Bharath Nagaraj
Analyst, Cantor Fitzgerald
Replay available
Gorilla Technology Group (NASDAQ:GRRR) Q3 2026 earnings call, held 2026-11-20. Watch the replay and read the transcript on 6ix.

On 6ix: 6ix.com/event/gorilla-technology-group-inc-grrr-q3-2026-earnings-call
Automated transcript · Written by software from the replay's audio. It can mishear names and figures; the replay is the record.
0:00 For standing by, this is the conference operator. Welcome to the Guerrilla Technology Group Inc., NASDAQ GRRR, 3rd Quarter 2026 Financial Results Conference Call. As a reminder, all participants are in a listen-only mode and the conference is being recorded. After the presentation, there will be an opportunity to ask questions. To join the question queue, you may press star then 1 on your telephone keypad. Should you need assistance during the conference from an operator, you may signal by pressing star 0. Before we begin, we will read the forward-looking statement. Today's call includes forward-looking statements made pursuant to the safe harbor provisions of the Private Securities Litigation Reform Act of 1995. These statements reflect management's current expectations and projections about future events and are subject to known and unknown risks and uncertainties that could cause actual results to differ materially.
0:53 Forward-looking statements often include terms such as expects, believes, plans, anticipates, May, should, and similar expressions. For a discussion of important factors that could affect GORILLA's results, please refer to our filings with the FCC, including the most recent annual report on Form 20F. Except as required by law, GORILLA undertakes no obligation to update or revise any forward-looking statements made on this call, whether as a result of new information, future events, or otherwise. I would now like to turn the conference over to Jay Shandon, Chairman and Chief Executive Officer, and Bruce Bower, Chief Financial Officer. Please go ahead.
1:34 Thank you very much. Good afternoon, ladies and gentlemen, shareholders, analysts, and everyone joining us today. Thank you for being here. I want to begin today's discussion with something that seems to have rather been overlooked amid all the recent noise and excitement in the financial markets. Facts. Actual numbers, and heaven forbid, a little arithmetic. Now, we've had an extraordinary volatility, geopolitical uncertainty, semiconductor controversies, and enough speculation to keep the financial press entertained until Christmas. Now, and somewhere in the middle of all that excitement, a rather important development seems to be receiving insufficient attention. Now, Gorilla Technology has just delivered the largest revenue quarter in its history.
2:21 Not a projection, not a memorandum of understanding, not just another beautifully illustrated PowerPoint presentation. And I want to explain what we have achieved, why it matters, and why I believe we're still in the early stages of building a much, much, much larger business. Let's begin with the numbers. In Q3 of 2025, Gorilla generated roughly around $26.5 million in revenue. In Q1 of this year, we delivered about $28.2 million. In Q2, we delivered roughly around 50.1 million. And now in Q3, we've delivered a record of 69.5 million. That is 163% growth year-on-year and almost 39% sequentially. Now, we exceeded the operating of our own quarterly planning range by a little over $19.5 million. Now, let me repeat that. We expected up to about $50,000,000 and delivered nearly $70,000,000.
3:15 I appreciate the market has many great things to worry about, but surely 163% revenue growth definitely deserves at least a brief interruption to the national anxiety. Now, for the whole of 2025, Gorilla generated roughly around $101.4 million. Our minimum revenue outlook for 2026 is about $200 million. That would represent almost doubling the entire revenue. Our target for 2027 remains 450 to 500 million. Now, those are ambitious numbers. They require execution, and it's certainly not just guarantees. But I want to encourage investors to examine the progression of the business rather than merely movement of the share price in any particular afternoon or a week or a month.
4:04 The share price tells you what the market thinks today. Our financial statements tell you what the business is actually delivering and has delivered. and sometimes, ladies and gentlemen, those two stories appear to be reading from entirely different books. One of the more curious things I've observed is the tendency to analyze Gorilla as though we were established last Tuesday to rent out a few NVIDIA GPUs. I want to correct and let me correct that misunderstanding. Gorilla has an established business delivering security intelligence, network intelligence, AI analytics, systems integration, critical technology infrastructures. The majority of our current revenue continues to come from these broader technology and infrastructure operations. GPU as a service remains a relatively small contributor today. Egypt still remains an important customer.
4:56 We continue to deliver against our contractual commitments, and importantly, most importantly, we are collecting cash. Since the end of September, we have received approximately over $22 million from Egypt, with further collections of $15 to $17 million being pursued right now. In Taiwan, we recently secured another significant multi-year national intelligence contract valued in tens of millions of dollars with deployment scheduled across the coming quarters. Our established technology operations continue across other markets as well. Now, these businesses have not mysteriously disappeared simply because the market has discovered a new acronym, GPU, as a service. Indeed, they form an important foundation for the next stage of Guerrilla.
5:41 But our strategy is simply not to own the GPUs. It is to combine computing infrastructure with software, security, data intelligence, and all the associated services. A GPU provides computing power. But what do you do with all that power is where the broader opportunity becomes very interesting. Gorilla intends to participate in both, and that's why we're building that infrastructure program. Now, let me address the rather large elephant in the data country. Everyone wants GPUs, everyone wants recurring revenues, and apparently everyone expects the entire process to happen before the next earnings call. Unfortunately, to me, the laws of physics remain stubbornly resistant to financial models. You cannot order 5,000 GPUs on a Monday morning and expect a fully operational AI cloud by Friday. The equipment must be manufactured, shipped, installed, powered, Cooled, Networked, Integrated, and Tested.
6:41 Customers then complete their acceptance and begin utilizing the capacity. Only then can development recurring revenue economics develop. Now, for example, at Yota, we have already delivered 512 B200 servers. Yes, delivered. And 128 schedules to complete our plan, 640 servers, Phase 1 deployment, representing 5,120 GPUs. We're also advancing on the much larger V300 programs, and that schedule is to be complete by the end of December. Now, I want to emphasize something. A server delivered is not necessarily a server commissioned. A server commissioned is not necessarily a server accepted. And a server accepted is definitely not automatically generating cash at full utilization.
7:31 There is an entire commercial and operational lifecycle between those stages. And, you know, interestingly, an AI chip may generate a poem in three seconds. Sadly, it cannot commission its own data center in three seconds. So, we are progressing through these stages systematically. As the infrastructure enters service and the customer workloads increase, we expect recurring compute revenue to become a more meaningful part of our business. And that is precisely how we intend to reduce the lumpiness of our revenue over time. Now, I know the analysts would want to discuss gross margins with us, quite rightly so. Our gross margin in Q3-25 was at 37.3, this quarter it was 4.8. But let us examine the sequential performance.
8:18 In Q2 of 2026, we had a negative gross margin of 4.2%, with a loss of about 2.1 million. In Q3, we generated roughly 8.9 million in gross profit, which is roughly an 11 million turnaround. and a recovery of 17 percentage points in a single quarter. And that we achieved while increasing the revenue by almost 39%. Hardware delivery and infrastructure mobilization carries different economics from recurring compute and manage services. Now, higher margins do not materialize simply because the equipment has been purchased. They depend on the commissioning, the utilization, the commercial pricing and efficient operations. Now, Bruce, has informed me that my optimism is still not an approving account in standard under the IFRS. Unfortunately, I've appealed twice.
9:07 Both these applications were rejected. So, yes, margins need to improve. They will improve further. But $11 million gross profit recovery in one quarter, I believe, is a meaningful step in the right direction. Our focus is making that improvement sustainable. Now, during Q3, Gorilla also deployed approximately $218 million of cash for property and equipment. Our total property and equipment asset base has now reached nearly $250 million at the end of September. And we also closed the quarter with a little over $56 million, $57 million of cash, while operating activities used about $30 million. Now, these are substantial figures, and we take our financial responsibilities seriously.
9:52 AI infrastructure is a very capital-intensive business, but let me be very, very clear. Capital expenditure is not automatically value creation. A data center for me, filled with expensive equipment, but without customers paying, is mainly very expensive lighting installation. So our responsibility is to ensure that our investments are commercially supported, properly financed, successfully commissioned, and capable of generating sustainable returns. Now, Let me also touch briefly on the receivables where we're making meaningful progress. At the end of September, our combined receivables and contract assets are approximately stood at $203 million. What's most importantly we need to analyze is we reduced our unbilled contract assets by over 50% from approximately $104 million plus dollars to $52 million as we progress through the project milestones and buildings.
10:50 and that progress is also translating into cash. We've already collected meaningful cash from a number of other customers. Egypt's already been paying us, like I mentioned, more than 22 and there are substantial customer collections expected. As we complete more contractual milestones, we expect to convert additional unbilled revenue into receivables and ultimately into cash. So for me, the direction is very clear. Accelerate billing, strengthen collections, steadily reduce outstanding balances and we're simply not generating revenue. We're increasingly focused on converting that revenue into cash. We're also progressing institutional and project financing arrangements to support our infrastructure development. The objective is not just to build a bigger gorilla.
11:37 It's also to build a bigger, financially stronger, ultimately hugely profitable gorilla. And I would be rather remiss if I know the excitement surrounding the semiconductor industry. Now, we've all seen extraordinary market volatility, policy developments, significant changes in regulatory environment for advanced computing. And this is something we take extremely seriously. Now, the U.S. Bureau of Industry and Security has announced additional controls affecting the advanced chip exports and certain remote access arrangements involving overseas data centers. These developments actually require careful assessments Our equipment, deployment locations, customers, and end users. For us, our position has always been straightforward.
12:22 Compliance must be designed into infrastructure from the beginning. And that's why we've been having export control teams for the last couple of years. We are strengthening our processes around customer verification, beneficial ownership, equipment traceability, things like export classification, licensing requirements, access controls, ongoing monitoring, and so on and so forth. That's been happening already. So this is nothing new for Gorilla. Our commercial model is intended to be very transparent, with identifiable customers, controlled infrastructure, and clear accountability. Now, we will also continue to access any and all authorizations required for relevant transactions. I have absolutely no intention of building a billion dollar infrastructure business, only to discover that somebody's forgot to check who is using the equipment.
13:15 We believe in strong governance, credible compliance, and become an important competitive advantage while dealing with institutional customers as well as financing partners. Unfortunately, we do not control the semiconductor manufacturers. We certainly do not control the financial markets. What we do control is how Gorilla responds, how we allocate capital, and how we all professionally execute. Where do we go from here? Our priorities... for the remainder of 2026 and into 2027 are straightforward. First, complete infrastructure deployments already underway and bring more capacity into productive service. Second, increase our customer utilization and develop the recurring revenue contribution from our AI compute business.
14:01 Number three, continue growing our established technology operations which remain a substantial part of Agorilla's revenue. improve our gross margins, operating performance, customer collection, cash generation. And finally, fifth, strengthen the governance, financial controls, regulatory disciplines, more importantly, to manage a considerably larger company. Our minimum revenue outlook for 2026 remains at $200 million. Our 2027 revenue target remains at $450 million to $500 million. We recognize the execution requirements and the risks that stand between us and those objectives. but consider what we've already achieved. Once again, please. We've increased our quarterly revenues by 163% 12 months. We have delivered 11 million plus sequential recovery in gross profits.
14:52 We have materially expanded our infrastructure asset base. Our established technology business continues to be delivering revenue and our GPU as a service business is still at a very, very early stage. I would suggest that that this is a rather interesting combination for a company with underlining progress the market occasionally seems to be overlooking. Now let me finish with something I feel very strongly about. I understand that the shareholders have been frustrated by the recent market performance. I personally share that frustration. But I refuse to confuse movements in the share price with the underlying operating achievements of this company. They are related over time. They are not identical on every trading day.
15:38 We have delivered extraordinary revenue growth. We are building significant infrastructure capacity and we continue to strengthen the organization. But that does not mean we are beyond criticism. We have margins to improve, capital to manage, equipment to commission, customers to collect from, and more importantly, profitability to demonstrate. We will be held accountable. We are accountable if it goes both ways for us. If the market wishes to challenge the performance, I welcome the scrutiny. but I will simply ask that the scrutiny begins with the facts rather than ends with the share funds. Our team has worked extraordinarily hard across multiple countries. I want to make sure I thank all of them, our customers, our partners, and our shareholders. And I should probably thank my family who also banned the word GPU, megawatt, data center from the dinner table.
16:27 I have been appealing that decision to all my prospects. Rather, they seem to be failing and my iPod application with Bruce has failed as well. So let's Thank you. And with that, let us turn to your questions. Thank you, sir. We will now begin the question and answer session. To join the question queue, you may press star 1 on your telephone keypad. If you are using a speakerphone, please pick up your handset before pressing any keys. To withdraw your question, please press star 1 again. We will pause for just a moment to assemble the queue. And your first question comes from Gary Mobley from StoneX.
17:14 Hi, guys. Thanks for taking my question and let me extend my congratulations on the strong execution, the strong quarter. Jay, I want to ask about something you didn't touch on in your prepared remarks but is recent in the news, you know, your news. and that is the proposed acquisition of U.S.-based data center assets. I think it was just a preliminary review when you issued the press release. Maybe you can give us an update on where the due diligence stands with that potential acquisition and any other details you can share.
17:53 Absolutely. Gary, once again, thank you. There are lots of implications with the latest regulatory changes. We're currently carefully reviewing the latest U.S. Bureau of Industry and Security Regulations. The implications for our international AI infrastructure program. Our share price has taken a dip. I'm not going to hide that. So, you know, fundraising has been a little difficult for other projects apart from the IOTA and the other important investments we're trying to make. Our current position is, as a precautionary measure, we are going to review all of the affected projects, and we will assess the regulatory landscape. But at the same time, we're also working very closely with our regulatory advisors to ensure that we are fully compliant with all of the U.S.
18:44 export controls. So, as and when our review is complete, we will communicate any material decisions through a formal announcement at that appropriate time. Does that make sense?
18:55 Thank you. How much of it is supported by what you have now in deployed PP&E, plant property and equipment, and your existing capital on hand, likely sources of capital, and anything else you can share there?
19:44 Bruce, do you want to take that? I'm sure you're reaching to go.
19:49 Yeah, sure. So thanks, Kerry, for the question. The first thing we'll touch on is, so Jay mentioned that we've received 512 servers or around 4,000 GPUs that we're setting up now. That is for the primary off-taker in Yota 1. That primary off-taker would account for a little over $5 million a month of revenue once billed. So I'll leave it to the commercial team to say when we start billing, but in the first quarter, for sure. And then the second 128 servers would bill about 1.5 million a month. So that's 6.6 million a month that we expect to be billing in the first quarter of 2027.
20:34 That is with the equipment that we either have received or we have the resources on hand to pay for. And then leading to the second part of your question, I mean, I'll touch first on the markets overall and then on our situation within them. So the markets overall have been, there's no secret, they've been, you know, a bit tumultuous in the past weeks. I would say, though, that the real chaos has been in the unsecured market for certain neoclouds. Everyone's talking about COVID unsecured, etc., The senior secured market, i.e. for project-level finance, has been a little volatile, but it's been more stable.
21:21 Where projects can demonstrate strong cash flow generation and then a comprehensive security package, they're still getting financed. If you look out in the market, there have been a few deals that have closed in the billions, internationally and in the U.S., that were senior secured project level financing with solid off-takers. We believe that we have in the YOTSA 2 projects a very solid set of off-takers anchored by one of the strongest balance sheets and operating performances around. We also are very confident in the structuring work that we've done. I know that everyone is so where we are with that is we are doing with a tier one investment bank a 1.7 billion dollar bond is I would expect to close within weeks and that is to refinance Yota 1 where you know we've already deployed the capital for it and then that would be to finalize the financing for Yota 2.
22:32 I would also add This is, of course, subject to market conditions and final documentation, but we are also working with an anchor investor who is a very well-known participant in this space. In order to get this to the finish line, it's involved numerous work streams, and they've been much more complicated and much more, I would say, stressful as a result of market conditions. Everyone wants to triple-check their work. Every two weeks, there's either market tumult or there's, you know, announcements from the export control authorities or something that makes it difficult. So, but it is very much on track, how we would characterize it. So, that $1.7 billion would deliver the financing for all of the Yota 2 projects. And the Yota 2 projects would, when deployed, would carry us to the guidance number.
23:29 Okay.
23:30 That's a very good call. I appreciate that.
23:31 You finally answered that. and more importantly, We're in, you know, the next few days. We are, not even a few days, a few days maybe, Matt. We are expected to receive another $130-plus million in relevant payment milestones from the customers as well. So, we are pushing forward, and whatever liquidity we get from our customer payments as well at the same time, We will continue to honor our contractual obligations to Yota and all the other projects as well.
24:35 Thank you, guys. Thank you. And the next question is from Brian Kinslager from Alliance Global Partners.
24:46 Hey, great. Thanks so much for taking my questions. Can you quantify how much CapEx, including GPU purchases, is remaining on both Yota 1 and Yota 2 separately? How long after project financing do you expect you can get Yoda 2 up and running? Sorry, those are my first two questions.
25:09 Okay. Bruce, do you want to take the first half? I'll take the second half.
25:13 Yes. So, basically, we have one installment payment left of $50 million on the 512 servers, and then we have for the 128 servers, we have to pay another $50 million. So, it's $100 million on Yoda 1. which we are comfortable we can cover primarily through the customer review payments. And then we go to two is $1.5 billion. And then, like I said, we're pursuing a bond program of 1.7. So that would comfortably cover not only the CapEx for GPUs and networking, but also any OpEx reserve or DSRA that we need to have. And indeed, it would be some refinancing where the money comes back from the project level to the parent company level. So that's the outlook for that.
26:00 And Jay, second part of the question over to you.
26:03 Absolutely. Brian, so the one important distinction is IOTA 1 is already fully, it's been shipped and currently being tested and will complete all of deployment by mid of December. In fact, we've already started seeing traction in terms of revenue last month, or this month, I apologize. and we will continue to gain revenues in the quarter this year. We will be at full capacity on Yota 1 by the January of next year. And in terms of Yota 2, which is the deployment of the B300, that's 20,736 NVIDIA B300 GPUs. The decision is that we're not starting from scratch. All of the broader deployment programs have already been completed.
26:49 All of the RFS for three floors out of the five is also complete. So we are going with F&C, whose partner has already started the production, and we will be deploying our first networking equipment over the course of the next 30 days. And all of the deliveries are scheduled, depending on, again, you know, the planes being available, are scheduled by the end of December. So the key point here is the transition of revenue, which you've asked for. Yota 1 will transition into full revenue by January next year. Yota 2, all of the deployments will be complete by mid-January to end January, and there will be a full deployment by February. Our priority is making sure that we deploy the GPUs as quickly as possible, so we have teams working around the clock, whether it's the SMC team, whether it's the Yota team, Gorilla is a large team in Mumbai and in Delhi, and at the same time, we've also got the NDIS team, which is the NVIDIA services team, also working.
27:49 working very closely to close everything by the end of this year.
27:54 Brian? But just a follow-up on year two. Until you have the financing, I would assume you can't buy the GPUs. So how long, what's the lead time right now? Once you get the financing, is it weeks? Is it a month or two? Just maybe, you know, take me through that if you don't mind. Then I have one last follow-up.
28:18 Again, Bruce, do you want to take the first half of the financing or take the little deposit?
28:23 We work closely with the suppliers, so it's not like, you know, we're in constant contact with them. So, we align the delivery schedule, the production schedule, the delivery schedules to the financing schedule. So, there won't be a gap of weeks. You know, with Kyoto One, it was pretty much, you know, we tell them when we expect to pay, they prepare the production, we pay, they ship. within a couple of days in some cases. So it should be very quick. That's why we're confident in the timelines that we gave for the financing and then also for the deliveries.
29:00 Great. My last question. Sorry, Jay, you do have something to add. I apologize.
29:06 Yeah, I did, Brian. Sorry. See, the financing is the catalyst for releasing and delivering the equipment, not starting the manufacturing process. Okay? Okay. SMC, obviously, being a partner, just, you know, having a free photo is not something we intend to do with SMC. With Charles, what we have done is we've actually paid them, for the lack of a better word, a shit ton of money. And they have already also got the advance payment. So they have actually started sending over some of the networking equipment for all the RFS that's required. SMC was there last week as well. We completed the RFS of the evaluation of the data centers. That's why it's there. There are three floors which are fully ready and two floors which will be fully fitted out by the end of this month. All the HVAC and cooling for the three floors are also now in place.
29:52 So what SMC has gone through is that they've started the manufacturing and it's well underway. And as and when we finish our testing, remember, we are going to take every single equipment that comes out, we test it. As we test it, we approve it as a final sign-off from Raj, who's our group CTO. Then we will pay the money and we will ship it out. And typically that, you know, the shipment, because we're sending it by planes, you know, charter planes, it usually takes only about 24 to 48 hours.
30:23 I hope that's super helpful. That's super helpful. My last question that I have, in terms of Neutra DC, you touched on the changing regulations that are being discussed. How do you think about this? Is it on the back burner right now until you can buy, you know, clearly Yoda 1 and 2 are your top priorities. So, just maybe take us through that, and is there anything that's changed on how you need approvals going forward in India? I assume not, but I just want to double check if anything's changed in terms of the scrutiny or process.
31:03 That's a great question. So, I apologize if I'm going to be a little diplomatic here. The current position is that we have taken a precautionary measure. We haven't stopped, we haven't disqualified, or we haven't put anything on hold, but all we're saying is we're taking, you know, full commercial commitment for the affected projects, mostly new to D.C., for example. We're working very, very closely with our legal and regulatory advisors. We've hired a couple in the U.S., and we're making sure that we will not rush into any commitments until we have absolute clarity. Now obviously the DIS has published a 132-page document which still is not very clear. So we wanna make sure that we don't want to end up into any sort of issues.
31:50 So, and Brian, one thing which you will also recognize is that we already have a very significant export controls team as well, which we've already been using. So this particular DIS rule does not affect any of the YOTA implementation. But it may have some implications on the neutral DC. But again, we will absolutely make sure that we are committed to building all of these AI infrastructure opportunities. But I want to make sure that the BIS compliance is completely clear to us. And at that point of time, I would rather come back to you and communicate and let you know where we stand with that. Today, it's still... I would say business as usual, but it's a precautionary measure.
32:36 Great. Super helpful. Thank you, Jay. Thank you, Bruce.
32:40 Thank you, Brian. And Siddharth Shabalan from B-Rally Securities has the next question.
32:48 Thank you very much, operator. Greetings, everyone. I do have a question on potential repayment of October convertible payments. Thank you very much. Thank you very much. as the note allows at 5% premium just to limit the dilution. If you're just curious about your thoughts on this, thank you very much.
33:38 Bruce?
33:41 Yes. So, just to be clear how the instrument works. So, we drew down 25 million. We have to repay the face value which is 27.75 million. If we don't repay the face value, then the holder of the note has the ability to convert over time into shares. There is also the ability for us to, as a one-time thing, when the registration statement for the note goes effective, we can repay the note's face value plus 5% and avoid the conversion of the note. That is our base case for what we do with the note is we, upon effectiveness, we will be able to pay it off. Jay mentioned that we are in line imminently for up to $130 million of prepayments from our customers.
34:32 That will form the liquidity buffer that we use to pay this note off. As a second step, if that is either not available to us or for whatever reason we decide not to use it, then the project financing, which we've put in $330 million into the Yota projects already, So we'll be able to take some of that back when the project financing clears and that can be applied to repay this note. And then last but not least, if market conditions are horrendous and for whatever reason we are not able, the note holder does not have the ability to convert it all at once. They can only convert 6 million a month. So we have several months before it's fully kind of converted into shares. So we thought on the balance that this was actually a very good outcome for shareholders.
35:29 Maybe the headlines might be scary, but actually when you look at how the instrument works, it's fair for us and for the note holder. The one thing I'd also add is that if we do need equity, this facility provides for up to $100 million overall. So rather than having to go to market in uncertain times and wonder where we'll get the money and all what terms and stuff, this is already lined up. and then we can draw on it several times and then do the same type of repayment, you know, at a small premium. So, our philosophy is always, you know, to be overly cautious rather than, you know, sort of hoping that all works out. I hope that answers your question.
36:13 Can I add something to that as well please?
36:15 Yeah.
36:16 One of the things I know, you know, this has generated considerable market attention. I don't know why. Because the arranged bridge financing is not a preferred permanent capital structure. I think the market needs to understand that. The sneaker reaction has kind of frustrated all of us. So we received initial funding. And our intention, Bruce and I have made this very clear, is to repay the outstanding obligation in cash over the next four to five weeks. Okay? As the customer receives from available funds. Now, we are collecting cash at a very rapid pace. And this is from all our customer prepayments, our customer postpayments, any dues. We've managed to collect everything. I think what the market is failing to understand is they need to look at the balance of cash on the books and say, look, these guys have the capability to pay.
37:04 So, we will make sure that all of our contracts or repayment conditions are satisfying. and more importantly, our aim is to pursue a resolution that minimizes further debt equity valuation. So, we will make sure that we will absolutely collect money from all our customers and have this repaid. That's kind of where Bruce and I are working towards. It frustrates me, to be honest, that the market doesn't seem to understand that at all and there's this massive need of reaction about, oh, valuation and so on and so forth. Over to you.
37:38 Thank you very much. That's super helpful. And my follow-up on the U.S. data center and tenant there. Where does the acquisition stand now against the end of November closing target? And is the planned project financing also expected to fund the initial GPU deployment there? And how far along are discussions with a tenant for that capacity? Thank you.
38:09 That's a really good question. So, we remain very interested in establishing our first AI infrastructure in the United States. Now, we've been progressing on the discussion with the facility owners, our potential commercial partners, and so on and so forth. But the challenge we have, and this is me being very honest and open here, okay, the share price has caused a lot of commotion for us because we're not able to raise capital effectively and efficiently. We are going for the motions. We have put in the offer, and we have taken an extension, by the way. I don't think so we'll be able to close by November. Our share price is in the dumps right now, and unfortunately, I have to make sure that the company is not overcommitting and overburdening itself. So we will make a decision based on how our share price improves over the next few weeks, but right now, there's an extension up until the end of December.
39:00 and we will make a decision. If the share price doesn't move, then we will have to take a radical decision whether we actually go ahead with the transaction or not. But we are hoping that the share price will continue to improve because we'll continue to deliver. The intention for us is to basically secure the infrastructure, the GPU deployments and so on and so forth. And we are already in conversations with a couple of off-takers who are willing to take the entire process Six megawatts going up to 36 megawatts straight away. I hope that answers your question.
39:35 Thank you. Thank you very much for your call, Jay and Bruce. Thank you.
39:41 One thing to add, Fyodor, is that the project financing that we're talking about is only for Iota, so 1.7 billion. So this is... There is financing discussions we've had separate to that, but... I don't want to give everyone here like a play-by-play on every single financing discussion we've had for every project that we've announced and haven't announced, right? We want to keep it, you know, to the high-level points that matter and that are potentially market moving. You know, we're not here to share kind of my daily log of calls with banks.
40:19 I appreciate it, Ricardo. Thank you very much for your perspective and best of luck. Thank you. The next question is from Mike Lattimore from Northland Capital Markets.
40:31 Great, thank you. Congrats on the strong growth of the quarter. I guess on the YOTA programs one and two, do you still see the same EBITDA margin targets there as, you know, you did last, you know, kind of a couple months ago?
40:51 Yes. Yes, absolutely, would be the quick answer. Yes. Yes.
40:59 And what about in India, on the India projects? What kind of tax rate do you think you will have there?
41:09 We've been working with... What was that again? Just the tax rate in India.
41:17 You and Bruce were taking it off, sir?
41:23 Yeah, so we've been working with tax advisors in India and in Singapore. So Singapore is where the assets are actually held in the Singapore SPD. It's the first choice of the financing counterparties. So that's why we chose that. And there have been a couple of announcements that have come out recently. Like in the last 10 days about different tax treatment for GPUs, especially for financing GPUs that is where there's a blend of onshore and offshore capital. So I wouldn't want to give a definitive answer at the moment. I think that, you know, the overall group tax rate is sort of around 20%. And I would direct you that it would be around the group tax rate.
42:10 But, you know, hopefully we can deliver an answer that is optimized and improves
42:18 on that. So, let me add to that as well. So, Mike, the typical tax rates in India for domestic companies are roughly around 20, between 20 and 22%, okay? But there are concessions. There's what is called the concessional regime. Don't quote me on this. I think it's section 115 or 116. I can't remember it. But it's typically, you know, you'll end up between 22% and 25%. Now, with the new GPU structures, there are two ways you can do this. You create what is called an SEZ structure, or what is called a GIF-CT IFSE structure. Okay? Now, what has happened in the last few weeks, which is actually very exciting for us, is the International Financial Services, or IFSE as they call it, the Indian regulator has formally recognized GPU and associated data center equipment leasing as an eligible financial activity within the IFSC.
43:14 So we've already secured the SEZ for all of our withholding taxes and our corporate income taxes and so on and so forth. We've also secured, we are in the process of establishing our IFSC. This happened only about three or four weeks ago. It's just a day or two before Diwali. And so that allows, this is very interesting, from a tax perspective, qualifying companies such as ourselves will benefit from what I call a substantial income tax holiday, partially covering roughly around 20 consecutive years out of a 25-year period. And then, according to the framework, I think after the 20 years, the proposed tax rate is roughly around 15%.
44:00 Now, what is also very interesting is that our structure is based in Singapore. Now, Singapore, we've already been working with the EDD and all the top honchos in Singapore to establish a very, very significant capital efficient, capital investment efficient, tax-optimizable structure. So, the free trade agreement between India and Singapore, and especially India and the IFSC, sorry, IFSC India and Singapore start operations, allows GPUs to be owned and hosted in Singapore, but lease or rent it to India, and that gives us an opportunity to create a very efficient financial structure. So, in terms of taxpayers, we're trying to reduce that to like 2% overall, okay? And in Singapore, there would be some taxes over a five-year period, and the benefit of that is that we could write that off against some other projects, which we are obviously securing as we speak.
45:01 I hope that answers your question, Michael.
45:05 So, is it sort of fair to say that 20% would be worst-case tax rate?
45:14 Yes. That would be the worst, worst, worst case.
45:18 Got it. Got it. Perfect. And then, any update on your current project?
45:27 Oh, lots. I thought you wouldn't ask. So, we are... Let me give you some numbers on Korat, because I think, you know, you and I talked about this in terms of questions and answers. Our project in Korat has actually taken shape much more significantly than we had expected. Now, as you know, we have secured over 142 rides, roughly on 65 acres of land in Korat. Power remains one of the greatest constraints for all of the infrastructure development. So at Kora, I'm very proud to announce that we are now secure 280 megawatts of power allocation with full dual redundancy, representing two independent 280 megawatt supply arrangements and a total of 560 megawatts of provisioned power capacity.
46:16 We have six drop lines on the fiber. We have water of roughly 18,000 cubic meters being allocated to us, 18,000 cubic meters per day. and more importantly, we've also got 30% green energy being provided to us. Now more importantly, all of this is supported by the local authority and at the national grid levels, providing resilience so that where essential, all of the infrastructure campus is fully provided with electricity supply. There's significant development milestones which we're also looking at in terms of how we're building this out. We're securing the critical infrastructure to build and operate at one stage, but we've also progressed environmental testing, again, something which we have completed in the last 45 days. Environmental testing, ground analysis, utility planning, water and fiber is currently being dug up and being looked into, and we're advancing engineering and construction partner selection as well. So we've invited about 14 of the top players across Asia, to come in and put in for an RFP, respond to an RFP.
47:28 And at full development and utilization, my current illustrative projections indicate a potential annual revenue of roughly about $4 billion. Now, that is, personally, you might look at it and say, God, Jay, this is an extraordinary scale of opportunity you're pursuing. But it depends, it remains dependent, personally, on securing the customers. So I can also tell you now, that we're not just building the capacity hoping that the customers would arrive. We are already in engagement with some of the largest customers on the planet. American, I just want to be very clear, American. And now it's about turning that demand into contracted revenue. And Mike, once again, I want to make this very clear. We are not getting into the habit of building this data center.
48:16 without a customer. So before we lay our first stone on the ground, we will have secured our customer as well. And then finally, Korat for us also is, as I mentioned, is a long-term infrastructure asset. Our objective is to turn 50-megawatt phases, so we are building 50-megawatt data halls, fully commissioned capacity contracted customers, and we've also hired, and I think one of the things you would be very... Thank you. Wow, that's great. Lots of progress.
49:15 Interesting. Okay. I guess last one for me, you know, the political change in the U.S., you know, there's a little more scrutiny on just data centers generally. Like, is that creating more demand in India, you know, like, kind of beyond your Yoda product or, like, getting more, you know, inbound calls or anything like that?
49:38 I always love your questions, Mike. Okay. So the new BIS rules do affect Thailand, Indonesia, Singapore. You know all the countries we're talking about. But we're taking them extremely seriously. But I just want to make sure I'm very clear on this. This is a compliance requirement. It's not a prohibition on building air infrastructure in Thailand or Indonesia. And mark my words, I am not stopping any building here because we're not doing anything wrong. We're not tightening up GPUs to China illegally. That's not our business. Our core development, as I mentioned, is 200 megawatts. But that said, we've also signed up another 40 to 50 megawatts additional capacity. We're looking at Indonesia right now for another 300 megawatts as we speak. And our intended commercial model is straightforward.
50:23 We have properly screened customers, off-takers, including U.S. off-takers, we will screen them, control them structured, and we will prohibit all remote access or diversion of GPUs. So now what we have done, Mike, again, We have created a very robust compliance framework covering all of the export licensing, customer verification, beneficial ownership, GPU traceability, physical security, remote access controls, independent monitoring, and so on and so forth. So, I will come back to your question. I know you talked about, you know, is that creating demand? But we are obtaining all the necessary licenses, establishing the identity, and so on. Frankly, I would rather invest in compliance right away, which we've already been doing so far. rather than explaining to Washington why somebody forgot to check who was using that equipment. Now, in terms of demand, India is obviously, you know, a benefactor.
51:20 But the challenge we will have with India is also the, you know, I think the previous question was about taxation. The taxation is a mammoth task. It takes, you know, just to give you the scale, I have employed 30 finance people just to manage the taxation between Singapore and India. It's a very complex, very complex structure, and we have to make sure that we are able to support whatever the governments on both sides need, as well as the U.S. government requirements. So India will go through the challenge of getting huge orders, but I believe that will take much more longer to build out the infrastructure as the momentum continues.
52:05 Markets will obviously continue to evaluate other regions. I'm sure you've already seen people like Microsoft, Google, Oracle, Meta, they're all, and profit included, they're all looking at Southeast Asia in a big way. And we're probably one of the fewest people here intending to commercialize that model for them. Mike?
52:28 Great. It makes sense. Good deal. Thank you. Thank you. The next question comes from Michael Donovan, Compass Point.
52:38 Jay and Bruce, congrats on the progress and thanks for taking my questions. Going back to CORAT, we are assuming that construction there begins in the next two to three months. Do you think that window is still reasonable?
52:57 Yes. Yes, it is very reasonable. So we've, as I've mentioned, we have completed a significant amount of work already, okay? The one important thing you have to take into account is that all of the testing, analysis, utility planning has been completed. All of the water and fiber requirements have been completed. So now it's about making sure that we're building the substations. So FYI, we've already kind of started the construction of the substation. There are two substations, as I mentioned, 280,280. and what we're also seeing is that there's significant demand from the off-takers. Now, the one thing I'd mentioned previously is that we are dividing our development strategy into four data halls of 50 megawatts each.
53:43 Now, we have huge amounts of land. We can actually convert that into six data halls of 50 megawatts and increase it because the power availability is kind of quite high. But we are also making sure that our planning to execution will be complete in the next three months. Now, One of the things you will also see, Michael, is we are not doing a traditional old-school build. Okay? We are doing a hybrid build. And you will see us actually deploying a hybrid modular technology, which we are very proud of. We are actually looking at probably bringing it in-house as well, the modular technology. And I want to make sure that we are able to finished the construction from time of build in a span of six to nine months, not take two to three years.
54:40 Very interesting. And on that module- I think another thing- Go ahead, Bruce.
54:45 Another thing to add, Michael, is the preparation, the site acquisition and preparation, it hasn't cost us an arm and a leg. I think to get from Land acquisition all the way to site ready for building will be about 14, $15 million all in from our side. So, you know, that's why we jumped on the project is because it's obviously a massive opportunity, but, you know, a lot of the infrastructure, et cetera, was in place or there was a pretty straight line to get it in place. So, that's why we seized the opportunity.
55:22 That's helpful, Bruce. And then on the hybrid modular design, On CapEx, the speed and then also the cost savings are very interesting to us. So are you still expecting in line with about $68 million per megawatt?
55:44 I love that. So let me kind of give you the high level on this, okay? One of the things which you will have to take into account is that the engineering approach It's very, very, very different. The prefabricated data halls, you're looking at factory-built modular data halls, standardized rack layouts, containment, high-density GPU infrastructure. On the electrical systems, we are building medium-voltage switchgears, transformers, all of the UPS, battery storage, prefabricated distribution states, and so on and so forth. Now, on the cooling part, All of our factory-assembled cooling distribution units, liquid cooling loops, the heat exchangers, the central cooling plants, the high-density B200s that are for high-density B200-300 class GPU deployment. We're also building the redundant independent electric supply paths as well. So it's an appropriate what I call an N plus one or a 2N architecture for the critical systems. Now, this is where you're going to be surprised.
56:50 Our cost for build is between 4 and 4.5 million US dollars per megawatt. Not 6 to 7. So we are looking at roughly around 800 to 900 million for the full 200 megawatt build-out. So that would include all of your civil works, foundation, building, electrical infrastructure, transformers, UPS, all of the liquid cooling, mechanical systems, networks, Security Controls, Contingencies, Modular Fabrications, Integration, and Installation.
57:29 Very interesting, Jay. Yeah, so covered in below our expectations to the plus side. Last question. This one's a little bit at a high level. So, with the growing emphasis and focus on cybersecurity, What are you hearing from customers? Are they interested in adding Gorilla's cybersecurity capabilities as a managed service alongside GPU as a service?
57:57 Absolutely, Michael. That's one of the most exciting opportunities for us today because cybersecurity and AI infrastructure, personally, when we talk to customers, are becoming increasingly interconnected. Now, what we're hearing from customers, especially, you know, that we work very largely with sovereigns and governments, So they come to us and said, we're no longer looking at computing capacity. They want all of this with secure, resilient, sovereign infrastructure. Now we are a cybersecurity, video intelligence, network intelligence community, right, or a company. What we have is we've already got this operationalized, we have experience, we have all the relationships, and we're expanding our footprint. So what that has allowed us to do is create additional revenue targets. Now, a lot of people kind of dissed the fact that we actually invest in a company called AstroCost, by the way, in India.
58:50 That allows us to actually expand our capability, provide recurring software and managed services to sit on top of the underlying contracts. So, you will see, that's why in my first introduction, I'd mentioned that Guerrilla is not just trying to build GPU as a service. Our underlying business is what people seem to be forgetting. And those commercial discussions, by the way, are already in place. They're creating huge opportunities for us for a fully integrated solution. And that is a model, Michael, where it just starts simply looking to rent computing power. We're building the AI infrastructure ecosystem and creating multiple recurring revenue streams. I hope that answers your question.
59:36 It very much does. I appreciate that. That's the luck. Moving forward, James Bruce.
59:43 Thank you. The next question is from Bharath Nagaraj, Cantor Fitzgerald.
59:51 Hi, thank you for taking my questions. Most of them have already been answered. Maybe just a couple for me, please. Given that Jensen was a big supporter of startups and biggest supporter of AI, trade, build-out, are there any worries for Vala on, you know, the future references that you might get and how is the media relationship since this step down? That's the first one.
1:00:17 I'm going to try and answer this very diplomatically. First of all, our relationship with NVIDIA remains important to our AI infrastructure strategy. And we will continue to engage with NVIDIA ecosystem and all of our equipment partners, whether it's Dell, Supermicro, OHV, and so on. Now, I would want to distinguish... between the broader industry commentary about AI financing and how the fundamentals of guerrilla business are going to be affected and some people will start speculating. We're not building a speculative business. We are working very closely with NVIDIA. By the way, NVIDIA services are still kind of running operationally on the ground. Nothing has changed with Jensen's departure.
1:01:04 And we are providing increasing emphasis on on all the principles that underlie the data center and the project. Now, of course, we do not take the future allocations for granted. And we are definitely not saying that NVIDIA has provided any commitments beyond what has been already agreed. But what has been agreed, they are fully honoring, and it is going in the right direction. In fact, we're pushing forward even more quicker than before, as I mentioned on previous earning calls. Now, that said... We are also looking at alternatives. I mean, we have already been, you know, looking at AMD. We met with the entire AMD team. We're working on them. We're trying some POCs. And we are anticipating that the Helios will also have significant effect into some of the future allocations as well.
1:01:50 So we are going to be working very closely on both of them. And we're also, you know, we've had some conversations with the Cerebrus team, which is also actively engaged with AMD. So There are multiple conversations we are having at the same time so that we can de-risk our business as well.
1:02:12 Barack? Sorry. Okay. Thank you. Yeah. The next question is around what's... Sorry, Barack.
1:02:19 One other thing to add is... Sorry, the microphone doesn't like with me. It was sort of stated publicly that some of the circular financing arrangements are under scrutiny. It's important to note that there is no circular finance arrangement with our contract with NVIDIA. NVIDIA is a customer. There's no backstop. There's no investment by NVIDIA. There's nothing that sort of looks like the kind of circular financing that's under scrutiny. So, in that respect, I think we're in, you know, we have less to worry about than other players would.
1:02:54 Got it. That's helpful to know. Thank you. The second question I have is around what's kind of your plan B if the worst happens and the $1.7 billion bond financing that you're currently working on does not go through any thoughts there on what you might do or if you have anything you can share?
1:03:14 Bruce, do you want to take that? I'll take the second off.
1:03:21 Sorry, could you repeat that? I didn't hear the first.
1:03:25 But the basic question was, if the 1.7 billion bond programming does not go through, what happens? What is your plan B?
1:03:34 We are still in discussions with two private credit players. Okay. Okay.
1:03:43 All right. So the last one, yes, like housekeeping for the model. Sorry, go ahead, please, Jay. You were saying?
1:03:49 So, just to add to that, right, I mean, the project financing is through, you know, the traditional bond group, right? We've already invested more than $330,000 plus million, and we're continuing the conventional model, but we're also working with a couple of other institutions for long-term associated contract financing as well. We're also engaged with banks and other strategic capital participants who can provide alternative equipment financing as well. So, We're definitely not sitting here and twiddling on our thumbs. I guarantee you that. But we're working very closely to close our bond program. Of course, it's run by the largest institution on the planet. But we will make sure that we have Plan D, Plan C, Plan D, and Plan E at the same time. So we are working on all plans at the same time in Papua.
1:04:40 Okay, okay. Thank you. The last one is just the housekeeping for the model. Given the several projects and the different phases and timelines of each of them, what should we be thinking about with regards to the, you know, the gross margin and the bid-hour margin kind of range we're talking about for 2026 guidance of $200 billion of revenue? And is there any follow-up on how much contribution is expected from, you know, the GPU as a service and any of the data center projects you're working on? Thank you.
1:05:10 Bruce, do you want
1:05:13 to take that? For 2026, I mean, I would see the gross margin in the fourth quarter improving sequentially, but it wouldn't be a dramatic change. We, I mean, like Jay mentioned, we will recognize some revenue from GPUs of service in the fourth quarter, but it won't be enough to dramatically shift the gross margins for the full year. I think the real impact from the improved gross margin from GPUs of service will come in the first quarter when The revenue numbers will become quite large and also the margin impact will be tremendous. So you can infer from that that the gross margin will improve sequentially in the fourth quarter and that overall the...
1:05:59 I'm trying to hedge my words. I don't want to give away too much. So you can imply that the EBITDA... The EVIT performance will improve, but the real improvement will come in 2037.
1:06:15 Got it. All right. Thank you very much. Good luck. Thanks a lot. We now have a follow-up. It comes from Brian Kinslicker from Alliance Global Partners.
1:06:32 Hi. Thanks for taking my question. It's a little backward-looking, the first question is, When I look at the revenue for the third quarter, how much were hardware purchases that keep the margins low that are kind of one time in building out the infrastructure versus legacy services contracts, smart contracts, you know, the portfolio that you had before you were moving into the data center business?
1:07:04 Bruce?
1:07:07 Brian, a majority of the revenue recognized in the third quarter was from either systems integration or hardware where there was a depressed gross margin. And then the other thing I'd emphasize is that some of the Egypt-related revenue also saw a depressed gross margin for the same reason we saw in the second quarter, which Thank you very much.
1:08:11 Data Center-related revenue. Again, that Egypt type work or any other contractor outside of that data center business.
1:08:24 Business as usual from Taiwan, so that's the core mix of maintenance and recurring customers will, including the recent contract we announced in October, will be probably $25 million. We assume a contribution from the Egypt project. The exact one is, I wouldn't want to guide to a specific number at the moment because we have a contract that's scheduled to end in July. And then we're sort of discussing at the moment what comes after the end of that contract, right, in the form of possible payments or supports, etc. So I wouldn't want to pick a number quite yet. You know, our strategy is only to deliver a number, is only to announce numbers that have been contracted that have a date and a number next to them.
1:09:15 Before that, it's, you know, we don't like to do that. So, and then, so the vast majority of the revenue in our guidance is attributed to the Yota Project, where we have, as Jay mentioned, we have already taken delivery and we're configuring Yota Phase 1. and then, you know, to phase two, we have a delivery schedule that is aligned for, you know, to get up and running and billing in the first quarter.
1:09:42 Okay. Thank you so much. Let me answer that as well. Yes? Sorry, but I'm just going to answer that. I mean, the revenue target that you're talking about is completely not dependent or entirely not dependent on GPU as a service. We're expecting, you know, major contributions from both the technology operations, our expanding AI infrastructure business and so on and so forth. Now, as Bruce alluded to, Egypt remains significant, but if you look at all the Taiwanese projects which we have recently signed, they also become massive platforms for us, for our cybersecurity, network intelligence, RIA infrastructure, surveillance, and so on and so forth. And then, more importantly, I think I want to carry this message over to everyone. We're not abandoning our technology heritage business, right?
1:10:29 So just to become a data center operator, data center is part of the infrastructure story which we've already built. I think that market needs to recognize it. Now, as we move forward, Brian, I think this you will definitely appreciate. All of the technologies in our data center in Kodak for 200 plus megawatts will come from Gorilla. All of the software, all of the security platform, all of the managed services, all of the infrastructure services will be provided by Gorilla for Gorilla, which effectively means your next year's revenue and going into 2028, you will see a huge, maybe a jump in terms of GPU as a service, but 2028, it will start evening out. Now you're looking at a significant portion of multi-year contracts from your network surveillance and AI surveillance, infrastructure management solutions, your Intelligent Cyber Security Solutions, and so on and so forth, evening out and making GPU as a service almost like, you know, 40, 50, 60% of the business, and the rest actually taking over a much bigger chunk as well.
1:11:32 And that's why we are very excited about this, not just as a data center operator. I hope that answers your question, Roy.
1:11:40 Absolutely. Thank you.
1:11:43 Thank you, Suhas. At this time, there are no further questions. I'd like to hand the conference back to management for any additional or closing remarks.
1:11:53 Thank you very much. I mean, there were some very interesting questions today. I really appreciate it. I'm sure there's a lot more pressing questions. I always hear at the end of it, people are asking where you didn't respond to this and so on and so forth. We're limited by time, but we will try and make sure that we can respond to every single question. Thank you very much. Now, just to reiterate, you know, we are up 163%, our largest quarter in history. I'd love to take credit for it, but unfortunately, it's all the people behind us who delivered those results, and they're all listening in right now.
1:12:41 So, hush, hush. Now, let me share something a little more funny. My wife recently asked me what I was thinking about over a dinner. Let me call it less romantic, but a romantic dinner. And I said power distribution, GPU utilization, data center cooling. She replied, Jay, whatever happened to the romance? And I said, you know, hey, I have secured 560 megawatts of redundant power. If that is not commitment, I really don't know what it is. And guess what? Apparently, I'm still sleeping in the spare room. Now, this is not something I'm reading out, just FYI. I made this up because as CEO, for me, I have to provide ambition. Bruce provides the financial discipline. I see a billion-dollar revenue company. Bruce sees 70 reasons how to make this more profitable.
1:13:28 But seriously, guys, our shareholders, employees, customers, partners, thank you for your continued confidence in us. I know we are working very hard, and I don't want to let anybody down. We have demonstrated that we can deliver growth. Now our responsibility is to translate that we can grow into it profitably, create cash generation, and long-lasting shareholder value. Now this was Gorilla's largest quarter ever, and we intend to work exceptionally hard to make sure that it's merely the beginning. So thank you, ladies and gentlemen. It's time for me to go back to my spare room. It's 5.45 in the morning here. Cheers. Take care. Bye-bye. Once again, ladies and gentlemen, that does conclude today's conference. Thank you all for your participation. You may now disconnect.
Follow Gorilla Technology Group Inc. into a list and get an email when it puts out news.
Analyst, Cantor Fitzgerald
Chief Financial Officer
Analyst, StoneX
Analyst, Northland Capital Markets
Analyst, Compass Point
Analyst, Alliance Global Partners
Analyst, B. Riley Securities
Chairman and Chief Executive Officer