Meeka Metals Limited · ASX:MEK

Meeka Metals — Shareholder Meeting (November 2025)

16 slides from Meeka Metals's shareholder meeting presentation, Nov 25, 2025

  1. Slide 1: Set for growth

    AGM Presentation 25 November 2025 Set for growth meekametals.com.au ASX:MEK

  2. Slide 2: Important Information

    Important Information Disclaimer Mineral Resources This information contained in this presentation is issued by Meeka Metals Limited (“Meeka” or the “Company”). The The information that relates to the Mineral Resource for Turnberry was first reported by the Company on 6 May 2024. The information con

  3. Slide 3: FY25 – a strong year of development and growth

    FY25 – a strong year of development and growth We received final regulatory permitting, funded and successfully developed Meeka’s first gold mine, the First mine development Murchison Gold Project, on time and within 12 months. First gold production We poured first gold on 1 July 2025, only 9 months

  4. Slide 4: Capital Structure

    Capital Structure $0.30 120.0 $0.25 100.0 $0.225 2,930m Price ($/share) Volume (m) $0.20 80.0 share price $0.15 60.0 (24 November 2025) shares $0.10 40.0 $0.05 20.0 $659m 13m $- - market cap options Ownership $59m 5% cash nil Board & Management (30 September 2025) debt 49% 51% Institutional Other Ho

  5. Slide 5: Leadership

    Leadership Have done it before and are well aligned (have invested $4m in the Company to date). Board Management Paul Chapman Chris Davidson - Chief Operating Officer Non-Executive Chairman MINING ENGINEER ACCOUNTANT Mine manager for Silver Lake Resources responsible for developing their newest Char

  6. Slide 6: Murchison Gold Project

    Murchison Gold Project Site Layout. ASX:MEK meekametals.com.au 6

  7. Slide 7: Processing ramp-up on track, targeting ~600ktpa

    Processing ramp-up on track, targeting ~600ktpa Ability to further expand processing capacity. Higher capacity secondary crusher Expansion study underway, targeted for Jun-26 quarter release. New cyclone structure and gravity gold circuit 2x new 600m3 CIL tanks Larger 750kW ball mill Upgraded gold r

  8. Slide 8: Processing ramp-up in line with plan

    Processing ramp-up in line with plan Production Processed ore tonnes 14% above DFS ramp-up plan in Sept-25 quarter. Unit Costs Processing unit costs 19% below DFS estimate ($43/t in Sept-25 quarter). Should trend lower as throughput continues to increase. Recovery Recovery averaging 98% in Sept-25 q

  9. Slide 9: Open pits accelerated and growing

    Open pits accelerated and growing Three pits now in production. Third mining fleet mobilised in July 2025 to accelerate open pit production. Fleet now operating at targeted production levels, ore stockpiles building. Meeka’s second underground mine at Turnberry commencing in the Jun-26 quarter follo

  10. Slide 10: Open pit mining accelerated and performing well

    Open pit mining accelerated and performing well Production 3 open pits currently in production, 2 new pits starting in FY26. Unit Costs $8.20/BCM all in open pit mining unit costs tracking in line with DFS estimate. Production Third open pit mining fleet (200t digger + trucks) mobilised in July 2025

  11. Slide 11: Positive drilling results likely to deliver further open pit production growth

    Positive drilling results likely to deliver further open pit production growth Total open pit Mineral Resource 360koz @ 1.4g/t Au (86% M&I). Stage 1 oxide open pits produce 55koz @ 2.6g/t Au (optimised at $2,350 AUD/oz). Significant opportunity to expand open pit production and the Resource with dri

  12. Slide 12: Development commenced in July 2025 months ahead of plan

    Development commenced in July 2025 12 months ahead of plan Mining schedule brought forward to de- risk FY26 and FY27 production plan. Cross Section First 18 Months of Production Portal infrastructure setup Suzie lodes Judy lodes Low capital re-start with existing decline to ~500m below surface. Wilb

  13. Slide 13: Underground mining ramping up successfully

    Underground mining ramping up successfully Production Owner-operator mining by Meeka is working well and ramping up, 3rd development jumbo commencing in Dec-25 quarter. Unit Costs Owner-operator underground mining is providing greater operating flexibility and a cost advantage over contract mining.

  14. Slide 14: Andy Well Growth

    Andy Well Growth Open down plunge, drilling from underground platforms starting in 2025. 14

  15. Slide 15: 25km Long Archean Greenstone Belt

    25km Long Archean Greenstone Belt Significant organic growth opportunity at Gnaweeda. Gnaweeda belt remains largely untested. 25km contact with major regional structure (Boundary Shear Zone). 90% of the greenstone belt has no drilling or ineffective, broad spaced reconnaissance RAB drilling from 199

  16. Slide 16: Contact

    Contact Tim Davidson | Managing Director +61 8 6388 2700 info@meekametals.com.au ASX:MEK meekametals.com.au

Meeka Metals — Shareholder Meeting (November 2025) on 6ix