Replay available

Hut 8 (NASDAQ:HUT) Q4 2021 Earnings Call

Hut 8 (NASDAQ:HUT) Q4 2021 earnings call, held 2022-03-17. Watch the replay and read the transcript on 6ix.

Thu, March 17, 2022 at 10:00 AMendedReplay
Hut 8 (NASDAQ:HUT) Q4 2021 Earnings Call
Company
Hut 8 Corp. (NASDAQ:HUT)
Period
Q4 2021 earnings call
Date
Thu, Mar 17, 2022, 10:00 AM ET
Replay
Watch the replay on this page · 30 min
Results news release
Hut 8 Reports Operating and Financial Results for 2021 · Thu, Mar 17, 2022

On 6ix: 6ix.com/event/hut-8-corp-hut-q4-2021-earnings-call

Replay

Transcript

Automated transcript · Written by software from the replay's audio. It can mishear names and figures; the replay is the record.

0:00 Good morning, ladies and gentlemen, and welcome to the fourth quarter HUT 8 2021 earnings call. My name is Brandon, and I'll be your operator for today. At this time, all participants are in a listen-only mode. Later, we will conduct a question and answer session during which you may dial SR1 if you have a question. Please note this conference is being recorded. I will now turn it over to Shane Downey, and Shane, you may begin.

0:23 Thank you. Good morning, ladies and gentlemen, and welcome to the 2021. Annual Earnings Call for HUD-8 Mining Corp. I'm joined this morning by Jamie Leverton, CEO of HUD-8. It was a transformative year for the business, becoming the first Canadian miner to list its common shares on the NASDAQ, surpassing 2x a hash and hash rate, and well in excess of 5,000 Bitcoin held in reserve at the end of 2021.

0:56 We'll run through some short disclaimer language and then jump into a summary of our annual results. I'll then turn things over to Jamie, and we'll open it up to Q&A. In addition to the press release issued earlier today, you can find our financial statements, MD&A, and annual information form on CDAR, and shortly on both EDGAR and our website at HUD8Mining.com. Unless noted otherwise, all amounts referred to are denominated in Canadian dollars. I'd like to remind you that comments made during this call may include forward-lifting and Mark Eidelman. These statements are current expectations and as such are subject to a variety of risks and uncertainties that could cause actual results to differ materially from current expectations.

1:43 These risks and uncertainties include but are not limited to the factors discussed in the company's annual information forum for the year ended December 31, 2021. Overall, we are pleased with the strong operating results for 2021, with the improvements in Bitcoin mining economics and our strategic capital investments, including the acquisition of the data center business from TerraGo, but it remains well-positioned for continued growth. Along with record-breaking financial performance, we had a tremendous year in the capital markets, being the first Canadian digital asset miner to list on the NASDAQ and also the first blockchain company to be added to the S&P TSX index here in Canada.

2:29 We also strengthened our relationship with MicroBP with the purchase of nearly 32,000 bus miners, substantially increasing our hash rate to an excessive 2x hash. We also demonstrated flexibility in our approach to capital structuring, entering into US $30 million equipment financing with Trinity Capital. This non-dilutive capital with limited collateral support has provided valuable flexibility as we continue to pursue our growth strategy. We achieved record revenue of 173.8 million for the year, with sequential revenue increases in each quarter over the prior year . This performance was driven by strong mining activity, increased hash rate throughout the year, and Bitcoin price. Our 2021 revenue was more than triple 2020's revenue of $40.7 million. We achieved revenue of $165.4 million from mining activities as we mined 2,786 new Bitcoin at an average of approximately $59,400 per Bitcoin.

3:31 This compares with 2,798 Bitcoin at an average of approximately $13,900 in the prior year. Our hosting line of business generated $8.4 million of revenue, compared to $1.7 million in the prior year. Hosting benefited from onboarding a second customer in late May of this year, whereas the prior year reflected the initial launch of our first hosting customer. Cost of revenue for the year was $85 million, compared to $59.29 million in the prior year. This increase is the result of higher site operating costs, mostly electricity, and an increase in depreciation expense. The increased depreciation expense was driven by the addition of over $85 million of new mining equipment over the past 12 months, partially offset by the revised estimated useful life of the company's infrastructure assets from four to 10 years, which was made in Q2 of this year.

4:34 Site operating costs increased due to HUD's continued expansion, specifically the addition of miners to our fleet. I note that in absolute terms, site operating costs were depressed in the prior year when due to poor Bitcoin mining economics, the company ran much of our mining fleet in eco mode so as to reduce power consumption. General and administrative costs were $40.3 million compared to $5.1 million in the prior year. After excluding non-cash share-based compensation expense of $9.9 million, one-time transaction costs of $3 million, and non-operational sales tax expense of $10.7 million. G&A expense was $16.7 million compared to 2.9 in the prior year period. This increase stems from the strategic investment into building a larger and deeper pool of executives and managers, professional fees associated with various capital markets initiatives, and the new management team's commitment to best corporate practices, as well as higher insurance and investor relations costs.

5:41 Sales tax expense relates to amounts we expect ultimately to be refunded by Canadian tax authorities but have been fully provided against due to collection uncertainty. The $10.7 million quantum is larger in 2021 due to sales tax import duties associated with our mining equipment purchases. We currently have Bitcoin lending arrangements with Genesis and Galaxy. We earned $2.9 million of income in 2021 from our Bitcoin lending arrangements, which are reported in finance income. These lending arrangements currently earn an annual return ranging from 2% to 2.25% and allow the company to generate additional fiat cash flow while supporting our HODL strategy.

6:27 We recorded a net loss of $72.7 million for 2021 compared to a net income of $19 million in 2020. This net loss is driven by non-operational IFRS-driven accounting treatment as opposed to the company's operating performance, which achieved a record gross profit of $88.8 million compared to a gross loss of $18.5 million in 2020. The prior year net income was driven by the combination of a $13.7 million revaluation of digital assets to the P&L, a $13.2 million impairment reversal, and a $15 million deferred income tax recovery. 2021 earnings, meanwhile, were impacted by a $114.2 million unrealized loss on revaluation of warrant liability, as well as a $5.6 million deferred tax expense.

7:22 With respect to the warrant liability, which, to be clear, is a new classification as of 2021 year-end, We assessed the classification of our issued warrants and determined that certain warrants, which were issued in our January 2021 and June 2021 capital raise transactions, met the definition of financial liabilities under IAS 32. As a financial liability, we first present these instruments in the liability section rather than the equity section of our balance sheet, and second, measure these warrants at fair value at each reporting period while flowing the unrealized market-to-market gain or loss through the PML. As of December 31st, 2021, the fair value of the warrant liability was $99 million.

8:08 We also recorded a cumulative unrealized revaluation of loss in respect of warrant liability of $114.2 million in 2021, which was driven ultimately by the increase in the company's share price. The deferred tax expense of $5.6 million was due to higher taxable net income, which excludes the impact of the loss on revaluation of loan liability. Finally, given the movement in the price of Bitcoin over the year, we recorded a $57.9 million unrealized gain on digital assets, all of which went through OCI on an after-tax basis. Taken together, this results in other comprehensive loss of $14.9 million for 2021. Driven by the strong operating performance, HUD-8 achieved adjusted EBITDA of $96.6 million for 2021 compared to negative adjusted EBITDA of $0.2 million in 2020.

9:08 I'll now turn to Q4 results and provide some additional commentary. Fourth quarter results for 2021 also reflect many of the themes and achievements I just touched on for our annual performance. We achieved record quarterly revenue of $57.9 million compared to $13 million in the prior year's quarter. Our increased hash rate and BTC price resulted in $55.1 million of digital asset mining revenue, while our hosting business contributed $2.4 million. Cost of revenue was $27.3 million versus $14 million in the prior year's quarter, with the increase driven by power consumption consistent with our increased number of ASICs deployed Average power rates as well as higher depreciation expense as a result of the expansion of our mining fleet.

9:57 The cost of mining each Bitcoin for Q4 2021, excluding depreciation expense, was approximately $22,800 compared with approximately $20,200 in the prior year quarter, with a slight increase primarily due to increased Bitcoin network difficulty as well as average power prices in Alberta. And I want to bring emphasis to the fact that our cost to mine figures are fully loaded costs, inclusive of electricity, T&D, and associated fees, as well as personnel, network monitoring, and equipment repair. General and administrative expenses were $14.1 million for the fourth quarter versus $1.6 million in the prior year period. After excluding non-cash share-based compensation expense of $2.5 million, one-time transaction costs of $2 million, and non-operational sales tax expense of $4.9 million, G&A expense was $4.6 million versus $1 million in the prior year.

11:01 The higher general and administrative costs for the quarter reflect the same factors previously discussed in our annual results. namely the investment in building out our management team, investor relations function, and professional fees associated with corporate best practices. We reported a net loss for the fourth quarter of $111.2 million compared to net income of $27.3 million in the prior year's quarter. The net loss was again a result of our strong operating performance being more than offset by the previously discussed $114.2 million unrealized loss on revaluation of warrant liability, which was recorded entirely in Q4. Our strong operating performance is reflected in our fourth quarter adjusted EBITDA of $35.3 million versus $1.6 million in the prior year's quarter.

11:54 Our balance sheet remains healthy. We raised approximately $413 million across three equity issuances in 2021. The proceeds from these issuances were and will continue to be invested in the growth of the company through the acquisition of mining equipment, development of our third mining site in North Bay, Ontario, as well as the acquisition of Terriga's data center business. We also continue to evaluate non-diluted measures to enhance liquidity, including securing a US $30 million equipment financing arrangement with Trinity Capital at the end of 2021. Our Bitcoin holdings are marked at fair value and totaled $323.9 million as of December 31, 2021. This balance consisted of 3,518 Bitcoin held in custody and 2,000 Bitcoin held subject to lending arrangements with Genesis and Galaxy. We continue to emphasize our long-term huddle strategy and do not sell any Bitcoin during the quarter.

12:52 With that, I will turn the call over to Jamie, who will speak in more detail to our recent acquisition of Terriga's data center and cloud business. And from there, we'll move across to Q&A. Jamie?

13:06 Thank you so much, Shane, and good morning, everybody. 2021 was a tremendous year for HUD-8, and I'm incredibly proud to see our vision of transforming from a $100 million market cap company into a billion-dollar Global Leader in Digital Asset Mining and Infrastructure Innovation. I'd like to recognize the entire HUD-8 team and our board of directors for their hard work and leadership to get HUD-8 to where we are today. In 2021, we embarked on our diversification strategy and began to do things differently. From diversifying our fleet and beginning to mine Ethereum, to being the first Canadian digital asset mining company listed on the NASDAQ, and being the first digital asset miner to be named to the TSX S&P index. From upgrading our infrastructure by ordering nearly 32,000 top of the line miners and becoming a certified repair center for MicroBT, to leveraging our team's experience as data infrastructure specialists to, and most importantly, seize upon a crucial acquisition opportunity that will bring HUD-8 to the forefront of infrastructure innovation, at the intersection between blockchain and Web 3.0. It's been a year of growth shaped by our relentless dedication to innovate and our vision of building a company capable of providing the infrastructure to support the ecosystem working in rapidly growing blockchain environments and the nascent Web 3.0 space.

14:32 Now that we've laid the crucial building blocks, we are laser focused on realizing continued execution, scale, and growth. With over 6,000 Bitcoin on our balance sheet, we will continue to strengthen our position as market leaders, hodlers, and digital asset miners. As we've said, we're not just miners. We are business building technologists. Through innovation, imagination, and dedication, we are helping to shape the digital asset revolution to create value, a platform for the future of applications built on the internet, and helping to power the fourth industrial revolution. With our acquisition of TerraGo's data centers and cloud business, we welcomed more than 400 enterprise customers to the HUD-8 family. We also gained 36,000 square feet of geo-diverse data center space and cloud capacity, powered by emission-free energy sources.

15:25 This acquisition is giving us the white space to revolutionize these conventional assets and create the industry's first hybrid data center model that provides both traditional high-performance computing and creates the infrastructure to capitalize on the nascent digital asset computing, blockchain gaming and web 3.0 industries. Our fleet of data centers now provides tier zero facilities traditionally used for our digital asset mining all the way to two geodiverse tier three data centers located in Mississauga and Kelowna as part of our new TerraGo Acquisition, and the HUD-8 High Performance Computing Division. Location is key, and we're so excited to now have eight locations across the map in Canada, with our mining sites in Drumheller and Medicine Hat, our third site, rapidly completing construction in North Bay, and our new data centers in Kelowna, two in Vancouver, Vaughan, and Mississauga, Ontario.

16:31 We are thrilled to be one of Canada's fastest growing technology companies. And with that, I will turn it back to the operator and we'll open it up for Q&A. Thank you, Jamie. We'll now begin the question and answer session. If you have a question, please dial star 1 on your phone keypad. If you'd like to be removed from the queue, please dial the pound sign on the hash key. There may be a delay before each question is announced. If you're on a speakerphone, please pick up your handset first before dialing. Once again, if you have a question, please dial Star 1 on your phone keypad. And we're standing by for just a moment.

17:09 Thanks, Brandon. From Canaccord Genuity, we have Joseph Zafi.

17:19 Please go ahead. Good morning, Joe. Hi, thanks for taking the question. So first, can you remind us what your mining production plan is for the rest of the year and any additional color you can offer on the operational side of the business?

17:55 I'm happy to take that. As we've communicated, we have our third site rapidly completing construction in North Bay. We actually have racking being installed at that location this week and expect to power it up within the next four to eight weeks, which will bring the first 35 megawatts online, which will be approximately just over one exahash of incremental compute will come on when we power up that North Bay facility and then we are continuing to work towards a six exahash goal over the balance of the year as we look at the opportunities available in the supply chain for new mining equipment over the next few months as well.

18:53 Great, thanks for that. Following up on the TerraGo acquisition, you are now operating a truly diversified business here. What's your vision for that piece of the business as we look out one to two years? And can we expect to see more M&A along those lines?

19:15 Look, we've been transparent that we'll continue to drive growth through organic and inorganic means. We have proven ourselves to be patient with our balance sheet and opportunistic when it comes to deploying capital, and that's something that you'll continue to see from us. So I can't speak to anything specific because we do evaluate on a case-by-case basis, and again, we're really looking to make sure that when we deploy capital, it's into the right assets at the right point in time.

19:49 Great. Thanks for the questions.

19:53 No problem. Thank you. From Craig Hellam, we have George Sutton online. Please go ahead.

20:00 Good morning, George. Oh, it's actually Adam on for George. Hi, Jamie.

20:05 Good morning, Adam. Could you give us an update about your thinking about capital allocation now that you've acquired the data center assets, specifically between mining, hosting, and the DC business?

20:21 The capital requirements of the different businesses are fundamentally different. I'm not sure a better way to say it. Mining compute is obviously very capital intensive. The There's a lot more power dedicated to the mining side of our business, whereas the data centers that have come in through the TerraGo acquisition are more traditional enterprise-style data centers. The capital required is fundamentally different. The power is obviously quite a bit less, but it's a different motion as far as the white space, the infrastructure involved in those facilities. So we will continue to look at how we deploy capital based on where we see the market opportunity, the demand coming in from customers and from the ecosystem as we continue to build out some of our new product thinking.

21:24 Great. And to make that a little more simpler – Any updated thinking on how you look at hosting versus proprietary mining?

21:36 We are, don't quote me on the numbers, we're probably 94% prop mining today at our mining sites. And really the focus is shifting to hosting and Collocation and Cloud Managed Services as really in the TerraGo data center. So the focus will be using the TerraGo data centers for that non-digital asset mining revenue and focusing our traditional mining sites will be predominantly prop mining. Great. And then one final question for me.

22:22 There's a modest tick up in cost per coin quarter over quarter. Curious to know if you have any insight on with the third site coming online with lower power costs, do you expect material changes in cost per coin over the next year?

22:39 Well, that requires taking a view on the overall global network hash rate and difficulty. And that's the challenging part, difficulty and Hashrate have moved up quite quickly over the last few months and that's really the primary impact that's difficult to predict and everybody kind of needs to run their own models on where they think Hashrate and Difficulty are going in the short and medium term. Okay, great, thanks. No problem. And once again, if you do have a question, please dial star 1 on your phone keypad. And from D.A. Davidson, we have Chris Renter. Please go ahead.

23:18 It's actually Chris. Hi, guys. How are you doing?

23:19 Good morning, Chris.

23:21 Good morning. Thanks for taking my questions. I just want to follow up on that last question. I understand that, obviously, hash rate and the network have a big impact on your cost per coin. But I do think that the North Bay facility, our understanding, at least previously, we could potentially see a pretty significant improvement in cost. you know, absent like a big change in network, can we get sub 20,000 here, you know, potentially once North Bay is fully operational?

23:51 We potentially could, but again, it really depends how everything moves across the different variables that go into those, to the cost and the Bitcoin mining economics globally.

24:04 That's a very good answer. Definitely not, can't say for sure. Okay, let's go to the other side of the of the coin. How about the minor deliveries to get to six? You said, I think we have 10,000 still coming. So do you still need to close that gap? But I've heard that pricing has gotten a little better for new deliveries. Can we just talk about your strategy there as you get to ramp to six extra hash?

24:28 Yeah, so we're very consistent as far as pricing. How we look to deploy capital into hardware, and you're absolutely right. The pricing that we had been seeing the last few months was we thought out of sync with where the economics were. From an IRR perspective, we expected the price per terahash to come down, particularly as we see new entrants moving into the ASIC manufacturing space. and we are starting to see some of that softening now and actually better delivery lead times as well. So a softening in price and better delivery times. So we are, we're constantly evaluating what's going on in the marketplace and we'll continue to do so and be opportunistic accordingly.

25:26 Okay. Maybe it could be for Shane as well. The strategy of lending out Bitcoin rather than borrowing against it, just given the pretty dramatic change we've had in the capital markets appetite for Bitcoin miners and things don't improve or the stock price doesn't go higher, is lending it out better than borrowing against it?

25:52 Well, I can start and then have Shane chime in. We have borrowed against it in the past when capital markets were constrained and mining economics weren't as good in order to preserve our Bitcoin balance, but access capital, we have used our Bitcoin to do that in the past. We currently don't have Bitcoin encumbered. We are... using the yield relationships instead. But again, it's a decision that we make based on what's available in the market. And we're certainly not against it. It's a tool we've used in the past. Shane, I don't know if you have anything to add there.

26:33 Yeah, not a lot to add. I would say it's certainly something even like today with sort of more or less a moment's notice almost or a day's notice, we could go ahead and execute on that borrowing against Bitcoin. So, yeah, it's definitely something in the toolkit. And we've, to date, like Jamie said, sort of very intentionally in the last year, anyway, very intentionally not pursued that path.

26:59 Okay. I'll ask one last one because I can't resist. Ethereum mining, how much does that contribute in the most recent, like, I guess it's still doing a very good job, like 15%, 20% of your Bitcoin mine is actually Ethereum. but that could change. Any update on what happens if that does change and we go to ETH 2.0?

27:22 So our answer remains the same. We really don't have a timeline for that move for Ethereum to go proof of stake. It's obviously been talked about for many years. If and when that happens, we would move our compute to the next most profitable blockchain to mine using our GPUs and I think currently that is Ethereum Classic, but I haven't checked it in a while. Okay, my dog said to wrap it up.

27:51 Thank you.

27:52 Great. No further questions at the moment. We'll just pause for a moment in case. Once again, it is Star 1 if you have a question over the phone.

28:04 Thanks, Brandon. and we have David Shapiro online. Please go ahead.

28:16 Yes, Jamie. I was just curious to what extent you've looked at immersion cooling to drive down your electricity costs.

28:25 Yeah, we've looked at immersion. There is some interesting new tech happening in the space as the space matures and it's something our head of technology, Jason Zalewski, pays very close attention to. We have the benefit of being in cold climates in our mining sites. Drumheller, Medicine Hat, and North Bay all take advantage of significant free air cooling, which means we're not requiring CapEx or incremental OpEx to cool the equipment. We let Mother Nature up here in Canada do that for us. So for us, it's a bit of a different conversation, and the ROI calculations that we run are different. That said, the space is maturing, and we're paying close attention, and when it makes sense for us, we'll look at it.

29:15 But again, we let Mother Nature do the work, and she doesn't charge us for it.

29:24 Thank you.

29:26 My pleasure. All right, Dan, looks like no further questions at the moment.

29:33 Okay, then... We wish everybody a very happy St. Patrick's Day. Thank you all for joining and your continued support. Thank you, ladies and gentlemen. This concludes today's conference. Thank you for joining. You may now disconnect.

Follow Hut 8 Corp. into a list and get an email when it puts out news.

Latest news releases

Companies on this call

Speakers

Jamie Leverton

Chief Executive Officer

Joseph Vafi

Analyst, Canaccord Genuity

David Shapiro

Analyst

Shane Downey

Chief Financial Officer

Chris Brendler

Analyst, D.A. Davidson

More from Hut 8 Corp.