Tanami Gold Nl · ASX:TAM
Tanami Gold Nl — Paydirt Gold Conference 2011
34 slides from Tanami Gold Nl's conference presentation, Mar 30, 2011
Slide 1: Production, Performance, Profit…
For personal use only ASX:TAM Production, Performance, Profit… 30-31 March 2011 PAYDIRT GOLD CONFERENCE
Slide 2: Who is Tanami Gold NL?
For personal use only Who is Tanami Gold NL? Australian gold company – 100% of assets in Australia Established production base with a clear path targeting 200,000oz per annum Current Resource inventory of over 2.0Mozs gold [75% Measured and Indicated]1 Mining licence areas, resource potentia
Slide 3: Corporate
For personal use only Corporate Item Value Share Price A$0.91 cents1 Shares Outstanding 260.9 million Market Capitalisation A$238 million Cash and cash equivalents A$6.8 million2 Debt A$16.2 million2 Enterprise Value A$247million Allied Propertied Resources – 23.5% Sun Hung Kai Investments – 12.8% E
Slide 4: Tanami Gold NL - Key Assets
For personal use only Tanami Gold NL - Key Assets The Tanami Trio – Immediate cash flow, substantial production growth, outstanding exploration potential 4
Slide 5: Key Assets – Western Tanami Operations
Tanami Gold NL – Key Assets Western Tanami Operations (100% owned) For personal use only Total Resource at Western Tanami1 3,119,000t @ 5.5g/t for 554,700ozs 65% in measured and indicated category Open pit and underground operations Treatment capacity 350Ktpa Current production 40-50,000oz
Slide 6: Key Assets – Central Tanami Project
Tanami Gold NL – Key Assets Central Tanami Project (100% owned) For personal use only Total Resource at Central Tanami1 18,259,000t @ 2.5g/t for 1,476,000ozs 75% in measured and indicated category Proposed open pit & underground operations Proposed treatment capacity 1.5Mtpa Production tar
Slide 7: Key Assets – Strategic shareholding in ABM Resources
Tanami Gold NL - Key Assets Strategic shareholding in ABM Resources NL For personal use only (approx. 21% or 25% fully diluted) Provides the company direct and indirect control to over 35,000km2 of tenements in highly prospective Tanami-Arunta province The Tanami Trio – Immediate cash flow, subs
Slide 8: Western Tanami – Coyote Operations
For personal use only Western Tanami – Coyote Operations Direction of Plunge The Tanami Trio – Immediate cash flow, substantial production growth, outstanding exploration potential 8
Slide 9: Western Tanami - Bald Hill Operations
For personal use only Western Tanami - Bald Hill Operations 35km north of Western Tanami treatment plant Two open pits – Sandpiper and Kookaburra Mining recommenced late Nov’10 Important - Host rocks equivalent to Dead Bullock Formation Recent exploration success highlights underground pot
Slide 10: Bald Hill - Sandpiper Underground Potential
Bald Hill - Sandpiper Underground Potential Outstanding underground For personal use only growth potential: 15.1m @ 6.1g/t Au incl 8.8m @ 9.5g/t 5.0m @ 7.3g/t Au 11.0m @ 4.9g/t Au incl 0.8m @ 34.2g/t 1 4.7m @ 4.8g/t Au 2.6m @ 30.1g/t Au incl 0.6m @ 118.1g/t 6.3m @ 6.2g/t Au Open down plunge…….. The
Slide 11: Central Tanami Project
For personal use only Central Tanami Project Acquired from Newmont for $22M Immediate Resource upgrade purchase price $21/oz zero value assigned to treatment plant / infrastructure / exploration Acquisition includes: 0.5Mozs JORC Resource (2010) 1.2Mtpa treatment plant and extensive infras
Slide 12: Central Tanami Tenement Plan
For personal use only Central Tanami Tenement Plan The Tanami Trio – Immediate cash flow, substantial production growth, outstanding exploration potential 12
Slide 13: Central Tanami Schematic Long Section
For personal use only Central Tanami Schematic Long Section The Tanami Trio – Immediate cash flow, substantial production growth, outstanding exploration potential 13
Slide 14: Central Tanami Schematic Long Section
For personal use only Central Tanami Schematic Long Section The Tanami Trio – Immediate cash flow, substantial production growth, outstanding exploration potential 14
Slide 15: Tenement MLS153
Tenement MLS153 Historic mining - 15 open pits For personal use only 1.2 Mtpa treatment plant 120 person accommodation village Office, workshop and airstrip Open pit and underground potential No mining since 1994 Approximately 15 kilometres of mineralised structures The Tanami Trio – Imm
Slide 16: Hurricane-Repulse Open Pit
For personal use only Hurricane-Repulse Open Pit The Tanami Trio – Immediate cash flow, substantial production growth, outstanding exploration potential 16
Slide 17: Schematic Long Section – Hurricane Repulse
For personal use only Schematic Long Section – Hurricane Repulse The Tanami Trio – Immediate cash flow, substantial production growth, outstanding exploration potential 17
Slide 18: Carbine Open Pit
For personal use only Carbine Open Pit The Tanami Trio – Immediate cash flow, substantial production growth, outstanding exploration potential 18
Slide 19: Carbine Deposit
For personal use only Carbine Deposit The Tanami Trio – Immediate cash flow, substantial production growth, outstanding exploration potential 19
Slide 20: Groundrush Open Pit – ML 22934
For personal use only Groundrush Open Pit – ML 22934 The Tanami Trio – Immediate cash flow, substantial production growth, outstanding exploration potential 20
Slide 21: Schematic - Groundrush Long Section
For personal use only Schematic - Groundrush Long Section The Tanami Trio – Immediate cash flow, substantial production growth, outstanding exploration potential 21
Slide 22: Exploration: The exploration potential of the Tanami region
For personal use only Tanami Gold NL EXPLORATION “The exploration Potential of the Tanami region” Production – Performance – Potential – Profit The Tanami Trio – Immediate cash flow, substantial production growth, outstanding exploration potential 22
Slide 23: Central Tanami Exploration Potential
For personal use only Central Tanami Exploration Potential The Tanami Trio – Immediate cash flow, substantial production growth, outstanding exploration potential
Slide 24: Western Tanami Exploration Potential
For personal use only Western Tanami Exploration Potential The Tanami Trio – Immediate cash flow, substantial production growth, outstanding exploration potential
Slide 25: Resources as at Dec 2010
Resources as at 31 Dec 2010 Total Western and Central Tanami Mineral Resources For personal use only Measured Indicated Inferred Total Deposit Grade Grade Grade Ounces Tonnes Grade (g/t) Tonnes Tonnes Tonnes (g/t) (g/t) (g/t) MLS153 1,051,000 2.2 2,207,000 2.9 1,072,000 3.1 4,331,000 2.3 317,000 MLS
Slide 26: Gold Resource Growth Since 2009
For personal use only Gold Resource Growth Since 2009 The Tanami Trio – Immediate cash flow, substantial production growth, outstanding exploration potential 26
Slide 27: Summary
Summary Unhedged For personal use only Current production 40-50,000ozpa targeting 200,000ozpa Total Resource 2.03Moz1 - will grow very quickly and cheaply Over 5,000 km2 of highly prospective exploration tenements Tenement package has potential to host very large ore bodies of +5Mozs Key
Slide 28: Any Questions?
For personal use only ASX:TAM ANY QUESTIONS? Production, Performance, Potential… 30-31 March 2011 Building a 200,000oz per annum Australian gold producer The Tanami Trio – Immediate cash flow, substantial production growth, outstanding exploration potentialPAYDIRT GOLD CONFERENCE
Slide 29: Disclaimer & Competent Person’s Statement
Disclaimer & Competent Person’s Statement Disclaimer & Forward-Looking Statements For personal use only Certain statements contained in this presentation, including information as to the future financial or operating performance of Tanami Gold NL and its projects, are forward-looking statements. S
Slide 30: Central Tanami Resources as at Dec 2010
For personal use only Central Tanami Resources as at Dec 2010 Measured Indicated Inferred Total Deposit Grade Grade Ounces Tonnes Grade (g/t) Tonnes Tonnes Grade (g/t) Tonnes (g/t) (g/t) MLS153 1,051,000 2.2 2,207,000 2.9 1,072,000 3.1 4,331,000 2.3 317,000 MLS167 2,470,000 3.0 2,854,000 3.4 1,742,0
Slide 31: Western Tanami Resources as at June 2010
Western Tanami Resources as at June 2010 Measured Indicated Inferred Total For personal use only Deposit Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Coyote 78,000 25.6 64,000 473,000 11.5 174,000 329,000 7.0 74,000 880,000 11.0 312,000 Sandpiper 27,000 3.3 3,000 4
Slide 32: Western Tanami Project – Hutch’s Find
For personal use only Western Tanami Project – Hutch’s Find Western Tanami Project - Hutch’s Find significant intersections from recent drilling Significant Intersections Hole Collar Collar Collar Collar Collar Hole Number Depth Length Grade Easting Northing RL Dip Azimuth Interval (m) (m) (g/t) 98m
Slide 33: Central Tanami Project – Southern
For personal use only Central Tanami Project – Southern Central Tanami Project – Southern significant intersections from recent drilling Significant Intersections Collar Collar Collar Hole Hole Number Collar RL Collar Dip Length Grade Easting Northing Azimuth Depth (m) Interval (m) (g/t) SODD2 57383
Slide 34: Central Tanami Project – Miracle
Central Tanami Project – Miracle Central Tanami Project – Miracle, Legs and Lynx significant intersections from recent drilling For personal use only Hole Significant Intersections Collar Collar Collar Collar Collar Prospect Hole Number Depth Length Grade Easting Northing RL Dip Azimuth Interval (m)