Replay available

Cemindia Projects (NSE:CEMPRO) Q2 2027 Earnings Call

Cemindia Projects (NSE:CEMPRO) Q2 2027 earnings call, held 2026-11-06. Watch the replay and read the transcript on 6ix.

Fri, November 6, 2026 at 4:34 AMendedReplay
Cemindia Projects (NSE:CEMPRO) Q2 2027 Earnings Call
Company
Cemindia Projects Ltd (NSE:CEMPRO)
Period
Q2 2027 earnings call
Date
Fri, Nov 6, 2026, 4:34 AM ET
Replay
Watch the replay on this page · 41 min

On 6ix: 6ix.com/event/cemindia-projects-limited-cempro-q2-2027-earnings-call

Replay

Transcript

Automated transcript · Written by software from the replay's audio. It can mishear names and figures; the replay is the record.

0:01 Ladies and gentlemen, good day, and welcome to CEMPROJETS Limited Q2 FY 'twenty seven Earnings Conference Call. As a reminder, all participant lines will be in the listen only mode, and there will be an opportunity for you to ask questions after the presentation concludes. Please note that this conference is being recorded. I now hand the conference over to Mr. Mohit Kumar from ICIC Securities for his opening remarks. Thank you, and over to you, sir. Thank you. Good morning. On behalf of ICICI Securities, I welcome you all to the Q2 FY 'twenty seven Earnings Call of Cemindia Projects Limited.

0:52 Today, we have with us from the management Mr. Jayanta Vasu, Managing Director Mr. Ritesh Sharma, CFO and Mr. Rahul Agarwal, Head of Investor Relations. We'll begin with the opening remarks from the management, which will be followed by Q and A. Thank you, and over to you, sir. Results call of Cemindia Projects Limited. I'm Nitesh Sharma, CFO of the company, and I welcome you all and wish you a very happy Dantiras. Before we begin, please note that today's discussion may include forward looking statements.

1:37 These statements are based on management's current expectations and assumptions and are subject to risks and uncertainties that could cause actual results to differ materially. The company undertakes no obligation to update these statements publicly. I will begin with our financial performance for the quarter and the half year and then cover certain developments, order inflow and order book. Our Managing Director, Mr. Jayanta Basu, will then take you through our operational performance. So taking you to the first quarter FY 'twenty seven performance. The total operating income of INR 2,749 crore, up by 25% year on year basis from INR $2,001.95 crore to in Q2 FY 'twenty six.

2:23 EBITDA of INR $2.80 crore, up 15% Y o Y from INR $2.43 crore in Q2 FY twenty twenty six. EBITDA margin of 10.2% compared with 11.1% in Q2 FY twenty twenty six. FAT of INR 131 crore, up 21% year on year from INR 108 crore in Q2 FY twenty twenty six. Now I'll talk about H1 performance. Total operating income stood at INR 5,470 crore, which is up 15% year on year from INR 4,772 crore in H1 FY twenty six. EBITDA of INR $5.65 crore, up 12% year on year from INR $50.04 crore in H1 FY 'twenty six. And EBITDA margin of 10.3 compared with 10.6% in H1 FY 'twenty six. PAT of INR $2.71 crore, up 10.8% Y o Y from INR $2.45 crore in H1 FY 'twenty six.

3:17 As on 09/30/2026, our net worth stood at INR 2,619 crore and net debt of INR $7.73 crore and net debt to equity ratio of 0.3x roughly. Now certain developments, which has happened in last quarter. So we raised INR 1,400 crore to our QIP, issuing INR 1.26 crore equity shares at INR $110.08 per share. The issuer attracted bit of around 2.3x, the base deal size of INR 1,000 crore from a diverse set of domestic mutual funds and other financial investors. A strong vote of confidence in our growth prospects. The issue proceeds will be placed primarily for CapEx, a repayment of certain borrowings, working capital requirement and general corporate purpose. That will provide further impetus to the company's growth plans.

4:06 A very significant development, which has happened in last quarter is that we have received positive ratings across actions from all creating agencies. ICRA has upgraded both long term and short term rating with AA stable. KL has upgraded to AA minus stable again, and Crystal has assigned a fresh rating of AA stable. Order inflow momentum remains strong. Since the quarter of the since the start of the quarter, we have secured new orders worth INR 5,968 crores, that is INR 3,487 crores in Q2 FY 'twenty seven and a further $2,004.81 crore in October 2026. So that makes our order book stood at an all time high of INR 32,715 crore with strong revenue visibility as well as diversified across eight business areas, that is maritime structures, urban intra, MRTS and airports, industrial structures and buildings together account for 62% of the order book, with data center contributing around 15%.

5:08 So that's it from my side, and I'll hand over to Mr. Dhyantha Basu for update on our operational performance. Thank you all. Thank you, Nitish. Good morning to all, and happy Dhyantha Basu. There are a few items which I have to highlight for the last quarter and H1 performance before I discuss about the performance of the project. The Cemindia, Iqra and KIR, they have the ratings has Upgraded. Upgraded, which is very significant to our company. And QIP, just Nikesh has mentioned, all of you know that. And another thing that we have been awarded few arbitration award and some award, they have been also received in terms of payment also. Like in Ugandan, we have received INR 85 crores additional claim, which is significant to our company.

6:01 Otherwise, if you see that this quarter, our revenue is around INR 2,700 crores, which is just 1% more than the last quarter. But if you see traditionally, second quarter is always less by 10% to 15% compared to first quarter. This time, it is almost same quarter to first quarter, which is a good thing. And the job of what we have now, I don't think any job which is doing bad. Significant event is Badawan Port, which was not progressing for last one point five years, but now we have started the work. The activities are going on outside, which is a good sign. And the major jobs like Cemindia Projects completion. Bangalore Metro is also a part of completion.

6:49 Ulaan Gudi is completed handed over. Bangladesh job, which is very difficult in terms of political situation, we could be able to complete substantially, payment received. Abu Dhabi job at main job at Abu Dhabi also going on well. We have started Pune Metro and Delhi Metro. We have started main job at Dota Zari Port is getting completed. I've got a new job at Calcutta. So overall, the job scenario is good. New jobs have started, old jobs are getting completed. Today, we have 32,000 crores of work in hand, which is also significant because normally, it is to be around INR 20 crores, 21,000 crores.

7:36 And already, we have secured around INR 15,000 crores of jobs in first two quarters. So our target of INR 25,000 crores for this year will definitely be achieved and if it can cross also. And if you see the job in pipeline, more or less around 130,000 crore of jobs are in pipeline at various stages. Out of that, marine will be around INR 25,000 crores, underground metro, 6,000 crores, tunnel, road tunnel and railway tunnel, 25,000 PSP 10,000 crores and elevated metro around 5,000 crores. So and nuclear also INR 25,000 crores.

8:24 So plenty of jobs in the pipeline. These are all external jobs. In addition to that, there are lot of internal jobs from the group, which involve data center, again, PSP, power plant, which we have not been sitting here. So the jobs are going okay. Cash position is good. And if you see our net worth is around INR 2,600 crores, ROE 27%, ROCE 33%. Debt equity around zero point... Net debt, 0.3. INR 0.3. And CapEx, 150 crore so far, working capital, ninety six days and inventory, twenty eight days. So these are the parameters which we monitor, and all the parameters are within control or getting better.

9:14 It's in our sale. That's all about the company's performance. We're happy to have any questions from you, and we'll be answering that. Thank you. Thank you, sir. We will now begin the question and answer session. Participants are requested to use handset while asking a question. Ladies and gentlemen, we will wait for a moment while the question queue assembles. The first question comes from the line of Tananjay Mishra with Centrum Broking. Please go ahead.

10:18 Hello, sir. Hope I'm audible? Yes. Yes. Yes. Yes. So my question is... I mean, congratulation on very strong as we said in q one. So my question is about the margin side. This quarter, if we exclude other income, it is 9.7%. So how do you look margin going forward in H2, whether we will be able to achieve 10.5 kind of margin on full year basis? Yes. I think as we have maintained our guideline, we'll be able to do 10% plus. But margin is always a challenge because sometimes certification gets delayed, sometimes we cannot start the execution because of various reasons.

11:04 But still, we are confident to have around 10% margin on an average throughout the year. Okay. But I mean, Q1, we had some impact on commodity inflation and labor issue. So how we are placed in Q2, whether we have seen improvement in that sense? In general, there are few jobs which have not achieved the threshold limit to declare the margin. One of them is Vadawan Port. And so and as you know that a lot of new jobs have secured recently, like most other, like Munges, K Rides, DMRC Pune and all. So all this will convert it to margin after one or two quarters. So last quarter, we may get the impact of that.

11:57 So if you put to the Excel sheet, it is automatically coming that we'll be able to achieve the margin. Okay. And sir, in terms of order inflow, could provide some detail about Q2 order inflow? We had about INR 3,500 crores. Optima also, we are listening 2,500 crores job we have got. So all if you could give detail of the job, which segment we have received this job. We have got data center from our group company, we have got around 1,000 crores in Andhra Pradesh. We have got Damla Port around INR 800 crores. Project Versa for Indian Navy, out of Harbour, we have got INR 700 crores.

12:43 Then from GSW, we got a contract INR $2.31 crores, 35 crores. So altogether, 3,400 crores they have received in last quarter. So which is mostly marine and data center. And in October, sir? October, we also got INR 2,500 crores. October, we have got Jaipur Metro, INR $7.81 crores. K Ride at Bangalore, we have got INR $6.60 crores and INR 1,000 plus crores that we have got from group company, Dhubri, total around INR 2,400 crores. Okay. So we are on track to achieve our INR 25,000 per order inflow guidance. There will be no miss on that front?

13:35 Very much, very much. We will achieve more than that. Okay. So any any development on this new phase two, whether Adani is looking for awarding that project? I think we can be designing a phase as of now, and we are looking to for the contractor to be ordered. What is the likelihood of it coming in Q3? Yes. I think they are discussing with the prospective bidders. We are one of them. And discussions are in the advanced stage. Hopefully, by Q3 or later by Q4, the work will start. Okay, sir. That is all from my side. Thank you. Thank you. Thank you.

14:25 Thank you. The next question comes from the line of Aditya Sahoo with HDFC Securities. Please go ahead. I had a query on the... I think you've provided the guidance for the order inflow and the bit margins. On revenue front, are we still maintaining the guidance of 20%, 25% that we had already sort of indicated? Yes. Yes. We are maintaining the same 20%, 25%. Understood, sir. Understood. On the also on the CapEx front, I think you had mentioned INR 150 crores of CapEx we have done in H1. What sort of are we looking at in H2 and FY 'twenty eight? Considering that we have also done the QIV, so a little bit insight on that would be helpful. Yes, there could be two scenarios.

15:17 Normally, maybe another 150 crores, INR 200 crores normally. But if you are able to secure a big job, which involves larger diameter TBM, this can go up to INR 1,500 crores. But the major will come in the next year's financial year only because this will have at least fourteen to sixteen months of deployment, the larger ones, I would say. So this year, the number would be around the same, what the variance number will be INR 150 to 200 crores. Okay. Okay. So in 'twenty eight is when we should expect the TBM and INR 1,015 INR 100 crores for CapEx to be deployed? Absolutely. Understood, sir. On the on the receivables front, you know, we had mentioned, I think, that, you know, we had some receivables from Bangladesh, and that was in the close of completion.

16:09 So have you sort of completed the job in Bangladesh and any other backlog over there to receive and also on the receivables? There is no backlog as per the terms of the contract and whatever work we have done that has been paid to us. And most of the job is completed now, so Bharat Ramondus also be coming soon. Understood, sir. What would be the l one position right now that we have? So far, I don't think we are in a there is no job which we are L1 is up to today. Yes, yes. So there is no such tender, which has been opened and we are in urban position today. There are various tenders which are in pipeline, so not not a position today.

16:54 What we what we say is in October, what we have got is 2,500 odd crores of new orders. That is the position what we have. Okay. Okay. A little bit on the data point, you know, if you can provide on the group and non group sort of bifurcation pertaining to the order book spread and the order inflow that we have in H1. So how much has that been from group and So group stands at roughly, let's say, 53% to 54% of the total order book composition. That means that during the last two quarters or say three quarters, the major influx has come from the group, which is around 70 plus percent. Regarding Okay. Data center, so far, our work in hand is close to INR 5,000 crores, INR 6,000 crores.

17:45 But there are opportunities of plenty because it is not only in Mumbai, there are Hyza, there are Gujarat also. So many of the other data center we are pursuing with our group. So others who will be more and more in this segment. Understood, sir. The bid pipeline that you have mentioned, 1.38 lakh crore. On that front, so how much of the bid are you looking at from group entities and from external bids? So bifurcation on that also? Bifurcation of that as far as prospect is concerned is very difficult because external, we whatever we have, we have just mentioned.

18:31 The internal, there are plenty and it comes so often. So it's very difficult to say that what is the situation as of... So when you say INR 130,000 crores of pipeline, this is mostly this is external what we are talking about. Okay. Okay. Internal is beyond that, and the numbers are floating because there are there are multiple inquiries going on. And Right. So so group group group order inflow is sort of moving is what you're trying to say, but the $1.1.3 lakh crore that you have mentioned, the external pipeline that you're targeting? External pipeline what we are talking about. Yeah. Understood, sir. I'm just wondering. I'm... I think I just wanted to check if is it possible that you can give the revenue spread, you know, between the group and non group, like, you know, how much... In terms of h one, how much that has been? It's close to 35% from the group side, 35% to 36 from the group and balances from the non group for this year. Gradually gradually, you'll see the the composition that's trending towards the order book composition what we have.

19:37 Understood, Understood. Thank you so much. Thank you so much. Thank you. The next question comes from the line of Abhinav with ICIC Securities. Please go ahead. Good morning, sir. Thanks for the opportunity. My fourth question is pertaining to data centers. Just trying to understand how has been the execution of these orders till late? Has the execution started? Has it contributed to the revenues? And on an average, what is the timeline to execute these orders? And can we expect any further order inflows in the coming six to nine months on the data centers? Well, see, data center has got two major components. One is your civil structures and next one is the electromechanical part.

20:29 Normally, 20% by 80%, CV is 20% in terms of value, and this is 80% from the electromechanical part. And we have got now one, two, three, four, five, and six data centers we are working now to advise that and three here. And there are four here, I'm sorry. And there are few more we have just started in the yard. So civil structure for the first and second data center has come up well. Just for your understanding, if it is 10 storey building, we have almost done up to eight storey building recast. So that is going on well. Here to mechanical part for first two data centers, almost vendors are finalized.

21:17 The order has been placed. I'm not able to tell you exactly in terms of value how much it has been done, but it is so far as per the track. Understood. So just trying to understand, I mean, can we expect growth in this contribution of data center in the coming quarters? Yes. It depends upon how fast we execute the electromechanical part, as I've just mentioned to you. A large chunk of revenue is there. So once the things start coming, like supplies and start directing them, placing them, the revenue will generate. And the average time line will be to execute these orders? It depends upon see, various data centers have various stages.

22:03 First one is to start able to collecting them from the next year, January, February. By mid of next year, we will see large chunk of revenue will come from data centers. So Q4, we'll see the traction of revenue coming from the MEP front from the electromechanical front in data center. Typically, will be eighteen to twenty four months. Once we complete that, then the electromechanical starts. That's how the structure is. Understood. So any color on the margins and also any expected orders in the coming quarters on the data center? I think in our business, margins are you know that. I mean, I don't have to say anything new. It varies eight, nine, 10, 11, 12, 13 in that range only.

22:53 So it depends upon the segment. Of course, underground sector and marine gives better margin. Data center being a job which is not the specialized job, I should say that. We don't expect the margin more than 10%. Understood. And in the opening remarks, you mentioned that Q2 has been flat compared to q one, which is a good sign, you know, given historically q two is always subdued compared to q one. This is a sign, I mean, a sign of, you know, the order that we had one at the end of FY twenty six. Those kind of picking up and, you know, in further quarters, there would be much more growth than, you know, what what we've seen in the... In the in the second quarter. That assumption will be right. Right?

23:45 No, I have not gone for the root cause analysis. But basically, probably, last year or second last year, we have done more work, which is affected by the rain, like road work, which we cannot do during monsoon. But probably this year, that type of work is less and work which I have that can be done during monsoon. That could be one of the reason. Understood. Thank you and all the best. Yeah. You too. Thank you. The next question comes from the line of with Equity Securities. Please go ahead. Yeah. Hi. Thanks for the opportunity for calling. Yeah. Yeah. Yeah. And congratulations on a good side of.

24:31 Also, my question relates to the project that we were supposed to get from the. What we see is that there has been some, you can say, issue going on with the, let's say, government, coalition parties in the group regarding, you can say, the the... A project. And on this particular project also, there has been some restriction from the China as well in terms of tunnel boring machine. So how do we see this project? Like, by when project would be awarded to the group? By when we'll be getting it from the group? And if we are going to do the CapEx for TDM, will it be from India? Or will it how does we do it from, you can say, any other country for that particular purpose? Okay. I think I should answer it step by step. First of all, whether the order will go to the group or not, I cannot have any comment on that because neither I'm bidding the job, neither I'm giving the job.

25:21 So it is between the group and the entity, they have to sort it out. If group gets the job, there's a high possibility that we will get the job. That is for sure. And if we get the job, TBM will not be a problem. China cannot stop us doing business. There are other countries as well from where we can get TBM. And that is also we are pursuing that. So China is not an issue at all. Got it, sir. Got it. And sir, the front end that you have done, it is for the large CapEx and something that we will be targeting for some jobs. If, let's say, this particular order doesn't turn off, will there be any specific projects that we'll be looking at for which the CapEx would be required for us, which eventually get funded from the PLT proceeds?

26:08 See, when you do business, you have to take some chances. So if we get the job, then where do you get money? There is the money, and we are hopeful that some of the job will come. It is not only one or two, there are six, seven jobs are in pipeline. Something will happen. And if that doesn't happen, then we have money to spend for something else. We'll see about that. So large PBMs, there are not only this Bangalore one, but there are at least four other jobs which are in pipeline, other tenders, which we are working on closely. And there are very likely chances that at least one we should have. Got it, sir. And just last question from my side. If we see our trajectory over the last four, five years, we have gone from, let's say, 5,000 here to 10,000 here of top line, we are targeting twenty twenty five odd percentage growth.

26:56 Our order or you can say order visibility has also improved because of the Adani taking over us. And eventually, you can say there has been lots of contract that you'll be getting. Our eligibility criteria has changed over a period of time wherein, let's say, earlier we used to target projects of some maybe, let's say, 100,000, 2,000. Now we would be targeting something maybe four, five, 6,000. Anything on this, like, to see the visibility for medium to long term, what kind of projects we'll be doing? What kind of size of those projects would be? And eventually, for a longer term, what kind of, you can say, growth we can see on a top line on a consistent basis? Well, I think this is a very relevant question. And as you rightly said that we are targeting jobs, which is big ticket job. I mean, once upon a time, used to do 20, 30, 40 road jobs, then we come to 1,000 crores. Now we are targeting INR 3,000 crores, 4,000 crores plus.

27:45 And we are targeting because we are able to do them and we are able to get qualified also. So that is number one. And number two, when you have to do more revenue, you require more leaders at positions who can deliver. So if you have four division or five division, you can achieve certain amount of revenue. If you have seven or eight division, you can definitely achieve more revenues, provided you have good leader. We are focusing in both of the things. One is development of leadership and targeting bigger jobs as markets are available. For next Got it, sir. For future, we say that at least for next three years' time, we definitely look forward for keeping a CAGR of 25% on the top line.

28:32 Got you, sir. Just follow-up on this, whenever we are going for large size also or anything, how do we see the, let's say, labor issue or if you see from execution point of view, of course, one thing is that you will get the order and you will have the materials and everything in place. So let's say the supply chain has been ready. But do we have the manpower and overall, you can say, processes to make sure that we are eventually able to execute an order over a period of time, like what could be execution challenges that we would see while growing at 20%, 25% over three years, which will eventually making our revenue from 10,000 to 20,000 over the next three, four years? Actually, I'll give you one small example. If we are exhibiting a job of building of INR 1,500 crores, we require INR 2,500 labors.

29:19 If we're executing INR 1,500 crore underground metro, we require 500 labors. So it totally depends on the segment where we are working. And we try to aware consciously the job, which involves a lot of manual labor, particularly building and some other structure like that. Where we cannot I mean, if we have to have labor force available for the building jobs, we have to find the ways and means, but better to try avoid such kind of business or labor force that require more. Try to do more decarized job, try to improve your technology. Those things are enough of us now. Thank you. You.

30:09 The next question comes from the line of Nipur Kimka with CD Research. Please go ahead. Yeah. Hi, sir. So my first question was given that your thesis is largely towards buying machines, which barely have any gestation period. So how fast will you be able to pull up your sales to prevent sharp fall in ROE? So by our estimates, sir, your ROE may fall to some 17% in FY '28, which was 28% in '26. So even if your sales grew to some, let's say, 15,000 crores in FY '28, still it will fall. So any comment on that? You have to leave with that because something you do for short term, something you do for long term, okay?

30:55 And sometimes you have to compromise this for the other one. So these are all exercised towards a long term issue. ROE may fall a little bit short term, but definitely will have much major impact going forward in long term. Yes. You must see this still up again happening at, say, post twenty four months large machines are deferred and they start contributing towards the top line So as well as bottom it's more of a long term call which is being taken here. Understood. Understood. But like, on the on the same lines, given the capital intensive nature of of our business, we have already diluted some 7% equity, and we plan to dilute more 15%.

31:40 So how cognizant are... Is the management of the growing pressure on ROEs in future? No. So that if you're referring to the enabling approval of INR 5,000 crore, that's just an enabling one. I mean, it's not about that the dilution is So seen I mean, we'll see the kind of progress what we have and the kind of conversions we have in the pipelines what we have written. And this is that a prudent call will be taken to have enough leverages as well because the balance sheet is very strong. We have got enough headroom to get leverages now to the desired level what we want to fund our future growth pipelines. Thank you.

32:36 The next question comes from the line of with NBS Corporate. Please go ahead. Hello. Yes, sir. So my question is that h two is typically stronger than the first half of the company. And now with healthy order pipeline and 25,000 crores of order info targeted for FY twenty seven, So is there a scope to exceed our revenue growth guidance for the current year? That is one. And second question was on the Vadwan course. So now the construction activity has been reportedly underway. So when can we expect the revenue contribution from a package to begin, and what kind of revenue potential do you post? Yes. I'll answer the last one first. One thing is that Vadawan Port activity has started. And now how fast we have to go, how fast we can go, it needs to be seen.

33:24 At this moment, it will not be fair on my part to give the revenue guidelines for Baduan Port. We're happy that work has started. We don't want to rush to make it a difficult situation. So that is my comment about Radwanpur. Regarding revenue and the margin growth of H2 with the work in hand and the work expected. So whatever we have today, that effect will come on next year. We don't expect much from this year. So I think we'll maintain the same guideline what we have done for H1. Okay, sir. The next question comes from the line of Akshat Shanti.

34:15 Good morning, sir, and congratulation on the strong performance, and thank you for taking my questions. So my first question is regarding data center business. I see that as of 09/30/2026, data center accounted for around 15% of your total book value. I also noticed in your annual report, '26 annual report, that your capabilities already cover CEMPRO, ME, and testing and commissioning. As the industry moves towards more complex AI oriented data centers, so do you see the company taking on a large share of these technically specialized scopes? And over, say, next three to five years, could this change the margin profile of your data center business?

35:07 You're absolutely right. At least volume of the business because of data center will grow quite substantially, I must say that, because there are a lot of opportunities, as you rightly said, and we are getting everyday inquiry. But we like to confine ourselves with the group activity, I mean, the data center, which is being done by the group initially because that is also quite handful of jobs. Regarding margin as because of new segment, we'll definitely try to achieve better margin. But let us see how it goes. Generally, I think we'll be able to predict over the margin, but volume was definitely will do a lot of work from this segment. Okay. Got it. And my second question is regarding the capital productivity.

35:57 I see following the INR 1,400 crore QIP in October 26, you have additional capital to support the next phase of expansion. Given that the different project categories, particularly strong tunnels and specialized infrastructure, can have very different capital and working capital requirement. So how do you evaluate the returns before committing capital to these projects? And how do you ensure that the expansion translate into stronger incremental ROCE and cash generation, say, over next three to five years? See, basically, these jobs are quite big ticket job, INR 10,000 crore plus.

36:43 And naturally, such jobs, you don't get much of competition. That is number one. And if you have proper technique and if you know the job, this job can produce good margin also. So with all these analysis only, we are going for such CapEx, whatever we have action taken. Now it is a matter of getting the job and executing them and see what happens to that. But there's definitely plan, and that has been done quite consciously. I can we can promise that whatever QIP has been done that we couldn't lose for the company's benefit so that every stakeholders can be benefited out of that. Okay. Got it. Got it. And thank you for answering my both the questions. Best of luck for the future.

37:32 You. Thank you. The next question comes from the line of Sunil Shah with Catalyst Asset Manager. Sir, I have two questions. One is on The U. One port and other is on the crude thing that we have with the current. Sir, this INR 7,500 crores of order book that we have for the port business, out of that INR 7,500 crores, sir, how much is pertaining to Vadvan Port? INR 1,500 INR $11,500 Okay. Fine, sir. I'm sure from the group business that we have, Adani Group, sir, like it happens in public sector units, you know, if there is another public sector unit, which is an L2 in any of the order, then they get a chance to match it to the L1 so that the business close to its public sector unit.

38:25 Even within our group, do we have any such possibilities that if Adani is trying to get some order and if hypothetically, if we as a company come as an L2, do we get some chance to match it to the L1 to get the order from the group? Does it work that way? See, it depends upon work to work project as a project because Adani also has their own company. And each company has their own management system, their MD, CEO. Everybody wants to protect their business interest. So just like that, they will not give the job to us. It has to do with the competitive bidding. And if you are L1, then we get chance. And so it's our business.

39:10 So all things goes on. Not like that, that they'll call us and give the price. I don't think that has happened ever so far. Sir, one last question. The group has committed a capital expenditure of close to INR 2 lakh crores every year for the next five years. So out of that INR 2 lakh crores of capital expenditure that the group is planning, how much is the addressable market or the potential addressable market for us of that INR 2 lakh crores, if we can get some sense on the number over there? I think it will be around INR 50,000 crores. Sir, so in the earlier remarks, you stated that our potential business from outside the group is close to INR 1 lakh INR 30,000 crores, and another INR 50,000 crores can be potential within the group. Is my understanding correct on this? Yes, you're correct.

40:04 All right. Thank you, sir. Thanks for this understanding and clarity. Thanks and all the best in the future. Thank you. Thank you. Ladies and gentlemen, there are no further questions from the participants. I now hand the conference over to the management for closing comments. Thank you so much for attending the call and wishing you all a very happy and safe Diwali. Thank you. Thank you, sir. On behalf of ICC Securities, that concludes this conference. Thank you for joining us, and you may now disconnect your lines. Thank you.

Follow Cemindia Projects Ltd into a list and get an email when it puts out news.

Latest news releases

Companies on this call

Speakers

Mohit Kumar

at ICIC Securities

Jayanta Vasu

Managing Director at Cemindia Projects Limited

Ritesh Sharma

CFO at Cemindia Projects Limited

Rahul Agarwal

Head of Investor Relations at Cemindia Projects Limited

Nitesh Sharma

CFO at Cemindia Projects Limited

Jayanta Basu

Managing Director at Cemindia Projects Limited

Tananjay Mishra

at Centrum Broking

Aditya Sahoo

at HDFC Securities

Nipur Kimka

at CD Research

Akshat Shanti

Sunil Shah

at Catalyst Asset Manager

More from Cemindia Projects Ltd