Slide 1: Edna May Analyst Site Visit
For personal use only Edna May Analyst Site Visit 5 August 2012
Slide 2: Disclaimer
Disclaimer For personal use only This presentation has been prepared by Evolution Mining Limited (“Evolution Mining”) and consists of slides for a presentation concerning the company. By reviewing/attending this presentation, you acknowledge and agree the following. This presentation includes fo
Slide 3: Location
Location For personal use only 350km east of Perth, 45km from Merredin, 2km from Westonia, Western Australia 10km from Great Eastern Hwy and Trans Australia railway line Project development and construction 2009-2010, first gold pour April 2010 Power: 8.5MW - grid power Water: In-pit bore
Slide 4: Site Layout
Site Layout For personal use only Integrated Waste (m) Landform Process (m) Plant Greenfinch Edna May Golden Point
Slide 5: Edna May Overview
Edna May Overview For personal use only Edna May open pit ore body: Stage Producing 200m wide, 800m long, 255m deep Mine Type Open pit Current nine-year mine life Minerals Gold and silver Reef structures and gold Bulk mining: Mineralisation type stockwork FY13F - 2.8Mtpa ore Throughput 2.6
Slide 6: Edna May History
Edna May History 1910 - Prospector Edmund Annear applied for the first mining lease in this area For personal use only and named it Edna May after his aunt 1910 - High-grade underground mining commenced and suspended in 1922 due to underground water and ore depletion 1934 - High-grade undergro
Slide 7: Safety
Safety Strong and participative safety For personal use only culture Good track record ~10 TRIFR Targeting 15% improvement in FY13 Initiatives include: Safety leadership training Major risk assessments Edna May Crushing Circuit Fit For Work initiative ERT training 7
Slide 8: Performance
For personal use only Performance
Slide 9: Production
Production For personal use only 100,000 75,000 - 80,000oz 80,000 73,264oz Production (oz) 65,593oz 60,000 40,000 20,000 Edna May Crushing Circuit 0 FY2011A FY2012A FY2013F Production ounces (oz) Guidance Range July 2012 record monthly production 8,500oz: higher than average grade, improved throug
Slide 10: FY12 Physicals
FY12 Physicals For personal use only Sep Qtr Dec Qtr Mar Qtr June Qtr Units FY2012 2011 2011 2012 2012 OP ore mined 000' t 508 617 723 667 2,666 OP mined grade g/t 0.97 1.13 1.07 1.11 1.07 OP waste mined 000' t 1,123 1,573 1,279 1,496 5,470 Total tonnes processed 000' t 596 623 541 613 2,373 Head gr
Slide 11: For personal use only
q ~ SQ Ajuo os | CUA Evolution MINING
Slide 12: Cutback Outlines: Plan view
Cutback Outlines: Plan view For personal use only Process F Plant C B 12
Slide 13: Cutback Outlines: Section view
Cutback Outlines: Section view Current Final Design For personal use only Total depth of 255m Pit length east to west ~1km B C F 110m below surface 155m below surface 255m below surface 13
Slide 14: Mining Fleet
Mining Fleet For personal use only Dry Hire Model 1 x EX 1900 Excavator - Primary digging 1 x EX 1200 Excavator - Batter and backup 7 x Cat 777 dump trucks Force Equipment: supply and maintenance of mobile equipment Monthly fixed cost for labour, infrastructure and overheads Variable c
Slide 15: Continuous Improvement
Continuous Improvement For personal use only 6.3Mtpa Total movement FY13 2.8Mt Ore & 3.5Mt Waste Ore-bound in 3 months Improved fragmentation Improved void management Improved scheduling Productivity and efficiency of mining fleet Engaging business partners for cutback fleet options
Slide 16: Processing
For personal use only Processing
Slide 17: Process Plant Overview
Process Plant Overview For personal use only Conventional CIL Plant Refurbished plant from Big Bell Trio 5442 Jaw Crusher (-115mm) 2kW SAG and 3.7MW Ball Mill Gravity circuit with approx 45% recovery 2 x 2000m3 leach tanks 6 x 1100m3 adsorption tanks Pressure Zadra elution circuit Ta
Slide 18: Continuous Improvement
Continuous Improvement For personal use only Plant availability Tonnes Processed Maintenance systems: technical 2,650 2,600 2,600 specialists support 2,550 Tonnes (kt) 2,500 2,450 84% mill utilisation targeting 90% 2,400 2,373 FY13 2,350 2,316 2,300 2,250 Critical spares 2,200 2,150 Plant
Slide 19: Exploration
For personal use only Exploration
Slide 20: Mine Geology
Mine Geology For personal use only 300m Geology Westonia Greenstone Belt Existing open pit resource 300m below surface Mafic and Ultramafic greenstone sequence Ore Body Edna May Gneiss High grade quartz reefs hosted in a mineralised Gneiss and halo mineralisation Dimensions 200m wide x 800m
Slide 21: Exploration – Regional Consolidation
Exploration – Regional Consolidation For personal use only Regionally >2.5Moz gold endowment remains in-situ; ownership of prospective greenstones is reasonably fragmented Potential to deliver higher grades and higher value feed to the Edna May plant Leverage off existing infrastructure at Edn
Slide 22: Exploration Focus
Exploration Focus For personal use only FY13 exploration budget of A$1.7m Targeting high-grade primary and oxide ore sources All targets are within hauling distance of the EMO process plant FY13 Target Areas 22
Slide 23: Perrins
Perrins For personal use only Within 6km of Edna May process plant Perrins Edna May Targeting high-grade and 6km oxide resources Recent shallow drill results include: 8m grading 10.87g/t Au from 23m 7m grading 2.74g/t Au from 17m Follow-up drilling is planned Diamond drilling at Perrins
Slide 24: Greenfinch
Greenfinch For personal use only High-grade mineralisation extended 150m down-dip Resource update 2HFY2013 and further drilling planned 24
Slide 25: Holleton
Holleton For personal use only Agreement to acquire from Independence Group NL signed June 2012 FY13 Target Areas Substantial ground holding; prospective for high-grade Archaean gold deposits Early stage: Symes Find, Brahma, Holleton Central Multiple untested targets; anomalous geochemistry
Slide 26: Symes Find
Symes Find For personal use only Surface gold anomaly over 1.5km, ~500m in width at >200ppb gold 50ppb gold contour covers an area approximately 2km x 750m Oxide mineralisation from surface - open along strike Primary mineralisation potential at depth Further drilling planned 26
Slide 27: People
For personal use only People
Slide 28: People
People For personal use only Emphasis on local recruitment ~ 25% local hires Favourable roster: 8 days on, 6 days off June Quarter Manning Evolution 150 Contractors 40 Total 190 28
Slide 29: Future
Future N ——; Evolution MINING
Slide 30: Future
Future For personal use only Short term (0-3 months): Resolution of plant throughput constraints Medium term (3-9 months): Increased throughput options (secondary / tertiary crushing) Underground development strategy New team in place to drive improvements Exploration programs Resource
Slide 31: Appendix
For personal use only Appendix
Slide 32: Process Flowsheet
For personal use only Process Flowsheet 32
Slide 33: Edna May Mineral Resources
Edna May Mineral Resources June 2011 (including Ore Reserves) For personal use only Total Measured, Measured Indicated Inferred Indicated & Inferred Million Gold '000 Million Gold '000 Million Gold '000 Million Gold '000 Tonnes g/t Oz Tonnes g/t Oz Tonnes g/t Oz Tonnes g/t Oz Greenfinch 0.9 1.1 31 2
Slide 34: Edna May Ore Reserves June 2011
Edna May Ore Reserves June 2011 June 2011 For personal use only Total Proved and Proved Probable Probable Million Gold '000 Million Gold '000 Million Gold '000 Tonnes g/t Oz Tonnes g/t Oz Tonnes g/t Oz Greenfinch 0.8 1.1 28 1.7 1.0 58 2.5 1.1 86 Edna May & Golden Point 14.4 1.1 504 8.5 1.1 298 22.8
Slide 35: Competent Person Statement
Competent Person Statement For personal use only The information in this presentation that relates to exploration results, Mineral Resources or Ore Reserves listed in the table below is based on work compiled by the person whose name appears in the same row, who is employed on a full-time basis by t