Getchell Gold Corp. · CSE:GTCH
Getchell Gold — Investor Presentation (January 2026)
35 slides from Getchell Gold's investor presentation, January 2026
Slide 1: The Fondaway Canyon Gold Project, Nevada
The Fondaway Canyon Gold Project, Nevada Multi-Million Ounce, Open Pittable Gold Deposit Initiating Pre-Feasibility in 2026 January 2026 CSE: GTCH OTCQB: GGLDF FWB: GGA1
Slide 2: Foundational Value with Excellent Growth Potential
Fondaway Canyon Gold Project Foundational Value with Excellent Growth Potential Evident Value Large Mineral Resource Estimate Robust Preliminary Assessment Top Mining Jurisdiction Upside Potential Strong Gold Market Gold Mineralization Open for Expansion Multiple Factors Contributing to
Slide 3: Capital Structure and Management & Board
Capital Structure Management & Board SHARES OUTSTANDING: 197.2 M MIKE SIEB, President A senior executive with over 30 years of strong corporate and MARKET CAP: CA$75 M project management experience in international mining and exploration across multiple commodities and jurisdictions. During WARRANTS
Slide 4: Excellent Location (Road Access, Resources, and Jurisdiction)
Fondaway Canyon Excellent Location (Road Access, Resources, and Jurisdiction) Consistently Ranked One of the Top Mining Jurisdictions in the World Producing Gold Mines 22 major gold mines Ranked 8th in the world for gold production 4.0 M oz of gold produced annually valued at ~USD 18 billion (at tod
Slide 5: Mineral Resource Estimate
Minerat Resource Estimate GETCHELL GOLD CORP.
Slide 6: Fondaway Canyon – Claims and Gold Corridor
Fondaway Canyon – Claims and Gold Corridor 2024 Mineral Resource Estimate* Gold mineralization OPEN for further expansion in most directions along strike and dip Excellent gold grade Consistent and thick body of mineralization Significant oxide component * Refer to appendix for additional de
Slide 7: Central Area Mineral Resource Estimate 2024
Fondaway Canyon Central Area Mineral Resource Estimate 2024 Two Major Discoveries All Drill Holes Colorado SW Zone Intersected Substantial FCG21-08: Gold Mineralization 1.4 g/t Au over 203.9m North Fork Zone FCG22-17: 3.8 g/t Au over 85.9m High Confidence for Additional Discoveries 7
Slide 8: 2024 Colorado SW MRE 3D Gold Grade Block Model
2024 Colorado SW MRE 3D Gold Grade Block Model (Looking NW) The Colorado SW gold Gold Mineralization mineralization reveals at Surface excellent continuity Has been traced over 550 metres down-dip from surface Remains OPEN along strike and dip Fondaway Canyon MRE 3D gold grade block model sliced thr
Slide 9: 2024 North Fork MRE 3D Gold Grade Block Model
2024 North Fork MRE 3D Gold Grade Block Model (Looking NW) Excellent continuity of mineralization traced 500m down-dip from surface Hole FC17-05 intersected 2.5 g/t Au over 23.8m and ended in mineralization providing strong indication for the continuation of gold mineralization beyond the curren
Slide 10: North Fork Gold Zone - Near Surface High Grade
North Fork Gold Zone - Near Surface High Grade Discovered the highest ‘grade x thickness’ drill intercepts in the 40-year history of the Project Higher grade zones appear less constrained and reveals the potential thicker and deeper roots of the mineralizing system High grade gold intervals are indi
Slide 11: Preliminary Economic Assessment
Preliminary Economic Assessment
Slide 12: 2025 Preliminary Economic Assessment Published February 2025
Fondaway Canyon 2025 Preliminary Economic Assessment (“PEA”) Published February 2025 Conventional open pit mining and 8,000 tonne/day milling operation with an initial PEA was limited to the 10.5 year mine life and the ship/sale of a high-grade concentrate to a local 3rd party refinery open pit mi
Slide 13: 2025 Preliminary Economic Assessment: Economic Parameters
Fondaway Canyon 2025 Preliminary Economic Assessment (“PEA”) Table 1: Economic Parameters (USD) Key Assumptions Base Case Gold Price $2,250/oz Production Profile Total Tonnes Processed (mt) 30.3 Total Tonnes Waste (mt) 143.4 Strip Ratio 4.7 Mill Feed Grade 1.50 g/t Au Mine Life 10.5 years Throughput
Slide 14: 2025 PEA: Robust Production and Cost Profile
Fondaway Canyon 2025 Preliminary Economic Assessment (“PEA”) Robust Production Profile 1.23 million ounces gold recovered over a 10.5 life of mine 117,300 ounces average annual gold production 84% gold recovery Excellent Cost Profile Table 5: Operating Cost Estimate (USD) $/tonne $/oz Au Table
Slide 15: Strong Base Case Project Economics
Fondaway Canyon 2025 Preliminary Economic Assessment (“PEA”) Strong Base Case Project Economics Table 2: Project Economics Summary (USD) $2,250/oz Gold Price $2,500/oz Gold Price Pre-Tax Pre-Tax After-Tax Pre-Tax After-Tax $546 million pre-tax NPV10% NPV5% ($M) $ 761 $ 668 $ 990 $ 849 51.2% pre-
Slide 16: Gold Price is Markedly Higher
Gold Price Gold Price is Markedly Higher US$1,950 gold price US$2,250 gold price Current gold spot Higher gold price underpins the 2024 underpins the 2025 price is more than Mineral Resource Preliminary Economic double the underlying directly improves Estimate Assessment basis for valuation economic
Slide 17: Metallurgical Studies
Fondaway Canyon Metallurgical Studies 1988-2017: Metallurgical testing of the mineralized material at Fondaway Canyon conducted by reputable labs. 2024: In support of the PEA, the metallurgical studies reported a marketable concentrate and highly satisfactory gold recoveries of 84%. Additionally, pr
Slide 18: 2025 Drill Results Fondaway Canyon Gold Project, Nevada
2025 Drill Results Fondaway Canyon Gold Project, Nevada
Slide 19: Central Area 2025 Drill Program Objective
Fondaway Canyon Central Area 2025 Drill Program Objective An initial 10-hole, 3,000m (10,000 ft), drill program was designed to further extend the mineralization along strike and dip The intent is to increase the mineral resource, enlarge the open pit model, and substantially enhance the Project's o
Slide 20: Central Area 2025 Drill Program Results
Fondaway Canyon Central Area 2025 Drill Program Results Highly Successful Extended Colorado SW zone: 1.) up- and down-dip; 2.) along strike to the NW; and 3.) Discovered high-grade gold. Intersected thick intervals of gold mineralization 1.) Connecting the Colorado SW and North Fork Zones, and endin
Slide 21: 2025 Drill Program Results Cross-Section C
Fondaway Canyon Central Area 2025 Drill Program Results Cross-Section C FCG25-29 Successfully intersected high-grade C’ mineralization 25m below surface grading: 2.1 g/t Au over 58.7 m including 13.7 g/t Au over 3.3 m Indicates a greater depth extent of gold mineralization than previously deline
Slide 22: 2025 Drill Program Results Cross-Section C
Fondaway Canyon Central Area 2025 Drill Program Results Cross-Section C C’ FCG25-31 Intersected two closely spaced intervals: 1.3 g/t Au over 45.4 m; and C 1.1 g/t Au over 40.3 m Intersected a newly developing upper lens grading 1.9 g/t Au over 50 m Extended the Colorado SW zone 40m down- dip an
Slide 23: 2025 Drill Program Results Long-Section B
Fondaway Canyon Central Area 2025 Drill Program Results C’ FCG25-36 Long-Section B Extends strike of gold mineralization 70m NW New high-grade discovery: 5.8 g/t Au over 19.0m, situated 35m beyond mineral resource pit shell and open for further expansion; and Structural setting is a newly discov
Slide 24: 2025 Drill Program Results Long-Section A
Fondaway Canyon Central Area 2025 Drill Program Results C’ FCG25-33 Long-Section A 1.4 g/t Au over 122.3 m in a broader 212m zone Ended in high-grade mineralization grading 4.8 g/t Au over 12.5 m FCG25-34 2.1 g/t Au over 51.0 m in a broader 145m zone FCG25-38 2.8 g/t Au over 40.8 m Demonstrates stro
Slide 25: 2026 Steps to Increase Value
Fondaway Canyon 2026 Steps to Increase Value 2026-Q1 Revise Mineral Resource Estimate 2026-Q2 Update Preliminary Economic Assessment incorporating: • Results of 2025 drilling and metallurgical studies • A revised gold price reflective of the current market 2026-Q2 Initiate Pre-Feasibility Stag
Slide 26: Fondaway Canyon Gold Project
FONDAWAY CANYON GOLD PROJECT An Advanced Exploration Stage Project That Continues to Impress Contact us: Karen Mate, Corporate Communications Main Office: (416) 230-6454 +1 647 249 4798 kmate@capitalmarketsadvisory.ca info@getchellgold.com www.getchellgold.com CSE: GTCH FWB: GGA1 OTCQB: GGLDF
Slide 27: Forward Looking Statements
Forward Looking Statements Certain of the statements made and information contained herein are “forward-looking information”. These statements relate to future events or the Company's future performance. Statements, other than statements of historical fact, may be forward-looking statements. General
Slide 28: Mineral Resource Estimate Notes
Fondaway Canyon Mineral Resource Estimate Notes 1. The independent and qualified person for the mineral resource estimate, as defined by NI 43-101, is Michael Dufresne, P.Geol., P.Geo., from APEX Geoscience Ltd. 2. Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic
Slide 29: Preliminary Economic Assessment Notes
Fondaway Canyon Preliminary Economic Assessment Notes The PEA is preliminary in nature, includes Inferred Mineral Resources that are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as Mineral Reserves, and there is no c
Slide 30: Appendix
APPENDIX 30
Slide 31: 2024 Mineral Resource Estimate Tables
Fondaway Canyon 2024 Mineral Resource Estimate Tables 31
Slide 32: Drilling Highlights 2025
Drilling Highlights 2025 Colorado SW Zone Mid-Central Zone North Fork Zone 32
Slide 33: Drilling Highlights 2020-2022
Drilling Highlights 2020-2022 33
Slide 34: Drilling Highlights 2020-2022
Drilling Highlights 2020-2022 34
Slide 35: Capital Structure (as at Jan. 12, 2026)
Capital Structure (as at Jan. 12, 2026) 35