Getchell Gold Corp. · CSE:GTCH
Getchell Gold — Investor Presentation (July 2026)
29 slides from Getchell Gold's investor presentation, July 2026
Slide 1: The Fondaway Canyon Gold Project, Nevada
The Fondaway Canyon Gold Project, Nevada 2026 Preliminary Economic Assessment July 2026 CSE: GTCH OTCQB: GGLDF FWB: GGA1
Slide 2: Capital Structure / Management & Board
Capital Structure Management & Board SHARES OUTSTANDING: 202.6 M MIKE SIEB, President A senior executive with over 30 years of strong corporate and MARKET CAP: CA$46 M project management experience in international mining and exploration across multiple commodities and jurisdictions. During WARRANTS
Slide 3: Fondaway Canyon: Excellent Location
Fondaway Canyon Excellent Location (Road Access, Resources, and Jurisdiction) Consistently Ranked One of the Top Mining Jurisdictions in the World Producing Gold Mines 22 major gold mines Ranked 8th in the world for gold production 4.0 M oz of gold produced annually valued at ~USD 18 billion (at tod
Slide 4: 2026 Mineral Resource Estimate
2026 Mineral Resource Estimate
Slide 5: Fondaway Canyon Claims and Gold Corridor 2026 Mineral Resource Estimate
Fondaway Canyon – Claims and Gold Corridor 2026 Mineral Resource Estimate* Versus 2024 MRE Significant Growth due to Highly Successful 2025 Drill Results and Gold Price Increase 21% Global Increase in Mineral Resources Open Pit model expanded by 50-65m on strike and dip Gold mineralization OPE
Slide 6: 2026 Mineral Resource Estimate By Zone
Fondaway Canyon – Claims and Gold Corridor 2026 Mineral Resource Estimate* By Zone Oxide Cap** ** Subset of and included in the 2026 MRE (not additional to) 88% of Mineral Resources is Hosted in the Central Pit 9% Other Open Pit Resources 3% UG resources 8% of Global Mineral Resources is Oxi
Slide 7: Colorado SW Section (C-C') – 2025 Drill Results
2026 Mineral Resource Estimate Colorado SW Section (C-C’) – 2025 Drill Results Surface High-Grade FCG25-29: 2.1 g/t Au over 58.7m OPEN Up Dip FCG25-30: 1.1 g/t Au over 55.8m Down Dip FCG25-32: 1.1 g/t Au over 90.7m On Strike to the NW FCG25-36: 2025 Drill Holes 1.4 g/t Au over 23.6m Extend Gold Mine
Slide 8: Colorado SW Section (C-C') – Gold Grade Block Model
2026 Mineral Resource Estimate Colorado SW Section (C-C’) – Gold Grade Block Model Gold Mineralization and Open Pit Model Extended Down Dip to the SW OPEN Along Strike to the NW Strong Continuity with Gold Mineralization OPEN for Further Expansion Open Pit Model Extended 65m Down Dip to the
Slide 9: Mid-Central Section (M-M') – 2025 Drill Results
2026 Mineral Resource Estimate Mid-Central Section (M-M’) – 2025 Drill Results Down Dip FCG25-33: 1.4 g/t Au over 122.3m Ended in High-Grade FCG25-34: 2.1 g/t Au over 50.0m 1.5 g/t Au over 36.0m 2025 Drill Holes Extend Gold Mineralization Down Dip Mineralization Remains OPEN along Strike and Dip 9
Slide 10: Mid-Central Section (M-M') – Gold Grade Block Model
2026 Mineral Resource Estimate Mid-Central Section (M-M’) – Gold Grade Block Model Gold Mineralization and Open Pit Model Extended Down Dip to the SW Strong Continuity with Gold Mineralization OPEN for Further Expansion Open Pit Model Extended 60m Down Dip to the SW Mineralization Remains OPEN
Slide 11: Longitudinal Section (L-L') – 2025 Drill Results
2026 Mineral Resource Estimate Longitudinal Section (L-L’) – 2025 Drill Results The Importance and Contribution of Holes FCG25-33 and 34 for the: Continuity; and Increase to the mineralization. FCG25-36 for the: Increase to the Mineralization; and Discovery of High-Grade Well Beyond any Pr
Slide 12: Longitudinal Section (L-L') – Gold Grade Block Model
2026 Mineral Resource Estimate Longitudinal Section (L-L’) – Gold Grade Block Model Gold Mineralization and Open Pit Model Extended Along Strike to the NW and SE Strong Continuity with Gold Mineralization OPEN for Further Expansion Mineralization Remains OPEN along Strike and Dip 12
Slide 13: 2026 Preliminary Economic Assessment
2026 Preliminary Economic Assessment
Slide 14: 2026 Preliminary Economic Assessment (PEA)
Fondaway Canyon 2026 Preliminary Economic Assessment (“PEA”) Conventional open pit mining and 12,000 tonne/day milling operation with an initial PEA was limited to the 10.1 year mine life and the ship/sale of a high-grade concentrate to a 3rd party refinery open pit mineral resources in the Centra
Slide 15: PEA Table 1: Economic Parameters
Fondaway Canyon 2026 Preliminary Economic Assessment (“PEA”) Table 1: Economic Parameters (USD) Key Assumptions Base Case Gold Price (USD/oz) $3,200 Production Profile Total Tonnes Processed (mt) 42.8 Total Tonnes Waste (mt) 296.3 Strip Ratio 6.9 Mill Feed Grade 1.38 Mine Life (years) 10.1 Throughpu
Slide 16: PEA Project Economics Summary and Gold Price Sensitivity
Fondaway Canyon 2026 Preliminary Economic Assessment (“PEA”) Table 2: Project Economics Summary (USD) Strong Base Case Project Economics $3,200/oz Gold Price Pre-Tax After-Tax Pre-Tax After-Tax NPV5% ($M) $ 1,264 $ 1,112 $1 Billion (NPV8%) $905 Million (NPV8%) NPV8% ($M) $ 1,004 $ 905 58.8% IR
Slide 17: PEA Production Profile, Capital and Operating Costs
Fondaway Canyon 2026 Preliminary Economic Assessment (“PEA”) Robust Production Profile 1.52 million ounces gold recovered over a 10.5 life of mine 150,000 ounces average annual gold production 84% gold recovery to concentrate / 80% post processing Excellent Cost Profile Table 4: Capital Cost E
Slide 18: 2026 Project Activities
Fondaway Canyon 2026 Project Activities 2026-Q2 Plan of Operation • Complete Field Studies • File a Comprehensive Plan of Operations with the relevant regulatory authorities to accelerate development at Fondaway Canyon 18
Slide 19: Foundational Value with Excellent Growth Potential
Fondaway Canyon Gold Project Foundational Value with Excellent Growth Potential Evident Value Large Mineral Resource Estimate Robust Preliminary Assessment Top Mining Jurisdiction Upside Potential Strong Gold Market Gold Mineralization Open for Expansion Advancement to Pre-Feasibility
Slide 20: Fondaway Canyon Gold Project – Contact us
FONDAWAY CANYON GOLD PROJECT An Advanced Exploration Stage Project That Continues to Impress Contact us: Karen Mate, Corporate Communications Main Office: (416) 230-6454 +1 647 249 4798 kmate@capitalmarketsadvisory.ca info@getchellgold.com www.getchellgold.com CSE: GTCH FWB: GGA1 OTCQB: GGLDF
Slide 21: Forward Looking Statements
Forward Looking Statements Certain of the statements made and information contained herein are “forward-looking information”. These statements relate to future events or the Company's future performance. Statements, other than statements of historical fact, may be forward-looking statements. General
Slide 22: 2026 Preliminary Economic Assessment Notes
Fondaway Canyon 2026 Preliminary Economic Assessment Notes The PEA is preliminary in nature, includes Inferred and Indicated Mineral Resources that are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as Mineral Reserves
Slide 23: 2026 Mineral Resource Estimate Notes
Fondaway Canyon 2026 Mineral Resource Estimate Notes 1. The MRE was completed by Kevin Hon, B.Sc., P.Geo., Senior Resource Geologist with APEX. Mr. Hon is an independent Qualified Persons, as defined by NI 43-101, and is responsible for the completion of the Mineral Resource Estimate, with an effect
Slide 24: Appendix
APPENDIX 24
Slide 25: Fondaway Canyon 2025 Mineral Resource Estimate Tables
Fondaway Canyon 2025 Mineral Resource Estimate Tables 25
Slide 26: Drilling Highlights 2025
Drilling Highlights 2025 Colorado SW Zone Mid-Central Zone North Fork Zone 26
Slide 27: Drilling Highlights 2020-2022
Drilling Highlights 2020-2022 27
Slide 28: Drilling Highlights 2020-2022
Drilling Highlights 2020-2022 28
Slide 29: Capital Structure (as at July 17, 2026)
Capital Structure (as at July 17, 2026) Warrants 29