Tanami Gold Nl · ASX:TAM

Tanami Gold Nl — Annual Geoscience Exploration Seminar (AGES) 2023

19 slides from Tanami Gold Nl's conference presentation, April 2023

  1. Slide 1: Central Tanami Project Joint Venture

    TANAMI GOLD NL Central Tanami Project Joint Venture Annual Geoscience Exploration Seminar (AGES) Presentation April 2023 1

  2. Slide 2: Disclaimer and Important Notices

    Disclaimer and Important Notices TANAMI GOLD NL Central Tanami Project JV Nature of Document This presentation may not be reproduced, redistributed or passed on, directly or indirectly, to any other person, or published, in whole or in part, for any purpose without the prior written approval of CTP

  3. Slide 3: Corporate Snapshot

    Corporate Snapshot TANAMI GOLD NL Central Tanami Project JV Central Tanami Project Joint Venture (“CTP Shares 50% Northern Star Resources (ASX:NST) JV”) is a 50/50 joint venture between Market cap: $15.75B(1) Tanami Gold NL and Northern Star Resources Limited. 50% Tanami Gold NL (ASX:TAM) Market cap

  4. Slide 4: Project Location

    Project Location TANAMI GOLD NL Central Tanami Project JV • Central Tanami Project is located 650 km northwest of Alice Springs, 850 km southwest of Darwin and adjacent to the Tanami Road. • The 2,211km2 tenement area encompasses highly prospective, underexplored geological sequences, in an area tha

  5. Slide 5: Jims to Groundrush

    Jims to Groundrush TANAMI GOLD NL Central Tanami Project JV 52km ML168 ML167 ML153 ML22934 Produced 122,000oz Produced 541,000oz Produced 725,000oz Produced 611,000oz Dogbolter Callie Jims Main Redback SW Carbine Miracle/Southern Hurricane/Repulse Groundrush/Ripcord Gold Lynx Mine Central Tanami Leg

  6. Slide 6: Mineral Resource Update Highlights

    Mineral Resource Update Highlights TANAMI GOLD NL Central Tanami Project JV • Updated Mineral Resource estimates for the Groundrush, Ripcord, Jims, Hurricane and Crusade gold deposits returns 13.0Mt at 3.7 g/t gold for 1.5Mozs. • The updated Mineral Resource estimates have collectively increased in

  7. Slide 7: High-Grade Gold Development

    High-Grade Gold Development TANAMI GOLD NL Central Tanami Project JV Well endowed Mineral Resource – 1.5Moz (1) History of mining – including Groundrush with recoveries of 95% producing over 600,000oz at 4g/t Existing Infrastructure – Exisiting CIL Processing Facility, Airstrip, Camp, Sealed Haul Ro

  8. Slide 8: Groundrush

    Groundrush TANAMI GOLD NL Central Tanami Project JV • Located on granted Mining Lease ML22934, 40km north 1,300m N of the existing CTP Mill. S • MRE of 7.7Mt at 4.3 g/t gold for 1.1Mozs.(1) • Constrained to open pit shell at a COG of 0.7g/t gold and underground MSO’s at a COG of 1.7g/t gold based on

  9. Slide 9: Groundrush

    Groundrush TANAMI GOLD NL Central Tanami Project JV BOCO Groundrush represents a reverse faulted, orogenic gold system with mineralisation typically hosted in stacked vein sets in a variety 100mRL of orientations, within a sub-vertical quartz-filled shear zone hosted within a fractionated dolerite s

  10. Slide 10: Ripcord

    Ripcord TANAMI GOLD NL Central Tanami Project JV • Located on granted Mining Lease ML22934, 3km south of Groundrush. • MRE of 750kt at 2.1 g/t 580m Infill drilling underway gold for 51kozs.(1) N S • Constrained to open pit shell at a COG of 0.6g/t gold using a gold price of A$2,700/oz. (1) • Based o

  11. Slide 11: Ripcord

    Ripcord TANAMI GOLD NL Central Tanami Project JV The geology and deposit style at Ripcord has similarities to the nearby Groundrush deposit, although it is yet to be fully determined if the host dolerite body is the same. BOCO 350mRL The host dolerite unit at Ripcord shows similar fractionation text

  12. Slide 12: Groundrush to Ripcord

    Groundrush to Ripcord TANAMI GOLD NL Central Tanami Project JV Groundrush Ripcord 1.1Moz @ 4.3 g/t 2.2km 51koz @2.1 g/t N S Above: Above: Long section looking North East, showing the Groundrush existing pit (Brown), Whittle shells (red), stope optimisation (green) and MRE wireframes 12

  13. Slide 13: Jims

    Jims TANAMI GOLD NL Central Tanami Project JV • Located on MLS168, 23km south of the existing CTP N S Mill. • MRE of 1.5Mt at 2.3 g/t gold for 120kozs.(1) • Constrained to open pit shell at a COG of 0.7g/t gold and underground MSO’s at a COG of 1.9g/t gold using a Open gold price of A$2,700/oz. (1)

  14. Slide 14: Crusade

    Crusade TANAMI GOLD NL Central Tanami Project JV • Located on EL28282, 100km north of the existing CTP Mill. • MRE of 1.3Mt at 2.3 g/t SW NE gold for 94kozs.(1) • Constrained to open pit shell at a COG of 0.8g/t gold and underground MSO’s at a COG of 3.0g/t gold using a gold price of A$2,700/oz. (1)

  15. Slide 15: Hurricane-Repulse

    Hurricane-Repulse TANAMI GOLD NL Central Tanami Project JV • Fully encompassed by MLS153, MLS125 and MLS129. Adjacent to the existing CTP Mill. S N • MRE of 1.5Mt at 3.8 g/t gold for 180kozs.(1) • Constrained to open pit shells at a COG of 0.6g/t gold to 1.0g/t and underground MSO’s at a Open Open C

  16. Slide 16: Resumption of Exploration Activities in FY23

    Resumption of Exploration Activities TANAMI GOLD NL in FY23 Central Tanami Project JV • Resumption of field activities in May 2022 under the new CTP JV banner. • Positive restart, albiet with minor start-up issues. ❖ Engagement of CTP JV General Manager and Resource Project Geologist. ❖ Northern Sta

  17. Slide 17: Focus for FY24

    Focus for FY24 TANAMI GOLD NL Central Tanami Project JV Resource Development and Exploration Program Underway • Resource drilling at Groundrush, Ripcord and Jims to upgrade Inferred resources to Indicated resources. • Near-mine exploration between and surrounding Groundrush and Ripcord. • Greenfield

  18. Slide 18: Mineral Resource Estimate

    Mineral Resource Estimate TANAMI GOLD NL Central Tanami Project JV Measured Indicated Inferred Total Confirmation COG Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces The information is this report that relates to CTP Deposit JV’s Mineral Resources estimates is extract

  19. Slide 19: Questions

    Questions TANAMI GOLD NL Central Tanami Project JV Groundrush gold panned from 1 metre of reverse circulation drill cuttings from GRRC6 114m to 115m. (ASX Announcement “Groundrush Drilling Update” dated 31 January 2012 and the 2012 TAM Annual Report available at www.tanami.com.au and www.asx.com) 19