Tanami Gold Nl — Shareholder Meeting (November 2012)

20 slides from Tanami Gold Nl's shareholder meeting presentation, Nov 20, 2012

  1. Slide 1: Annual General Meeting

    For personal use only November 2012 Annual General Meeting ASX: TAM 1

  2. Slide 2: Milestones 2011-12

    Milestones 2011 - 12 Central Tanami Project Resource Growth For personal use only  Groundrush – 203 koz to + 1.0 Moz @ 4.3g/t Au(1) – 390% increase  Ripcord - Maiden Resource - 89 koz Feasibility Study  Completed Pre-Feasibility – Jan 2012  Tracking toward completion of bankable standard FS – Ap

  3. Slide 3: CTP – Groundrush: Resource Position as at June 2011

    For personal use only CTP – Groundrush Resource Position as at June 2011 (1) Historic production of over 600Koz between 2001-2004 1.5 Mt at 4.1g/t Au for 203 koz as of March 2011 TNGL drilling on the Groundrush deposit began in April 2011 Note 1 – Refer Slide 19 3

  4. Slide 4: CTP – Groundrush: Resource Position as at September 2012

    For personal use only CTP – Groundrush Resource Position as at September 2012 6.9 million tonnes at 4.5g/t Au for 1.0 Moz(1) Strong geological model and understanding – completed 55,942 drill metres Remains open in multiple directions Note 1 – Refer Slide 17 , Note 9 4

  5. Slide 5: Groundrush – Geology & Exploration

    Groundrush – Geology & Exploration Geology  Focussed effort on developing a strong geological For personal use only model and understanding  Shifted to predictive exploration drilling  Geological knowledge allowing appropriate mining plan to be developed Exploration Potential  Highly prospective

  6. Slide 6: Definitive Feasibility Study

    Definitive Feasibility Study General  Targeting completion April 2013 For personal use only  Independent expert consultant engaged to provide continuous audit of progress and standards  Independent expert consultant to provide independent third party endorsement and sign off to the completed stud

  7. Slide 7: Project Overview Central Tanami Project

    Project Overview Central Tanami Project Asset Overview – Strengths For personal use only  Good grades and widths within the deposit Central Tanami Project  Substantial resource with growth potential  Strong production track record  1.2Mtpa process plant (on care maintenance)  Relatively low CAP

  8. Slide 8: Coyote Underground Mine

    Coyote Underground Mine Operations Continuously striving for operational improvements For personal use only  Augmented OHS resources deployed at the mine and exploration sites  Replaced or rebuilt key components of the mining fleet  Improved mining planning capabilities  Targeted development int

  9. Slide 9: Coyote – Simplified Geological Plan

    For personal use only Coyote – Simplified Geological Plan Conceptual target area Coyote Fault on the Kavanagh Sandstone Exploration Effort Shifts Historical focus on near mine and to the west Focus shifts towards the center of the anticline, east and at depth Additional conceptual targets to the eas

  10. Slide 10: Kavanagh Long Section

    For personal use only Kavanagh Long Section 10

  11. Slide 11: Kavanagh Long Section

    For personal use only Kavanagh Long Section 11

  12. Slide 12: Coyote – Simplified Geological Plan Cross Section

    For personal use only Coyote – Simplified Geological Plan Cross Section 12

  13. Slide 13: Kavanagh Long Section

    For personal use only Kavanagh Long Section First hole drilled from surface returns multiple free gold intersections Second hole approaching target zone 13

  14. Slide 14: Regional Exploration

    Regional Exploration The year past  Bolstered regional exploration team For personal use only  Wholly dedicated to discovering new deposits  Detailed targeting matrix developed with the assistance of external consultants - expertise covering structural geology, geochemistry, geophysics and region

  15. Slide 15: Questions

    For personal use only November 2012 QUESTIONS ASX: TAM 15

  16. Slide 16: Tanami Gold Mineral Resources as of September 2012

    Tanami Gold Mineral Resources as of September 2012 Resource Category For personal use only Project Measured Indicated Inferred Total Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Coyote 486,000 2.9 45,000 1,073,000 5.7 197,000 1,378,000 4.7 210,000 2,937,000 4.8 453

  17. Slide 17: Central Tanami Project Mineral Resources by tenement

    Central Tanami Project Mineral Resources by tenement as of September 2012 Resource Category Mineral Lease Measured Indicated Inferred Total For personal use only Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces MLS153 1,051,000 2.2 73,000 3,046,000 2.2 217,000 849,000

  18. Slide 18: Coyote Gold Project Mineral Resources by Deposit

    Coyote Gold Project Mineral Resources by Deposit as of September 2012 Resource Category For personal use only Deposit Measured Indicated Inferred Total Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Coyote 29,000 21.5 20,000 332,000 10.9 116,000 314,000 8.9 90,000 67

  19. Slide 19: Tanami Gold CTP Mineral Resources as of March 2011

    Tanami Gold CTP Mineral Resources as of March 2011 Tanami Gold CTP Mineral Resources as of March 2011 Mineral Lease Measured Indicated Inferred Total For personal use only Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces MLS153 1,051,000 2.2 73,000 3,046,000 2.2 217,00

  20. Slide 20: Disclaimer and Competent Person's Statement

    Disclaimer and Competent Person’s Statement Disclaimer and Forward-Looking Statements For personal use only • Certain statements contained in this presentation, including information as to the future financial or operating performance of Tanami Gold NL and its projects, are forward-looking statement