Slide 1: From Capital Deployment to Production Growth
From Capital Deployment to Production Growth Mining Forum Americas | September 2026 ASX: MEK meekametals.com.au
Slide 2: Important information
Important information Disclaimer Mineral Resources The information contained in this presentation is issued by Meeka Metals Limited (“Meeka” or the “Company”) . The The information that relates to the Mineral Resource was first reported by the Company on 16 September 2026 . The information contained
Slide 3: Corporate overview
Corporate overview Board Share Price (close 25 Sep 2026) $/share 0.10 Paul Chapman Non -Executive Chairman 1 Shares on Issue M 3,526 Tim Davidson Managing Director & Chief Executive Officer 1 Roger Steinepreis Non -Executive Director Market Capitalisation $M 353 Paul Adams Non -Executive Director 2
Slide 4: Western Australian focused gold producer
Western Australian focused g old producer Extensive, new infrastructure in place to support stable, long -life mines ~$174m 1 invested to establish extensive mining, processing and support infrastructure necessary to deliver a stable, long life (10yr), high margin, production plan. Underground minin
Slide 5: FY26 Financial Results
FY26 Financial Results First full year as a gold producer | Year ended 30 June 2026 NPAT ($M) Basic EPS (cents) $160.8M $51.3M Revenue Net profit after tax 51.3 FY25: nil FY25: $4.2M loss 1.74 $89.8M $37.9M Operating cash flow Cash at 30 June 2026 FY25: ($4.5M) Expected ~$50m at Sep -26 quarter end
Slide 6: Extensive new infrastructure in place to support a long-life operation in the Murchison
Extensive new infrastructure in place to support a long -life operation in the Murchison 250 Person Village Capacity for all current and planned operations. Meeka is currently leasing spare capacity to third party operators in the region. 600ktpa CIL Processing Plant Commissioned in Jun -25, ramped
Slide 7: Andy Well underground
Andy Well underground Current mining areas High -grade, gets better with depth High -grade 0.5Moz @ 8.8g/t Au Resource (73% M&I) Grade is performing in line with the Mineral Resource and is expected to improve on subsequent levels below current development based on drilling results ASX: MEK meekamet
Slide 8: Stope production ramping up at Andy Well
Stope production ramping up at Andy Well Driving meaningful improvement in mill head grade through FY27 Cross Section Suzie lodes First ~12 -18 months of production from new, shallow mining areas within ~200m of surface Judy lodes Stoping commenced late in the Jun -26 quarter and is ramping up Wilbe
Slide 9: Plan View – Andy Well Current Operating Areas
Plan View – Andy Well Current Operating Areas Productivity and production to improve through FY27 as the mine continues to open up and an increasing number of work areas become available Three development drills operating between the Wilber and Judy lodes (~600m per month) Multiple levels being deve
Slide 10: Wilber Long Section
Development face grades 74m strike, 39m width @ 33 g/t Au £8 88° SPS eect: WON aN Metals 40m strike, 4.0m width @ 3.0 g/t Au 29m strike, 37m width @ 64 9/t Au Ue 28m strike, 35m width @ 48 g/t Au 35m strike, 35m width @ 37 g/t Au 4Im strike, 3.7m width @ 15.1g/t Au 4im strike, 37m width @ 40 g/t Au
Slide 11: Drilling indicates both grade and strike to increase on subsequent levels
Drilling indicates both grade and strike to increase on subsequent levels below current development Judy North Long Section ASX: MEK meekametals.com.au 11
Slide 12: Second underground mine at Turnberry
Second underground mine at Turnberry Development commencing Oct -26 Production Portal Mining and support equipment in place Workforce recruited Portals established ready for development to commence in Ventilation portal early Oct -26 Stores yard Power station and mine services ASX: MEK meekametals.c
Slide 13: Turnberry underground
Turnberry underground Providing additional high -grade ore from Jan -27 Simple top -down underground mining strategy Good ground conditions – simple mesh and bolt ground support regime 450m below surface Broad zones of mineralisation – average stoping width ~6m Recent drilling demonstrates growth to
Slide 14: Mt Holland growth opportunity
Mt Holland growth opportunity No significant gold focused drilling in the last ~15 years Acquired by Meeka in Aug -26 Significant past production from the area ~1.2Moz @ 5.12g/t Au prior to 2001 (largely at Bounty – not owned by Meeka) Gold is shear -hosted in steeply dipping banded iron formation (
Slide 15: Multiple targets for discovery
Multiple targets for discovery Typical mineralisation has short strike and long plunge favouring underground discoveries Most anomalies are undrilled below 80m Typical vein -style high -grade gold mineralisation at Blue Vein, 10.92m @ 4.4 g/t Au from 161m (CBV041DT) ASX: MEK meekametals.com.au 15
Slide 16: Blue Vein – modest resource, strong growth potential
Blue Vein – modest resource, strong growth potential High -grade 250koz @ 2.5g/t Au Resource 2.2km of strike, open to the north and at depth Limited drilling below 100m depth ASX: MEK meekametals.com.au 16
Slide 17: Contact
Contact Tim Davidson | Managing Director +61 8 6388 2700 info@meekametals.com.au www.meekametals.com.au ASX: MEK meekametals.com.au
Slide 18: Mineral Resources and Ore Reserves
Mineral Resources and Ore Reserves FY26 Mineral Resource Cut-off Measured Indicated Inferred Total Grade Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Project Area Type (g/t) (kt) (g/t) (koz) (kt) (g/t) (koz) (kt) (g/t) (koz) (kt) (g/t) (koz) St Anne's OP 0.5 - - -