facing any such issue in any any of our projects? Varun, like, you know, our company is very, very conservative while selecting the geography, while selecting the project, and also while selecting the client. So by God's grace, we don't see any issues in collecting the payment. All of our payments are coming on time. So if you see our data, our working capital cycle has also, like, you know, it's well within hundred hundred days, which is very good as compared to all the peers. So we don't see foresee any payment issues with any of Varun, if you look at the top... The details that we have shown as of September 30, which is around 1,500 crores, already more... Around 900 crores worth of payment has already been received as of today when we speak. So that... You can clearly understand. It's only 600 crores worth of payment, which is pending as of September 30. So the collection is reasonably good.
23:16 That's good to hear, sir. That's it from my side. Thank you, and best of luck for the second half. Thank you, Varun. The next question comes from the line of Shravan Shah with Dollar Capital. Go ahead. Hi, sir. Sir, just, sir, two, three things. One is for you, I mentioned that you have collected in the product plus, which is a good on the data front. So in terms of the working capital core inventory data payable, so whatever the current days that we have, we will be seeing further improvement or this kind of our 100 is manageable? So one hundred to one hundred twenty days is what we have always said. And if you look at it, today, we are standing at hundred hundred days. So we should be there within the same band only. So it shouldn't be changing anything drastically.
24:11 Okay. And and for the from one twenty to 100 now. Sorry, sir. I I didn't listen. I said we have already improved our age from hundred twenty two hundred, and we should be remaining around the same bandwidth more or less. That's the require... That's the cycle time, basically. Okay. Got it. And and the gross rate is also less than 800 odd cover, which we were looking at. So this kind of a gross rate, we will be managing, or can we see a further some some reduction is is possible? So if you see, we are at point two three, the equity, and, like, you know, so we'll be around this only, point two three, point two four. So this One the increase in the top line and the booking of new orders, we are able to still able to maintain this.
25:01 And at net level, we are cash positive. I think it's a very good scenario, and hardly you will find any infra companies with such financial discipline. So we will continue to make them. True. True. True. And, sir, that Visa monetization, one eighty or that... So it will be by this quarter q three, we will be able to do it? Yep. I said the monetization is going well. Like, you know, we're just waiting for one approval from the local government about some layout approvals. So a lot of deals are already finalized. So we have received good money in this quarter. And, like, you know, going forward in this coming two quarters, I think the... Will be much above the targeted projections.
25:48 Okay. Okay. And, initially, you mentioned that we are also looking at the hand project. So going forward, sir, because till now, we were only in the EPC. So that is also the thing that one now we are looking at? Or or... And if yes, then anything specific in terms of the equity commitment that initially we will look for $2,300 crore kind of equity commitment? So if you see, as I told you before, the government and the ministry, MRTH, has tightened up the conditions, you know, about your... What to say, this... Network network, about your PQ condition. So, you know, the small contractors won't be able to bid for bigger projects. Okay? So we will be only concentrating on the projects where, you know, it is our niche area, expertise area, and where the competition is left.
26:40 So, you know, we are exploring projects of hand which are really lucrative or where we find the numbers to be decent. There we may explore, but surely not BOT. But, yes, I'm being almost Like a default payment. C. So it's a default payment, and there we will try to explore some of the opportunities if we get. But our primary focus remains as EPC. But... And and in the HAM also, only the the the NHA HAM or or it could be even NHA additional more? Okay. Okay. Mainly, NHA only. But there are... In terms of the equity commitment, do we have any any broad thought process that we will only initially take one project, maybe a 100,200,300, so kind of on that. Yeah. It is too. Depending on the type of project and, like, nature of project, but, you know, the opportunity what we get in that project.
27:34 It is on a case to case basis, so I don't think it's And I think we have sufficient leverage, so there's not an issue with us for this. Okay. Okay. Okay. Got it, sir. Thank you, and all the best. Thank you. The next question comes from the line of Hemant Kanungo with. Please go ahead. Yeah. Thanks for the opportunity, sir. I just want to know looking into that is going on the market and with the likes of other calling the same as, like, you know, if you are not audible properly, please? Can you hear me now, sir? Yes, much better. Please. Yes. So I just want to ask that looking at the current competition intensity in the market and with the likes of Adani coming in the sector through Chemtro and with our standard of margin, like 15% to 16%.
28:23 And if we want to grow like 10% to 15% every year, so how are we planning to take this forward, considering we'll have to maintain a continuous order intake inflow? So are we like planning to get into more complex projects or any other way? Like how we have to maintain the continuous order intake? So firstly, Hemant, your point that Adani is coming into the infrastructure. So Adani Enterprises, they are basically focusing mainly on DOT projects. They are not coming in EPC projects at all. So mainly, you will see them coming into BOT projects or HAM for that matter, but not EPC. So and we are core EPC players. And there so it is I wouldn't say that it's a relevant point to us. And competition has always been there even if the company has been working for forty five years.
29:15 And I would say the competition intensity keeps on increasing and decreasing to some extent, but it has always been there. So it is nothing new or something that we need to worry about as to whether we'll be able to do it. If you talk of metro segments, if you talk of large diameter tunnels, if you talk of elevated corridors with complex nature, there always you will be finding five to six bits on an average. So it's not that things have changed anything dramatically. It's more or less the same. The intensity keeps on increasing of the desperation depending upon the number of opportunities available in the market. So it's a very momentary thing and nothing to worry. Okay. Okay. Well noted, sir. And secondly, sir, in the month of April, there was some exchange... There was some order put up with exchange regarding some SIOs... SFIO related matter.
30:11 So is that resolved or what... Or, like, any update on that, It is the old matter, which was earlier raised by SEBI and all the matters have been clarified. All the documents has been submitted long back. It was cleared by SEBI. And so similar replies what we are expecting from SFI also. It's a matter of procedure, and we are we are cooperating fully with the department, and there is nothing that we need to be worried about. Okay. Okay, sir. Got it, sir. Best of luck, sir. Thank you. Thank you. The next question comes from the line of Vipul Shah with Sumangal Investments.
30:56 Please go ahead. Hi. Congratulations for a decent set of numbers. So my question relates to media reports that China has restricted the export of TBM machines to India. So will this in any way affect working of our company or we have we have fully covered? So, mister Bipul, if you look at the tunnel boring machines, it was... This is a myth that all the... It was being supplied by the Chinese companies. If... As a percentage of... Or means, like, hundreds of TBM that's available in India, if you look at the Chinese contribution, it won't be more than 10%. It will be less than 10%. So basically, what was happening was that companies like HK, that is, Teratec, Robbins, these guys were supplying the heart of the TV and the major components pairs from different origins, European and US areas, sending it to China for assembly. So China was mainly the hub for assembly of this digital boring machine and making the shield, that's the outer body and the cutter head. So that was because it's a more of a fabrication job, and India and China are the cheapest place where you can assemble or fabric... Do this fabrication jobs.
32:19 So this base has been now shifted to other locations, and the TBM supply has been very regular. There has not only... There was a problem where people had already ordered, like, Fcons. They had ordered c two machine... For the c two project of high speed. They had placed an order with Hong Kong, with China, and the machine got stuck there. Even GMLR, we had ordered two machines. One was supplied in China and getting assembled... Was getting assembled there. So that took us little one month, two months, it got delayed. And the second second machine was already shipped to some other country, assembled, and the machine is already working with us. So machine supply for TBM is absolutely no issue. And HK, that is, already opened a huge facility in Chennai, and they are manufacturing the TBMs and sending on a regular basis. So this is absolutely no problem for India as such. Forget J.Kumar.
33:17 Okay. And secondly, sir, any plan to enter marine segments? Because we we generally don't bid for marine projects. So any reason for that? We are already doing some projects in water, if you see, mister Bipul. Okay. The Chennai project, what we are doing 25 kilometer out of that, like, last... Apart from the last five... 20 kilometer is in Poham River. So we are doing work related to that. The coastal road, what we are doing of Mumbai is again in marine. So we are doing water projects. Even if the right opportunity with the right numbers, we can do it. It's absolutely not, and we are doing. So it's not an issue that we are not interested. We already taken up marine project. Mumbai. Is again a sea bridge that we have made, a river bridge.
34:06 We have already made... We are making coastal road at Mumbai as well. We are doing the riverfront development jobs. So marine jobs, we have been there. But, yes, earlier, the marine jobs were not so much in big... Of bigger ticket size, and that's how we are not focused as such. And there are some specific prequalification requirements also that are there. So now as we can see some bigger ticket size, we are trying to explore that vertical as well, and we'll be surely looking at it. There is no reason that we wouldn't look at. So we have all the technical capabilities to bid for all marine projects. Right, sir? Yes. Yes. Yes. For doing the coastal roads, you need to make it a tap that is temporary excess bridges that we are already making at all of our coastal roads and other projects.
34:57 So it's the similar technology to which we have to do these jobs. So doing this work is not a problem. It depends upon the ticket size, geography, and other... What... Means geometries that's attached to the job. So we'll be surely looking at those ventures as well. Okay, sir. Thank you very much, and all the best. Thank you,. The next question comes from the line of Pritesh with Tata Investments. Please go ahead. Congratulations on a great set of numbers. I have couple of questions. First is on the tunnel boarding machines. If I see quarter on quarter, considering the execution for Metro has been done to a great extent, the order book from Metro, both elevated and underground, and specifically underground is only three to 4%.
35:53 But... And I I understand we have seven tunnel boring machines. So just wanted to understand how many tunnel boring machines are currently in use and in terms of metro underground order booking. Where do we see the potential? So the JKumar, we have seven tunnel boring machines for metro, out of which four machines are in execution right now at Delhi. And there are some lot of tenders of underground metro like Delhi has come up with three underground metro projects currently, which are in the pipeline and we are support... We are about to bid for those projects. Again, Bombay has come up with one underground project at Metro Line 5 in Kane area, Bivandi.
36:41 So and again, there are some jobs in Pune. So jobs are continuously coming up in as I had said earlier also that now there is lot of visibility on it. And currently, from the last five years, all our tunnel boring machines were active. Now with the completion of Surat and the Delhi job that we are about to complete for tunneling, the machines will be free. And again, with with some maybe gap of six months or twelve months, again, it will be redeployed. Any which ways, once we get a project, we have to re... After we complete a project, we have to refurbish these machines. So there would be some billing period we would require for that. So... And these machines, all they have done, like, two to three projects every machine has completed.
37:26 So we already have an upper hand to bid for these jobs. That's great. My second question is on the net debt. You mentioned in your opening remarks that you are cash positive in terms of 69 crores of net cash positive position. My question is how much is the FD, which is you know, free FD to to ask for? And why don't we use it to reduce debt? Because, you know, this is impacting your ROE, ROCE. I mean, be obviously 100 growth. So we need to try and need to check the free FD also. Right? So we've checked that. FDs are basically required for giving margin money, which is a compulsion.
38:13 Every project that we back, 10% is the performance guarantee that we are supposed to give. If we take mobilization advance, 110% of the 10%, that is another 11%, we have to give bank guarantees. And for those bank guarantees, it is mandatory that we need to give cash deposits, which we get converted into the FDRs. Again, after the completion of the project also till the different liability period is there, the performance guarantees are blocked. So that's how you are seeing this big amount of FDRs, and it has to be maintained. We don't have that choice. Specific question was how much is the free FDR? I understand for non fund deal limits, you will require those FDR. But, you know, we always keep a little bit as spare money because we have to continuously keep bidding for new projects also. And now with the increasing ticket size, as a financial discipline in the organization, we always keep some free FDR there so that we don't have to worry about the margin money to be given for bidding these projects.
39:14 So we keep those... It's also as a backup, as a collateral you are having as a security. So we don't touch that amount unless very much required. And even if you look at the debt, it is just point two three and which is working capital requirement that's required for the ongoing projects, which we keep paying off from the respective projects. Sure. That's it from my side. Thank you, and all the best for next quarter. The next question comes from the line of Varun Agrawal, an individual investor. Please go ahead. Sir, do we have an update on the pledge that we have with our banker? I think it would be very good if we can have it released because it could allow more institutional participation.
40:01 This this pledge is done with the very initial stage for the company when we have taken our working capital limit with the main Bank of India and all. So this was pledged against the... This thing. Working capital requirements of our... And, like, bank Fund limits that were required, fund and non bank fund limits. So we don't have any other. So that was as a use... Even as a collateral, and bank will give us But still, we have already sent a request to them. But, you know, it's the process. But we have already give... Sent a request to them six months back that you should return this pledge because the date amounts are... Have been reduced substantially.
40:50 But a good point and we are working on it, sir. Right. So it would be really helpful for the the price actually and the company as well. And just one small request, sir. In the earnings presentation, if we can update the color scheme of the pie charts, it would be helpful to... It would make it easier to read. Into the color scheme of the pie chart. I'll be redoing for sure from the coming then. We're with Thank you. We'll give it next time. The next question comes from the line of Raj Shah with Insight Advisors.
41:36 Go ahead. Good afternoon, sir. So just first, a clarification point, if you can help me with the breakup of fund based and non fund based limits, please? Yes. One second. Fund based and all. We have utilized around 70% of the fund and non fund based limit as of now. Yeah. And if you need the breakup So total sanction is 6,230... 6,290, and utilized is 4,400. And out of that, this thing, non fund base is 5,000 out of 6,200, and Mhmm. Utilize is, like, you know, 3,500.
42:25 And non fund base? This is non fund base. Yeah. And fund base is, like, you know, but is 800 plus four seventy term loan also. So, like, in a utilize this, like, fund base 42% of seven eighty and a 100% of term loan. 42% of $807.80? Yeah. And the balance 400 odd was It's a term loan. We take out his equipment. Understood. Like, the TV and other equipment. So that is, like, paid in some three year, four year, five year. Right? Since. Yeah. Correct. Look, broadly across all the intricacies, you've heard a commentary about labor shortage for integration of work and all. Just wanted to check this 15% growth will be considering any challenges in terms of labor problems, or this is like you've not come across any specific labor issues across a project, and this is a rational growth which would have come to a project?
43:26 As rightly pointed out by you, labor shortage is there. It's not that it's not there. So because there's so many works at a simultaneously been going on, so there are some labor shortages. No problem. We are like, know, in this quarter also what we have done, we had seen some issues, but we can manage because, you know, JKumar, we focus more and more to see where the labor requirement goes down by, like, you know, mechanizing the work and, like, using more of automatization, more of equipment. So where the requirement of labor is, they do that compared to other projects. So other challenges there and, like, you know, being... JKumar also being a good paymaster, I think, like, you know, we attract labor, so it should not be issue. So this 15% is a normalized Labor shortage is what I would like to say.
44:13 Sorry, sir. I missed you on the last call. Labor issue, sir. No alarming situation of labor shortage is what we are trying to say. And as Kumarji has also mentioned, we are trying to going for more and more of forecasting methods and mechanized methods, wherein the requirement also we are trying to... The whole... As a requirement basis, we are trying to reduce it. Got it. And, sir, given the current run rate... I'm sorry if I would have missed that in the earlier question. Given the current run rate, how do you see that you're closing in terms of revenues specifically? We have given a top top line growth of 15%, which we are confident that we should be able to achieve. So around 6,500 for FY twenty seven. 7. Got it. Thank you. That's all from my end, sir. Thank you so much. Thank you, Raj.
45:02 Ladies and gentlemen, that was the last question for today. I would now like to hand the conference over to Mr. Kamal Gupta for the closing remarks. Yeah. As we look ahead, we remain confident in our growth prospects supported by a strong order book, healthy balance sheet and our unwavering focus on exhibition excellence and profitable growth. We are excited about the opportunities before us and remain committed to creating sustainable long term value for all our stakeholders. Before we conclude, on behalf of the entire team, would like to extend our warm wishes to all of you and your family for the festive season. May this season bring happiness, prosperity, good health and success. Thank you once again for your participation and support. We look forward to interacting with you again next quarter. Thank you.
45:47 Thank you, sir. Ladies and gentlemen, on behalf of JKumar Infraprojects Limited, that concludes this conference call. Thank you for joining us, and you may now disconnect your lines.
Follow J.Kumar Infraprojects Limited into a list and get an email when it puts out news.
Latest news releases
- NSE:JKIL — press release for the Un-Audited Standalone and Consolidated Financial Results · Fri, Nov 13, 2026
- NSE:JKIL — J. Kumar Infraprojects Limited Press Release Aug 06 2026 · Thu, Aug 6, 2026