Golar LNG (NASDAQ:GLNG) Q2 2022 earnings call, held 2022-08-11. Watch the replay and read the transcript on 6ix.

On 6ix: 6ix.com/event/golar-lng-limited-glng-q2-2022-earnings-call
Automated transcript · Written by software from the replay's audio. It can mishear names and figures; the replay is the record.
0:00 Welcome to the GOLA LNG Limited Q2 2022 results presentation. After the slide presentation by CEO Karl Fredrik Staubo and CFO Eduardo Maranhao, there will be a question and answer session. Information on how to ask a question will be provided then. At this time, all participants are in a listen-only mode. I will now pass the floor over to Karl Fredrik Staubo. Karl, please go ahead.
0:32 Thank you, and welcome to Goal RLNG's Q2 earnings results presentation. My name is Karl Fredrik Staubo, the CEO of Goal RLNG. Before we get into the presentation, please note the forward-looking statements on slide 2. I'm accompanied today by our CFO, Mr. Eduardo Maranhao, to present this quarter's results. Turning to slide 4, this provides an overview of Golar today. Following a group simplification and sale of about $6.8 billion of assets during the last 18 months, we are now a focused FLNG owner and operator. We own two FLNG vessels, the Hilly, which has been in operation since 2018 under a contract with Perenco in Cameroon.
1:23 She is the best performing FLNG globally, with 100% operational utilization since delivery. Secondly, we have the FLNG Gimmi, currently 86% complete under construction at Kleppos Shipyard in Singapore. She will start a 20-year contract for BP on the Tor 2 field located offshore Mauritania and Senegal, and will unlock an EBITDA earnings backlog of $3 billion to Golar, or 151 million dollars of EBITDA annually from next year and until 2043. We are focusing our efforts on FLNG growth projects and have developed three different FLNG designs.
2:15 All three designs are based on the same proven liquefaction technology and maritime interface. However, they differ in liquefaction capacity and shipyard location. The Mark I has a liquefaction capacity of up to 2.7 million tons per annum. Both our existing units, Hilly and Gimmi, are Mark I designed FLNGs, and they're based on conversion of existing LNG Mustankers. The Golar Gandria remains a Golar-owned conversion candidate for potential future incremental Mark I units. The Mark 2 design has a liquefaction capacity of up to 3.5 million tons.
3:07 Mark 2 is also based on converting an existing LNG carrier, but instead of adding liquefaction equipment to the width of the ship, Mark 2 places the liquefaction topside on a new shift midsection added to an existing carrier. This allows for larger liquefaction capacity and reduces the conversion construction time. Lastly, our Mark III new build design is one we have worked to develop for more than a decade. Mark III has a liquefaction capacity of up to 5 million tons, and it's based on a new build hull which allows for increased storage and deck space. As a result of the corporate simplifications we've undertaken in the last 18 months, we also own three significant listed positions.
4:01 We currently own about 6% of New Fortress Energy, valued at around $700 million at yesterday's close. We own 31% of Cool Company, the shipping spin-off we established during Q1 of this year. And we own about 24% of Avenir LNG, a small-scale LNG shipping and terminal business. The total value of these investments amounts to over $850 million. Turning to slide 5, as a result of the corporate simplification and FLNG concentration, we now have a balance sheet position for FLNG growth. At quarter end, we have a cash position of $602 million.
4:50 Added to that are listed securities that we just went through. We have a total liquidity of around $1.5 billion, or approximately $14 per goal or share. Our net debt position was reduced from 1.7 billion last quarter to around a billion at Q2. This is a result of the vessel disposals and scheduled amortization. Hence, we currently have a net cash position of $500 million. We expect EBITDA generation from our existing FLNG portfolio to quadruple from 2021 levels into 2024.
5:45 This could meaningfully increase further once additional FLNG growth projects are announced. We now have cash and debt capacity to facilitate FLNG growth from internal resources, which will be the key focus for the next phase of the company. Lastly, we have no debt refinancings until 2025 and expect to generate significant quarterly cash flow to equity from operations going forward. I'll now hand it over to Eduardo to present our Q2 numbers.
6:18 Thanks, Karl, and good morning, everybody. I'm very pleased to provide an update on our group results for the second quarter of 2022. Turning over to slide number seven, I wanted to show some of the highlights of this quarter. Starting with our FLN
6:46 We have agreed initiatives with Keppel Shipyard to safeguard sale away of the unit within the first half of 2023. We have also advanced a number of initiatives towards the development of a new Mark II unit, capable of producing 3.5 million tons of LNG, and which could be delivered as early as 2025. We'll talk a bit more about that on this presentation. We reiterate the target to announce a new FLNG Project within 2022. Moving on to shipping, the last steps of the spin-off of our TFDE fleet were completed this quarter. The last four vessels were sold to Cool Company, and the transfer of our shipping and FSIU management organization is now complete.
7:32 In line with our simplification efforts and to focus our business on FLNG, we've been awarded a conversion contract for Golar Arctic for 269 million euros, and sold our FSRU Tundra for $350 million to SNAM. All those initiatives and divestments released net cash proceeds of close to half a billion dollars this quarter and allowed us to reduce our contractual debt from $1.7 billion to $1 billion at the end of the quarter. We have also continued our share buyback program, repurchasing We would like to provide a bit more coloring to the breakdown of our earnings from Healy.
8:25 The FLNG continued its perfect operational track record since delivering in 2018, market leading for FLNG operations globally. The Healy tariff comprises of three components, a fixed tariff, a Brent-linked tariff, and a TTF-linked tariff that started up on 1st of January this year. Due to increasing commodity prices, we continue to see a strong increase in Healey's EBITDA generation, up 2.5 times year-on-year or 9.5% quarter-on-quarter, a trend we expect to continue into 2023, which will be further explained on slide number 11. Interesting to note that this increase in earnings came with no additional OPEX to us.
9:10 While the base tariffs stood in line with previous quarters, We recorded $29 million from Brent-linked revenues and close to $20 million from TTF-linked revenues in Q2. I'll now hand over the call to Karl, which will talk a bit more about that.
9:26 Thank you, Eduardo, and turning to slide 11. As Eduardo mentioned, Terenko exercised their option to produce the 0.2 million tons from 2023 to 2026. Hence, HILI will continue with three components to its digital generation. In 2021, GoLar's share of Hili EBITDA amounted to $95 million. For 2022, we expect GoLar's share to come in at around $270 million. The earnings increase is caused by higher rent prices and the startup of the TTF Link production. For 2022, we have hedged the TTF price exposure for Q3 at $25.37 per MMBTU, generating $19 million of TTF-linked EBITDA to Golar for the quarter.
10:19 We remain open for Q4 2022. At current Q4 forward prices, we expect to make an EBITDA of around $47 million for Q4 alone. For 2023, we have just entered into a TTF price swap for 50% of the TTF exposure at $49.5 per MMDTU. That's the energy equivalent of crude Brent prices at $291 a barrel. With TTF at 49.5 for 2023, this will generate approximately $160 million in EBITDA to GOLAR, where 50% of that is now secure in terms of locked in the price.
11:05 Combined with the Brent forward price for 2023, which currently stands at $88 a barrel, we expect to generate $305 million in Golar's share of Hylli EBITDA next year. Total debt service for Golar's share of Hylli is $50 million, and Hylli alone will generate free cash flow to equity of $255 million for 2023, or $2.35 per Golar share. Turning to slide 12 and GIMI. GIMI is now 86% technically complete for its conversion into an FLNG at Keppel Shipyard in Singapore. We have currently worked over 22 million man-hours on the conversion with a daily construction team currently amounting to 4,200 workers.
12:00 The remainder of the build is mainly around construction, installation and testing of equipment ahead of the 2023 SailAway, which will unlock $151 million in annual EBITDA to Golar for 20 years. During the quarter, Golar and Keppel Capital, together the owners of Gimi, agreed to a $50 million incentive payment to Keppel Shipyard for initiatives to safeguard SailAway within the first half of 2023. Incentive payment is payable at certain milestones, and part of the amount is retractable if milestones are not met on agreed dates. Since Golar is the 70% shareholder of Gimi, 35 million of the 50 million incentive payments will be covered by Golar.
12:51 Gimi is on track to sail away from the shipyard during the first half, and for contract startup during the second half of 2023. Turning to slide 13 and some of the most interesting developments that happened to Golar during the quarter. We have seen a significant pickup in interest from new clients investigating FLNG solution for gas field development. Current and forward gas commodity prices combined with energy shortage seems to have fueled efficiencies in gas field development decisions. This is also reflected in our existing pipeline of FLNG growth projects that have seen a very strong progression during the quarter, both for tolling and integrated projects.
13:42 On the back of this, we've taken active steps to confirm yard availability and updated capex pricing for our three different FLNG designs. We've received confirmed price and yard availability for both Mark 1 and Mark 2 designs, and we are now in discussions with the Mark 3 shipyard for price and availability of a 5 million ton new build. Despite busy shipyards and an inflationary cost environment, we are happy to announce that we can deliver FLNGs during 2025 if we commit to a project during the second half of this year. The CAPEX numbers received have seen inflation, but remain within the $500 to $600 million of CAPEX per ton of liquefaction capacity, which we think is highly attractive compared to other maritime and shore-based liquefaction solutions.
14:40 This also compares very well to ENI's recent announcement to acquire the FLNG Exmar Tungo, for an implied price of between 950 million to 1.1 billion dollars per ton of liquefaction capacity. So approximately exactly double of where we would have a CAPEX. Furthermore, with the acquisition of the Ex-Mart Tango, Golar is now the only service provider of FLMGs with a proven track record globally. We've also received financing term sheets for construction and long-term lease financing for potential FLNG new builds from an existing relationship lease counterpart. As Eduardo alluded to, we maintain our target for other FLNG project announcements within 2022, and we believe our organization and balance sheets are set up to execute up to two to three FLNG projects in parallel, subject to the details of each project.
15:44 Turning to slide 14 and further elaborating on actions taken in the quarter. On the back of the growing pipeline of FLNG growth projects, we are ramping up both engineering activities and plan to order long lead items for a Mark 2 FLNG within the second half of this year to safeguard 2025 vessel delivery. The majority of the long lead items in discussion can also be deployed to our other FLNG solutions. The Mark II design has a liquefaction capacity of up to 3.5 million tons and as described is based on a conversion of an existing carrier. We have identified and inspected a suitable vessel candidate for that conversion. The yard selection is concluded and the financing term sheet has been received.
16:39 That term fit is also not dependent on a charter or long-term off-take if it's an integrated project. We're excited about the progress made on the Mark II project and the attractive delivery window that we have gotten confirmation. Together with the interest from charters, which includes ongoing discussions for an integrated field development project and multiple clients for charter alternatives, We're confident that proceeding with Mark 2 is the right way for the company going forward. Elaborating on the delivery timeline and why we think early is important, you can see on slide 15.
17:25 As discussed on previous quarterly calls, the gas market was tight before the geopolitical situation in Europe. In Q4 of last year, We saw LNG prices above $50 per MMBT. LNG demand is expected to continue as the world is looking to source stable sources of energy with attractive environmental attributes. There is very limited new liquefaction capacity coming on for the first half of this decade, whilst most of the incremental production comes on from late 2500s. Hence early delivery of an FLNG project is increasingly attractive both from a demand and LNG price point of view.
18:12 New liquefaction capacity from 2021 to 2030 currently stands at 130 million tons of FID or projects under construction. An additional 42 million tons of liquefaction project are needed between now and 2030 if we are to meet the estimated demand growth for the period. That's before taking into account the possible effects of Europe and other regions reducing dependency on single-source Russian gas exports. Interestingly, if we break down the anticipated 130 million tons of new liquefaction projects coming online further, About 12 million tons of that volume is expected to be sourced from Russia, where the geopolitical situation is likely to add pressure to project execution and timelines.
19:07 Furthermore, 55 million tons of the 130 million tons in total is expected to come online from U.S. exports. Source cost in the U.S. is currently at $8.5 for MMBTU, and long-term forward prices suggest $4 to $5 in gas source costs before liquefaction. In addition to that, most of the US volumes are sold on long-term off-day contracts. Turning to slide 16, we're encouraged by this development and we're furthermore encouraged by the lack of liquefaction projects from what we think is the cheapest gas resource in the world.
19:53 We mainly focus on African proven or stranded gas reserves, as we see very favorable characteristics of the three key components driving delivered cost of LNG. That's source cost, liquefaction cost, and the shipping distance to the end user. We believe that you can develop a stable source gas price of anywhere between $1 to $3 in lifting costs, dependent on the size of the field. that's significantly cheaper than current and long-term Henry Hub prices. Secondly, Golar's liquefaction technology has a lower capex per tonne compared to other floating and shore-based liquefaction solutions. Lastly, African Gas is physically a shorter sailing distance to end-users whether the clients are in Europe or Asia.
20:47 Hence, if you have lower input costs on the three key cost drivers of LNG, We see that as a compelling competitive advantage. If you elaborate that into numbers and turning to slide 17, this is again a familiar slide that we have presented at earlier occasions, but this time we've adjusted it to describe possible Mark II FLNG growth projects. If you assume a source gas for African projects of a dollar per MMBTU, A tolling fee similar to what we are charging BP, ranging between $2 to $3 per MMBTU, and shipping cost at $1.50. You can deliver LNG to end users at around $5.
21:33 If you compare that to both historical and current gas prices, this is a very solid economic proposition. As an illustrative example, we have highlighted some Mark II tolling fee scenarios, ranging from $2 per MMBTU in the low end, which is lower than for most the most recent U.S. shore-based liquefaction project, yet they would give GOLAR a capex to EBITDA of around five times on capital employed, so 20% unlevered return. If we can achieve tolling rates Similar to that of Hilli at current commodity prices, the capex to EBITDA multiple reduces to two times capital employed.
22:23 If you further go closer to the hydrocarbons and work on integrated projects at current gas prices, you currently have payback in less than six months. You can now understand our focus on early delivery and going towards the integrated sections. We think you can hedge out a lot of the volatility of hydrocarbon prices through forward price fixtures, similar to what we have done on our TTF exposure on hilly. Shifting gears and for the last time giving an update on our FSRU business. On slide 19, we have highlighted the two asset disposals that was concluded during the quarter.
23:12 First, we agreed to sell our steam LNG carrier called Golar Arctic to SNAM for 269 million euros. The transaction entails that Golar will undertake the vessel conversion and deliver the FSRU in Italy. The estimated conversion cost for the unit is around 160 million dollars before the cost of the vessel and contingencies. We expect SNAM to give final notice to proceed towards the end of this year or early next year. This project is very similar to the previous vessel to FSRU conversion when we converted the Golar Viking and sold her to LNG Croatia.
24:00 The second transaction we announced with SNAM was the sale of the FSRU Tundra for $350 million. The concession was announced and closed on May 31st, raising net proceeds to GOLAR of $193 million. We have agreed to charter Kundra back from the acquisition date until mid-November, and we expect to make an additional positive cash contribution from in this period. We're also in the final stages of entering into a development agreement where GOLAR will assist SNAM in minor vessel upgrades before the unit is expected to start FSRU operations in the first half of next year. This development agreement will likely add further value to GOLAR.
24:52 Turning now to corporate and the earnings potential from our existing asset portfolio. Again, a familiar slide, but increasingly simplified as we are selling off the non-core assets. Our 2021 adjusted EBITDA, comprised of HILI earnings, less G&A, giving us an EBITDA of $74 million. Add to that the commodity upside on Brent and TTFLink production from HILI, we expect Earnings for her to increase by $220 million on 2023 over 2021 levels. And to that, the contracted EBITDA from GIMI from Startup in second half of next year. We expect to have a run rate EBITDA of north of $400 million and subject to commodity prices ranging between $400 to $500 million.
25:54 Our net debt position is negative, so we have a net cash position of half a billion dollars. Hence, we think the company is in a very good shape, both on cash flow basis, debt basis, and liquidity basis to be positioned for growth. So finally, to summarize the company highlights on slide 22, our key focus is on FLNG growth. and we are targeting an FLNG announcement within 2022. Before growth, we expect our EBITDA earnings to quadruple from 2021 to 2024. We have cash enlisted securities of 1.5 billion targeted to fund FLNG growth projects and have significant free cash flow to equity generation in the interim.
26:47 Our book value stands at $2.7 billion, again expected to continue to increase as we are free cash flow to equity positive. Golar has a proud history, celebrating 75 years of existence this year, 50 of which in LNG, where we have been a proven market pioneer, being a first mover on FSRU, FLND, and integrated FSRU to Power Project. This concludes our Q2 earnings presentation. Thank you for taking time to listen in and we'll now hand it over to the operator for any questions. Thank you. We will now begin the question and answer session. If you wish to ask a question, you will need to press star 1 and 1 on your telephone and wait for your name to be announced.
27:39 We ask you to limit your questions to two per person. Please stand by while we compile the Q&A roster. We will take our first question. And your question comes from the line of Chris Zang from Webber Research and Advisory. Please ask your question.
28:05 Hi, good afternoon, Karl and Eduardo. How are you? Good, thanks. You? Good, thanks. I wanted to just touch on the .
28:19 You're breaking any chance you can try to speak closer to the speaker.
28:24 Can you, is this better? Yes, please. Yes, sorry, I was saying, we've seen the target sale-away date for the Gimme slide from Q1, 23 to first half of 23, and now with the $50 million incentive payment to the capital to maintain that first half of 23 date. Can you provide some color of the risk of Gimme being further delayed in terms of, like, months, or was it quarters?
28:50 I think if you listen to Kuzmo's earnings call, on the eighth earlier this week. I think they also provided some updates on where they are, both on the FPSO progress, which is somewhat delayed, but reiterated the contract startup date. So I think the combination of, to answer the question, this is a combination of making sure we build the best quality unit and to align the schedule with BP We do not expect any further delays. As we have been highlighting on several of our previous quarterly calls, we've taken very active steps to ensure the current timeline, which is basically the driver of the $50 million cost increase, which then safeguards that timeline. And we are very happy with the progress we're making, basically on a daily basis, and feel very comfortable with the current delivery date.
29:53 Great, thanks, Stuart. So it wasn't something that was systemic to the conversion project. It was just one-off in aligning the schedule with COSMO.
30:01 Yeah.
30:03 Okay. And just as a, sorry, this is my second question, the last one. When would you need to reserve slots at the yard for Mark 1 and 2? Would you risk losing it if the order isn't placed this year?
30:20 I think what we have confirmed on the call today is that we have agreements in place with the shipyard that would construct the Mark 1 and Mark 2, where we have also secured the available slot space. and as we've highlighted a few times, we are targeting to make an FOMD announcement within the second half of this year. I think it's possible to lock in the slot for somewhat longer than just this year, but if you delay a day, you also delay delivery, and for us, early delivery is going to be important going forward.
30:58 Sure. Thanks, Johan, for the color. I'll take time in here. Thank you. Thank you. We will take our next question. Your question comes from the line of Ben Nolan from Stiefel. Please ask your question.
31:16 Thank you, Operator, and hi, Carl. So I wanted to ask first, just to make sure that I understand, with respect to... Back to... The ordering or conversion. Am I right in understanding that you guys would be willing to order a conversion on spec or without a contract? Is that the implication here?
31:53 Yes. This would be similar to how we would view Hille when she was first ordered. She was not ordered... and many more. We see now with the scramble to secure new liquefaction as late as by the move by ENI to acquire a idle FLNG at a very high price. That time is The key attributes of the market and also all of the chartering discussions we have. And we think negotiating power would slightly move to us if we move ahead on this basis. But we have a very clear view of where it will end up.
32:48 Whether the contract is secured Before, simultaneously, or in the not-too-distant timing just after, we feel very confident about where we sit right now.
33:00 Okay. That's helpful. And I'm going to try to squeeze two into one here. So as it relates to sort of those contract negotiations, I know one of the things that you have called out is wanting to have a Some element of commodity exposure, similar to what you have on the hilly but less so in the gimmy. First, I guess, is that something that gas owners are willing to do or increasingly willing to do versus where we might have been earlier? and then sort of connected with that, you call out specifically a Mark II, but I know that you already own the Gandria. Is there a reason why it seems like there's a little bit more of a Mark II focus versus a Mark I that might be a little bit more bird in hand?
33:55 Okay, so that's the first part. Yes, we think that it's easier to have commodity-linked production discussions now than earlier. I think the gas fields that we are targeting are either stranded or associated gas. We don't think that the owners of those resources have many, if any, alternatives to utilize those PITs. Hence, it's either an FLNG or it's not monetizing the unit. And with the amount of pressure to secure near decrepaction right now, we think that it's an easier environment to have those negotiations. I think it's also fair to say that the more oil major you go and the longer duration you go, the less they're incentive or wanting to give commodity exposure, but we think we can obtain attractive commodities exposure to solid counterparts.
34:57 The second part of your question, I think As we highlighted, we have confirmed price and yard availability for both Mark 1 and 2. What we see as a key attraction of the Mark 2 is the fact that you have somewhat higher liquefaction capacity, somewhat higher storage capacity, and due to the way the vessel is converted, a quicker conversion time. We also have a fairly good view of the FLAD growth pipeline and we're confident that ordering a Mark 2 presents a very attractive risk reward and that's why we want to proceed that. Saying that, we would not rule out building another Mark 1 with the starting point from Gandria, but Gandria is not suited for a Mark 2.
35:48 All right, I appreciate you taking both, albeit somewhat different questions. Thank you.
36:00 Thank you. We will take our next question. Please stand by. And your question comes from the line of Craig Shear from TUI Brothers. Please ask your question.
36:16 Hi. Good morning New York time. Good morning. So, as far as future capital availability and liquidity, First question is, is it reasonable to... Securities position.
36:47 And we think we can further optimize the debt on those two units once construction risk is taken out of GIMI. and once re-contracting risk is taken out of HILI. That's why we are not pushing forward on that right now. We have a sufficient cash at hand together with the term sheets received for both Mark 1 and Mark 2 new builds to proceed with the spec build without having to use anything but our cash position and available credits or received term sheets for potential new credits etc.
37:26 So even if you build on spec, the shipyard will let you kind of put in your equity over time so you don't have immediate issues as far as needing more liquidity. That's correct. Thank you. Thank you. We will take our next question. And your question comes from the line of Sean Morgan from Evercore. Please ask your question.
37:56 Hey, Karl. So as we step up in terms of the volumes for a Mark II to Mark III with the 5 MTPA, is that going to require, I guess, preceding off-taker work? Or do you think that the E&P partner that you select for the development of that project would be able to basically take full off-take at 5 MTPA?
38:20 Just to confirm, we would not do a mark three on spec because that's a large volume and it's a bigger impact. So on those, you would typically, that's more towards tolling arranged contracts where we would expect that the off-taker would lock in some of the production volume.
38:42 Okay. And then you talked about in the presentation about the kind of Low Cost of the Asset Development Off of the West Coast of Africa and the Proximity to Europe. So it would indicate that Europe would be the primary market for these projects. So have you been surprised at all of kind of the slowness of Europe to sign long-term SPAs on sort of the percentage of SPAs that have been signed in 22 since the war started relative to, say, Asia? And do you think is that carbon driving that, or what's causing sort of the delay in heavy European contracting?
39:19 I'm not surprised by it because we know what it takes to kick an FLND project off the line and offtake is only part of the puzzle. I think if you're securely offtake, you still need to have the development plans, the regulatory approvals, everything that's needed to produce the gas. I think to some extent to the contrary, I think The European countries have been very swift to move on FSRU, fairly swift on the LNG carriers. And I think right now they're actively working on how to crack increased gas production. I think a further testimony to that is when Senegal is invited to G7. At least last time I checked in the previous meetings, Senegal wasn't invited to G7. So I think they're starting to get what's going on here.
40:13 and I don't think it's really down to just the offtake. It's way more, you have to sort of embrace the full project and all the scopes of it and not just think that tying up offtakes sorts the problem. I know that several European countries are looking at offtake and financing to help lift some of these projects. But you also need a stable geopolitical environment in the country that you want to operate if you are to put billions of dollars of infrastructure there. Our advantage, of course, is that an FLNG is floating.
40:58 The infrastructure is mainly upstream. The unit can always be redeployed, and we are, as you know, a generic asset, so we are not customized to the specific feed. So we think that our technology suits well for those type of projects.
41:13 All right. Thanks, Karl. Appreciate it.
41:16 Thank you. Thank you. We will take our next question. and a question comes from the line of Wayne Cooperman, who is an individual investor. Please ask your question.
41:33 Hi, guys. Two quick questions. On Hilly, Parenko didn't take all the amount they wanted. Is there any chance that you can get more volume from somebody else, or does that really have to wait until their contract expires? And secondly...
42:04 Since you sold a third of the NFV at a lower price, is it the plan to continue to monetize that, especially now that their stock has gone up a lot?
42:15 Thank you. I think for the first part of the question, as you know, the production on the incremental volume is linked to TTF. If you take a TTF cargo and deliver it spot into Europe today, you're looking at a fairly steep discount at somewhere between $5 to $10. Hence, it wasn't in the interest of the offtaker from Perenco to meaningfully increase volumes at the agreed tariff. And there was no incentive for neither Golar nor Perenco to go to the negotiating table to increase volumes beyond the 0.2% if that meant the renegotiating of the TTF-linked tariff. I think the way we have viewed this is that let's just see what happens to the option that was declared at point two.
43:07 I think there is scope to increase production further, but that would likely be at the tariff to be negotiated. Theoretically, there is capacity to sell it away from the current off-taker. Practically, that's going to be very difficult. I think the solution to this is that the off-taker Perenco & Os needs to sit around the table and see if there is a solution that works for all the three parties. If not, the current TTF prices take care of the earnings for Hidli, but I think everyone is in alliance to see if there are ways where we can boost that further. When it comes to the second part of your question, It's correct that we sold a third of our NFE holding.
43:54 I think we further said that we would rather sit NFE than cash, and I think to date that's been the right decision. We like the progress of NFE, and currently we have plenty of cash and available liquidity to execute our ambitions. So for now that position remains the same, but we obviously keep a close eye on the development of the company. We think they've been very successful executing large improvements to the company just in the last quarter. So we like the development currently.
44:34 Thank you and congratulations.
44:36 Thank you. Thank you. We will take our next question. and the question comes from the line of Barry Haynes from Sage Asset Management. Please ask your question.
44:52 Thanks so much and congrats on all the progress. My question is, you talked about having enough funding for two additional flings. Would that include a Mark II and a Mark III? Could you fund a Mark III? And maybe just talk about the relative costs of of one versus two versus three, because those numbers were not on that one slide where you laid out the differences. Thanks so much.
45:23 I think if you take the liquefaction capacity and multiply by the guided five to $600 million a ton, I think you get to the price. So that's your price. Sorry, what was the rest of the question?
45:40 Could you fund a Mark II and a Mark III?
45:44 Yeah, basically the answer to that depends on the project. So for some of these projects, if you have long-term off-take, you get very attractive financing and then you can easily do both. For some of the long-term contracts, we know that the charter would also like to take equity participation in the unit, especially if it's contracted for the life of the unit. And hence that would enable... Thank you. Thank you. and the CAPEX that we are guiding on between 500 to 600.
46:59 You're also right that Tango is a smaller unit with less liquefaction capacity and significantly less storage compared to RF LNG technology, and also not with the same strong operational track record. They did, of course, operate for YPF in Argentina, but she's been idle for some time after that.
47:24 Perfect, thanks. That good call seems to be quite significant upside potential then. Thank you. Thank you. Thank you. We do have a follow-up question. Are you happy to take that question? Yes, please. Thank you. One moment, please. And you have a follow-up question from the... The line of Ben Nolan from Steinfeld. Please ask your question.
47:56 Yeah, thanks, and thanks for taking the follow-up. I didn't get quite enough out of my two-and-a-half questions last time. A little bit more on the potential opportunity to expand in Mauritania and Senegal. Just to be clear, my understanding was that was likely to be a Mark III design. Do you have any further color on sort of the direction that that might be headed?
48:26 I think we don't normally comment on specific projects, but we would lean then on the quarterly earnings call that Cosmos held earlier this week, where they said that they are targeting concept select for the growth of the TOR II phase. within Q3 of this year. It's interesting that last time they did a concept select, they ended on FLNV, which is the GIMI, and with the capex per ton liquefied and the carbon footprint per ton liquefied that our FLNV technology can provide, we struggled to see and how there are other liquefaction solutions that can be deployed on that site that would be competitive on those two parameters at least.
49:19 So we're looking forward to that concept select. So I think that's what we would say and whether they want to grow from two and a half, which is give me to five with sort of two mark ones or whether they want to add a mark three I think it's a question better directed to Cosmos and BP. But we did note that Cosmos was talking about both phase two and three of tour two within 2024.
49:52 Yeah, that's helpful. And then again, sort of I'm doing two on an unrelated topic. You guys did buy back some shares, a little bit of shares in the quarter. Maybe just thinking about capital allocation, as I recall, you're a little bit limited on your ability to pay dividends until the delivery of the GIMI. First of all, is that still the case? And how are you thinking about sort of in the intermediate term capital allocation as it relates to shareholder returns?
50:27 You're correct, Ben. So the only debt facility we have with such restriction is the $300 million unsecured bond, which prevents us from paying a cash dividend until GIMI delivers. We are, however, allowed to do an incremental $15 million of buyback from our return today. We are also allowed to dividend out either the 51% of the total equity value of our sharing cool company, either through shares or cash. So since we sold two thirds for cash and remained one third shareholding, the entire cool co position could either be monetized and distributed in cash or distributed in shares.
51:17 When it comes to
51:30 Capital Allocation, we are generating a healthy free cash flow from every quarter from now onwards. I think we're having active discussions with the board to introduce cash dividends from when GIMI delivers. Currently, there are no plans to ask for an amendment to the unsecured bond or otherwise bring that dividend forward, as we think our key focus should be on FOMG growth. But subject to how that materializes over the next six to nine months, that could... Thank you.
53:30 The conference will begin shortly. To raise your hand during Q&A, you can dial star 1 1.
Follow Golar LNG Limited into a list and get an email when it puts out news.