Replay available

Endeavour Mining (TSX:EDV) Q3 2026 Earnings Call

Endeavour Mining (TSX:EDV) reported Q3 2026 results on this call. Replay available.

Thu, November 12, 2026 at 8:30 AMendedReplay
Endeavour Mining (TSX:EDV) Q3 2026 Earnings Call
Company
Endeavour Mining PLC (TSX:EDV)
Period
Q3 2026 earnings call
Date
Thu, Nov 12, 2026, 8:30 AM ET
Replay
Watch the replay on this page · 54 min
Results news release
Endeavour Mining : MD&A (EDV Q3 2026 Results Management Report) · Thu, Nov 12, 2026

On 6ix: 6ix.com/event/endeavour-mining-plc-edv-q3-2026-earnings-call

Replay

Transcript

Automated transcript · Written by software from the replay's audio. It can mishear names and figures; the replay is the record.

0:00 Good day and thank you for standing by. Welcome to Endeavour Mining's third quarter 2026 results webcast. At this time all participants are in listen-only mode. After management's presentation there will be the question and answer session. So for those who wish to ask a question please dial in to the phone line. Please note that due to time constraints we'll be prioritising questions from covering analysts and we ask analysts to limit themselves to two questions before jumping back into the queue. Today's conference call is being recorded and transcript of the call will be available on Endeavor's website tomorrow. I would like to hand the call over to Endeavor's Vice President of Investor Relations, Jack Garman.

0:43 Hello everyone and welcome to Endeavor's third quarter 2026 results webcast. Before we start, please note our usual disclaimer. On the call today, I'm joined by Ian Cockerill, Chief Executive Officer. Guy Young, Chief Financial Officer and Djaria Traore, Executive Vice President of Operations and ESG who will talk you through the presentation. I'm also joined by Sonia Scarselli, Executive Vice President of Exploration and Growth and Rousseau Joost, Chief Technical Officer who will be available as part of the Q&A. Today's call will follow our usual format. Ian will first go through the highlights of the first three quarters of the year Guy will present the financials and Djaria will walk you through our operating results by mine before handing back to Ian for his closing remarks.

1:30 We'll then open up the line for questions. I'll now hand over to Ian.

1:37 Thank you Jack and hello to everyone who's joining us on the call today. Our solid operational performance coupled with higher realized gold prices has underpinned record financial performance so far this year. We remain on track to achieve the lower half of our production guidance for the year, with costs in line on a royalty-adjusted basis, as Le Figuet's particularly strong performance has helped offset lower than expected production at Mana.

2:23 We expect Q4 to be our strongest quarter as Hyundai, ITI and Sabadar Masawa move into higher grades and that is despite the recent suspension of underground mining at Mana which Djaria will talk through in more detail later. This performance has driven record free cash flow generation of the same period last year. That cash generation has allowed us to maintain a net cash balance sheet position of $263 million while underpinning our key strategic priorities of delivering both sector-leading Shell returns and sector-leading organic growth. On Shell returns, we delivered a record return for H1 and we're on track to deliver another record for the full year.

3:16 On organic growth, We are very pleased to have approved the final investment decision at ASIFU and we have launched project development targeting first gold in H1 2029. At Sabadala Masala underground expansion phase one is progressing well with phase two expected to start early next year with commercial production on track for delivery in early 2028. and finally our exploration program continues to focus on unlocking our significant discoveries at Vindaloo deeps, Hyundai, and Kusara at Sabadala Masawa. Updates on both of these multi-millionaires resources are expected later this year offering significant life of mine upside at both of these mines.

4:09 So to summarize, our operations remain highly cash generative, we're returning a meaningful share of that cash to shareholders, while investing in the projects that are going to support our next stage of growth. Now, let me walk you through each of those areas in a little bit more detail. On slide seven, starting with our outlook for the year. As mentioned, we are on track to deliver both group production and all-in sustaining cost guidance with stronger production and costs experienced expected in Q4. We expect production in the lower half of the range Due to lower than expected production of miner following underperformance this year that has been compounded by the suspension of underground mining activities following the ramps of silence that we reported a few weeks back.

4:59 On costs, we are firmly on track given year to date ASIC that is $1,700 per ounce on a royalty adjusted gold price basis, completely in line with the midpoint of our original guidance range. This year's performance highlights the importance of our high quality and because when one asset underperforms, any one of the others can certainly help pick up the slack. As we move into next year, we will leverage this portfolio, particularly Lefige, driving higher throughput and Sabadala Massawa optimizing throughput and grades to try to offset as much of the shortfall from Mana as possible.

5:45 On slide 8 you can see we've produced 820,000 ounces so far this year at a record margin of 40% higher than the same period last year. Clearly we are capturing higher margins at higher gold prices but at the same time our low cost base ensures we remain resilient even at lower gold prices. On slide 9 we generated a record 2.25 billion dollars and many more. Our record earnings have translated into a record cash flow. On slide 10, you can see we've generated free cash flow of over a billion dollars, equivalent to $1,246 of free cash flow for every ounce of gold that we produce.

6:58 That's around 50% higher than the corresponding period last year. We expect to continue generating strong cash flow into Q4, given the stronger production profile and seasonally lower cash costs. On slide 11, a strong free cash flow generation has continued to bolster our balance sheet, which remains in the healthy net cash position of $263 million, with leverage well below our long-term target. Our strong cash flow, coupled with our very healthy balance sheet, positions us well to prioritize our strategic objectives of delivering sector-leading returns whilst delivering Thank you for joining us today.

8:12 Thank you for joining us. We don't expect Maya to have an impact on our shovel return program either. On slide 14 and looking at our sector-leading organic growth pipeline, we have a clear runway to achieve a 27% production growth by 2030 through our top-tier Asafoetidae project and a Sabadala-Masawa underground expansion.

9:08 Beyond these projects, exploration will support further growth with major discoveries like Vindaloo deeps and Kusara, both offering significant life of mine upside at our existing mines. But we've not stopped there. To ensure our pipeline is robust and that we can continue to deliver organic growth over the long term, our new ventures exploration program is focused on identifying a diverse suite of top tier development projects to support continued organic growth even after Asifu. Turning to Astaflu on slide 15, where we've approved the final investment decision and launch project development.

9:53 This is obviously an important milestone that significantly de-risks the next phase of the project and the timeline to first gold, which is expected in H1 2029, just seven years after discovery and 24 to 30 months post FID. Since our last update, We have now finalized the in-principle terms of the Mining Convention with the Minister of Mines based upon the 2014 Code and we expect to have this fully signed off by the rest of the government in the coming weeks. We've increased our CAPEX envelope to $1.2 billion in order to further de-risk the project. The majority of this increase, around 60%, is due to increased land and crop compensation rates that followed Local government and community consultations and we expect to finalize the resettlement plan by the end of this year Around 25% of the increase is from additional contingencies particularly around the highway diversion the grid connection and the the moved transmission lines as both are still under final negotiation with government and Finally around 15% of the increase is driven by a number of small de-risking changes including additional advanced grade control drilling, an extension of the EPCM and owner's team support,

11:23 additional spares and improving the site's network connectivity. We've now committed about 5% of the initial capital and activities at Asafru will start to ramp up in Q4 as we finalize the mining tenders and start plant, dam and relocation earthworks. Moving to slide 16, which is a simple reminder that ASIFU is a top-tier project and clearly one of the best approved gold projects globally. What I'm particularly excited about is that we're building a scalable processing plant and a lot of exploration potential across our permits is in close proximity to the ASIFU plant.

12:08 We see potential to expand throughput beyond the initial design over time with significant exploration upside beyond the 5 million ounces of resource that's been defined to date for this project. At Sabadala Masawa, we're also making progress on the underground expansion that will bring high-grade ore into the CIL plant and lift production towards our 350,000 ounce a year goal. The initial phase of expansion is on track for first ore by year end and the second phase is now board approved. That's expected to launch in early 27, targeting commercial production by early 2028. Early works for phase two are already underway with key contracts, procurements and underground drilling starting to accelerate.

13:00 Beyond these two projects, exploration is advancing at two large discoveries, Vindaloo deeps at Hyundai and Kusara at Sabadala Masawa. Both of these multi-million ounce discoveries are expected to drive significant life of mine extensions at both mines and that's not factored into our 1.5 million ounce target. We will be announcing resources for both later this year and moving into next year we will prioritize reserves definition and mine plan updates as well as further resource definition as our focus steps out beyond the initial resources. Before handing over to Guy, I'd like to touch on our commitment to safety.

13:47 Last month we sadly lost a colleague at our IT mine and clearly our thoughts remain with his family and his colleagues. The safety of all our employees and contractors is a number one priority for us and we've been implementing throughout the year a number of initiatives to reinforce safety practices that Djaria will take you through shortly. During the quarter we also officially launched our phase 2 ESG strategy which we call ESG 2030. Guided by our purpose which is to produce gold that provides meaningful value to people and society, our ESG 2030 strategy is structured around five strategic pillars.

14:34 Championing our people, empowering host communities, boosting local economies, Protecting the Environment, and last but by no means least, Upholding Ethics and Compliance. Co-designed with our stakeholders, our strategy supports delivery of the UN Sustainable Development Goals and the National Development Plans of Senegal, Côte d'Ivoire and Burkina Faso. To bring our ESG 2030 strategy to life, we organized a dedicated ESG caravan across our sites and host communities. Through toolbox meetings, presentations, cultural events, and social media, we've reached over 4,500 employees and contractors and connected with more than 8,500 members of our host communities.

15:26 And with that introduction, let me hand you over to Guy, who will take you through the financials. Guy, over to you.

15:34 Thank you, Ian, and hi to everyone. I'll walk you through our financial results for the third quarter now. On slide 21, our Q3 production and sales were in line with our expectations, albeit slightly lower than Q2 due to the usual wet season impact and mine sequence. All-in sustaining costs were $50 per ounce lower quarter on quarter, driven predominantly by lower sustaining capital expenditure across the portfolio, as well as lower than anticipated input cost increases. EBITDA and adjusted EBITDA were lower due to the lower sales and realized gold prices. However, cash flow was significantly stronger quarter on quarter with free cash flow up 76% driven by lower quarterly cash taxes in line with our guidance.

16:24 As Ian mentioned earlier, we expect to achieve the lower half of our full year production guidance range despite the operational challenges at MANA and with costs within the range. We produced 256,000 ounces of gold in Q3, down from Q2 as I said, and driven by lower grades processed at Iti, Hyundai and Lafayette due to their mine sequence, lower tons milled at Hyundai due to the wet season, and the pause in mining activities at the Avera portal at Manor. Our ASIC improved quarter on quarter largely due to lower sustaining capital. Despite the lower ASIC, our all-in sustaining margin per ounce was slightly lower quarter on quarter because of the lower realized gold price. Most of these factors, though, are expected to reverse in Q4, with higher grades at Hyundai, ETI and Sabadala Masawa expected to make Q4 the strongest production quarter of the year, despite the suspension of underground mining activities at MANA since late October.

17:25 Q4 costs are also expected to improve due to the higher production as well as the reduced contribution from the higher cost Manor Mine. On slide 23, our adjusted EBITDA decreased slightly to $639 million for the quarter due to lower gold sales and gold prices with the EBITDA margin also declining slightly reflecting the lower gold prices. On slide 24, our operating cash flow increased by 28% to $407 million for the quarter The bridge shows the negative impact of $110 million from lower gold sales and prices, partially offset by a small decrease in operating expenses, including lower royalty payments related to the lower gold price.

18:12 Cash taxes decreased by $291 million quarter on quarter, in line with the usual payment seasonality. And finally, net working capital reversed from a $52 million inflow last quarter to a $54 million outflow in Q3. Driven by normalization of payables from the prior quarter, an increase in VAT receivables, as well as a build-up in spares and consumable inventories. As a result of this stronger operating cash flow, you can see on slide 25 that free cash flow increased by 76% to $261 million for the quarter, bringing year-to-date free cash flow to a record $1.02 billion. Similar to previous years, we expect our strongest operating quarter in Q4, and as guided, we've now paid around 95% of our full-year cash taxes.

19:05 As such, we expect to generate strong free cash flow again in Q4, building on our record year-to-date performance. If we can move on to our balance sheet now, where we maintained a very healthy net cash position and a stable leverage ratio quarter-on-quarter. During Q3, we generated $407 million of operating cash flow and spent $146 million in investing activities, including mine and project capital. On financing, we paid $227 million in minority dividends in line with the timing of minority dividend declarations and cash upstreaming, as well as $16 million in financing fees and lease liabilities. In terms of gross debt, we also repaid $410 million on our revolving credit facility and $10 million on our Lefege term loan during the quarter, bringing our gross debt down to $586 million.

19:59 Overall, liquidity is very healthy with around $850 million of cash and $700 million available through our undrawn RCF. And our healthy leverage position gives us the required flexibility to fulfill our shareholder commitments of both investing in growth while maintaining our strong shareholder returns program. Finally, for me on slide 27, earnings from mine operations were $514 million for the quarter. I won't go through every line on the slide, but just highlight a couple of the standout items, including our current income tax expense, which fell by $180 million, reflecting lower taxable profits and the timing of approvals for cash upstreaming. Deferred tax was $37 million expense, as compared with the recovery in Q2, largely reflecting the local board approval and payment of withholding tax in the prior period.

20:53 Finally, add-back adjustments of $35 million included other expenses, a non-cash tax adjustment related to foreign exchange on deferred taxes and losses on financial instruments relating to foreign exchange movements between the euro and dollar, partially offset by fair value gains on our marketable securities. That brings us to the adjusted net earnings attributable to shareholders of $241 million or a dollar per share. Thank you for your attention. I'll now hand over to Djaria to walk you through our operating performance. Djaria?

21:27 Djaria? Thank you, Guy, and hello, everyone. I will begin with safety. As Ian mentioned earlier, we sadly lost our colleague, Mr. Guillemin Leon Bado, who had been with our ET mine for over 30 years. He passed away on the 7th of October after being found unresponsive in the processing plant. Our thoughts and prayers remain with his family, his friends and his colleagues. Following a comprehensive investigation, we are implementing several recommendations, including an expansion of camera coverage in the process plant, as well as testing currently some wearable technology to support earlier incident detection and prevention for employees who are working alone or in distress.

22:22 In addition, we have commissioned an independent third party review of our operational risk and safety culture. And this month, Ian and I will be hosting a contractor CEO safety workshop in Abidjan. And that is really to ensure that all our business partners are fully aligned with our health and safety requirements and we affirm their own commitment to zero-arm. While our trailing 12-month total recordable injury frequency rate of 0.67 remains below industry average, the commitment that we have to zero-arm for everyone at our operations is achieved.

23:10 If we turn to slide Our performance over the first month of the year positions to achieve a high-quality portfolio. The strength of the portfolio helps mitigate variability, allowing high-performing assets to offer up-to-date performance. Our performance is expected to be in the lower half of the guidance range, and stronger than expected performance mitigates. We expect quarter four to be our strongest and Sabado Power in line with and remains on track.

24:08 Royalty adjusted basis. We expect quarter We've also improved compared to Q3. That is due to the higher rate and lower contribution from the higher rate. On slide 31, I will start by providing a brief overview of what we saw in the last quarter. On slide 33, we saw a decrease in the number of trips at the end of the day, which coupled with the impact of the website, to a decline in production by a quarter. Oil production costs have decreased due to the loss of sustaining capital with a proportion of the strong other-end of the rate classified from sustaining to not-sustaining capital.

25:03 This reclassification was related to the privatization of mining and the slight delay in stocking the waste Can you hear me? Can you hear me?

25:27 Hello? Hello?

25:44 We can hear you, Djaria.

25:46 Very good. I do apologize. I'm not sure when the line was lost, but I'll go back to the beginning of Hyundai. So on slide 31, I will start with a mind-by-mind overview with Hyundai. As we flagged last quarter, quarter three was the peak of waste stripping activity at Hyundai. which coupled with the impact of the wet season has led to a decrease in production during the quarter. Oil in sustaining cost has also decreased due to lower sustaining capital spent with a portion of wet stripping at the Vendaloo main pit reclassified from sustaining to not sustaining capital.

26:32 This reclassification was related to the prioritizations of mine mining or mining and the slight delay in starting the wet stripping activity. Looking forward, we expect a stronger quarter flow at Hyundai, mainly driven by higher grid ore following the completion of wet stripping at the Vendello Main 3 pits. As a result, productions and oil and sustaining costs are both on track at Hyundai for four year guidance. Turning now to ETI. Work production decreased in the quarter as we processed lower grades from the Le Plaque as well as Zia Peat as expected.

27:18 Despite this, oil and sustaining costs improved due to lower sustaining capital following the completion of the wet stripping at the Le Plaque and a buildup of stockpile inventory. In quarter four, we expect grades to increase as we mine more higher grade ore mainly from the Bay Tool, Walter and the Le Plaque pits. As a result, ET remains on track to achieve its four-year productions and cost guidance. While costs are currently tracking below the low end of the range, the higher sustaining capital related to stripping activities and plant upgrade in quarter four is expected to bring all in sustaining costs within the guidance range by year end.

28:10 We have also reduced non-sustaining capital spend for the full year by 20 million down to 25 million as we focus on advancing the details engineering around the resigned plant upgrades before we implement it fully into next year. On slide 33, at MANA, production and cost for the quarter were consistent with the prior quarter as higher grades offset the impact of the pause in mining activities at the Avira portal. After the end of the quarter, on October 28th, we paused all underground mining activities due to access ramp subsidence on the ramp leading to the Wona open pit.

29:02 As a result, we expect production to be significantly below the lower end of the production guidance with costs above the top end. Capital expenditure guidance is on charge for this year. So on slide 34 and 35, I want to highlight what has happened. and also provide you with an update on our geotechnical findings so far, as well as the outlook. The access ramp leading into the Warner pits and eventually providing the access to both Danguna and Avira portals partially subsided, which meant the ramp was no longer usable and the surface access to the Danguna and Avira portals was also restricted.

29:56 Access to the third portal of WONA is via a different ramp and that access is not impacted. However, following the ramp subsidence, we paused all underground mining activities as a precaution and we launched a comprehensive geotechnical review. In the first two weeks since the incident, The geotechnical review focused on visual inspections as well as drone-assisted scans across the upper levels of the Warner Underground Walkings, where so far no anomalies or evidence of ground failures were found.

30:41 While the review is still underway, it has identified a significant north-south trending graffiti shear zone, which runs through the affected area. These geological structures, coupled with the historic use of the sub-level open-stopping mining method, especially in the shallower portion of the underground walkings, may have contributed to the subsidence event. Now, if you go on to slide 35, in terms of next steps, we continue the geotechnical review While we also increase our routine geotech monitoring program using various methods radars lidar as well as insert data to ensure safe operations and also advancing into the avira portal in terms of the underground activities we expect to re-enter wona in quarter four Initially we would like to focus on stabilizing the shallow area of the deposit as a precaution before we restart any ore mining which is expected in quarter two 2027 and that is subject to all the relevant regulatory approvals.

32:10 At the same time the geotech review will continue to advance through Aviera with the objective of a sign-off to re-enter. Once re-entry is authorized, we expect to start remediation works that are currently planned to extend through to Q2 next year, and that is to provide access and avoid the area in close proximity to the subsized section of the REM. In terms of open pit activities, we are working on accelerating the Banner Camp open pit, and we have now received the mining permit. At the same time, we will start grid control at the Maula open pit ahead of ore mining which is expected in Q2 2027, subject of course to positive drilling results.

33:04 We expect processing to remain paused until Q2 2027 to allow for stockpiles build up, therefore support a stable operation. It's a little premature to discuss guidance for 2027, as we are still in our budgeting process at the moment. But a detailed guidance will be provided with our usual update at the end of January. So in short, we will expect full year 2027 production to be impacted by the lack of processing, especially in quarter one. and the ramp-up of underground mining activities from Q2 onwards.

33:53 However, at the group level, we are focused on opportunities across the group to boost production and particularly from La Cigue and Sabado La Massawa, where we do see some scope through an increase in throughput as well as higher-grade ore. Now moving into slide 36 with Sabadolla Masawa. Production increased slightly due to improved meal availability following a maintenance program from quarter three and the addition of higher grades from Masawa zone stockpile, which was through the bio explant as part of the test work program.

34:41 The test work program results in lower recovery as previously communicated. Our baits better than expectations as we blended the ore from Masawa North Zone with our main feed from the Masawa Central Zone. A focus on optimizing the recovery rate. Based on this test work, we expect to start processing the Masawa North Zone fresh ore late in 2027. During the quarter three, oil in sustaining costs decreased, which is driven by lower sustaining capital and higher gold sales. Now, looking ahead at Sabodala, we expect a stronger quarter four of both process plants.

35:28 Higher grade ore from the Nyaka Ferry West, Gumbati and Samina Pit is expected to support an increased production through the CIL plant. while at the same times we continue optimizations in the biox plant to deliver higher throughput and even better recovery. So at Sabadola Masawa, we're well on track to achieve both production and all in sustaining cost food guidance for the year. Now La Figue on slide 37, we've had a very strong nine months at Lafayette, mainly driven by the outperformance of processing throughput, which has achieved an 11.5% above design nameplate for the year to date 2026.

36:25 In quarter three, production decreased slightly due to increased road run of lower grid stockpile during the wet season, while the oil and sustaining costs increased slightly due to higher mining costs through the wet season. We expect slightly lower production than Lafayette in quarter four as we begin the pre-stripping for the next pushback at the main and wet state, which is result in lower grade and lower throughput. But given the strong performance so far at Lafayette, the mine is on track to deliver near the top end of its production guidance with costs near the lower end of the range.

37:12 Now if we move into slide 38. At Lafayette we've launched a 16 megawatt solar power plant project to help lower cost reduce our CO2 emissions by nearly 27 percent and also diversify our power sources. The deferred purchase sales agreement with Total Energy ensures We incur limited upfront capital and lock in a low unit rate for solar power for the reserve life of mine. We are launching construction in early 2027 and we expect to complete construction in early 2028, supporting again our target to reduce our CO2 emissions intensity by 30% by 2030.

38:07 Thank you everyone. I will now hand back over to Ian for his conclusion remarks.

38:14 Thanks very much, Djaria. Before we open up for Q&A, let me just take a few minutes to walk you through why we believe Endeavor is still a very compelling investment. We have a strong track record of delivery and exploration, project development and operations, which has helped build the high quality and resilient business that we have today. But we've not stopped there. We're future-proofing through our organic growth projects, including Asafo and the Sabadala-Masawa underground expansion, driving sector-leading organic growth to the end of this decade. And in addition, our new ventures exploration strategy provides a solid foundation for new projects into the 2030s.

38:59 Thanks to our high margin production, strong free cash flow generation, and Healthy Balance Sheets Trent, we can pay a sector-leading shareholder return whilst we continue to grow. So in short, Endeavor offers a rare combination, strong cash flow, an unrivaled organic growth pipeline, sector-leading shareholder returns and very few companies in our sector can deliver all three of those at the same time at such an attractive valuation. With that, let me hand you back to the operator and let's open the line for any questions you may have. Thank you. Thank you, dear participants. As a reminder, if you wish to ask a question, please press star 11 on the telephone keypad and wait for your name to be announced.

39:44 To withdraw a question, please press star 11 again. Please stand by, we'll compile the Q&A and we'll start. This will take a few moments. And now we're going to take our first question. and the question comes from the line of Daniel Major from UBS. Your line is open, please ask your question.

40:04 Hi there, can you hear me okay?

40:10 Yes Daniel, good afternoon.

40:13 Great, thanks so much, thanks so much for the questions. Yeah, the first one, you've provided a CAPEX update for ASIFU. I guess you'll provide more details with the full year results, but can you give us some A broad steer on the distribution of the 1.2 billion of spending between now and ramp up in commissioning in 29?

40:42 We said previously that for this year the likelihood is that we would spend around about up to 100 million. That 100 million was really focused on long lead items and obviously now as we started with the The crop compensation scheme and we've already started paying out to people that's where the 100 million will go there and then in in 27 and 28 I would say reasonable sort of balance maybe slightly biased towards 2028 for the the extra sort of 1.1 billion so let's assume you know up to 500 in 28 Sorry, in 27 and say about 600 odd in 28 and then preparing us for production coming in in the beginning of 2029. Okay, that's good.

41:44 Thanks. Sorry, just to clarify, you would still expend the group to spend somewhere near 100 million this year on growth capex. So implying you'll have a pretty significant acceleration in Q4 from SFE, just to clarify on that.

41:58 well you're going to see a big increase principally as I said because we started getting out the the crop compensation and obviously certain invoices coming through now you know for the long lead items so you know we're well underway but the hundred million obviously forms part of the 1.2 it's certainly not in addition to the 1.2 just for clarity's sake got it thank you and then my second question

42:27 yeah I mean on MANA we've obviously you know had a an incident an issue um you know that happens in this industry but I guess for some time the discussion has been whether this asset is um of a comparable quality to the rest of the portfolio um yeah I guess it's been another source of downside to guidance offset by other assets you know when you look at Manor, is it still core in the portfolio in the potential you see in the asset?

42:57 I said before Daniel you know up until this particular incident you know it has been strongly cash generative it's made a very healthy contribution to the group this is an unfortunate hiccup as Jaria said you know we're grateful that there was absolutely zero injuries as a result of this incident The initial on-site investigations, I've been on-site with Djaria and the team, the on-site investigations lead us to believe that there is a workaround to get back in underground on the operation. It's not going to be an overnight turnaround story.

43:42 It will take some time. Based upon the information that we now have, certainly with Understanding the importance of this sympathetically aligned graphitic shear zone in the the shallow areas that certainly I think for the abundance of caution says to us you know we should be extremely cautious about going back in again we're going to do it in a way that is responsible that is properly thought through we'll make sure that We will not have this problem again and certainly the deeper operations, everything that we have seen, we're not seeing any further deterioration.

44:29 I think the important point to make here is this is not like say for instance in South Africa where you have significant ground movement due to seismicity. There was no associated seismic activity with this. It is just simply an unraveling Thank you very much. There may well be additional www.miningplc.com at the end of January next year when we do the year-end results.

46:06 Okay, thank you. And then just one more if I could. Yeah, very much I think the market appreciates the increase in capital returns. When we look at what you said earlier in the year, you said $600 million of capital returns if the gold price was $4,500 million. I guess it's probably going to be slightly below that, but would it be fair to say that somewhere between 500 and 600 million of capital returns for the full year would remain the target on the basis of the 600 at 4,500 you previously gave?

46:43 Look, we never give forward guidance on something like that. Your calculator works as good as ours does. But I think as we said in the narrative, and Guy mentioned it, We're still in a sound position to be able to give very, very good returns. I would not want to give an exact number, but we're still in a strong position to continue being a sector leader when it comes to shareholder returns.

47:17 All right, I'll leave it at that. Thanks so much for the questions. Thank you. Just give us a moment and now we're going to take our next question. And the question comes from Christiane Kosciani from National Bank of Canada. Your line is open. Please ask your question.

47:40 Hi there, everyone. Congratulations on the strong quarter. Thanks for taking my call. Could you just walk us through what's required on the regulatory front to get the open pit mining started at Bannecamp and Maola, if anything, especially now that you've received that permit for Bannecamp? and similarly for the restart of underground mining at Wona, Dancuna and Vieira. Have those conversations with the authorities already started?

48:03 Yeah, Christian, thanks. Two great questions. As you know, we have now, after some delay, we have now received the official permit to go into Barnacamp. We had already done some preparation work so that once we got that approval we could sort of start getting stuck in there will be some limited sort of ground movement in terms of a little bit of stripping leveling off of areas creation of drill pads we'll be doing some advanced grade control drilling just to to firm up all body models and on the basis of that It would be our intention to start doing some stripping hopefully early next year and we will be looking to be in a position where we could start stockpiling ore from from Bionicamp and from the other permit by certainly moving into Q2 of next year once all the stripping is done. These are not areas of Thank you very much.

49:39 starting sometime in the first half of 2027. With regard to approvals for restarting underground, we've already had conversations with the Minister of Mines who's following the whole process very carefully and has certainly insisted that his team and his advisors should be strongly associated Firstly with the program, secondly with approval of that plan and then finally giving the overall approval to commence operations. Bluntly as you would expect any responsible regulatory authority in any country to do.

50:25 So there's good, open, transparent conversations taking place with the authorities and we're making good progress in that regard.

50:38 Thanks for that. And for my second question, I just wanted to get some color on the grade profiles for Hyundai and Latige. At Hyundai with Vindaloo main phase 3 dumps, is the big Q4 step up a peak or should we expect it to be the new baseline for 2027? And at Latige with the next main and waste pit pushback starting at Q4, how long and how deep is the grade and recovery dip as stock pile feed rises? Thank you.

51:06 Yeah, I'll let Djaria give you the detailed response on that.

51:11 Thank you, Ian. Christian, I believe, again, sorry, because I'm in Abidjan, the line is a bit unstable. You were talking about the Vendelumens 3 at Hyundai in terms of stripping, isn't it?

51:24 Yeah, I just wanted to know whether the great step up with

51:30 thank you for is going to be a peak so it's going to move back down again in 2027 or should we consider uh the great step up to be the new baseline moving forward that's Monday okay thank you no i think as we we've communicated earlier uh vendor lumen three was made the main source of the productions in 2026 so now that we've done the the peak of the stripping uh we're seeing the the higher grade that we're expecting We do not believe that it will go back down obviously at each because it's all based on the mite sequencing so we will make sure that throughout 2027 and onward we also do we always draw stripping and then we see the higher grade but what we're seeing today I think it was expected and we've already communicated way before that we'll be doing a higher stripping but what you're seeing today again is all part of the mine sequencing there won't be whether or not it will be the baseline I think it will depend on again what we're trying to achieve and I think we always said let's try and maximize our production in quarter one quarter two always quarter three you'll see a dip and then it'll come back again into quarter four but we also make sure that we always try to sequencing as such

52:48 Great, thank you. Thank you. Dear participants, as a reminder, if you wish to ask a question, please press star 11 on your telephone keypad and wait for a name to be announced. Dear speakers, I don't have further questions. I would like to hand the conference over to the management team for any closing remarks.

53:24 Thank you very much indeed and thank you everyone for your participation today. As usual, if any of you have any thoughts or ideas or questions that you want to raise, having digested the results, please feel free to reach out to Jack and his team and we'll respond as quickly as we can. Thank you all and we look forward to seeing you all again when we do our full year results at the end of January. Thanks very much everyone and good afternoon. This concludes today's conference call. Thank you for participating and now all disconnect. Have a nice day.

Follow Endeavour Mining PLC into a list and get an email when it puts out news.

Latest news releases

Companies on this call

Speakers

Christiane Kosciani

Analyst, National Bank of Canada

Djaria Traore

Executive Vice President of Operations and ESG

Jack Garman

Vice President of Investor Relations

Ian Cockerill

Chief Executive Officer

Guy Young

Chief Financial Officer

Daniel Major

Analyst, UBS

More from Endeavour Mining PLC