1911 Gold Corp. · TSXV:AUMB

1911 Gold — Technical Presentation (February 2026)

42 slides from 1911 Gold's technical presentation, Feb 10, 2026

  1. Slide 1: True North Gold Project PEA Webinar

    TRUE NORTH GOLD PROJECT PEA WEBINAR FEBRUARY 10, 2026

  2. Slide 2: Cautionary Statements

    CAUTIONARY STATEMENTS Disclaimer The information provided in this presentation is not intended to be a comprehensive review of all matters concerning 1911 Gold Corporation ("1911 Gold" or, the "Company") and should be read in conjunction with all other disclosure documents of the Company available o

  3. Slide 3: On the Call Today

    ON THE CALL TODAY Gary O’Connor Shaun Heinrichs Éric Vinet Executive Chairman President and CEO COO Michele Della Libera Suzette Ramcharan VP Exploration VP Investor Relations 3

  4. Slide 4: Our Location: Manitoba, Canada

    OUR LOCATION: MANITOBA, CANADA Snow Lake Belt Apex 100% (Au, Li) Mining Friendly, Tier 1 Jurisdiction • Pro-development Province of Manitoba • Strong provincial support and funding Abitibi Belt (Timmins) Manitoba Skilled Labour & Suppliers • Significant local workforce • Readily available local serv

  5. Slide 5: True North Complex (Vrify Slides)

    TRUE NORTH COMPLEX (VRIFY SLIDES) 5

  6. Slide 6: True North Surface Infrastructure (Vrify Slides)

    TRUE NORTH SURFACE INFRASTRUCTURE (VRIFY SLIDES) 6

  7. Slide 7: True North Camp Infrastructure (Vrify Slides)

    TRUE NORTH CAMP INFRASTRUCTURE (VRIFY SLIDES) 7

  8. Slide 8: True North PEA: Highlights

    TRUE NORTH PEA: HIGHLIGHTS The 2026 True North PEA outlines a foundational mine plan based on the 2024 Mineral Resource Estimate: Indicated Resources 499koz (3.5Mt @ 4.41 g/t Au) & Inferred Resources 644koz (5.5Mt @ 3.65 g/t Au) Significant Upside Strong After-Tax Economics* (Base Case - US$3,000/oz

  9. Slide 9: True North PEA: Overview

    TRUE NORTH PEA: OVERVIEW Key advantages are existing, permitted infrastructure and timeline to production Exchange Rate (CDN:USD): 1.39 Base Case Spot Prices PROJECT ECONOMICS Units Pre-Tax Post-Tax Post Tax Gold Price US$/oz US$3,000 US$3,000 US$4,800 Initial Capital Expenditures (“Capex”) $M $59 $

  10. Slide 10: True North PEA: Highly Leveraged to a Rising Gold Price

    TRUE NORTH PEA: HIGHLY LEVERAGED TO A RISING GOLD PRICE The sensitivity analysis revealed that the project is most sensitive to changes in gold prices, and foreign exchange and less sensitive to changes in capital and operating costs Long-term After-Tax Sensitivity Summary (Base Case) Gold Price (US

  11. Slide 11: True North PEA: Labour and Economic Impact

    TRUE NORTH PEA: LABOUR AND ECONOMIC IMPACT Leveraging a highly experienced site leadership team that continues to attract top-tier technical talent to grow our workforce, while fostering a culture rooted in SAFETY, RESPONSIBILITY and OPERATIONAL EXCELLENCE KEY POSITIONS FILLED JOBS CREATION ECONOMIC

  12. Slide 12: 2024 MRE and Near Mine Exploration Targets

    2024 MRE AND NEAR MINE EXPLORATION TARGETS | M ICHELE DELLA LIBERA 12

  13. Slide 13: True North PEA: 2024 Mineral Resource Estimate

    TRUE NORTH PEA: 2024 MINERAL RESOURCE ESTIMATE EFFECTIVE DATE: AUGUST 29, 2024 Resource Indicated Inferred Area Tonnage Gold Grade Contained Gold Tonnage Gold Grade Contained Gold (Name) (t) (g/t) (Oz) (t) ( g/t) (Oz) Cartwright 274,000 3.31 29,000 361,000 3.56 41,000 Hinge 247,000 4.27 34,000 156,0

  14. Slide 14: True North Current Resources (Vrify Slides)

    TRUE NORTH CURRENT RESOURCES (VRIFY SLIDES) 14

  15. Slide 15: True North Current Resources with SAM W Target

    TRUE NORTH CURRENT RESOURCES WITH SAM W TARGET (VRIFY SLIDES) 15

  16. Slide 16: True North Current Resources with SAM SE & Shore Targets

    TRUE NORTH CURRENT RESOURCES WITH SAM SE & SHORE TARGETS (VRIFY SLIDES) 16

  17. Slide 17: Infrastructure, Costs, Mining, and Production Profile

    INFRASTRUCTURE, COSTS, MINING, AND PRODUCTION PROFILE | É RIC VINET 17

  18. Slide 18: Existing Infrastructure & Capital Cost Requirements

    TRUE NORTH PEA: EXISTING INFRASTRUCTURE & CAPITAL COST REQUIREMENTS Site Mill Total Capital Costs Infrastructure ▪ Targeted run-rate of up ▪ Permitted TMF constructed in Total Capital Cost Description to 1,350 tpd (PEA 2013 (millions) targeting 1,215 tpd) Mining Development* $333.5 ▪ Operational 150

  19. Slide 19: True North PEA: Operating Costs

    TRUE NORTH PEA: OPERATING COSTS Operating Costs (LOM Average) Operating costs have been estimated using the following sources and assumptions: Unit Cost • Mining unit costs have been estimated based Mining costs (underground) $/t milled $175 on AMC benchmark data as well as 2025 quotes and 1911 Gold

  20. Slide 20: True North PEA: Mining

    TRUE NORTH PEA: MINING Mining Areas and Projected Production* Access Deposit Tonnes Grade Ounces Shaft/Decline Zone t g/t Au oz 710 Complex 1,163,297 4.67 174,812 Deep East 196,967 4.94 31,309 A Shaft L24 189,780 3.83 23,393 Cartwright 284,082 4.14 37,849 A Shaft Sub-total 1,834,128 4.53 267,363 • M

  21. Slide 21: True North PEA: Mining Methodology

    TRUE NORTH PEA: MINING METHODOLOGY The deposits are all amenable to underground mining Mining Method • Longitudinal long-hole open stope mining methods Minimum Dimensions • 25 m long by 1.5 m wide by 18 m high between sublevels Dilution & Mining Recovery • 15% dilution (zero grade applied) • 97% min

  22. Slide 22: Vrify Slide – Underground Development

    VRIFY SLIDE – UNDERGROUND DEVELOPMENT 22

  23. Slide 23: Vrify Slide – Underground Development All Deposits

    VRIFY SLIDE – UNDERGROUND DEVELOPMENT ALL DEPOSITS 23

  24. Slide 24: Gold Production & Grade Profile

    TRUE NORTH PEA: GOLD PRODUCTION & GRADE PROFILE Steady-State Production Rates (years 2029-2034) Peak Production (year 2031) 1,215 tpd at a mill head grade of 4.40 g/t Au Peak grade at 4.70 g/t producing 61,327 oz for average annual production of 58,114 oz Gold Production & Grade Profile 70,000 5.0 6

  25. Slide 25: True North PEA: Processing Facility

    TRUE NORTH PEA: PROCESSING FACILITY • Gravity/ float (regrind)/ leach • Ore hardness: 12-14 BMWI (Medium, no hard material) • Electricity: $0.05/kwh • Capacity: 30MW (2-10MW Transformers in place) • Leach: Carbon-in-Pulp (CIP) • 93.5% gold recovery • Produce doré at site 25

  26. Slide 26: True North PEA: Tailings Management Facility (TMF)

    TRUE NORTH PEA: TAILINGS MANAGEMENT FACILITY (TMF) Located 1.6 km north of the process plant in an area naturally defined by bedrock ridges around a low flat area • Tailings pumped from the processing plant to the TMF via pipeline • Transported as slurry (34% solids by weight) • East Tailings Manage

  27. Slide 27: Cash Flow, Opportunities, and Timeline to Production

    CASH FLOW, OPPORTUNITIES, AND TIMELINE TO PRODUCTION | SHAUN HEINRICHS 27

  28. Slide 28: After-Tax Cashflow Profile

    TRUE NORTH PEA: AFTER-TAX CASHFLOW PROFILE Cumulative Free Cash Flow LOM Payback in 2.2 years Base Case of US$3,000/oz Undiscounted Post-Tax Cash Flow Profile (Base Case) 100IRR of 105% 800 $545 M 75 600 Cumulative Free Cash Flow LOM Cumulative cashflow ($M) 50 400 at Assumed Spot Price of Cashflow

  29. Slide 29: True North PEA: Opportunities

    TRUE NORTH PEA: OPPORTUNITIES The PEA outlines several initiatives that may enhance the Project including: Processing Capacity: Waste Reduction and Operational Efficiency Opportunities: • Existing Processing Capacity - Additional capacity currently • Integrated Underground Waste Management exists wi

  30. Slide 30: Potential Addition of New Resources from Regional Targets

    TRUE NORTH PEA: POTENTIAL ADDITION OF NEW RESOURCES FROM REGIONAL TARGETS First-time consolidation 1911 Controls the Rice Lake Greenstone Belt of the land package consisting of ~62k ha • A number of past producing mines - like Ogama-Rockland (currently being drilled) • Numerous prospective gold occu

  31. Slide 31: Hub and Spoke Opportunity

    HUB AND SPOKE OPPORTUNITY: TO SUPPORT PHASE I: Near Mine Exploration Targets +100KOZ OPERATION • NEW TARGETS - SAM W, SAM SE, Shore Target • Resource expansion potential • Cartwright • Hinge, Cohiba, 007, SG1 (ramp access mines) PHASE II: High-Priority Regional Targets • Ogama-Rockland – DRILLING CO

  32. Slide 32: Path to Production

    ANZ ‘vad | SBINNY ?XO9.10 | BIN ‘AXSL nA MRE & Economic Studies Surface Exploration Drilling PATH TO PRODUCTION PEA Update MRE for Global MRE Update, Commence PFS. PEA on Ww Ogama-Rockland True North discoveries & Ogama-Rockland Ogama-Rockland; SAM W, SAM SE & Shore Ogama Rockland, Targets Central M

  33. Slide 33: wo oid

    wo oid

  34. Slide 34: Resource Estimate: Sensitivity by Gold Grade

    RESOURCE ESTIMATE: SENSITIVITY BY GOLD GRADE True North Resource Update Sensitivity Grade Indicated Inferred Gold Grade Tonnage Gold Grade Contained Gold Tonnage Gold Grade Contained Gold (g/t) (t) (g/t) (oz) (t) (g/t) (oz) 2.00 2,781,000 5.23 468,000 4,852,000 3.96 618,000 2.25 2,530,000 5.54 451,0

  35. Slide 35: True North Gold Project: Resource Target Areas

    TRUE NORTH GOLD PROJECT: RESOURCE TARGET AREAS True North Project Geology ▪ Centrally located within the Rice Lake Geological Setting Greenstone Belt ▪ Archean orogenic gold deposit, north dipping and extending at depth ▪ Gold mineralization associated with: ▪ ▪ ▪ Historical drilling focused on only

  36. Slide 36: True North Mine Complex: Mine Infrastructure

    TRUE NORTH MINE COMPLEX: MINE INFRASTRUCTURE Prolific Gold Producer ▪ Historically produced +40Koz per annum for 50 years ▪ 1.1 Moz gold resource adjacent to existing infrastructure ▪ Significant mineralized intercepts outside of current resource wireframes ▪ Parallel untested structures/host rocks

  37. Slide 37: True North Gold Project: New Targets

    TRUE NORTH GOLD PROJECT: NEW TARGETS Potential Extension of New Targets New Discoveries Extend At Depth ▪ Untested potential at depth on both surface discoveries ▪ Hosted within the San Antonio Gabbro Unit ▪ Completed drill testing shallow targets from surface ▪ Started to drill test depth extension

  38. Slide 38: Ogama-Rockland Gold Deposit

    OGAMA-ROCKLAND GOLD DEPOSIT ▪ 27km by road from True North mine and mill complex ▪ Ogama-Rockland – 45,000oz production (11.20 g/t Au) with current NI 43-101 resource: 337,000 oz Gold (8.17 g/t Au)* Highlights of Drill Program – Drilling Commenced Dec-2025: ▪ 2,200 m of surface diamond drilling plan

  39. Slide 39: Resolving Legacy Issues

    RESOLVING LEGACY ISSUES Historical Issues Path to Optimizing the Operations ▪ Inadequate Mining Methods: bulk tonnage (>3 m) long-hole ▪ Optimize Mining Methods: Fit the mining method to the open stope mining (Up to 500% in grade dilution) orebody characteristics (long hole, sub-level up/down hole,

  40. Slide 40: Strategic Asset

    Strategic Asset Fully Permitted Significant Asset Value Centralized Processing Facility 1,300 +$400 million Hub and Spoke Operation tonnes per day replacement cost Multiple potential ore sources within trucking mill and mine site infrastructure reduced timeline from discovery to production distance

  41. Slide 41: 1911 Gold: ESG & Sustainability

    1911 GOLD: ESG & SUSTAINABILITY On the Right Track Social Responsibility Environmental Responsibility ▪ Fully permitted ▪ Renewable Electricity Low carbon 100% Opportunity to ▪ Over 90% of the work force locally based electrify entire footprint hydro-electric ▪ Major employer of First Nations operat

  42. Slide 42: Contact Us

    Contact Us 1911 Gold Corporation Suite 1050, 400 Burrard Street Vancouver, BC V6C 3A6, Canada Suzette Ramcharan VP, Investor Relations 647-284-5315 ir@1911gold.com 1911Gold.com TSX-V: AUMB | OTCQX: AUMBF | FRA: 2KY