Replay available

Aurelia Metals (ASX:AMI) Q1 2027 Earnings Call

Aurelia Metals (ASX:AMI) Q1 2027 earnings call, held 2026-10-27. Watch the replay and read the transcript on 6ix.

Tue, October 27, 2026 at 7:00 PMendedReplay
Aurelia Metals (ASX:AMI) Q1 2027 Earnings Call
Company
Aurelia Metals Limited (ASX:AMI)
Period
Q1 2027 earnings call
Date
Tue, Oct 27, 2026, 7:00 PM ET
Replay
Watch the replay on this page · 41 min
Results news release
Quarterly Update and Outlook - September 2026 · Tue, Oct 27, 2026

On 6ix: 6ix.com/event/aurelia-metals-limited-ami-q1-2027-earnings-call

Replay

Transcript

Automated transcript · Written by software from the replay's audio. It can mishear names and figures; the replay is the record.

0:00 Thank you for standing by and welcome to the Aurelia Metals Limited September 2026 quarter report. All participants are in a listen-only mode. There will be a presentation followed by a question and answer session. If you wish to ask a question, you will need to press the star key followed by the number one on your telephone keypad. I would now like to hand the conference over to Steve Bardenhorst, Managing Director and Chief Executive Officer. Please go ahead.

0:27 Thank you, Mel, and good morning, everybody, and thank you for joining us for the first quarterly meeting for the new financial year for Aurelia Metals. I'm joined today by Martin Cummins, Andrew Graham, and Angus Wiley. It's also my first quarterly review, so I'll give a very short moment to give a brief overview of who I am. As announced at the beginning, I'm Steve Barton. I've taken the reins recently as the Managing Director and Chief Executive Officer for Aurelia. Most recently, I've been with Rio Tinto and a few other tier one mining organizations. My career as a mining engineer has largely been in operational leadership roles in everything from bulk commodities to base metals in both surface and underground operations in multi-mining jurisdictions.

1:16 I have a strong passion for operational excellence, which we'll cover later. Enough about me, though, and I'd now like to hand to Martin and the team to share the great news on our first quarterly performance, which he and the team delivered over the period from Brian's departure to my start a few weeks ago.

1:35 Thanks, Steve. And I'll be talking to the presentation that we released on the ASEC this morning. So turning to slide three, and really the key highlight this quarter is that our production growth is translating into stronger cash generation. Our copper, gold and zinc production was higher and our lead production was in line with the last quarter. It's that higher production that has again driven Cobar Regional operating cash flows to the highest quarterly outcome since 2018. And in turn, it took our cash and liquidity to over $200 million. Our growth projects are on track and we now have our leadership in place for Steve's commencement this month. So holistically, our operating performance and our balance sheet really sets us up well for our next chapter under Steve's leadership.

2:27 So turning to slide four, and as I said, a strong start to the year, setting us up well against our production, cost and capital guidance, which we have also reaffirmed. Our gold production of 16.2 thousand ounces was supported by continued access to high-grade gold ore from the Peaks Out mine. This amount represents close to 30% of the midpoint of our full year production guidance after just the first quarter. Our copper production increased to 1.3 thousand tonnes which was 43% of the midpoint of our FY27 guidance. We did process proportionately more copper ore this quarter than we will in future quarters and grains were strong but it sets us up well for copper production guidance for the year.

3:14 Our zinc production of 8.3 thousand tonnes was the highest quarterly result for zinc since FY22 and our lead production of 5.2 thousand tonnes was largely in line with last quarter, but importantly remains on track against guidance. Group operating costs were lower this quarter at just under 90 million, noting that in the prior quarter we were reporting rehab costs for DAGs that are now being reported separately. The main decrease in our operating costs this quarter was a greater proportion of costs being capitalised at Federation for mine development and some lower corporate costs. Our operating costs will vary quarter on quarter with movements in the amount of mine development completed, but we remain on track relative to our guidance. Just a side note on diesel, given everyone's interest, we've not seen any issues this quarter with deliveries continuing uninterrupted.

4:06 nor are we aware of any issues on the horizon in terms of future supply. For capital, sustaining capital was $13.2 million and growth capital was $11.7 million. For sustaining, we do have some investments in fleet in Q2 that are expected to increase the spend next quarter and that will result in a spend profile more closely aligned to the four-year guidance. Our exploration expenditure increased $4 million which was based on accelerated across our regional and underground programs and you saw some excellent results yesterday that Andrew will talk to later in the pack. So moving on to slide five and the key message here is that our mines are continuing to build the ore availability needed to support our planned production growth.

4:54 At peak mine development continues to track above 1500 metres per quarter and all mine was 148,000 tonnes. It was down slightly after a very strong June quarter, but is slightly ahead of our plan year to date. The investment I talked about last quarter in production drilling capacity has continued to benefit our mining rates. Drilled stocks increased from around 25,000 tonnes at the end of June to more than 70,000 tonnes at the end of September, with those additional drilling contractors now demobilised from site. At Federation, 97,000 tonnes of oil mined, We did have some issues with production drilling and loaded downtime and also some operator shortages in July, but pleasingly our mining rates have returned to plan in August and September.

5:44 From a development perspective we did have to actively manage water on the surface with our water management dam and our TSF at Herra reaching levels that required us to slow down our mine dewatering. This resulted in the need to store water underground until additional capacity in the dams was created. Our water management infrastructure was upgraded with the purchase of two large evaporator fans and the rental of a second reverse osmosis plant. Pleasingly, these efforts have resulted in water levels dropping in both dams. But as a result, our mine development was lower at 1147 metres for the quarter, with the impact primarily relating to the inability to advance the decline deeper. Our current focus this quarter is to dewater the remainder of the water in the decline and re-establish services which is on track.

6:32 And we expect the normal development rates from Q3 of this year. But importantly, we don't expect this situation to impact our FY27 metal production guidance. So turning to slide 6, and the plant continued to perform strongly, processing 226,000 tonnes close to the record of 230,000 that we achieved in the June quarter. For production, the key driver was grade, with higher gold grade and higher copper grade in our copper ore, and also for our lead-zinc ore, an increased proportion of federation ore in the mill feed, resulting in higher zinc and lead grades. And pleasingly, recoveries continued to perform well to maximise metal production.

7:21 But just as important is the mining performance I covered on the previous slide enabled us to build our ROM stocks, notwithstanding the strong plant throughput. The combined peak and federation ROM stockpile is now 123,000 tonnes at the end of September, which provides additional feed as the expanded plant processing capacity becomes available through Q2 FY27. So just moving on to slide 7 with the expansion projects and the tailings and process water management project is now complete. The existing tailings thickener has been repurposed as a second leach feed thickener and the new tailings thickener was commissioned in June. This project will support higher copper and zinc recoveries and lower our cyanide consumption.

8:11 The tertiary ball mill and the new cyclone cluster have also been installed and tied in. This week the mill has actually been running on both water and slurry as part of the commissioning plan, and we'll look to complete that commissioning this quarter, with the expanded plant capacity expected to be fully available from quarter three. And as we announced in August, the regulatory approval to operate the plant at the expanded rate has also now been received. So moving on to slide eight and Great Cova, and the project continues to advance in line with plan. Mine development increased to 506 metres for the quarter, up from 438 metres in June, which takes total project development to 2,380 metres of the approximately 4 kilometres to be completed.

8:58 Our underground development is currently being prioritised towards the location of the fresh air raise, which represents the next major development milestone. On surface, the concrete foundation collar for the raiseable rig has been completed, You will see a photo of the pour of that collar back on slide three. The mobilisation of the raised bore rig is planned for November, with the pilot hole expected to commence during this quarter. Design work is also progressing for the electrical and dewatering infrastructure, the grid connection arrangements and the heavy vehicle road intersection. The project, as I said, remains on budget and schedule, with first ore on track for financial year 28. Great Cobar as you know will become an important source of high grade copper and gold ore and forms a central part of our strategy to increase production through the expanded processing plant at peak.

9:52 I'll now hand the call over to Andrew to take you through exploration.

9:57 Thanks Martin. Now exploration seems to be extremely busy through the quarter as was summarised in the quarterly. Just touching on a few of those items, work on new Kovar Federation as well as regional targets that we're waiting on assays for and processing those results. So really our intention is to be able to bring you updates on both the Federation exploration programs as well as the new Kovar mine exploration programs before Christmas, and then hopefully an additional peak South mine exploration update in due course. but we have also been busy at Peak Southline and as Martin alluded to we did put out a release yesterday on that work so I thought today rather than run through all the things we've been doing for the quarter to which we're still working on the results I'll run through those Peak Southline results so there's four items to touch on they're covered on the slide 9 of the pack that went out today. Firstly, in the peak kairos gap, I suppose, so between the peak western lead-zinc lens and the kairos eastern copper lens, there's an area that was poorly constrained by drilling.

11:11 You'll recall that we tied in that development between kairos and peak a little while back. It's given us platforms to drill from, and drilling from that, we did intersect what are some... There's nothing short of stellar grades.

11:26 There's a metre at 1,120g per tonne gold that we released yesterday.

11:30 Part of a broader zone of stem metres, 113g gold, 1.3% copper. and that's in hole 224, which you can see on the image. Even if you take out the effect of the nuggety hit, it's still a very broad, very good-grade intercept of gold and copper between kairos and peak, and the view now that we have is that those two lenses are actually joined in a single lens, so it gives us plenty of opportunity to continue to target that from drilling. The other pieces we put out, we released results from drilling of the Kairos instant copper lens, which extended mineralisation 100 metres to the north, as well as 80 metres down dip. And then the third item of good news that we put out was drilling at Percy Zone A. That included 2.8 metres of almost 4% copper within 11 metres of 1.4% copper.

12:27 Similar to Cairo-Eastern Copper, that extended a long strike about 30 metres. and I'm not even mentioning as a whole, which we didn't highlight, 9.7 metres at 2.1% copper. So some great hits there for the North Perseverance Zone A. Finally, if you're looking at the image, or if you saw the image in yesterday's release, you can see a drill hole trace from surface to below Kairos. hole 217. We drilled from surface so that we didn't get impacted by acute drilling angles and talc that has made underground drilling of kairos extensions problematic. That hole is now in place. The intention is to drill a series of wedges, so daughter holes off that parent hole. And those who recall Federation some years ago, that technique was used to great effect significantly reducing the cost of drilling.

13:19 So the intention through this financial year is to come back and put a series of daughter holes off that Kairos hole. So we've been very busy on exploration. It was great to be able to bring you the Peak South mine results yesterday. We talked through those just now. And we look forward to bringing Federation and new Cobar exploration updates to you shortly. Back to you, Martin.

13:43 Thanks Andrew and I'll now turn to slide 10 and really just shows that the operating performance this quarter has translated into meaningful increase in cash and liquidity. So you can see the chart there on the left shows the increase in operating cash flow after sustaining capital for our Covi region, now up to $65.3 million for the quarter, which was once again the highest quarterly result since 2018. Key to this really is the strong production and sales that I covered earlier. In addition, this funded our growth capital of $11.7 million, which is on track with spend primarily for Great Cobra and the peak plant expansion. And we also invested a further $4 million into exploration.

14:28 Just the other point to note on the cash flow chart on the right, you will see a working capital outflow of $23 million for the quarter. The three main things that make that up. The first is we did build higher concentrate receivables at quarter end. So we do take receivables through our operating cash flow and then recognise the actual cash receipt in working capital. So those receivables did build up at quarter end. We also did unwind some of our trade payables from the costs from the June quarter primarily. So trade payables are lower with an outflow through cash. And finally, September is when we pay our annual incentives. So we've been accruing costs throughout the year and paid our annual incentive to employees in September. But after these movements, our net cash increased to $160.7 up from $143.9. And as I said earlier, it takes our liquidity with our undrawn revolver above $200 million.

15:29 One other comment on cash, most of you will know at the post the quarter end we paid our one cent fully franked dividend that we announced in August. That was paid on the 8th of October for a total of $17.2 million. So that's all, I'll hand you back now to Steve for closing comments.

15:47 Thank you, Martin, and thank you, Andrew, for that exploration update as well. I'd now like to focus on the last slide, slide 11, on some key focus areas based on initial observations and conversations I've had with many of you over the recent weeks that I've been with the organisation. Firstly, I think it's really important we deliver safe, predictable operating performance, which is aligned to the next point on driving productivity and cost improvement. Planned work and correctly scheduled and correctly executed work is far safer. It's more cost-effective and it's cheaper. It's more sustainable. It's good for our customers. It's really good for our investors. And it's good being in a winning team.

16:33 Importantly, if we can get the cost base reduced, we have access to a lot more ore in the cobalt basin, which will be reduced if we can't get the cutoff values low enough. The other one is to complete our growth project, as touched on by Martin. We're progressing really well with the times of the peak processing plant, and to get that completed to achieve the full 1.2 million tonnes of operating capacity annually is a really important commissioning stage, and we hope to take significant steps in that direction over the future. Great cobalt developments. I had the opportunity of being down there a few weeks ago. And that one is progressing really well.

17:19 The developments at that area where we will be intercepting the new raised ball shaft is progressing extremely well. And there's a lot of excitement in that area about the COP development that will come with COBAR. An area I have a passion for is to embed asset management fundamentals. We are an asset-intensive business with fixed and mobile assets. If correctly maintained, these assets will deliver the desired performance and reliability the organisation requires. This means asset criticality must be assessed, workers correctly planned, resourced and executed, and work management indicators will give us the necessary satisfaction if the work is being done correctly. If achieved, our supply chains can be optimised and the cost benefits are significant.

18:08 Unplanned work is roughly four times the cost of unplanned work. The increasing our wall body knowledge is really important and we've termed it there the continue advancing our wall body knowledge. There's a lot of information we've generated in the Cobar Basin over recent years. The more we know about our wall bodies, the better we can make longer term decisions regarding investments, growth, optionality, etc. We have access to an attractive collection of tenements in the Cobar Basin. and it's an important copper producer in the future, especially around the Great Kaaba project. How we understand this ore body is really important and as we know in the Kaaba region, many of the ore bodies we have access to, as recently discussed by Andrew, are open adepts and when we get into the underground areas, we get the opportunity of doing more infill drilling to explore that opportunity.

19:06 Finally, an area I have a passion for as well as to attract, develop and retain a high-performing workforce. I've been impressed with the people I've interacted with in the past few weeks. The knowledge, the experience and their commitment to achieve our results is really impressive. We need to align to our key objectives. We need to achieve our aspirations and people being part of the winning team is just a natural passion and I think most people have enjoyed being with the team where you're achieving results. We are working on options to solve some of the long-standing accommodation challenges in Cobar and working with many community members to solve that. Finally, we need a culture of inclusivity where everyone comes to work every day and gets the opportunity to contribute to our operations.

19:56 Mel, I'd close with that and hand back to you for any questions online. Thank you. If you wish to ask a question, please press star 1 on your telephone and wait for your name to be announced. If you wish to cancel your request, please press star 2. If you're on a speakerphone, please pick up the handset to ask your question. Your first question comes from Adam Baker with Macquarie. Please go ahead.

20:22 Hey, morning, team, and welcome, Steve. Not a bad quarter to be joining the company. Maybe just starting a strategy. Are there any changes in strategy that you'd like to make compared to the prior management team, or do you view the business as on a pretty even keel at this stage? Thank you.

20:41 Yeah, I'll probably take that question quickly. and you used the word keel, I think the ship is floating and this quarter the results reflect the good performance from the operation. If anything, I think it is minor adjustments to the course that we need to make to get more sustainable operating improvement. And as I touched on, one of the areas that I think is an opportunity is to get the asset management fundamentals working. we need to have the fixed and mobile assets that we have access to achieving the necessary performance objectives. That is really fundamental and also at the right functional availability.

21:27 So I don't think it's a change in strategy. If anything, it is a course correction, a minor course correction to get more sustainable improvement. And if I tie it back to the very first point, if we can do that and we can reduce our cost base, I think there's opportunity for us to improve the access to the reserves with the resources that we have in the Cobalt ASIN.

21:53 Okay, thanks for that, Carlo. And just one on Federation, if I may. You know, you mentioned the, you know, the intersection of more water. Just wondering, is this related to a new aquifer that you might have intersected as you've been declining down? Or has the water been more related to, you know, surface water storage facilities on surface and, I guess, like a capacity from that side? Just trying to understand the issue on this side of things. Thank you.

22:24 Thank you. I'll pass that question to Angus, who's at Cobar and probably in a better position than I am.

22:31 Yeah, no, the increased water flow is certainly related to underground, so we've seen increased water flows increasing underground and just expanding our surface infrastructure capacity and our ability to deal with that water. We've seen positive progress. through the quarter with the installation of new evaporators and additional RO plants that we're now able to manage that volume of water and get back on top of it.

22:58 Okay thank you and just maybe following up on the expansion of the new mill or peak capacity plant expansion. Obviously got a few tie-ins happening this quarter relating to the tertiary ball mill and new cycling cluster. Are we expecting any downtime from this side of things?

23:20 Yeah, so we've just recently completed a five-day shutdown to complete those tie-ins. So we've got the new cyclone cluster up and running and, yeah, have ball mill turning and loaded with balls this week. So actively commissioning the tertiary ball mill at this point.

23:40 Yeah, OK. Thanks, guys. I might leave it there, everyone. Thanks. Thanks for your time.

23:44 Thank you. Thank you. Your next question comes from Peter Colmandy with Shorin Partners. Please go ahead.

23:53 Thanks for taking the question. Perhaps another question directed at Steve. Equity is well over $200 million for business and self-funding, so it's a fabulous time to join the business. Can you give us some high-level thoughts about your priorities and perhaps spreading those between Great Cabal or New Occidental or even further exploration of Peaks South?

24:19 Yeah, probably the liquidity obviously is an interesting one. If you look at our working capital, we require roughly $100 million for the ebbs and flows that happen in the organisation anyway. So yes, it's a great liquidity position and it's really effective to join an organisation at this sort of stage. I'm not sure we're ready to make any major decisions on how we're going to adjust our direction at this point. I don't think we're going to be deviating from the planned exploration this year or the planned expansion of the plant. Our growth projects we've locked in and they're running to schedule. I don't think we're going to be using that capital at this stage and in the next few months I'll be working with our board and early next year strategising with the board and at that stage I think we'll be in a better position probably end of Q2 to early Q3 to make a decision if there will be any direction change but I can't foresee that at this point.

25:17 Okay, thank you. I'll ask another one just about the gold heavy mix. September quarter annualises to a rate well over current guidance. Just how sustainable do you see the gold mix that we saw in the September quarter or is there going to be a step down in the second half of the year?

25:41 Angus, could you take that? The current quarterly plan for this coming quarter does have lower gold production, so we've had some very high-grade stoves last quarter. There is slightly lower gold production through this next quarter, but we remain on track and looking at the upper end of guidance then. Yeah, okay, thank you.

26:04 I guess, Peter, sorry, Peter, in my comments I talked about, you know, we had a lot of that gold, the copper ore that we processed this quarter. You know, we do have a fair amount of Federation ore sitting on the ROM that has that lower gold grade because it's got the highest ink and lead. So if you're thinking about just how we're, you know, if you're filling the cup on each of the guidances, you know, gold and copper are quite strong at the moment. and then as that plant capacity increases and we put more of that fed material through, that's how those metals will sort of pop up. So that's sort of how the year looks. Okay, thanks very much. Thank you. Thank you. Your next question comes from Paul Keener with Ord Minute.

26:49 Please go ahead.

26:51 Yeah, thanks. Morning, Steve, Martin, Andrew and Angus. Thanks for taking my questions. First one, just on those exploration results around Peak and Kairos. I mean, does that change how you're thinking around, I guess, the mine plan over the next three years? Does that change your outlook for Peak?

27:18 Andrew, could you take that?

27:20 Yeah, absolutely. Morning, Paul. Good to hear from you. Look, no, it doesn't change our plan. So through last year, we talked a bit about the fact that, you know, particularly the gold price, there was more inventory in Peak South Mine. This only adds to that. So effectively, we're getting certainly the stuff above Kairos, below Peak, that bridge area. It's great. Additional inventory is very close to development. All of the extensional drilling... where we were able to extend mineralisation along Strike is again very close to development. So those tons will come through. So what it does effectively is what we're already doing, which is to be in South Mine a little bit longer. Wiser's motionality, particularly as Great Cobar starts to come off the button, fundamentally change our plan.

28:11 Yeah, no, that's clear.

28:13 Thanks. Thanks, Andrew. And just following on from Peter's question just on guidance and you sort of touched on tracking at the top end of the parameter for gold and potentially copper as well but lead production that's also tracking above expectations I guess my question is was this quarter better than planned or should we expect a bit of a retracement across all the across all the commodity suites to see meet the midpoint of guidance, specifically for copper and lead.

28:54 Michael? Look, yeah, we're pretty happy, you know, without sort of going on a budget versus actual pool. We're pretty happy with the performance. You know, metal production is strong. And, you know, we're very comfortable with where the guidance is at. But, yeah, I guess we'll get through another quarter before we consider any changes to it. But, yeah, certainly on lead, lead's tracking at around 25% of midpoint, zinc's around 28%, 29%. Copper is high because of that mix issue. We just processed a lot more copper ore than we will in the balance of the year, and the gold came with it, and then... And just to explain that, as you said in the report, when we have the gold-only stoves that we're mining in the Peak South mine, we are reporting them as copper ore.

29:45 So we're putting them through copper ore in the stats. So a lot more copper ore and then a lot more lead zinc ore with Federation in the second half or in the balance of the year. But I will just say we're feeling comfortable about metal production.

30:05 Paul, if I could just go back to your previous question on the expansion potential and whether that will change in the next three years. I think one of the things I've quickly learned around the peak and all of these is as we get deeper into these operations, the opportunity to do infiltrating from established platforms deeper down, we know these old bodies are open at depth. And the more we can understand them, it's great seeing the exploration potential that comes through that particular update we've given. but the more we understand from depth, I think the better we're going to be able to predict. The nature of the cobalt ore bodies are probably better defined when we do infill drilling when we get to the top. Exploratory drilling from surface gives us a very good indication where it might be, but we do know the deposits go deeper, so the likelihood of expansion of depth is there, but it really requires us getting into the deeper mining areas establishing an exploration platform from which we can do this infill drilling.

31:08 That's great. Thanks, Steve, for that additional colour there. And then just last one on sort of senior management and personnel. I see Andrew's taken another role just around that IP leaving AMI. Sort of thoughts on his position and who's going to take that?

31:35 Yeah, it's one of the things that I've walked into. It's unfortunate to see Andrew move on and I wish him well for the next opportunities he's moving to. But it also gives us an opportunity to evaluate the organisation structure at this stage in our developments and I'll be doing that over the next few weeks. So certainly to predict whether it's a direct replacement or whether it's a reorganisation of sorts at this stage that could result from that. I wouldn't speculate at the moment, I think there's all options on this table, but I haven't landed on a position where we go for a direct replacement at this point. The team working for Andrew, very confident that those organisations or parts of the business are doing a great job.

32:24 there's an opportunity to reorganize how we have that reporting relationship, but that will come when we make the decision in the next few weeks.

32:36 Yep, too easy. No, that's it for me. Thanks, guys. Bye-bye for now. Thank you. Your next question comes from Daniel Roden with Jefferies. Please go ahead.

32:49 Hey, guys. I'm from the quarter, and... Maybe just getting a bit more colour on a couple of things we were already speaking about, but I just wanted to, I guess, dive into the peak mining costs. On my back of the envelope, I'm getting, you know, like 160 per tonne, which is, again, like my data sets, probably one of the highest on record. You know, just noting that, you know, the last year or two has been a really big focus on getting that unit cost down. Maybe just help explain what the contributors of that cost increase have been and how much of that has been, I guess, correlated to chasing higher-grade stoves that the current commodity price have a higher NSR.

33:35 How are you guys thinking about that internally? And I guess noting that this has been a pretty big focus over the last two years, what are some of the strategies that I guess you can implement from now and what hasn't worked over the past couple of years?

33:51 Thanks, Daniel. As I said, really passionate of mine and I think the experts at the moment, I'll pass to Martin.

33:58 Yeah, g'day, Dan. And I'll just make some opening comments and then I'll hand over to Angus for any additional colour. But yes, and I think we did note that 161, I think it is in the report, peak mining costs. I guess there's a couple of things in that. I talked about production drilling capacity and I talked about that at the June quarter. So we did consciously make additional investments in in operators primarily and equipment to get ahead on production drilling. So those operators did demode during September. So we consciously carried some of those costs over the June quarter and the September quarter. Diesel, obviously there's a cost inflation in that. We're not a huge consumer of diesel, but it does contribute to peak probably more so to Federation given the haulage of the bore up the road.

34:49 But I guess the other piece, and Angus will be able to go into more detail, but just when we were going through our budgets, the nature of the stoves and the number of stoves that we're mining at peak, the average stove size is getting a lot smaller. So what we're finding is we're going into the same setup and the same development to get to these smaller tonnage stoves but with higher grade stoves. So when you look at it on a margin basis, well worth going into them. But it doesn't mean that the mining cost to get in there on a dollar per tonne basis is higher, just driven by the fact that we don't have these larger stoves. Now, when we get across to Great Cobar, the average stove sizes will increase. So naturally, the per tonne metric will improve from that.

35:37 but certainly got a lot of focus of us as we're setting up our plans for this year. Angus, I might just throw to you for any other comments on that.

35:46 No, thanks, Martin. Yeah, as Martin said, that's really the key driver as we went through the budget. We are mining average stope sizes between 6,000 and 7,000 tonnes of stope this year. So similar, you know, same amount of work and effort required to set up those stopes as mining a 20,000-tonne stope. So... That's where some of the cost increases are coming through, and we continue to have a clear focus this year on productivity and efficiency improvements, and we'll hopefully see some of those results come through in the coming quarters as we work to improve our unit costs.

36:23 Yeah, no, perfect. Thanks for the call, guys. And maybe, I guess, leveraging off that, you know, the size has been a big contributor, maybe as you're conditioning and ramping up the mill expansion to the 1.1, 1.2. What areas, I guess, from the mining front are supportive of that? Federation's obviously still in its ramp up and its infancy for all intents and purposes, but it's still got a bit of a way to go there. Is the stoke size at peak south, for example, is that going to increase over the next post-expansion.

37:07 Agus? No, we don't see an increase in the stove size. It's really around... We're working those areas around peak and kairos, closer to the crusher and the hoisting infrastructure, and really driving those stoves. So, again, working on that productivity and efficiency, making sure we've got... those sloping fronts, and as Martin touched on earlier, we've got the production drilling, and we've carried that drilling to make sure we've got the drilled stops ahead of us, and we've got that material available in the coming quarters as we go forward.

37:42 Yep, thanks a lot. And that may be just one more from me, but kind of talking about, I guess, strategy and taking about the business going forward and everything like that, but if I, you know, is a bit of, I guess, working capital bills in this quarter that might be rolled back into next quarter's cash flows. Your business is in quite good, quite good health. How should we think about, I guess, capital allocation beyond project selection over the next 12 months. Are you thinking about shareholder returns? How do you think about shareholder returns in light of you've got $40 or $50 million of franking credits on the balance sheet?

38:32 Are those conversations that I guess you're having at the management and board level?

38:39 I think as we talked about in August, with Steve's arrival, it really gives us an opportunity to revisit the strategy work that he wants to do. The capital management framework, you saw our thoughts on that in August. We do want to flesh that out for you in terms of putting a bit more meat on those bones of how we're thinking about shareholder returns versus allocations to exploration. which I know Steve has a real interest in and also other inorganic growth. So discussion is definitely happening. Probably not ready to take you to the next level on what that means yet.

39:24 No trouble like that on us anyway, but I appreciate it, guys. Keep up the good work.

39:29 Thanks, Dan. Thank you. Thank you. Once again, if you wish to ask a question, please press star 1 on your telephone and wait for your need to be announced. Your next question comes from Ian Haycox, who is a retail shareholder. Please go ahead. Pardon me, Ian, your line is now live. Please ask your question.

39:57 Sorry, I didn't have a question. Sorry for any confusion. There are no further questions at this time. I'll now hand back to Mr. Vardenhorst for closing remarks.

40:09 Thanks, Mel, and thanks, everybody, for joining today. It's really great to join an organisation with the same quarterly performance as this quarter kicks off in the first of our 2027 financial year. It's really beneficial being part of the organisation. Thank you for the questions. Before we close, I'd like to... I wish Andrew the best of wishes in his new ventures as he will be leaving the organization in the next few weeks. And thank him for his contribution, in particular, leading the exploration portfolio as one of his passions as well. So thank you, everybody, for your contribution to the quarter.

40:54 Those of you with Aurelia, thank you for your commitment to our results. and I look forward to working with all of you over the next while to see that Q2 is even better than Q1 possibly. Thank you. That does conclude our conference for today. Thank you for participating. You may now disconnect.

Follow Aurelia Metals Limited into a list and get an email when it puts out news.

Latest news releases

Companies on this call

Speakers

Ian Haycox

Retail Shareholder

Peter Colmandy

Analyst, Shaw and Partners

Andrew Graham

Exploration Executive

Paul Kaner

Analyst, Ord Minnett

Steve Bardenhorst

Managing Director and Chief Executive Officer

Adam Baker

Analyst, Macquarie

Daniel Roden

Analyst, Jefferies

Angus Wiley

Operations Executive

Martin Cummins

Chief Financial Officer

More from Aurelia Metals Limited