Getchell Gold Corp. · CSE:GTCH

Getchell Gold — Technical Presentation (April 2026)

34 slides from Getchell Gold's technical presentation, April 2026

  1. Slide 1: The Fondaway Canyon Gold Project, Nevada

    The Fondaway Canyon Gold Project, Nevada 2026 Mineral Resource Estimate April 2026 CSE: GTCH OTCQB: GGLDF FWB: GGA1

  2. Slide 2: Capital Structure and Management & Board

    Capital Structure Management & Board SHARES OUTSTANDING: 201.2 M MIKE SIEB, President A senior executive with over 30 years of strong corporate and MARKET CAP: CA$60 M project management experience in international mining and exploration across multiple commodities and jurisdictions. During WARRANTS

  3. Slide 3: Excellent Location (Road Access, Resources, and Jurisdiction)

    Fondaway Canyon Excellent Location (Road Access, Resources, and Jurisdiction) Consistently Ranked One of the Top Mining Jurisdictions in the World Producing Gold Mines 22 major gold mines Ranked 8th in the world for gold production 4.0 M oz of gold produced annually valued at ~USD 18 billion (at tod

  4. Slide 4: 2026 Mineral Resource Estimate

    2026 Mineral Resource Estimate

  5. Slide 5: Fondaway Canyon – Claims and Gold Corridor

    Fondaway Canyon – Claims and Gold Corridor 2026 Mineral Resource Estimate* Versus 2024 MRE Significant Growth due to Highly Successful 2025 Drill Results and Gold Price Increase  21% Global Increase in Mineral Resources  Open Pit model expanded by 50-65m on strike and dip  Gold mineralization OPE

  6. Slide 6: Fondaway Canyon – Claims and Gold Corridor

    Fondaway Canyon – Claims and Gold Corridor 2026 Mineral Resource Estimate* By Zone Oxide Cap** ** Subset of and included in the 2026 MRE (not additional to)  88% of Mineral Resources is Hosted in the Central Pit  9% Other Open Pit Resources  3% UG resources  8% of Global Mineral Resources is Oxi

  7. Slide 7: Colorado SW Section (C-C’) – 2025 Drill Results

    2026 Mineral Resource Estimate Colorado SW Section (C-C’) – 2025 Drill Results Surface High-Grade FCG25-29: 2.1 g/t Au over 58.7m OPEN Up Dip FCG25-30: 1.1 g/t Au over 55.8m Down Dip FCG25-32: 1.1 g/t Au over 90.7m On Strike to the NW FCG25-36: 2025 Drill Holes 1.4 g/t Au over 23.6m Extend Gold Mine

  8. Slide 8: Colorado SW Section (C-C’) – Gold Grade Block Model

    2026 Mineral Resource Estimate Colorado SW Section (C-C’) – Gold Grade Block Model  Gold Mineralization and Open Pit Model Extended  Down Dip to the SW OPEN  Along Strike to the NW  Strong Continuity with Gold Mineralization OPEN for Further Expansion Open Pit Model Extended 65m Down Dip to the

  9. Slide 9: Colorado SW Section (C-C’) – Resource Classification Block Model

    2026 Mineral Resource Estimate Colorado SW Section (C-C’) – Resource Classification Block Model  Significant Conversion of Indicated to Inferred Resources OPEN Open Pit Model Extended 65m Down Dip to the SW Mineralization Remains OPEN along Strike and Dip 9

  10. Slide 10: Mid-Central Section (M-M’) – 2025 Drill Results

    2026 Mineral Resource Estimate Mid-Central Section (M-M’) – 2025 Drill Results Down Dip FCG25-33: 1.4 g/t Au over 122.3m Ended in High-Grade FCG25-34: 2.1 g/t Au over 50.0m 1.5 g/t Au over 36.0m 2025 Drill Holes Extend Gold Mineralization Down Dip Mineralization Remains OPEN along Strike and Dip 10

  11. Slide 11: Mid-Central Section (M-M’) – Gold Grade Block Model

    2026 Mineral Resource Estimate Mid-Central Section (M-M’) – Gold Grade Block Model  Gold Mineralization and Open Pit Model Extended  Down Dip to the SW  Strong Continuity with Gold Mineralization OPEN for Further Expansion Open Pit Model Extended 60m Down Dip to the SW Mineralization Remains OPEN

  12. Slide 12: Mid-Central Section (M-M’) – Resource Classification Block Model

    2026 Mineral Resource Estimate Mid-Central Section (M-M’) – Resource Classification Block Model  Significant Increase to Inferred Resources Open Pit Model Extended 60m Down Dip to the SW Mineralization Remains OPEN along Strike and Dip 12

  13. Slide 13: Longitudinal Section (L-L’) – 2025 Drill Results

    2026 Mineral Resource Estimate Longitudinal Section (L-L’) – 2025 Drill Results  The Importance and Contribution of Holes FCG25-33 and 34 for the:  Continuity; and  Increase to the mineralization. FCG25-36 for the:  Increase to the Mineralization; and  Discovery of High-Grade Well Beyond any Pr

  14. Slide 14: Longitudinal Section (L-L’) – Gold Grade Block Model

    2026 Mineral Resource Estimate Longitudinal Section (L-L’) – Gold Grade Block Model  Gold Mineralization and Open Pit Model Extended  Along Strike to the NW and SE  Strong Continuity with Gold Mineralization OPEN for Further Expansion Mineralization Remains OPEN along Strike and Dip 14

  15. Slide 15: Longitudinal Section (L-L’) – Resource Classification Block Model

    2026 Mineral Resource Estimate Longitudinal Section (L-L’) – Resource Classification Block Model  Shows the:  Significant Increase to Indicated and Inferred Resources;  Strong Continuity of Mineralization; and  Readily Apparent Areas to Target to Convert Indicated to Inferred Resources and Exten

  16. Slide 16: 2024 Preliminary Economic Assessment

    2024 Preliminary Economic Assessment† † Completed prior to 2025 drilling

  17. Slide 17: 2025 Preliminary Economic Assessment (“PEA”) Published February 2025

    Fondaway Canyon 2025 Preliminary Economic Assessment (“PEA”) Published February 2025 Conventional open pit mining and 8,000 tonne/day milling operation with an initial  PEA was limited to the 10.5 year mine life and the ship/sale of a high-grade concentrate to a local 3rd party refinery open pit mi

  18. Slide 18: 2025 Preliminary Economic Assessment (“PEA”)

    Fondaway Canyon 2025 Preliminary Economic Assessment (“PEA”) Table 1: Economic Parameters (USD) Key Assumptions Base Case Gold Price $2,250/oz Production Profile Total Tonnes Processed (mt) 30.3 Total Tonnes Waste (mt) 143.4 Strip Ratio 4.7 Mill Feed Grade 1.50 g/t Au Mine Life 10.5 years Throughput

  19. Slide 19: 2025 PEA: Production Profile and Cost Profile

    Fondaway Canyon 2025 Preliminary Economic Assessment (“PEA”) Robust Production Profile  1.23 million ounces gold recovered over a 10.5 life of mine  117,300 ounces average annual gold production  84% gold recovery Excellent Cost Profile Table 5: Operating Cost Estimate (USD) $/tonne $/oz Au Table

  20. Slide 20: Strong Base Case Project Economics

    Fondaway Canyon 2025 Preliminary Economic Assessment (“PEA”) Strong Base Case Project Economics Table 2: Project Economics Summary (USD) $2,250/oz Gold Price $2,500/oz Gold Price Pre-Tax Pre-Tax After-Tax Pre-Tax After-Tax  $546 million pre-tax NPV10% NPV5% ($M) $ 761 $ 668 $ 990 $ 849  51.2% pre-

  21. Slide 21: Gold Price is Markedly Higher

    Gold Price Gold Price is Markedly Higher US$3,000 gold price US$2,250 gold price Current gold spot Higher gold price underpins the 2026 underpins the 2025 price is more than Mineral Resource Preliminary Economic double the underlying directly improves Estimate Assessment basis for valuation economic

  22. Slide 22: Metallurgical Studies

    Fondaway Canyon Metallurgical Studies 1988-2017: Metallurgical testing of the mineralized material at Fondaway Canyon conducted by reputable labs. 2024: In support of the PEA, the metallurgical studies reported a marketable concentrate and highly satisfactory gold recoveries of 84%. Additionally, pr

  23. Slide 23: 2026 Project Activities

    Fondaway Canyon 2026 Project Activities 2026-Q2  Update Preliminary Economic Assessment incorporating: • 2026 Mineral Resource Estimate • metallurgical studies • A revised gold price reflective of the current market 2026-Q2  Plan of Operation • Complete Field Studies • File a Comprehensive Plan of

  24. Slide 24: Foundational Value with Excellent Growth Potential

    Fondaway Canyon Gold Project Foundational Value with Excellent Growth Potential Evident Value  Large Mineral Resource Estimate  Robust Preliminary Assessment  Top Mining Jurisdiction Upside Potential  Strong Gold Market  Gold Mineralization Open for Expansion  Multiple Factors Contributing to

  25. Slide 25: Fondaway Canyon Gold Project

    FONDAWAY CANYON GOLD PROJECT An Advanced Exploration Stage Project That Continues to Impress Contact us: Karen Mate, Corporate Communications Main Office: (416) 230-6454 +1 647 249 4798 kmate@capitalmarketsadvisory.ca info@getchellgold.com www.getchellgold.com CSE: GTCH FWB: GGA1 OTCQB: GGLDF

  26. Slide 26: Forward Looking Statements

    Forward Looking Statements Certain of the statements made and information contained herein are “forward-looking information”. These statements relate to future events or the Company's future performance. Statements, other than statements of historical fact, may be forward-looking statements. General

  27. Slide 27: Fondaway Canyon 2026 Mineral Resource Estimate Notes

    Fondaway Canyon 2026 Mineral Resource Estimate Notes 1. The independent and qualified person for the mineral resource estimate, as defined by NI 43-101, is Michael Dufresne, P.Geol., P.Geo., from APEX Geoscience Ltd. 2. Mineral Resources, which are not Mineral Reserves, do not have demonstrated econ

  28. Slide 28: Fondaway Canyon 2025 Preliminary Economic Assessment Notes

    Fondaway Canyon 2025Preliminary Economic Assessment Notes The PEA is preliminary in nature, includes Inferred Mineral Resources that are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as Mineral Reserves, and there is

  29. Slide 29: Appendix

    APPENDIX 29

  30. Slide 30: 2025 Mineral Resource Estimate Tables

    Fondaway Canyon 2025 Mineral Resource Estimate Tables 30

  31. Slide 31: Drilling Highlights 2025

    Drilling Highlights 2025 Colorado SW Zone Mid-Central Zone North Fork Zone 31

  32. Slide 32: Drilling Highlights 2020-2022

    Drilling Highlights 2020-2022 32

  33. Slide 33: Drilling Highlights 2020-2022

    Drilling Highlights 2020-2022 33

  34. Slide 34: Capital Structure (as at Jan. 12, 2026)

    Capital Structure (as at Jan. 12, 2026) 34

Getchell Gold — Technical Presentation (April 2026) on 6ix