1911 Gold Corp. · TSXV:AUMB

1911 Gold — Virtual Investor Conferences: Precious Metals & Critical Minerals, February 2026

34 slides from 1911 Gold's conference presentation, Feb 12, 2026

  1. Slide 1: Virtual Investor Conferences: Precious Metals & Critical Minerals

    VIRTUAL INVESTOR CONFERENCES PRECIOUS METALS & CRITICAL MINERALS FEBRUARY 12, 2026

  2. Slide 2: Cautionary Statements

    CAUTIONARY STATEMENTS Disclaimer The information provided in this presentation is not intended to be a comprehensive review of all matters concerning 1911 Gold Corporation ("1911 Gold" or, the "Company") and should be read in conjunction with all other disclosure documents of the Company available o

  3. Slide 3: Rice Lake Greenstone Belt

    RICE LAKE GREENSTONE BELT Uchi Sub-Province: >40M oz Gold Endowment Rice Lake Belt – The Western Extension of The Red Lake Belt: ▪ Located in Manitoba, Canada True North ▪ Control of entire Greenstone Belt >30 Moz ▪ Prolific Superior Province Production ▪ ▪ Under explored Exhibits All The Hallmarks

  4. Slide 4: Our Location: Manitoba, Canada

    OUR LOCATION: MANITOBA, CANADA Snow Lake Belt Apex 100% (Au, Li) Mining Friendly, Tier 1 Jurisdiction • Pro-development Province of Manitoba • Strong provincial support and funding Abitibi Belt (Timmins) Manitoba Skilled Labour & Suppliers • Significant local workforce • Readily available local serv

  5. Slide 5: 1911 Gold Overview

    1911 GOLD OVERVIEW Fully Permitted and Built Infrastructure ▪ ▪ ▪ 2026 PEA1 Outlines Path to Production in 2027 ▪ ▪ ▪ ▪ Exploration Upside Potential ▪ ▪ IMMEDIATE FOCUS IS THE TRUE NORTH MINE RESTART ▪ AND CASH FLOW GENERATION 1. Refer to press Cautionary Statements(slide 2), and to be read in conju

  6. Slide 6: Leadership Team

    LEADERSHIP TEAM Shaun Heinrichs Board of Directors Éric Vinet President and CEO COO Over 20 years of experience in senior corporate Over 30 years of progressive technical and finance roles with significant experience in Gary O’Connor operational experience in the mining industry, reporting, strategi

  7. Slide 7: Share Performance & Ownership

    SHARE PERFORMANCE & OWNERSHIP Share Price Performance (TSXV: AUMB) Ownership 52 Week High $1.54 52 Week Low $0.15 Volume (Millions) Price 25,000,000 14% $1.40 Eric Sprott 45% Retail 20,000,000 $1.20 16% $1.00 HNW 15,000,000 $0.80 7% 10,000,000 $0.60 Strategic 5% $0.40 13% Insider 5,000,000 $0.20 Ins

  8. Slide 8: Capital Structure

    CAPITAL STRUCTURE Capital Structure Analyst Coverage Shares Outstanding 306.86M 22JAN26 | ROTH CAPITAL PARTNERS Stock Options, RSUs, and DSUs 12.97M Mike Niehuser| Buy Rating Warrants (12.9M at $0.10) 15.03M 11NOV25 | HAYWOOD SECURITIES Jamie Spratt | Buy Rating Fully-Diluted 334.88M As at December

  9. Slide 9: True North Gold Project

    TRUE NORTH GOLD PROJECT Ready Permitted High-Grade 9

  10. Slide 10: PEA: Highlights

    TRUE NORTH PEA: HIGHLIGHTS The 2026 True North PEA outlines a foundational mine plan based on the 2024 Mineral Resource Estimate: Indicated Resources 499koz (3.5Mt @ 4.41 g/t Au) & Inferred Resources 644koz (5.5Mt @ 3.65 g/t Au) Significant Upside Strong After-Tax Economics* (Base Case - US$3,000/oz

  11. Slide 11: PEA: Existing Infrastructure & Capital Cost Requirements

    TRUE NORTH PEA: EXISTING INFRASTRUCTURE & CAPITAL COST REQUIREMENTS Site Mill Total Capital Costs Infrastructure Description Total Capital Cost ▪ Targeted run-rate of up ▪ Permitted TMF constructed in (millions) to 1,350 tpd (PEA 2013 Mining Development* $333.5 targeting 1,215 tpd) ▪ Operational 150

  12. Slide 12: PEA: Gold Production & Grade Profile

    TRUE NORTH PEA: GOLD PRODUCTION & GRADE PROFILE The deposits are all amenable to Steady-State Production Rates (years 2029-2034) Peak Production (year 2031) underground mining 1,215 tpd at a mill head grade of 4.40 g/t Au Peak grade at 4.70 g/t producing 61,327 oz for average annual production of 58

  13. Slide 13: PEA: After-Tax Cashflow Profile

    TRUE NORTH PEA: AFTER-TAX CASHFLOW PROFILE Cumulative Free Cash Flow LOM Payback in 2.2 years Base Case of US$3,000/oz Undiscounted Post-Tax Cash Flow Profile (Base Case) 100IRR of 105% 800 $545 M 75 600 Cumulative Free Cash Flow LOM Cumulative cashflow ($M) 50 400 at Assumed Spot Price of Cashflow

  14. Slide 14: Exploration Potential

    EXPLORATION POTENTIAL 14

  15. Slide 15: True North Gold Project: Resource Target Areas

    TRUE NORTH GOLD PROJECT: RESOURCE TARGET AREAS True North Project Geology ▪ Centrally located within the Rice Lake Geological Setting Greenstone Belt ▪ Archean orogenic gold deposit, north dipping and extending at depth ▪ Gold mineralization associated with: ▪ ▪ ▪ Historical drilling focused on only

  16. Slide 16: True North Project: Significant New Target Areas

    TRUE NORTH PROJECT: SIGNIFICANT NEW TARGET AREAS New Discoveries from Surface ▪ Two discoveries, third target developing ▪ Multiple significant intercepts, extending to over 500 metres ▪ Near mine infrastructure ▪ SAM West target ▪ Outside current resource ▪ Open to depth ▪ Extends to the Cartwright

  17. Slide 17: True North Gold Project: New Targets

    TRUE NORTH GOLD PROJECT: NEW TARGETS Potential Extension of New Targets New Discoveries Extend At Depth ▪ Untested potential at depth on both surface discoveries ▪ Hosted within the San Antonio Gabbro Unit ▪ Completed drill testing shallow targets from surface ▪ Started to drill test depth extension

  18. Slide 18: Regional Scale Land Position

    REGIONAL SCALE LAND POSITION Control of Rice Lake Greenstone Belt Rice Lake Greenstone Belt contains numerous large-scale target areas ▪ First-time consolidation of property package (over 61,647 hectares) ▪ Centrally-located True North mine facilities ▪ 90km long Gold Belt ▪ Historical production at

  19. Slide 19: Ogama-Rockland Gold Deposit

    OGAMA-ROCKLAND GOLD DEPOSIT ▪ 27km by road from True North mine and mill complex ▪ Ogama-Rockland – 45,000oz production (11.20 g/t Au) with current NI 43-101 resource: 337,000 oz Gold (8.17 g/t Au)* Highlights of Drill Program – Drilling Commenced Dec-2025: ▪ 2,200 m of surface diamond drilling plan

  20. Slide 20: Hub and Spoke Opportunity

    HUB AND SPOKE OPPORTUNITY: TO SUPPORT PHASE I: Near Mine Exploration Targets +100KOZ OPERATION • NEW TARGETS - SAM W, SAM SE, Shore Target • Resource expansion potential • Cartwright • Hinge, Cohiba, 007, SG1 (ramp access mines) PHASE II: High-Priority Regional Targets • Ogama-Rockland – DRILLING CO

  21. Slide 21: Path to Production

    Path to Production Note: Timeline is for guidance purposes only and is subject to change 21

  22. Slide 22: wo oid

    wo oid

  23. Slide 23: PEA: Overview

    TRUE NORTH PEA: OVERVIEW Key advantages are existing, permitted infrastructure and timeline to production Exchange Rate (CDN:USD): 1.39 Base Case Spot Prices PROJECT ECONOMICS Units Pre-Tax Post-Tax Post Tax Gold Price US$/oz US$3,000 US$3,000 US$4,800 Initial Capital Expenditures (“Capex”) $M $59 $

  24. Slide 24: PEA: Highly Leveraged to a Rising Gold Price

    TRUE NORTH PEA: HIGHLY LEVERAGED TO A RISING GOLD PRICE The sensitivity analysis revealed that the project is most sensitive to changes in gold prices, and foreign exchange and less sensitive to changes in capital and operating costs Long-term After-Tax Sensitivity Summary (Base Case) Gold Price (US

  25. Slide 25: PEA: Labour and Economic Impact

    TRUE NORTH PEA: LABOUR AND ECONOMIC IMPACT Leveraging a highly experienced site leadership team that continues to attract top-tier technical talent to grow our workforce, while fostering a culture rooted in SAFETY, RESPONSIBILITY and OPERATIONAL EXCELLENCE KEY POSITIONS FILLED JOBS CREATION ECONOMIC

  26. Slide 26: 1911 Gold: ESG & Sustainability

    1911 GOLD: ESG & SUSTAINABILITY On the Right Track Social Responsibility Environmental Responsibility ▪ Fully permitted ▪ Renewable Electricity Low carbon 100% Opportunity to ▪ Over 90% of the work force locally based electrify entire footprint hydro-electric ▪ Major employer of First Nations operat

  27. Slide 27: PEA: 2024 Mineral Resource Estimate

    TRUE NORTH PEA: 2024 MINERAL RESOURCE ESTIMATE EFFECTIVE DATE: AUGUST 29, 2024 Resource Indicated Inferred Area Tonnage Gold Grade Contained Gold Tonnage Gold Grade Contained Gold (Name) (t) (g/t) (Oz) (t) ( g/t) (Oz) Cartwright 274,000 3.31 29,000 361,000 3.56 41,000 Hinge 247,000 4.27 34,000 156,0

  28. Slide 28: Resource Estimate: Sensitivity by Gold Grade

    RESOURCE ESTIMATE: SENSITIVITY BY GOLD GRADE True North Resource Update Sensitivity Grade Indicated Inferred Gold Grade Tonnage Gold Grade Contained Gold Tonnage Gold Grade Contained Gold (g/t) (t) (g/t) (oz) (t) (g/t) (oz) 2.00 2,781,000 5.23 468,000 4,852,000 3.96 618,000 2.25 2,530,000 5.54 451,0

  29. Slide 29: PEA: Mining

    TRUE NORTH PEA: MINING Mining Areas and Projected Production* Access Deposit Tonnes Grade Ounces Shaft/Decline Zone t g/t Au oz 710 Complex 1,163,297 4.67 174,812 Deep East 196,967 4.94 31,309 A Shaft L24 189,780 3.83 23,393 Cartwright 284,082 4.14 37,849 A Shaft Sub-total 1,834,128 4.53 267,363 • M

  30. Slide 30: PEA: Tailings Management Facility (TMF)

    TRUE NORTH PEA: TAILINGS MANAGEMENT FACILITY (TMF) Located 1.6 km north of the process plant in an area naturally defined by bedrock ridges around a low flat area • Tailings pumped from the processing plant to the TMF via pipeline • Transported as slurry (34% solids by weight) • East Tailings Manage

  31. Slide 31: PEA: Opportunities

    TRUE NORTH PEA: OPPORTUNITIES The PEA outlines several initiatives that may enhance the Project including: Processing Capacity: Waste Reduction and Operational Efficiency Opportunities: • Existing Processing Capacity - Additional capacity currently • Integrated Underground Waste Management exists wi

  32. Slide 32: Resolving Legacy Issues

    RESOLVING LEGACY ISSUES Historical Issues Path to Optimizing the Operations ▪ Inadequate Mining Methods: bulk tonnage (>3 m) long-hole ▪ Optimize Mining Methods: Fit the mining method to the open stope mining (Up to 500% in grade dilution) orebody characteristics (long hole, sub-level up/down hole,

  33. Slide 33: Strategic Asset

    Strategic Asset Fully Permitted Significant Asset Value Centralized Processing Facility 1,300 +$400 million Hub and Spoke Operation tonnes per day replacement cost Multiple potential ore sources within trucking mill and mine site infrastructure reduced timeline from discovery to production distance

  34. Slide 34: Contact Us

    Contact Us 1911 Gold Corporation Suite 1050, 400 Burrard Street Vancouver, BC V6C 3A6, Canada Suzette Ramcharan VP, Investor Relations 647-284-5315 ir@1911gold.com 1911Gold.com TSX-V: AUMB | OTCQX: AUMBF | FRA: 2KY

1911 Gold — Virtual Investor Conferences: Precious Metals & Critical Minerals, February 2026 on 6ix