Ptr Minerals Limited · ASX:PTR

Ptr Minerals — Petratherm — Society of Petroleum Engineers (Victoria and Tasmania branches) presentation (January 2010)

30 slides from Ptr Minerals's conference presentation, Jan 28, 2010

  1. Slide 1: Paralana Project Presentation to Society of Petroleum Engineers

    ASX Release For personal use only PETRATHERM LIMITED ABN 17 106 806 884 Paralana Project Presentation to Society of Petroleum Engineers Petratherm’s Geophysicist, Ms Louise McAllister will later today present to the Society of Petroleum Engineers (Victoria and Tasmania branches) in Melbourne. The So

  2. Slide 2: About the Joint Venture Partners

    Yours faithfully For personal use only Terry Kallis Managing Director ABOUT THE JOINT VENTURE PARTNERS: Beach Energy (ASX: BPT) is an oil and gas company headquartered in Adelaide that farmed-in to the Paralana Project in January 2007. Beach can earn up to 36% of the project for $30 million plus its

  3. Slide 3: The Paralana – Engineered Geothermal Energy Project

    For personal use only The Paralana – Engineered Geothermal Energy Project Society of Petroleum Engineers Presented by Geophysicist, Louise McAllister Thursday, January 28, 2010

  4. Slide 4: Disclaimer

    Disclaimer For personal use only This presentation has been prepared by Any forward-looking statements included in Petratherm makes no representation or Petratherm Limited (Petratherm). The this document involve subjective judgment warranty as to the accuracy, reliability or information contained in

  5. Slide 5: Why Paralana?

    Why Paralana? For personal use only Evidence for Thermal Anomalism › Hot Springs › Fossil Hydrothermal Breccias Paralana Hot › Elevated groundwater temperatures Springs › High heat flow (Mt Gee 126 mWm-2) › Poontana basin insulator P1b P2 Potentially Commercial Viability at all stages Arkaroola

  6. Slide 6: Paralana Project – Commercial Overview

    Paralana Project – Commercial Overview For personal use only › Potentially commercially viable at all stages. Small off grid market (5- 30MWe) (Heathgate) followed by large on grid development (260 MWe+) › Expenditure well leveraged for proof of concept, then potentially fully funded to initial comm

  7. Slide 7: Development Model – Heat Exchanger Within Insulator

    Development Model – Heat Exchanger Within Insulator For personal use only › Higher Permeability › Chemically Stable › Lower Frac Challenge? › Adelaidean – bedding / joint surfaces = Cheaper Power!

  8. Slide 8: Initial Exploration Program

    Initial Exploration Program For personal use only › Pre-competitive geophysical data › Outcrop mapping › 2D Refection Seismic data › Local gravity and MT surveys › Heat flow modelling

  9. Slide 9: Exploring for Heat – Paralana Project

    Exploring for Heat – Paralana Project For personal use only 62uWm-3 22uWm-3 Insulator Up to 20 times normal granite: average = 8 times Permian Mt Painter Basement Adelaidean Curnamona Mt Painter Basement Basement Normal basement Early modelling indicated 200oC at approximately 3.6 - 4 km

  10. Slide 10: Paralana 1b

    Paralana 1b For personal use only › Drilled mid 2006 › Depth = 1809m › BHT= 109°C › Confirmed stratigraphy

  11. Slide 11: Further Exploration

    Further Exploration For personal use only › Poontana Seismic survey › 162km of 2D reflection seismic

  12. Slide 12: Poontana Seismic Survey

    Poontana Seismic Survey Paralana 1B Paralana 2 P2 :PA07-06, 319.95 :84-SPJ, 1657.19 :PA07-07, 390.10 1500 m SP: 550.0 600.0 650.0 700.0 750.0 800.0 850.0 900.0 950.0 1000.0 1050.0 1100.0 For personal use only 0.000 0.000 0.200 0.200 0.400 529 Bck 0.400 › P2 located with 0.600 895 Wirr 0.600 deep gra

  13. Slide 13: Paralana MT Survey

    Paralana MT Survey For personal use only › To determine depth to basement › Presence of fluids at depth › Confirm structural characteristics

  14. Slide 14: Paralana MT Survey

    For personal use only Paralana MT Survey

  15. Slide 15: Paralana MT Survey

    Paralana MT Survey For personal use only :PA07-06, 240.86 :84-SPJ, 1567.88 :PA07-07, 303.24 - :PA07-01 - SP: 200.0 250.0 300.0 350.0 400.0 450.0 500.0 550.0 600.0 650.0 700.0 750.0 800.0 0.400 0.400 Good structural correlation is seen between the MT model 0.600 0.600 and seismic data along 0.800 0.8

  16. Slide 16: Paralana MT Survey

    Paralana MT Survey For personal use only P1b

  17. Slide 17: Passive Seismic Array

    Passive Seismic Array For personal use only › IESE (Institude of Earth Science and Engineering) NZ › 1 deep borehole sonde at 1790m in Paralana 1b › 6 borehole sondes at 200m › 8 surface seismometers › 2 accelerometers

  18. Slide 18: Regional and Local Seismic Events

    Regional and Local Seismic Events For personal use only › Results from April 08 to June 09 › Local and regional events › Relative ML of ML-1 to ML 4

  19. Slide 19: Background seismicity

    Background seismicity For personal use only › Relatively small local events detected › Correlates faults within the Poontana Fracture Zone.

  20. Slide 20: Paralana – Drilling

    For personal use only Paralana 2 – Drilling  New Weatherford Owned 2000HP Le Tourneau Lightning Rig  57 metres high ~ 10 Stories  Arrived at Port Pirie 11 May 09  80 Semi-Trailer Loads  Spudded June 30, 2009

  21. Slide 21: Paralana - Operations

    Paralana 2 - Operations For personal use only › Petratherm/Beach – extensive stakeholder and community consultation – Adnyamathanha Community, Beverley Uranium Mine , Epic Pipe line, Arkaroola Village › Beach Petroleum – managed drilling operations › HSE - no lost time injuries › Only minor shake do

  22. Slide 22: Paralana - Drilling

    Paralana 2 - Drilling For personal use only › Hard Rock Formations encountered in the top of the hole – slow ROP 1-3 m/hr › Tested several BHA arrangements to optimize ROP › Conservatively drilled to maximize likelihood of success › Cost and Time overruns › Only deep well within 90kms

  23. Slide 23: Contingency Planning…..

    Contingency Planning….. For personal use only

  24. Slide 24: Paralana - Drilling Completed to 4012 M – Nov 2009

    Paralana 2 - Drilling Completed to 4012 M – 9 Nov 2009 For personal use only › First well designed following low-risk, standard operating methods › Steady but slow drilling due to hard formations › Conservatively drilled to ensure success › Wireline and LWD logging undertaken › Well is cased and cem

  25. Slide 25: Recent Micro-seismic activity

    Recent Micro-seismic activity For personal use only S-P~=0.247sec Horizontal ~1.5km Horizontal Vertical › Increased event detection since drilling began, most drilling related. › Regional and local events detected by the array on 11th Dec 2009 › Regional event about 140km from the sensor, not detect

  26. Slide 26: Recent Micro-seismic activity

    Recent Micro-seismic activity For personal use only S-P~=0.247sec Horizontal ~1.5km › MEQ event coincidental with Horizontal casing cementing. Vertical

  27. Slide 27: Future Work - Surface geophone array

    Future Work - Surface geophone array For personal use only › To ground truth method from use in EGS stimulations › To allow for new processing technique to be trialed. › “Star pattern” Microseismic Inc .

  28. Slide 28: Future Work - Magnetotelluric Monitoring of Geothermal Fluids

    Future Work - Magnetotelluric Monitoring of Geothermal Fluids For personal use only Temporal coverage with 3 surveys › Survey before fracturing › Survey during fracturing › Survey after fracturing

  29. Slide 29: Future Work Program

    Future Work Program For personal use only › 1st Qtr 2010: CHL program, Mini frac program/fracture stimulation design › 2nd Qtr 2010: Multi-zone fracture stimulation › 3rd Qtr 2010: drilling of the Paralana 3 deep producer well › End 2010/ Early 2011: Circulation Test – Proof of Concept › Early 2011:

  30. Slide 30: For personal use only

    For personal use only www.petratherm.com.au