  1. Slide 1: TZMI Congress Presentation

    ASX ANNOUNCEMENT 12 November 2025 TZMI Congress Presentation PTR Minerals Limited (ASX: PTR) (PTR Minerals or the Company) is pleased to provide a copy of the presentation to be delivered by Chief Executive Officer Peter Reid at the TZMI Congress on 12 November 2025. - END - This announcement has be

  2. Slide 2: About PTR Minerals Limited

    About PTR Minerals Limited PTR Minerals Limited (ASX: PTR) is a critical minerals explorer focused on the discovery of world- class deposits in both frontier and mature mineral provinces. The Company has a major project holding in the northern Gawler Craton in South Australia where recent exploratio

  3. Slide 3: The Muckanippie Titanium Project

    The Muckanippie Titanium Project A Significant Critical Mineral Discovery TZMI Congress 2025 12 November 2025 ASX: PTR ptrminerals.com.au

  4. Slide 4: Compliance Statements

    Compliance Statements Disclaimer JORC Information and Compliance Note This presentation has been prepared by PTR Minerals Limited (PTR Minerals). The information contained in this Further details (Including JORC 2012 Code Reporting Tables, where applicable) for the information presentation is a prof

  5. Slide 5: Investment Highlights

    Investment Highlights High grade, district scale titanium discovery Significant Exploration upside Flat lying, thick, continuous orebody near to Robust balance sheet with $7.2m cash (30 September 2025) surface Assemblage dominated by high value titanium Close to existing transport infrastructure INV

  6. Slide 6: Corporate Overview

    Corporate Overview Board and Key Management Shares on Issue1 Share Price (5/11/2025) Derek Carter Non-Executive Chairman 346.6M A$0.28 Derek Carter is a founder of the Minotaur group and a joint recipient of Explorer of the Year (AMEC) for the discovery of the Prominent Hill Copper Gold deposit. He

  7. Slide 7: PTR Portfolio: Highly prospective for Critical Minerals

    PTR Portfolio: Highly prospective for Critical Minerals Muckanippie Titanium Project ‣ Emerging camp style titanium province Woomera Copper-Gold Project ‣ Located in World-Class Copper-Gold Olympic INVESTOR PRESENTATION Province ‣ High calibre Tier-1 sized drill ready targets Mabel Creek Copper-Gold

  8. Slide 8: Muckanippie Project: High-Grade, District Scale Titanium Discovery

    Muckanippie Project: High-Grade, District Scale Titanium Discovery EL6715 ‣ The Muckanippie Suite is a rare, highly fertile layered Echo Prospect 6m @ 5.1% HM from 10m intrusion ‣ Project geology associated with rich metal and critical minerals deposits globally. INVESTOR PRESENTATION Nardoo Prospec

  9. Slide 9: Rosewood Project: High-Grade Marine

    Rosewood Project: High-Grade Marine Rosewood West Rosewood East ‣ Mineralisation extends over a continuous 40km2 area ‣ Two extensive high-grade mineralised zones (22km2 area) where all holes INVESTOR PRESENTATION drilled contain significant intercepts including: ‣ 26m @ 17.2 % HM ‣ 22m @ 19.1 % HM

  10. Slide 10: Rosewood Project: Cross Section

    Rosewood Project: Cross Section ‣ Cross section shows continuous high-grade nature of the Rosewood Prospect INVESTOR PRESENTATION ‣ Mineralisation starts at shallow depths typically from 5 to 7m ‣ Mineralisation thickness ranges from 5m - 30m | ASX:PTR ‣ High-Grade upper zone (~70% of mineralization

  11. Slide 11: Rosewood Project: Coarse Grain Size delivering Strong Recoveries

    Rosewood Project: Coarse Grain Size delivering Strong Recoveries ‣ Rosewood HM is coarse grained Rosewood Particle Size Distribution 12 and highly amenable for excellent mineral recoveries using conventional gravity spiral 10 9.7 INVESTOR PRESENTATION processing techniques 8.6 8.5 8.1 ‣ Median (P50)

  12. Slide 12: Rosewood Project: Metallurgical Studies

    Rosewood Project: Metallurgical Studies ‣ Bulk Sample Test work underway at two leading laboratories – IHC Mining and Mineral Technologies ‣ Ore sample sourced from 13 drill INVESTOR PRESENTATION holes over 1,900m and considered representative ‣ Ore head grade 12.5-15.7% ‣ Initial testing shows simp

  13. Slide 13: Rosewood Project: High-Value Mineral Assemblage

    Rosewood Project: High-Value Mineral Assemblage RM01 RM01 Sample ‣ High value titanium ores, low deleterious +250µm -250µm Rutile/Anatase 4.4 3.5 contaminants Leucoxene 82.4 80 ‣ ~ 95 % Valuable Heavy Mineral Content Altered Ilmenite 9.7 7.9 Mineral Mass % Ilmenite 0 0 ‣ Principal Ores INVESTOR PRES

  14. Slide 14: Strategic Location: Rail Access to International Markets

    Strategic Location: Rail Access to International Markets Less than 40km from rail head provides rail connection to; Whyalla Darwin INVESTOR PRESENTATION Port Adelaide Fremantle Each port also offers opportunity for further value-add processing options | ASX:PTR 12

  15. Slide 15: Muckanippie Project: Significant work streams underway

    Muckanippie Project: Significant work streams underway ‣ Significant Progress since discovery in September 2024 ‣ Work continues at pace ‣ Rosewood Resource Drilling Underway INVESTOR PRESENTATION ~ 40km2 Area to deliver initial JORC Inferred and Indicated level Resource ‣ Additional Bulk Sample Tes

  16. Slide 16: Contact

    Contact Peter Reid Rob Sennitt Chief Executive Officer Executive Director E: preid@ptrminerals.com.au E: rsennitt@ptrminerals.com.au T: 0435 181 705 T: 0414 295 264 ASX: PTR Rosewood Prospect: +106 to 125 µm ptrminerals.com.au - HM Composite Fraction Sample