Meeka Metals Limited · ASX:MEK

Meeka Metals — Investor Presentation (February 2026)

16 slides from Meeka Metals's investor presentation, February 2026

  1. Slide 1: Ramp-up continuing successfully

    Ramp-up continuing successfully Corporate Update February 2026 ASX:MEK meekametals.com.au

  2. Slide 2: Important Information

    Important Information Disclaimer Mineral Resources This information contained in this presentation is issued by Meeka Metals Limited (“Meeka” or the “Company”). The The information that relates to the Mineral Resource for Turnberry was first reported by the Company on 6 May 2024. The information con

  3. Slide 3: Capital Structure

    Capital Structure $0.35 120.0 $0.30 100.0 $0.225 2,946m $0.25 Price ($/share) Volume (m) 80.0 $0.20 share price 60.0 (11 February 2026) shares $0.15 40.0 $0.10 $0.05 20.0 $663m $- - market cap Ownership $67m 5% Cash & gold nil Board & Management (31 December 2025) debt 49% 51% Institutional Other Ho

  4. Slide 4: Leadership

    Leadership Have done it before and are well aligned (have invested $4m in the Company to date). Board Management Paul Chapman Chris Davidson - Chief Operating Officer Non-Executive Chairman MINING ENGINEER ACCOUNTANT Mine manager for Silver Lake Resources responsible for developing their newest Char

  5. Slide 5: High-grade production and strong free cash flow over 10 years

    High-grade production and strong free cash flow over 10-years1 A$3,500/oz A$4,100/oz Base Case Average gold production* koz 65 65 *(first 7 years) Peak production koz 76 76 M r h r e t Life of Mine average grade g/t 3.0 3.0 M M M Free Cash Flow (Pre-tax) $M 701 1,007 M era e r e Ore e er e M t t Fre

  6. Slide 6: Murchison Gold Project

    Murchison Gold Project Site Layout. ASX:MEK meekametals.com.au 6

  7. Slide 7: Processing ramp-up continuing, ~1 quarter behind schedule

    Processing ramp-up continuing, ~1 quarter behind schedule Production Throughput and grade increased, 9.2koz produced. Temporarily impacted in December by isolated but concurrent issues (now fully resolved). Recovery 97% recovery in Dec-25 quarter, in line with DFS estimate. Unit Costs Higher on acco

  8. Slide 8: Processing ramp-up on track for ~600ktpa by March 2026

    Processing ramp-up on track for ~600ktpa by March 2026 Ability to further expand processing capacity. Expansion study brought forward, will be released in the Mar-26 quarter. New screen deck install in Mar-26 Qtr Upgraded cyclones improving grind size/recovery Mill feed conveyors upgraded for increa

  9. Slide 9: Open pit mining operating at steady state

    Open pit mining operating at steady state Production Mining now at steady state, ~2.4Mbcm movement per Qtr, producing ~100-150kt of ore per month. Unit Costs $8/BCM all in open pit mining unit costs tracking DFS estimate, $64/t ore will continue to trend down as strip ratio reduces over 2026. Ore St

  10. Slide 10: Stage 1 open pit ramp-up complete

    Stage 1 open pit ramp-up complete Operating at steady state, ~2.4M bcm/quarter. Stage 1 oxide open pits produce ~2.5-3.0g/t Au (optimised at $2,350 AUD/oz). Total open pit Resource 360koz @ 1.4g/t Au (86% M&I). Ore stockpiles of 400kt (13koz Au) and continuing to build, adding ~80kt per month. Signi

  11. Slide 11: Positive drilling results likely to deliver further open pit production growth

    Positive drilling results likely to deliver further open pit production growth ASX:MEK meekametals.com.au 11

  12. Slide 12: Underground mining continuing to ramp-up successfully

    Underground mining continuing to ramp-up successfully Production Ore production currently 100% from development, stoping to commence late in Jun-26 quarter. Unit Costs Unit costs reducing as increased work areas become available productivity improves, targeting <$5,000/m all-in unit costs (currently

  13. Slide 13: Development months ahead of schedule to derisk FY26 and FY27 Production

    Development 12 months ahead of schedule to derisk FY26 and FY27 Production Cross Section First 18 Months of Production Mining schedule brought forward to de-risk FY26 and FY27 production plan. Suzie lodes Low capital re-start with existing Judy lodes decline to ~500m below surface. First ~12-18 mont

  14. Slide 14: Andy Well Growth

    Andy Well Growth Open down plunge, growth drilling commenced in 2025. ASX:MEK meekametals.com.au 14

  15. Slide 15: 25km Long Archean Greenstone Belt

    25km Long Archean Greenstone Belt Significant organic growth opportunity. The greenstone belt remains largely untested. 25km contact with major regional structure (Boundary Shear Zone). 90% of the belt has no drilling or ineffective, broad spaced reconnaissance RAB drilling from 1990’s and 2000’s. M